Stable high-speed tunnel construction trolley
By introducing hydraulic cylinder-driven mobile tracks and limit units on the tunnel construction trolley, automatic position adjustment of the steel arch frame is realized, problem of manual adjustment in the prior art is solved, and construction efficiency and stability are improved.
Patent Information
- Application Number
- CN202420592075.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When lifting steel arch frames in the existing tunnel construction trolley, due to manual operation errors, the center position of the steel arch frame is inaccurate, and multiple people need to cooperate and adjust, which is laborious and reduces work efficiency.
A stable high-speed tunnel construction trolley was designed, using hydraulic cylinder-driven mobile tracks and lifting frames, combined with limiting units and clamping structures, to realize automatic position adjustment of the steel arch frame and reduce manual operation requirements.
Through the automatic adjustment function, the fitting accuracy and working efficiency of the steel arch frame on the tunnel veneer is improved, the need for multiple people to cooperate is reduced, and the construction efficiency and stability are improved.
Smart Images

Figure CN221973540U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction equipment, in particular to a stable high-speed tunnel construction trolley. Background Art
[0002] Tunnels are engineering structures buried in the ground, and are a form of human use of underground space. When building highways, it is inevitable to build tunnels. Tunnel construction trolleys are special equipment that must be used in the tunnel construction process. Tunnel construction trolleys have various functions. When erecting steel arch frames in tunnels, a portal tunnel construction trolley is required.
[0003] In the prior art, there is a tunnel construction trolley whose main function is to hoist the steel arch frame erected in the tunnel to the tunnel veneer, and then the operator installs it in accordance with the tunnel veneer. Before hoisting the steel arch frame, the operator needs to assemble the steel arch frame on the ground first. After assembly, the hook on the trolley is used to hoist the steel arch frame to the push plates that move up on both sides. The push plates drive the steel arch frame to move to the top of the trolley. The support platform on the top of the trolley can move the steel arch frame to the tunnel veneer at the front of the trolley. When the steel arch frame is hoisted to the support platform on the top of the trolley, due to the error in manual operation, the center position of the steel arch frame cannot be accurately aligned with the center position of the top of the tunnel veneer, resulting in the operator needing to adjust the position of the steel arch frame on the operating table. The weight of the spliced steel arch frame is heavy, and manual handling and adjustment are required when adjusting the position, and multiple people are required to cooperate, which is laborious and reduces work efficiency. Therefore, the present application provides a stable high-speed tunnel construction trolley to meet the needs. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a stable high-speed tunnel construction trolley to solve the problem that the existing tunnel construction trolley needs multiple people to cooperate in adjusting the position of the steel arch frame after lifting the steel arch frame, which is laborious and reduces work efficiency.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:
[0006] A stable high-speed tunnel construction trolley comprises a trolley body, a lifting rail, a lifting frame and a moving rail, wherein the lifting rail, the lifting frame and the moving rail are all in two numbers, a pair of the moving rails are respectively fixedly connected to the two sides of the top of the trolley body, a moving block is arranged on each of the moving rails, a supporting sleeve is fixedly connected to the top of the moving block, a connecting sleeve is slidably sleeved in the supporting sleeve, a hydraulic cylinder is arranged inside the supporting sleeve, an output end of the hydraulic cylinder is fixedly connected to the top of the inner wall of the connecting sleeve, a positioning rod is fixedly connected at the top position of the connecting sleeve, a fixed A fixed block, wherein a first limit groove, a second limit groove and a clamping groove are provided on the fixed block, the positioning rod is rotatably connected to the inner wall of the first limit groove, a protrusion is fixedly connected to the positioning rod, and the protrusion is clamped in the clamping groove, a pair of first limit spring sheets are symmetrically fixedly connected on both sides of the fixed block, one end of the first limit spring sheet is fixedly connected to the inner wall of the top of the connecting sleeve, and a clamping block is fixedly connected to the top of the fixed block, the clamping block is U-shaped, and the steel arch frame is clamped in the middle position of the U-shaped structure; a limiting unit, the limiting unit is used to effectively limit the steel arch frame clamped on the clamping block.
[0007] Optionally, the limiting unit includes two groups of second limiting spring sheets fixedly connected to a pair of inner walls of the clamping blocks, each group of second limiting spring sheets includes a pair, the ends of a pair of second limiting spring sheets away from each other are symmetrically fixedly connected to the inner wall of the clamping block, the outer walls of the opposite sides of a pair of second limiting spring sheets are fixedly connected with abutment blocks, the bottoms of a pair of second limiting spring sheets are fixedly connected to the same limiting plate, the two ends of the bottom of the limiting plate are fixedly connected with two pairs of connecting spring sheets, and the bottom of each pair of connecting spring sheets is fixedly connected at the bottom position of the inner wall of the clamping block.
[0008] Optionally, the second limiting spring piece includes a connected inclined connecting surface, a first arc plate and a second arc plate, one end of the second arc plate is fixedly connected to the top of the limiting plate, the outer wall of the first arc plate is provided with a plurality of second weakening grooves, the abutment block is located on the outer wall of the first arc plate near the position of the second arc plate, and a plurality of reinforcing plates are fixedly connected at the connection between the bottom of the inclined connecting surface and the inner wall of the clamping block.
[0009] Optionally, the connecting spring piece is in a first V-shaped structure, and a third weakening groove is provided at a bending portion of the first V-shaped structure.
[0010] Optionally, the first limiting spring piece is in a second V-shaped structure, a first weakening groove is provided at a bend of the second V-shaped structure, and a plurality of reinforcing rods are provided at the connection between the two ends of the second V-shaped structure and the top inner wall of the connecting sleeve.
[0011] Optionally, the bottoms of the inner walls of a pair of clamping blocks are each provided with an inclined bottom surface, and the inclined bottom surface is arranged parallel to the limiting plate.
[0012] Optionally, the limiting plate has a wavy structure, and the limiting plate is made of an elastic sheet material.
[0013] Optionally, the second limiting groove is a fan-shaped structure, the clamping groove is arranged at a middle position of the fan-shaped structure, and the diameter of the second limiting groove is larger than the diameter of the first limiting groove.
[0014] Optionally, the protrusion has a trapezoidal structure.
[0015] Optionally, the abutment block has a hemispherical structure.
[0016] Compared with the prior art, the utility model has at least the following beneficial effects:
[0017] In the above scheme, by setting two pairs of first limiting spring pieces, when the center position of the steel arch frame is not aligned with the center position of the top of the high-speed tunnel veneer, when the steel arch frame is moved upward, one side of the steel arch frame will preferentially contact the high-speed tunnel veneer. Under the pressure of the high-speed tunnel veneer on the contact surface of the steel arch frame, the steel arch frame will be displaced to drive a pair of clamping blocks and fixed blocks to deflect synchronously until the steel arch frame is in contact with the tunnel veneer, thereby achieving the effect of automatically adjusting the position of the steel arch frame, eliminating the need for multiple manual operations to move the steel arch frame, and improving work efficiency.
[0018] By setting the second limiting spring piece, the steel arch frame is an I-shaped structure, and the steel arch frame slides into the clamping block. The second limiting spring piece abuts and limits the steel arch frame. The second arc plate of the second limiting spring piece can be wrapped around the outer wall of the lower horizontal end of the I-shaped structure of the steel arch frame, so as to better clamp and limit the steel arch frame, thereby improving the stability of the steel arch frame during transportation and movement.
[0019] Through the coordinated use of the set limit plate and the connecting spring piece, when the steel arch frame slides to the middle position of a pair of second limit spring pieces, the steel arch frame has a limit plate and a connecting spring piece set with an impact force to buffer the steel arch frame and protect the inner wall of the clamping block, thereby preventing the impact force generated when the steel arch frame is clamped with the clamping block from damaging the side of the clamping block. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The accompanying drawings, which are incorporated herein and constitute part of the specification, illustrate embodiments of the present invention and, together with the description, further serve to explain the principles of the present invention and enable those skilled in the relevant art to make and use the present invention.
[0021] Figure 1 Schematic diagram of the three-dimensional structure of the stable high-speed tunnel construction trolley and steel arch assembly;
[0022] Figure 2 It is a schematic diagram of the three-dimensional structure of the support sleeve, the connecting sleeve, the clamping block, the second limiting spring piece, the limiting plate and the connecting spring piece;
[0023] Figure 3 It is a schematic diagram of a partially cutaway three-dimensional structure of the support sleeve, the connecting sleeve, the clamping block, the second limiting spring piece, the limiting plate and the connecting spring piece assembly;
[0024] Figure 4 It is a schematic diagram of the local structure of the assembly of the support sleeve, the connecting sleeve, the clamping block, the second limiting spring piece, the limiting plate and the connecting spring piece;
[0025] Figure 5 for Figure 4 The enlarged structural diagram at A in the middle;
[0026] Figure 6 for Figure 3 The enlarged structural diagram at B in the middle;
[0027] Figure 7 It is a schematic diagram of the partially enlarged structure of the assembly of the clamping block, the second limiting spring piece, the limiting plate and the connecting spring piece.
[0028] [reference numerals]
[0029] 1. Trolley body; 2. Lifting track; 3. Lifting frame; 4. Moving track; 5. Moving block; 6. Support sleeve; 7. Connecting sleeve; 8. Positioning rod; 9. Boss; 10. Fixed block; 11. First limiting groove; 12. Second limiting groove; 13. First limiting spring piece; 14. First weakening groove; 15. Reinforcing rod; 16. Clamping block; 17. Inclined bottom surface; 18. Second limiting spring piece; 19. Limiting plate; 20. Connecting spring piece; 21. Inclined connecting surface; 22. First arc plate; 23. Second arc plate; 24. Second weakening groove; 25. Abutment block; 26. Third weakening groove; 27. Reinforcing plate; 28. Steel arch frame; 29. Slot.
[0030] As shown in the figure, in order to clearly implement the structure of the embodiment of the utility model, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the utility model to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION
[0031] The following is a detailed description of a stable high-speed tunnel construction trolley provided by the utility model in combination with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for a more specific description of the embodiments, and are not intended to specifically limit the utility model.
[0032] It should be noted that the references to "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).
[0033] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.
[0034] It is to be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” not only means “directly on” something, but also includes the meaning of being “on” something with intervening features or layers, and “on” or “above” not only means “on” or “above” something, but also includes the meaning of being “on” or “above” something with no intervening features or layers.
[0035] Additionally, spatially relative terms such as "under," "beneath," "lower," "above," "upper," and the like may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as shown in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein may be similarly interpreted accordingly.
[0036] like Figures 1 to 7As shown, the embodiment of the utility model provides a stable high-speed tunnel construction trolley, including a trolley body 1, a lifting rail 2, a lifting frame 3 and a moving rail 4. The number of the lifting rail 2, the lifting frame 3 and the moving rail 4 is two. The trolley body 1 is a prior art, specifically a portal arch installation trolley. A pair of lifting rails 2 are installed on one side of the trolley body 1. The lifting frame 3 is driven by a hoist to slide on the lifting rail 2 to lift the steel arch 28 to the top of the trolley body 1. The pair of moving rails 4 are fixedly connected to both sides of the top of the trolley body 1. , each moving rail 4 is provided with a moving block 5, a pair of moving rails 4 are installed on both sides of the top of the trolley body 1, a screw and a hydraulic motor are installed on the moving rail 4, the hydraulic motor drives the screw to rotate to drive the moving block 5 to move on the moving rail 4, the above are all well-known existing technologies that can be fully implemented by those skilled in the art, and are not repeated here. The top of the moving block 5 is fixedly connected to a support sleeve 6, and a connecting sleeve 7 is slidably sleeved in the support sleeve 6. A hydraulic cylinder is arranged inside the support sleeve 6, and the output end of the hydraulic cylinder is fixedly connected to the top of the inner wall of the connecting sleeve 7. The hydraulic When the cylinder is started, it can drive the connecting sleeve 7 to slide upward in the supporting sleeve 6, and synchronously drive the clamping block 16 to move upward to move the steel arch frame to fit the tunnel surface, which is convenient for construction personnel to operate. A positioning rod 8 is fixedly connected to the top position of the connecting sleeve 7, and a fixing block 10 is rotatably connected to the positioning rod 8. The fixing block 10 is provided with a first limiting groove 11, a second limiting groove 12 and a clamping groove 29 that are connected to each other. The second limiting groove 12 is a fan-shaped structure, and the clamping groove 29 is arranged in the middle position of the fan-shaped structure. The diameter of the second limiting groove 12 is larger than the diameter of the first limiting groove 11. The rod 8 is rotatably connected to the inner wall of the first limiting groove 11, and a protrusion 9 is fixedly connected to the positioning rod 8. The protrusion 9 has a trapezoidal structure and is clamped with the clamping groove 29. A pair of first limiting spring pieces 13 are symmetrically fixedly connected to both sides of the fixed block 10, and one end of the first limiting spring piece 13 is fixedly connected to the inner wall of the top of the connecting sleeve 7. A clamping block 16 is fixedly connected to the top of the fixed block 10, and the clamping block 16 has a U-shaped structure. The steel arch frame 28 is clamped in the middle position of the U-shaped structure; a limiting unit, the limiting unit is used to effectively limit the steel arch frame 28 clamped on the clamping block 16.
[0037] By setting two pairs of first limiting spring pieces 13, when in use, the operator can use the hook to hang the steel arch frame 28 on a pair of lifting frames 3 after splicing the steel arch frame 28 on the ground, start the driving device of the lifting frame 3, that is, the winch, to drive the lifting frame 3 and the steel arch frame 28 to move up to the top of the lifting rail 2 synchronously, at this time, the power source on the moving rail 4, that is, the hydraulic motor, can be started to drive the moving block 5 and the supporting sleeve 6 to move synchronously on the moving rail 4 to the bottom position of the clamping block 16 located at the steel arch frame 28, control the hydraulic cylinder set in the supporting sleeve 6 and the connecting sleeve 7 to start and drive the connecting sleeve 7, the positioning rod 8, the protrusion 9, the fixing block 10, the first limiting spring piece 13 and the clamping block 16 to move up to the middle position where the steel arch frame 28 is clamped to the clamping block 16, and when the pair of clamping blocks 16 move up, it drives the steel arch frame 28 to move up and away from the lifting frame 3, at this time, the operator can control the moving block 5 and the supporting sleeve 6 to move synchronously on the moving rail 4 to the bottom position of the steel arch frame 28. The hydraulic motor on the moving track 4 drives the moving block 5 and the supporting sleeve 6 to move in the opposite direction so that the steel arch frame 28 moves to the bottom of the position where the steel arch frame 28 is installed in the high-speed tunnel. At this time, the operator can continue to control the hydraulic cylinder in the supporting sleeve 6 and the connecting sleeve 7 according to the height of the steel arch frame 28 from the top of the tunnel to start and drive the connecting sleeve 7, the clamping block 16 and the steel arch frame 28 to continue to move upward. When the center position of the steel arch frame 28 is not aligned with the center position of the top of the high-speed tunnel veneer, during the movement, one side of the steel arch frame 28 will first contact the high-speed tunnel veneer, and continue to move the connecting sleeve 7, the clamping block 16 and the steel arch frame 28 upward. Under the pressure of the high-speed tunnel veneer on the contact surface of the steel arch frame 28, the steel arch frame 28 will be displaced, which can drive a pair of clamping blocks 16 and the fixed block 10 to deflect synchronously. For example, when the clamping block 16 and the fixed block 10 deflect to the right synchronously, as shown in FIG. Figure 6As shown, the first limiting spring piece 13 on the right side of the fixed block 10 is squeezed and deformed, and the first limiting spring piece 13 on the left side of the fixed block 10 is stretched and deformed. The first weakened groove 14 provided on the first limiting spring piece 13 is beneficial to the elastic deformation of the bending part of the first limiting spring piece 13 until the steel arch frame 28 is in contact with the tunnel surface. The operator can install the steel arch frame 28. After the steel arch frame 28 is installed, the hydraulic cylinder in the connecting sleeve 7 and the supporting sleeve 6 can be controlled to start and drive the connecting sleeve 7 and the clamping block 16 to move downward to release the limit on the steel arch frame 28. Under the tensile force of the first limiting spring piece 13 on the left side of the fixed block 10 and the elastic force of the first limiting spring piece 13 on the right side of the fixed block 10, the fixed block 10 drives the clamping block 16 to move downward. 6 is rotated to return to its original position, and the parameters of the tooth matching relationship between the protrusion 9 and the slot 29 are consistent. When the fixed block 10 and the clamping block 16 rotate, the protrusion 9 can be elastically squeezed and deformed, and the diameter of the second limiting groove 12 is larger than the diameter of the first limiting groove 11, and the second limiting groove 12 is a fan-shaped structure, so that the second limiting groove 12 will not limit the deformation of the protrusion 9, and at the same time, it can limit the rotation angle of the fixed block 10, so that the fixed block 10 will not deflect too much to cause damage to the first limiting spring pieces 13 on both sides, so that in the process of moving the steel arch frame 28 upward to install it, the effect of automatically adjusting the position of the steel arch frame 28 is achieved, and there is no need for multiple manual cooperation to move the steel arch frame 28, thereby improving work efficiency.
[0038] like Figures 2 to 7 As shown, the limiting unit includes two groups of second limiting spring pieces 18 fixedly connected to the inner walls of a pair of clamping blocks 16, and the number of second limiting spring pieces 18 in each group is a pair. The ends of a pair of second limiting spring pieces 18 that are away from each other are symmetrically fixedly connected to the inner wall of the clamping block 16, and the outer walls of the opposite sides of a pair of second limiting spring pieces 18 are fixedly connected with abutment blocks 25. The bottoms of a pair of second limiting spring pieces 18 are fixedly connected with the same limiting plate 19. The limiting plate 19 has a wavy structure, and the material of the limiting plate 19 is an elastic sheet material. Two pairs of connecting spring pieces 20 are fixedly connected at both ends of the bottom of the limiting plate 19, and the bottom of each pair of connecting spring pieces 20 is fixedly connected to the bottom position of the inner wall of the clamping block 16.
[0039] When the steel arch frame 28 is moved from the lifting frame 3 to the clamping block 16 by the second limiting spring piece 18, the operation process is to control the hydraulic cylinder set in the support sleeve 6 and the connecting sleeve 7 to start and drive the connecting sleeve 7, the positioning rod 8, the protrusion 9, the fixing block 10, the first limiting spring piece 13 and the clamping block 16 to move up to the middle position where the steel arch frame 28 is clamped to the clamping block 16. When the steel arch frame 28 is clamped with the clamping block 16, the steel arch frame 28 is an I-shaped structure, and the two sides of the bottom of the steel arch frame 28 are in contact with the inclined connecting surfaces 21 on the second limiting spring piece 18 fixed on both sides of the inner wall of the clamping block 16. The clamping block 16 continues to move upward so that the two sides of the bottom of the steel arch frame 28 are in contact with the first arc plate 22 on the second limiting spring piece 18. When the bottom of the steel arch frame 28 contacts the limiting plate 19, the pair of first curved plates 22 are no longer in contact with the bottom of the steel arch frame 28 and the deformation is restored. At this time, the abutment block 25 arranged at the bottom of the first curved plate 22 abuts against the top surface of the lower horizontal end of the I-shaped structure of the steel arch frame 28 to realize the clamping and limiting of the steel arch frame 28. The curvature of the first curved plate 22 and the second curved plate 23 are in opposite directions. The curvature of the first curved plate 22 is toward the middle position of the clamp block 16, and the curvature of the second curved plate 23 is toward the inner wall position of the clamp block 16, so that the first curved plate 22 can drive the abutment block 25 to contact the I-shaped structure of the steel arch frame 28. The top surface of the lower horizontal end of the I-shaped structure abuts, and the second arc plate 23 can be wrapped around the outer wall of the lower horizontal end of the I-shaped structure of the steel arch frame 28, so as to better clamp and limit the steel arch frame 28. The second weakened groove 24 opened on the first arc plate 22 is beneficial to the elastic deformation of the first arc plate 22. The provided reinforcing plate 27 can strengthen the connection strength between the inclined connecting surface 21 and the inner wall of the clamping block 16, and a pair of second limiting spring pieces 18 are inclinedly arranged along the inner wall of the clamping block 16. The height of one end of the second limiting spring piece 18 near the middle position of the top of the trolley body 1 is higher than the height of one end of the second limiting spring piece 18 near the side position of the top of the trolley body 1, which is the same as the placement direction of the steel arch frame 28, and can increase The contact area between the steel arch frame 28 and the second limiting spring sheet 18 when they are engaged improves the stability of the steel arch frame 28 during transportation and movement. After the steel arch frame 28 is installed, the operator can control the hydraulic cylinder in the connecting sleeve 7 and the supporting sleeve 6 to start and drive the connecting sleeve 7 and the clamping block 16 to move downward. Relatively speaking, the two sides of the top surface of the lower horizontal end of the I-shaped structure of the steel arch frame 28 move upward along the side walls of the second curved plate 23. The abutment block 25 of the hemispherical structure will not affect the upward movement of the steel arch frame 28. Continue to move the clamping block 16 downward, and the first curved plate 22 and the second curved plate 23 will undergo elastic deformation to separate the steel arch frame 28 from the clamping block 16. After that, the first curved plate 22 and the second curved plate 23 can restore their deformation for the next use.
[0040] By using the limit plate 19 and the connecting spring piece 20, when the steel arch frame 28 slides to the middle position of a pair of second limit spring pieces 18, the steel arch frame 28 has an impact force setting limit plate 19 and a connecting spring piece 20 to buffer the steel arch frame 28 and protect the inner wall of the clamping block 16, so as to avoid the impact force generated when the steel arch frame 28 is clamped with the clamping block 16 to damage the side of the clamping block 16. The limit plate 19 has a wavy structure. When the steel arch frame 28 slides to the bottom and contacts the top of the limit plate 19, the limit plate 19 is stretched to both sides of the inner wall of the clamping block 16 to deform, which can cushion the steel arch frame. The impact force of the steel arch frame 28 is buffered, and the connecting spring piece 20 can undergo elastic deformation during buffering. The connecting spring piece 20 is in a first V-shaped structure. The third weakened groove 26 opened at the bending part of the first V-shaped structure is beneficial to the elastic deformation of the connecting spring piece 20, which further buffers the impact force of the steel arch frame 28, thereby improving the buffering effect of the impact force of the steel arch frame 28. The limiting plate 19 with a wavy structure increases the contact point between the top of the limiting plate 19 and the bottom of the steel arch frame 28, thereby increasing the friction between the limiting plate 19 and the steel arch frame 28, thereby further improving the stability of the second limiting spring piece 18 when the limiting plate 19 is moving.
[0041] like Figure 2 and Figure 5 As shown, the second limiting spring piece 18 includes an inclined connecting surface 21, a first curved plate 22 and a second curved plate 23 connected to each other. One end of the second curved plate 23 is fixedly connected to the top of the limiting plate 19. The inclined connecting surface 21 provides a guide for the steel arch frame 28 when it slides and engages with the second limiting spring piece 18, so that the steel arch frame 28 can slide along the inclined connecting surface 21 to engage with the bottom of the first curved plate 22. The outer wall of the first curved plate 22 is provided with a plurality of second weakened grooves 24. The abutment block 25 is a hemispherical structure. The abutment block 25 is located on the outer wall of the first curved plate 22 near the second curved plate 23. A plurality of reinforcing plates 27 are fixedly connected at the connection between the bottom of the inclined connecting surface 21 and the inner wall of the clamping block 16. The opened second weakened groove 24 is beneficial to the elastic deformation of the first curved plate 22. The provided reinforcing plate 27 can strengthen the connection strength between the inclined connecting surface 21 and the inner wall of the clamping block 16.
[0042] like Figure 5 As shown, the connecting spring piece 20 is in a first V-shaped structure, and a third weakening groove 26 is provided at the bending portion of the first V-shaped structure. The third weakening groove 26 is beneficial to the elastic deformation of the connecting spring piece 20 .
[0043] like Figure 6As shown, the first limiting spring piece 13 is in a second V-shaped structure, a first weakening groove 14 is provided at the bending part of the second V-shaped structure, and a plurality of reinforcing rods 15 are provided at the connection parts between the two ends of the second V-shaped structure and the top inner wall of the connecting sleeve 7. The first weakening groove 14 provided on the first limiting spring piece 13 is beneficial to the elastic deformation at the bending part of the first limiting spring piece 13, and the provided reinforcing rods 15 can respectively strengthen the connection strength between the two ends of the first limiting spring piece 13 and one side of the fixing block 10 and one side of the inner wall of the connecting sleeve 7, thereby improving the stability of the first limiting spring piece 13 when in use.
[0044] like Figure 4 As shown, the bottom of the inner wall of a pair of the clamping blocks 16 is provided with an inclined bottom surface 17, and the inclined bottom surface 17 is arranged parallel to the limiting plate 19. The bottom of the connecting spring sheet 20 is fixedly connected to the top of the inclined bottom surface 17, so that the lengths of the two pairs of connecting spring sheets 20 are the same, which is convenient for production and installation.
[0045] The working principle provided by the utility model is that when in use, after the operator has spliced the steel arch frame 28 on the ground, the operator can use a hook to hang the steel arch frame 28 on a pair of lifting frames 3, start the driving device of the lifting frame 3, that is, the winch, to drive the lifting frame 3 and the steel arch frame 28 to move synchronously to the top of the lifting track 2, at this time, the power source on the moving track 4, that is, the hydraulic motor, can be started to drive the moving block 5 and the supporting sleeve 6 to move synchronously on the moving track 4 to the bottom position of the clamping block 16 located at the steel arch frame 28, control the hydraulic cylinder arranged in the supporting sleeve 6 and the connecting sleeve 7 to start and drive the connecting sleeve 7, the positioning rod 8, the protrusion 9, the fixing block 10, the first limiting spring piece 13 and the clamping block 16 to move to the middle position where the steel arch frame 28 is clamped to the clamping block 16, and the pair of clamping blocks 1 6 moves up and drives the steel arch frame 28 to move up and away from the lifting frame 3. At this time, the operator can control the hydraulic motor on the moving track 4 to drive the moving block 5 and the supporting sleeve 6 to move in the opposite direction so that the steel arch frame 28 moves to the bottom of the position where the steel arch frame 28 is installed in the high-speed tunnel. At this time, the operator can continue to control the hydraulic cylinder in the supporting sleeve 6 and the connecting sleeve 7 according to the height of the steel arch frame 28 from the top of the tunnel to start the connecting sleeve 7, the clamping block 16 and the steel arch frame 28 to continue to move up. When the center position of the steel arch frame 28 is not aligned with the center position of the top of the high-speed tunnel veneer, during the movement, one side of the steel arch frame 28 will first contact the high-speed tunnel veneer, and the connecting sleeve 7, the clamping block 16 and the steel arch frame 28 will continue to move up. Under the pressure, the steel arch frame 28 will be displaced to drive a pair of clamping blocks 16 and the fixed block 10 to deflect synchronously. For example, when the clamping block 16 and the fixed block 10 deflect to the right synchronously, as shown in the support sleeve 6, the first limiting spring piece 13 located on the right side of the fixed block 10 is squeezed and deformed, and the first limiting spring piece 13 located on the left side of the fixed block 10 is stretched and deformed. The first weakened groove 14 provided on the first limiting spring piece 13 is beneficial to the elastic deformation of the bending part of the first limiting spring piece 13 until the steel arch frame 28 is in contact with the tunnel surface. The operator can install the steel arch frame 28. After the steel arch frame 28 is installed, the hydraulic cylinder in the connecting sleeve 7 and the supporting sleeve 6 can be controlled to start and drive the connecting sleeve 7 and the clamping block 16 to move downward to release the limit on the steel arch frame 28. Under the tensile force of the first limiting spring piece 13 on the left side of the fixed block 10 and the elastic force of the first limiting spring piece 13 on the right side of the fixed block 10, the fixed block 10 drives the clamping block 16 to rotate and return to its original position, and the parameters of the tooth pattern matching relationship between the protrusion 9 and the card slot 29 are consistent. When the fixed block 10 and the clamping block 16 rotate, the protrusion 9 can be elastically squeezed and deformed. When the steel arch frame 28 is moved from the lifting frame 3 to the clamping block 16, the operation process is to control the hydraulic cylinder set in the support sleeve 6 and the connecting sleeve 7 to start and drive the connecting sleeve 7, the positioning rod 8, the protrusion 9, the fixed block 10, the first limiting spring piece 13 and the clamping block 16 to move to the middle position where the steel arch frame 28 is clamped to the clamping block 16. When the steel arch frame 28 is clamped with the clamping block 16, the steel arch frame 28 is an I-shaped structure.The two sides of the bottom of the steel arch frame 28 contact the inclined connecting surfaces 21 on the second limiting spring pieces 18 fixed on the two sides of the inner wall of the clamping block 16, and the clamping block 16 continues to move upward so that the two sides of the bottom of the steel arch frame 28 contact the first arc-shaped plates 22 on the second limiting spring pieces 18. At this time, a pair of first arc-shaped plates 22 elastically deform in the direction close to the inner wall of the clamping block 16, until the bottom of the steel arch frame 28 contacts the limiting plate 19, the pair of first arc-shaped plates 22 no longer contact the bottom of the steel arch frame 28 and the deformation is restored. At this time, the abutment block 25 set at the bottom of the first arc-shaped plate 22 abuts against the top surface of the lower horizontal end of the I-shaped structure of the steel arch frame 28, thereby realizing the clamping and limiting of the steel arch frame 28. When the steel arch frame 28 is installed After that, the operator can control the hydraulic cylinder in the connecting sleeve 7 and the supporting sleeve 6 to start and drive the connecting sleeve 7 and the clamping block 16 to move downward. In contrast, the two sides of the top surface of the lower horizontal end of the I-shaped structure of the steel arch frame 28 move upward along the side walls of the second curved plate 23. The first curved plate 22 and the second curved plate 23 will both undergo elastic deformation to separate the steel arch frame 28 from the clamping block 16. After that, the first curved plate 22 and the second curved plate 23 can restore the deformation for the next use. When the steel arch frame 28 slides to the middle position of a pair of second limiting spring sheets 18, the steel arch frame 28 has a limiting plate 19 and a connecting spring sheet 20 set with an impact force to buffer the steel arch frame 28 and protect the inner wall of the clamping block 16.
[0046] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the above preferred embodiments of the present invention, and those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.
[0047] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A stable high-speed tunnel construction trolley, characterized in that: It includes a trolley body, a lifting rail, a lifting frame and a moving rail, the number of the lifting rail, the lifting frame and the moving rail are all two, a pair of the moving rails are respectively fixedly connected to the two sides of the top of the trolley body, a moving block is arranged on each of the moving rails, the top of the moving block is fixedly connected to a supporting sleeve, a connecting sleeve is slidably sleeved in the supporting sleeve, a hydraulic cylinder is arranged inside the supporting sleeve, the output end of the hydraulic cylinder is fixedly connected to the top of the inner wall of the connecting sleeve, a positioning rod is fixedly connected at the top position of the connecting sleeve, A fixing block is rotatably connected to the positioning rod, and a first limiting groove, a second limiting groove and a clamping groove are provided on the fixing block. The positioning rod is rotatably connected to the inner wall of the first limiting groove, and a protrusion is fixedly connected to the positioning rod, and the protrusion is clamped in the clamping groove. A pair of first limiting spring pieces are symmetrically fixedly connected to both sides of the fixing block, and one end of the first limiting spring piece is fixedly connected to the inner wall of the top of the connecting sleeve. A clamping block is fixedly connected to the top of the fixing block, and the clamping block is in a U-shaped structure. The steel arch frame is clamped in the middle position of the U-shaped structure. A limiting unit is used to effectively limit the steel arch frame clamped on the clamping block.
2. The stable high-speed tunnel construction trolley according to claim 1, characterized in that: The limiting unit includes two groups of second limiting spring sheets fixedly connected to a pair of inner walls of the clamping blocks, each group of the second limiting spring sheets includes a pair, the ends of a pair of the second limiting spring sheets away from each other are symmetrically fixedly connected to the inner wall of the clamping block, the outer walls of the opposite sides of a pair of the second limiting spring sheets are fixedly connected with abutment blocks, the bottoms of a pair of the second limiting spring sheets are fixedly connected to the same limiting plate, the two ends of the bottom of the limiting plate are fixedly connected with two pairs of connecting spring sheets, and the bottom of each pair of the connecting spring sheets is fixedly connected at the bottom position of the inner wall of the clamping block.
3. The stable high-speed tunnel construction trolley according to claim 2, characterized in that: The second limiting spring piece includes a connected inclined connecting surface, a first arc plate and a second arc plate, one end of the second arc plate is fixedly connected to the top of the limiting plate, a plurality of second weakening grooves are provided on the outer wall of the first arc plate, the abutment block is located on the outer wall of the first arc plate near the position of the second arc plate, and a plurality of reinforcing plates are fixedly connected at the connection between the bottom of the inclined connecting surface and the inner wall of the clamping block.
4. The stable high-speed tunnel construction trolley according to claim 2, characterized in that: The connecting spring piece is in a first V-shaped structure, and a third weakening groove is provided at the bending portion of the first V-shaped structure.
5. The stable high-speed tunnel construction trolley according to claim 1, characterized in that: The first limiting spring piece is in a second V-shaped structure, a first weakening groove is provided at a bend of the second V-shaped structure, and a plurality of reinforcing rods are provided at the connection between the two ends of the second V-shaped structure and the inner wall of the top of the connecting sleeve.
6. The stable high-speed tunnel construction trolley according to claim 2, characterized in that: The bottoms of the inner walls of a pair of clamping blocks are each provided with an inclined bottom surface, and the inclined bottom surface is arranged parallel to the limiting plate.
7. The stable high-speed tunnel construction trolley according to claim 2, characterized in that: The limiting plate has a wave-shaped structure, and the material of the limiting plate is an elastic sheet material.
8. The stable high-speed tunnel construction trolley according to claim 1, characterized in that: The second limiting groove is in a fan-shaped structure, the clamping groove is arranged at the middle position of the fan-shaped structure, and the diameter of the second limiting groove is larger than the diameter of the first limiting groove.
9. The stable high-speed tunnel construction trolley according to claim 1, characterized in that: The projection is in a trapezoidal structure.
10. The stable high-speed tunnel construction trolley according to claim 3, characterized in that: The abutment block is in a hemispherical structure.