Tunnel construction trolley
By designing the arch frame splicing device and the upper step telescopic operation platform on the tunnel construction trolley, the problems of arch frame splicing difficulties and safety hazards are solved, the stable splicing of the arch frame and the effective support of the construction personnel are achieved, and the construction efficiency is improved and security.
Patent Information
- Application Number
- CN202420803585.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-18
AI Technical Summary
It is difficult for existing tunnel construction trolleys to ensure the docking posture of the top arch section and the side arch section during the arch splicing process, and it is impossible to effectively support construction personnel in the multi-step excavation process, resulting in splicing difficulties and safety hazards.
A tunnel construction trolley was designed, using arch frame splicing device and upper step telescopic working platform. Through arch frame crane, cantilever support, press cylinder and lifting slide rail components, the stable splicing and transport of arch frames is achieved, and the Install arch assembly on the upper step platform to provide support.
The efficiency and safety of arch frame splicing are improved, ensuring that construction personnel are effectively supported in the multi-step excavation process, and reducing the danger of rock falling in the surrounding rock to personnel.
Smart Images

Figure CN221973543U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction equipment, in particular to a tunnel construction trolley. Background Art
[0002] The tunnel construction trolley is a mobile multifunctional tunnel construction platform that can perform a variety of operations such as excavation, arch erection, initial support and spraying. Among them, the arch erection operation refers to hanging the arch frame on the trolley, welding the arch frame and steel bars into an arch frame assembly with a mesh support structure, and then transporting and lifting the arch frame assembly to the construction site to complete the fixing of the arch frame assembly in the tunnel. The existing tunnel construction trolleys have the following two main problems:
[0003] 1. The existing arch frame is composed of a top arch section and two side arch sections. Due to space and transportation limitations, the arch frame is not spliced on the ground, but is suspended on the tunnel construction trolley. When splicing the arch frame, the top arch section is first lifted by the crane on the trolley, and then the side arch sections are hung on both ends of the top arch section by a forklift or crane, and then the construction workers connect the side arch sections to the top arch section. The problem is that since the top arch section and the side arch section are both in a suspended state, their docking posture is difficult to ensure, making it difficult to splice the arch frame.
[0004] 2. Since the surrounding rock of some tunnels does not meet the stability requirements and is prone to collapse accidents, micro-step or multi-step excavation technology is usually used in construction. Accordingly, the tunnel construction trolley is required to have at least one retractable upper step working platform. During excavation, the construction workers stand on the upper step working platform to carry out excavation operations. This creates a safety problem. Since the upper step working platform is extended forward, the existing tunnel construction trolley cannot install the arch frame assembly above the upper step working platform. Without the support of the arch frame assembly, construction workers are easily injured by falling rocks from the top surrounding rock, causing casualties.
[0005] In summary, the existing tunnel construction trolley needs to be improved. Utility Model Content
[0006] In order to overcome the shortcomings of the background technology, the utility model discloses a tunnel construction trolley, which adopts the following technical solutions:
[0007] A tunnel construction trolley, comprising:
[0008] Vehicle body;
[0009] The arch frame splicing device includes two arch frame cranes arranged on the top of the vehicle body, and also includes a pair of cantilever supports arranged on the vehicle body columns, and a clamping cylinder is arranged above the cantilever supports;
[0010] The upper step telescopic working platform can be extended and retracted along the front and rear direction of the vehicle body;
[0011] The arch frame assembly transfer device includes a front lifting slide rail group and a rear lifting slide rail group, wherein the front lifting slide rail group is installed on the upper step telescopic working platform; the front lifting slide rail group and the rear lifting slide rail group are both composed of a pair of slide rails and multiple slide seats and lifting cylinders, wherein the slide rails are arranged along the longitudinal direction of the vehicle body, and the slide seats can slide along the slide rails for supporting and translating the arch frame assembly, and the lifting cylinders are used for lifting the slide rails.
[0012] To further improve the technical solution, the arch crane is composed of a rotating arm, a cylinder and a winch, a pulley is provided on the rotating arm; the rotating arm is hinged on the vehicle body, and the cylinder is used to drive the rotating arm to rotate forward and backward.
[0013] To further improve the technical solution, a steel bar crane is arranged between the two arch frame cranes. The steel bar crane is composed of a cantilever and a winch, and a pulley is arranged on the cantilever.
[0014] To further improve the technical solution, a pressure plate is hinged at the telescopic end of the clamping cylinder.
[0015] To further improve the technical solution, the slide seat includes a seat body, on which a supporting roller and a longitudinal roller are arranged, wherein the supporting roller is used to support the arch frame assembly, and the longitudinal roller is used to translate the arch frame assembly.
[0016] To further improve the technical solution, a pair of slide rails in the rear lifting slide rail group is located on the inner side of a pair of slide rails in the front lifting slide rail group.
[0017] To further improve the technical solution, the stroke of the lifting cylinder in the rear lifting slide rail group is smaller than the stroke of the lifting cylinder in the front lifting slide rail group.
[0018] After implementing the above technical solution, compared with the background technology, the beneficial effects produced by the utility model are:
[0019] The tunnel construction trolley has an arch frame splicing device, which can suspend and fix the top arch section, and then connect the side arch sections to the two ends of the top arch section with the help of an arch frame crane. Compared with the existing splicing method, the top arch section no longer swings in the air, and it is easy to align and connect the side arch section with the top arch section, thereby improving work efficiency.
[0020] The tunnel construction trolley also has an arch frame assembly transfer device, which realizes the welding, transfer and arch erection of the arch frame assembly through the coordinated work of the front lifting slide rail group and the rear lifting slide rail group.
[0021] This tunnel construction trolley sets the front lifting slide rail group on the upper step telescopic working platform. Before the excavation operation, the cofferdam above the upper step telescopic working platform is supported to ensure the personal safety of the excavation workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Attached Figure 1 What is shown is the overall structural schematic diagram of this tunnel construction trolley.
[0023] Attached Figure 2 Shown is a schematic diagram of the structure of a steel bar crane and an arch crane.
[0024] Attached Figure 3 Shown is a schematic diagram of the structure of the cantilever support and the clamping cylinder.
[0025] Attached Figure 4 Shown is a schematic diagram of the splicing of the arch frame.
[0026] Attached Figure 5 Shown is a schematic structural diagram of a rear lifting rail assembly.
[0027] Attached Figure 6 Shown is a schematic structural diagram of the slide.
[0028] Attached Figure 7-9 Shown is a schematic diagram of the transport process of the arch frame assembly.
[0029] Attached photos
[0030] 1. Car body;
[0031] 2. Arch frame splicing device; 21. Rebar crane; 211. Cantilever; 212. Winch; 22. Arch frame crane; 221. Rotating arm; 222. Oil cylinder; 223. Pulley; 23. Cantilever support; 24. Pressing cylinder; 25. Pressing plate;
[0032] 3. Step-up telescopic working platform;
[0033] 4. Arch assembly transfer device; 41. Rear lifting rail assembly; 411. Slide rail; 412. Lifting cylinder; 413. Slide seat; 4131. Seat body; 4132. Support roller; 4133. Longitudinal roller; 42. Front lifting rail assembly;
[0034] 5. Arch frame; 51. Top arch section; 52. Side arch section;
[0035] 6. Arch assembly. DETAILED DESCRIPTION
[0036] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the scope of protection of the present invention. It should be noted that in the description of the present invention, the terms "front", "rear", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of description, rather than indicating or implying that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. It should also be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or the internal connection of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0037] As attached Figure 1 As shown, a tunnel construction trolley has a movable body 1, on which an arch frame splicing device 2, an upper step telescopic working platform 3 and an arch frame assembly transport device 4 are arranged, and its structure and function are specifically described below.
[0038] See attached Figure 2 In order to solve the problem in the background technology, an arch frame splicing device 2 is provided on the vehicle body 1. The arch frame splicing device includes two arch frame cranes 22 arranged on the top of the vehicle body 1, a pair of cantilever supports 23 arranged on the columns of the vehicle body 1, and a clamping cylinder 24 fixed above the cantilever supports 23.
[0039] Specifically, a steel bar crane 21 is installed in the middle of the top of the vehicle body 1, and two arch frame cranes 22 are symmetrically arranged on both sides of the steel bar crane 21. The steel bar crane 21 is composed of a fixed cantilever 211 and a winch 212. The function of the steel bar crane 21 is to hang steel bars or steel meshes on the roof platform. On the roof platform, these steel bars or steel meshes need to be welded between three arch frames to form an arch frame assembly 6 with a mesh support structure.
[0040] The arch crane 22 is composed of a rotating arm 221, a cylinder 222 and a winch (not shown in the figure), and a pulley 223 connected to the winch wire rope is provided on the rotating arm 31. The rotating arm 221 and the cylinder 222 are respectively hinged on the vehicle body 1, and the cylinder 222 can drive the rotating arm 221 to rotate forward and backward.
[0041] See attached Figure 3A pair of cantilever supports 23 are provided on the pillars of the vehicle body 1 , a clamping cylinder 24 is provided above the cantilever supports 23 , and a clamping plate 25 is hinged at the telescopic end of the clamping cylinder 24 .
[0042] The arch frame 5 is composed of a top arch section 51 and two side arch sections 52. End flanges are provided at the ends of the top arch section 51 and the side arch sections 52. The top arch section 51 and the side arch sections 52 can be spliced together by bolts.
[0043] By the attached Figure 3 It can be seen that a pair of cantilever supports 23 are suspended horizontally, and can suspend and support the top arch section 51. The pressing cylinder 24 and the pressing plate 25 can press the top arch section 51 downwards, and fix the top arch section 51.
[0044] Stitching process:
[0045] See attached Figure 1 The top arch section 51 is suspended on a pair of cantilever supports 23 using two arch frame cranes 21, and then the pressing cylinder 24 is started to press the top arch section 51 from top to bottom. In this way, the top arch section 51 is fixed to prevent the top arch section 51 from swinging back and forth during the splicing process.
[0046] See attached Figure 4 Then, two arch frame cranes 21 are used to respectively lift the two side arch segments 52, so that the end flanges of the side arch segments 52 are close to the end flanges of the top arch segment 51, and then the construction workers align the flanges and use bolts to connect the side arch segments 52 and the top arch segment 51 together to complete the splicing of the arch frame.
[0047] The arch frame crane 22 has two functions: one is to lift and splice the arch frame 5, and the other is to hang the spliced arch frame 5 on the roof. After the splicing is completed, the arch frame 5 is first lifted as a whole by the two arch frame cranes 22, and then the rotating arm 221 rotates backward under the drive of the oil cylinder 222 to hang the arch frame 5 on the roof.
[0048] As can be seen from the above, the arch frame splicing device 2 can suspend and fix the top arch section 51, and then connect the side arch sections 52 to the two ends of the top arch section 51 with the help of the arch frame crane 22. Compared with the existing splicing method, the top arch section 51 is no longer suspended and swings, and it is easy to align and connect the side arch sections 52 with the top arch section 51. In addition, the arch frame crane 22 can rotate, and the spliced arch frame 5 can be hung on the roof.
[0049] Again refer to the attached Figure 1 In order to solve the problem in the background technology, an arch assembly transfer device 4 is also provided on the top of the vehicle body 1 .
[0050] Specifically, the arch assembly transfer device 4 includes a front lifting rail group 42, a rear lifting rail group 41 and an upper step telescopic working platform 3. Among them, the rear lifting rail group 41 is installed on the top of the vehicle body 1, the upper step telescopic working platform 3 is installed on the front of the vehicle body 1, and the front lifting rail group 42 is installed on the upper step telescopic working platform 3. The upper step telescopic working platform 3 can be extended or retracted in the longitudinal direction, which is suitable for the micro-step or multi-step excavation process of the tunnel. A pair of slide rails 411 in the rear lifting rail group 41 is located on the inner side of a pair of slide rails 411 in the front lifting rail group 42, and the lifting cylinder 412 in the rear lifting rail group 41 has a stroke smaller than the stroke of the lifting cylinder 412 in the front lifting rail group 42.
[0051] See attached Figure 5 The front lifting rail assembly 42 and the rear lifting rail assembly 41 are both composed of a pair of rails 411, a plurality of slide seats 413, and a lifting cylinder 412. The rails 411 are arranged along the longitudinal direction of the vehicle body 1, the slide seats 413 can slide along the rails 411, and are used to support and translate the arch frame assembly 6, and the lifting cylinder 412 is used to lift the rails 411.
[0052] See attached Figure 6 The slide 413 includes a seat body 4131, on which a supporting roller 4132 and a longitudinal roller 4133 are arranged, wherein the supporting roller 4132 is used to support the arch frame assembly 6, and the longitudinal roller 4133 is used to translate the arch frame assembly 6. Specifically, there are three groups of longitudinal rollers 4133, one group of longitudinal rollers 4133 rolls along the top surface of the slide rail 411, and two groups of longitudinal rollers 4133 roll along the two side surfaces of the slide rail 411. The rolling resistance of the longitudinal rollers 4133 is small, which facilitates the movement of the slide 413.
[0053] Transfer process:
[0054] See attached Figure 7 First, the three spliced arch frames 5 are hoisted on the three slide seats 413 of the rear lifting rail group 41 by means of two arch frame hoists 22, and then the steel bars are hoisted up by means of the steel bar hoist 21, and the three arch frames 5 are welded with the steel bars into an arch frame assembly 6 with a mesh support structure.
[0055] See attached Figure 8 The slide rail 411 and the arch assembly 6 are lifted up by the lifting cylinder 412 on the rear lifting slide rail group 41, and the arch assembly 6 is slid forward by the slide seat 413, so that the arch assembly 6 moves to the top of the front lifting slide rail group 42, and then the lifting cylinder 412 moves downward to place the arch assembly 6 on the slide seat 413 of the front lifting slide rail group 42.
[0056] See attached Fig. 9As the upper step telescopic work platform 3 extends forward and the arch assembly 6 slides on the front lifting rail group 42, the arch assembly 6 is moved to the bottom of the construction surface, and then the lifting cylinder 412 on the front lifting rail group 42 lifts the slide rail 411 and the arch assembly 6 to make the arch assembly 6 reach the fixed position, and then the arch assembly 6 is connected and anchored. After the arch assembly 6 is installed in place, the lifting cylinder 412 retracts, and the front lifting rail group 42 dives below the upper step telescopic work platform 3.
[0057] The upper step telescopic work platform 3 is a platform for construction workers to perform excavation operations. Since the upper step telescopic work platform 3 is supported by the arch frame assembly 6, there will be no accidents of rockfall from the top surrounding rock injuring people, thus ensuring the personal safety of the construction workers.
[0058] Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the protection scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A tunnel construction trolley, characterized by: include: Vehicle body; The arch frame splicing device includes two arch frame cranes arranged on the top of the vehicle body, and also includes a pair of cantilever supports arranged on the vehicle body columns, and a clamping cylinder is arranged above the cantilever supports; The upper step telescopic working platform can be extended and retracted along the front and rear direction of the vehicle body; The arch frame assembly transfer device includes a front lifting slide rail group and a rear lifting slide rail group, wherein the front lifting slide rail group is installed on the upper step telescopic working platform; the front lifting slide rail group and the rear lifting slide rail group are both composed of a pair of slide rails and multiple slide seats and lifting cylinders, wherein the slide rails are arranged along the longitudinal direction of the vehicle body, and the slide seats can slide along the slide rails for supporting and translating the arch frame assembly, and the lifting cylinders are used for lifting the slide rails.
2. A tunnel construction trolley as claimed in claim 1, characterized in that: The arch crane is composed of a rotating arm, an oil cylinder and a winch. A pulley connected to the wire rope of the winch is arranged on the rotating arm. The rotating arm and the oil cylinder are hinged on the vehicle body, and the oil cylinder is used to drive the rotating arm to rotate forward and backward.
3. A tunnel construction trolley as claimed in claim 1, characterized in that: A steel bar crane is arranged between the two arch cranes. The steel bar crane is composed of a cantilever and a winch, and a pulley is arranged on the cantilever.
4. A tunnel construction trolley as claimed in claim 1, characterized in that: A pressing plate is hinged at the telescopic end of the pressing cylinder.
5. A tunnel construction trolley as claimed in claim 1, characterized in that: The slide seat comprises a seat body, on which a supporting roller and a longitudinal roller are arranged, wherein the supporting roller is used to support the arch frame assembly, and the longitudinal roller is used to translate the arch frame assembly.
6. A tunnel construction trolley as claimed in claim 1, characterized in that: A pair of slide rails in the rear lifting slide rail group is located on the inner side of a pair of slide rails in the front lifting slide rail group.
7. A tunnel construction trolley as claimed in claim 1, characterized in that: The stroke of the lifting cylinder in the rear lifting slide rail group is smaller than the stroke of the lifting cylinder in the front lifting slide rail group.