Cement material preheating conveying pipeline inspection box

By designing a cement material preheating conveying pipeline inspection box, using hydraulic cylinder to drive sliding blocks and torsion spring mechanism to open the sealing plate, and setting a twisted dragon in the discharge pipe, the problem of cement raw material is solved and the smoothness of the conveying pipe is improved and work efficiency.

CN221975028UActive Publication Date: 2024-11-08TANGSHAN SHENGLONG CEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420350281.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-08
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

Cement raw materials are prone to clogging at the feeding port of the conveyor pipe, affecting working efficiency.

Method used

Design a cement material preheating conveying pipeline inspection box, including the inspection box and the conveying pipe, with a lower pipe and a sealing plate under it. The sealing plate can open the inspection port to facilitate viewing and unblocking the blocked material, and use hydraulic cylinder to drive and slide The block and torsion spring mechanism open the sealing plate, and a twisting dragon is installed in the discharge pipe to facilitate the clearance of the blockage.

Benefits of technology

It effectively reduces the adverse impact of cement material blockage on working efficiency, and improves the smoothness and working efficiency of the conveying pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221975028U_ABST
    Figure CN221975028U_ABST
Patent Text Reader

Abstract

The utility model relates to a cement material preheating conveying pipeline inspection box, and belongs to the technical field of cement production.The cement material preheating conveying pipeline inspection box comprises an inspection box body installed at the lower end of a conveying pipe and communicated with the conveying pipe, the lower side of the inspection box body is fixedly connected and communicated with a discharging pipe, and an inspection opening is formed in one side of the inspection box body; and a blocking plate for blocking the inspection opening is arranged on the inspection box. The device has the effect of reducing the adverse effect of cement material blockage on the working efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of cement production, and in particular to a cement material preheating and conveying pipeline inspection box. Background Art

[0002] In the cement production process, the cement raw material needs to be preheated. After the preheating, the cement raw material is transported to the rotary kiln through a conveying pipe for clinker burning.

[0003] During the process of cement raw meal being transported and discharged through the conveying pipe, blockage is prone to occur at the discharge port, affecting work efficiency. Utility Model Content

[0004] In order to reduce the adverse effects of cement material blockage on work efficiency, the present application provides a cement material preheating and conveying pipeline inspection box.

[0005] The cement material preheating and conveying pipeline inspection box provided in this application adopts the following technical solution:

[0006] A cement material preheating conveying pipeline inspection box comprises an inspection box installed at the lower end of a conveying pipe and connected to the conveying pipe, a material discharge pipe is fixedly connected to the lower side of the inspection box and connected to the inspection box, an inspection port is opened on one side of the inspection box, and a blocking plate for blocking the inspection port is provided on the inspection box.

[0007] By adopting the above technical solution, the preheated cement material is moved to the discharge pipe through the inspection box and discharged through the discharge pipe. When the cement material is blocked at the discharge pipe, the sealing plate is opened and the blockage of the cement in the discharge pipe is checked. At the same time, it is convenient to clear the blocked cement from the inspection port, thereby reducing the adverse effect of cement material blockage on work efficiency.

[0008] Optionally, one side of the blocking plate is hinged to a side wall of the inspection box, and a driving member for driving the blocking plate to rotate is provided on the inspection box.

[0009] By adopting the above technical solution, the driving member drives the sealing plate to rotate along the hinged side, thereby opening the inspection port, which is convenient for clearing the blocked material. When the cement is cleared, the driving member drives the sealing plate to rotate and seal the inspection port, thereby reducing the possibility of cement material splashing out of the inspection port, making it easier to drive the sealing plate to rotate, and further reducing the adverse effects of cement material blockage on work efficiency.

[0010] Optionally, the blocking plate includes a first blocking portion hinged to the side wall of the inspection box on one side and a second blocking portion located on the other side of the first blocking portion, and two symmetrically arranged torsion springs are provided on the side where the first blocking portion and the second blocking portion are close to each other, one end of the torsion spring is fixedly connected to the first blocking portion, and the other end is fixedly connected to the second blocking portion, when the first blocking portion and the second blocking portion block the inspection port, the torsion spring is stretched, and the driving member drives the second blocking portion to move to the side away from the hinged side.

[0011] By adopting the above technical solution, the driving member drives the second sealing part to move away from the side of the torsion spring. At this time, the torsion spring recovers its deformation and makes the first sealing part and the second sealing part fold along the hinged side, reducing the space occupied by the first sealing part and the second sealing part. When the end of the second sealing part away from the torsion spring moves to the side close to the first sealing part away from the torsion spring under the drive of the driving member, the inspection port is fully opened, which is convenient for clearing the blocked cement and reducing the adverse effects of cement material blockage on work efficiency.

[0012] Optionally, both ends of the second blocking portion away from the torsion spring are rotatably connected to sliding blocks, the sliding blocks are slidably connected to the side walls of the inspection box, and the driving member drives one of the sliding blocks to slide.

[0013] By adopting the above technical solution, the driving member drives one of the sliding blocks to slide toward the side close to the torsion spring of the first sealing part. At this time, the first sealing part and the second sealing part are folded along the hinged side under the drive of the torsion spring to restore the deformation, and move toward the side close to the first sealing part away from the torsion spring under the push of the sliding block until the inspection port is completely opened, thereby improving work efficiency.

[0014] Optionally, the driving member includes a first hydraulic cylinder fixedly connected to the inspection box, and the first hydraulic cylinder faces the corresponding sliding block and is fixedly connected to the sliding block.

[0015] By adopting the above technical solution, the first hydraulic cylinder drives the sliding block to slide toward the side of the first blocking part away from the torsion spring. At this time, the first blocking part and the second blocking part are folded and move and rotate toward the side of the first blocking part away from the torsion spring, thereby facilitating the opening of the inspection port and improving work efficiency.

[0016] Optionally, the feed pipe is provided with an auger arranged along the length direction of the feed pipe, and one side of the feed pipe is fixedly connected and communicated with a mounting shell for placing the auger, the mounting shell is provided with a moving part for driving the auger to move, and the upper side of the auger is provided with a rotating part for driving the auger to rotate.

[0017] By adopting the above technical solution, when the conveying pipe is unloading normally, the moving part drives the auger to move into the installation shell, thereby not affecting the normal unloading of the unloading pipe. When the unloading pipe is blocked, the moving part drives the auger to move into the unloading pipe. At this time, the rotating part drives the auger to rotate, so that part of the cement material moves downward under the drive of the auger, thereby facilitating the unblocking of the material blocked in the unloading pipe and reducing the adverse effect of the cement material blockage on the work efficiency.

[0018] Optionally, the auger includes a rotating shaft arranged along the length direction of the discharge pipe and blades wound along the length direction of the rotating shaft and fixedly connected to the rotating shaft, and the rotating member includes a rotating rod with one end inserted into the rotating shaft and threadedly connected to the rotating shaft, and the rotating rod is parallel to the length direction of the rotating shaft.

[0019] By adopting the above technical solution, the rotating rod is driven to move downward. At this time, the rotating shaft drives the blades to rotate under the drive of the rotating rod, thereby facilitating the movement of part of the cement material downward along the blades, thereby facilitating the unblocking of the material blocked in the discharge pipe and reducing the adverse effect of the cement material blockage on the work efficiency.

[0020] Optionally, the movable member includes a rotating ring which is sleeved on the outside of the rotating shaft and rotatably connected to the rotating shaft, a second hydraulic cylinder is fixedly connected to the outside of the mounting shell, and a telescopic rod of the second hydraulic cylinder faces the rotating ring and is fixedly connected to the rotating ring.

[0021] By adopting the above technical solution, when the auger rotates, the rotating ring and the rotating shaft are rotatably connected. When the auger is driven to move, the telescopic rod of the second hydraulic cylinder is extended or shortened, thereby driving the auger through the rotating ring to move away from or close to the mounting shell, thereby improving work efficiency.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. The preheated cement material is moved to the discharge pipe through the inspection box and discharged through the discharge pipe. When the cement material is blocked at the discharge pipe, the blocking plate is opened to check the blockage of the cement in the discharge pipe. At the same time, it is convenient to dredge the blocked cement from the inspection port to reduce the adverse effect of cement material blockage on work efficiency;

[0024] 2. The driving member drives the second blocking part to move away from the torsion spring. At this time, the torsion spring recovers its deformation and causes the first blocking part and the second blocking part to fold along the hinged side, thereby reducing the space occupied by the first blocking part and the second blocking part. When the end of the second blocking part away from the torsion spring moves to the side of the first blocking part away from the torsion spring under the driving of the driving member, the inspection port is fully opened, which is convenient for unblocking the blocked cement and reducing the adverse effect of cement material blockage on work efficiency.

[0025] 3. When the conveying pipe is unloading normally, the moving part drives the auger to move into the installation shell, so as not to affect the normal unloading of the unloading pipe. When the unloading pipe is blocked, the moving part drives the auger to move into the unloading pipe. At this time, the rotating part drives the auger to rotate, so that part of the cement material moves downward under the drive of the auger, so as to facilitate the unblocking of the material blocked in the unloading pipe and reduce the adverse effect of cement material blockage on work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of the cement material preheating and conveying pipeline inspection box in the embodiment of the present application.

[0027] Figure 2 yes Figure 1 A magnified view of the structure in the middle.

[0028] Figure 3 It is a structural schematic diagram reflecting the positional relationship between the auger and the feed pipe in the embodiment of the present application.

[0029] Explanation of the accompanying drawings: 1. Conveying pipe; 2. Inspection box; 21. Feeding pipe; 22. Inspection port; 23. Sliding groove; 24. Mounting shell; 3. Sealing plate; 31. First sealing part; 32. Second sealing part; 33. Torsion spring; 34. Sliding block; 4. First hydraulic cylinder; 5. Auger; 51. Rotating shaft; 52. Blade; 6. Moving part; 61. Rotating ring; 62. Second hydraulic cylinder; 7. Rotating rod. DETAILED DESCRIPTION

[0030] The present application is further described in detail below in conjunction with the accompanying drawings.

[0031] The present application embodiment discloses a cement material preheating and conveying pipeline inspection box. Figure 1 A cement material preheating conveying pipeline inspection box includes an inspection box 2 fixedly connected and communicated with the lower end of a conveying pipe 1, a feed pipe 21 is fixedly connected and communicated with the lower side of the inspection box 2, and a fixed frame for support (not shown in the figure) is installed on the conveying pipe 1.

[0032] Reference Figure 1 and Figure 2 An inspection port 22 is provided on one side of the inspection box 2, and a blocking plate 3 for blocking the inspection port 22 is provided on the side of the inspection box 2 close to the inspection port 22. The blocking plate 3 includes a first blocking portion 31 and a second blocking portion 32 sequentially arranged along the length direction of the inspection box 2. The first blocking portion 31 and the second blocking portion 32 are hinged to each other on the sides close to each other, and torsion springs 33 are provided at both ends of the hinged sides of the first blocking portion 31 and the second blocking portion 32, one end of the torsion spring 33 is fixedly connected to the first blocking portion 31, and the other end is fixedly connected to the second blocking portion 32. When the first blocking portion 31 and the second blocking portion 32 block the inspection port 22, the torsion spring 33 is stretched.

[0033] Reference Figure 1 and Figure 2 The first blocking part 31 is hinged to the side wall of the inspection box 2 on the side away from the torsion spring 33, and the two ends of the second blocking part 32 on the side away from the torsion spring 33 are rotatably connected to the sliding block 34. The side wall of the inspection box 2 is provided with a horizontal sliding groove 23 adapted to the sliding block 34. The sliding block 34 is inserted into the sliding groove 23 and is slidably connected to the side wall of the inspection box 2, and a driving member for driving the sliding block 34 to move is provided on the side of the box close to the first blocking part 31. In the embodiment of the present application, a first hydraulic cylinder 4 is set to be horizontal and fixedly connected to the inspection box 2. The first hydraulic cylinder 4 is located on the upper side of the first blocking part 31, and the telescopic rod of the first hydraulic cylinder 4 faces the sliding block 34 on the upper side of the second blocking part 32 and is fixedly connected to the sliding block 34 on the upper side of the second blocking part 32.

[0034] The preheated cement material moves to the discharge pipe 21 through the inspection box 2 and is discharged through the discharge pipe 21. When the cement material is blocked at the discharge pipe 21, the first hydraulic cylinder 4 drives the sliding block 34 to slide along the sliding groove 23 to the side close to the first blocking part 31 away from the torsion spring 33. At this time, the torsion spring 33 restores its deformation and causes the first blocking part 31 and the second blocking part 32 to fold along the hinged side. When the end of the second blocking part 32 away from the torsion spring 33 moves to the side close to the first blocking part 31 away from the torsion spring 33 under the drive of the driving member, the inspection port 22 is fully opened, which is convenient for checking the blockage of cement in the discharge pipe 21 and for clearing the blocked cement from the inspection port 22. When the cement is cleared, the first hydraulic cylinder 4 drives the sealing plate 3 to rotate and seal the inspection port 22 to complete the clearing of the cement material.

[0035] Reference Figure 1 and Figure 3 The feeding pipe 21 is provided with an auger 5 parallel to the length direction of the feeding pipe 21, and the auger 5 includes a rotating shaft 51 and a blade 52 wound around the outer side of the rotating shaft 51 and fixedly connected to the rotating shaft 51. The feeding pipe 21 is fixedly connected and communicated with a mounting shell 24 on one side close to the first hydraulic cylinder 4, and a moving part 6 driving the auger 5 to move into the mounting shell 24 is provided on the mounting shell 24, and a rotating part driving the auger 5 to rotate is provided on the rotating shaft 51.

[0036] Reference Figure 1 and Figure 3 The rotating member includes a rotating rod 7 with one end inserted into the rotating shaft 51 and threadedly connected to the rotating shaft 51, and the rotating rod 7 is parallel to the length direction of the feeding tube 21. The moving member 6 includes a rotating ring 61 sleeved on the upper end of the outer side of the rotating shaft 51 and rotatably connected to the rotating shaft 51. The outer side of the mounting shell 24 is fixedly connected to a second hydraulic cylinder 62, and the telescopic rod of the second hydraulic cylinder 62 passes through the mounting shell 24 and is fixedly connected to the side wall of the rotating ring 61.

[0037] When the conveying pipe 1 is unloading normally, the second hydraulic cylinder 62 drives the auger 5 to move into the mounting shell 24 through the rotating ring 61, so as not to affect the normal unloading of the unloading pipe 21. When the unloading pipe 21 is blocked, the second hydraulic cylinder 62 drives the auger 5 to move into the unloading pipe 21 through the rotating ring 61. At this time, the rotating rod 7 is driven to move downward, and the rotating shaft 51 drives the blade 52 to rotate under the drive of the rotating rod 7, so as to facilitate the downward movement of part of the cement material along the blade 52 to complete the unblocking of the cement material.

[0038] The implementation principle of the cement material preheating and conveying pipeline inspection box of the embodiment of the present application is as follows: the preheated cement material moves into the discharge pipe 21 through the inspection box 2 and is discharged through the discharge pipe 21. When the cement material is blocked at the discharge pipe 21, the first hydraulic cylinder 4 drives the sliding block 34 to slide along the sliding groove 23 to the side close to the first blocking part 31 away from the torsion spring 33. At this time, the torsion spring 33 restores its deformation and causes the first blocking part 31 and the second blocking part 32 to fold along the hinged side. When the end of the second blocking part 32 away from the torsion spring 33 moves to the side close to the first blocking part 31 away from the torsion spring 33 under the drive of the driving member, the inspection port 22 is fully opened, which is convenient for checking the blockage of the cement in the discharge pipe 21 and at the same time, it is convenient to clear the blocked cement from the inspection port 22. When the cement is cleared, the first hydraulic cylinder 4 drives the sealing plate 3 to rotate and block the inspection port 22 to complete the clearing of the cement material.

[0039] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A cement material preheating and conveying pipeline inspection box, characterized in that: The invention comprises an inspection box (2) installed at the lower end of a conveying pipe (1) and connected to the conveying pipe (1); a feed pipe (21) is fixedly connected to the lower side of the inspection box (2) and connected to the feed pipe; an inspection opening (22) is provided on one side of the inspection box (2); and a blocking plate (3) is provided on the inspection box (2) for blocking the inspection opening (22).

2. A cement material preheating and conveying pipeline inspection box according to claim 1, characterized in that: One side of the blocking plate (3) is hinged to the side wall of the inspection box (2), and a driving member for driving the blocking plate (3) to rotate is provided on the inspection box (2).

3. A cement material preheating and conveying pipeline inspection box according to claim 2, characterized in that: The blocking plate (3) comprises a first blocking portion (31) hinged to a side wall of the inspection box (2) on one side and a second blocking portion (32) located on the other side of the first blocking portion (31); two symmetrically arranged torsion springs (33) are provided on a side where the first blocking portion (31) and the second blocking portion (32) are close to each other; one end of the torsion spring (33) is fixedly connected to the first blocking portion (31) and the other end is fixedly connected to the second blocking portion (32); when the first blocking portion (31) and the second blocking portion (32) block the inspection port (22), the torsion spring (33) is stretched, and the driving member drives the second blocking portion (32) to move away from the hinged side.

4. A cement material preheating and conveying pipeline inspection box according to claim 3, characterized in that: Both ends of the second blocking portion (32) away from the torsion spring (33) are rotatably connected to sliding blocks (34), the sliding blocks (34) are slidably connected to the side walls of the inspection box (2), and the driving member drives one of the sliding blocks (34) to slide.

5. The cement material preheating and conveying pipeline inspection box according to claim 4 is characterized in that: The driving member comprises a first hydraulic cylinder (4) fixedly connected to the inspection box (2), the first hydraulic cylinder (4) facing the corresponding sliding block (34) and fixedly connected to the sliding block (34).

6. A cement material preheating and conveying pipeline inspection box according to claim 5, characterized in that: The feed tube (21) is provided with an auger (5) arranged along the length direction of the feed tube (21); one side of the feed tube (21) is fixedly connected to and communicated with a mounting shell (24) for placing the auger (5); a moving part (6) for driving the auger (5) to move is provided on the mounting shell (24); and a rotating part for driving the auger (5) to rotate is provided on the upper side of the auger (5).

7. A cement material preheating and conveying pipeline inspection box according to claim 6, characterized in that: The auger (5) comprises a rotating shaft (51) arranged along the length direction of the feeding tube (21) and a blade (52) wound along the length direction of the rotating shaft (51) and fixedly connected to the rotating shaft (51); the rotating member comprises a rotating rod (7) one end of which is inserted into the rotating shaft (51) and is threadedly connected to the rotating shaft (51); the rotating rod (7) is parallel to the length direction of the rotating shaft (51).

8. The cement material preheating and conveying pipeline inspection box according to claim 7 is characterized by: The moving member (6) comprises a rotating ring (61) sleeved on the outside of the rotating shaft (51) and rotatably connected to the rotating shaft (51); a second hydraulic cylinder (62) is fixedly connected to the outside of the mounting shell (24); a telescopic rod of the second hydraulic cylinder (62) faces the rotating ring (61) and is fixedly connected to the rotating ring (61).