Cold and warm water machine and temperature control system thereof

By designing independent high-temperature generator pipeline circuits in the temperature control system of the temperature cold water machine, independent operation of cooling, heating and sanitary heat is achieved, and the problems of frequent start and stop of the equipment and insufficient adaptability of the working conditions are solved, and the equipment life is extended. Improves the durability and supply stability of the system.

CN221975529UActive Publication Date: 2024-11-08YANTAI EBARA AIR CONDITIONER
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323533844.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-11-08
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

The temperature control system of the existing temperature-cooling water machine frequently starts and stops under refrigeration conditions, has a short service life, and is difficult to operate stably when the refrigeration load is low, which cannot meet the cold source supply needs of the refrigeration equipment.

Method used

Design a temperature control system to achieve independent operation of cooling, heating and sanitary heat through the first and second high temperature generators, avoid frequent switching of a single high temperature generator, and use cold water switching valves and hot water The switch meets different working conditions.

Benefits of technology

It extends the service life of the high-temperature generator and its supporting devices, improves the durability and working conditions of the temperature control system, and ensures the stable supply of cooling, heating and sanitary heat.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221975529U_ABST
    Figure CN221975529U_ABST
Patent Text Reader

Abstract

The utility model discloses a temperature control system which comprises a first high-temperature generator, a low-temperature generator, a condenser, an evaporator, an absorber, a low-temperature heat exchanger and a high-temperature heat exchanger which are circularly communicated through a first pipeline loop, and the first pipeline loop is communicated with the upstream of external refrigeration equipment through a cold water switching valve; the second high-temperature generator and the hot water heat exchanger are circularly communicated through a second pipeline loop, the first high-temperature generator is communicated with a first combustor and a first flow regulating valve, and the second high-temperature generator is communicated with a second combustor and a second flow regulating valve. The component layout of the temperature control system is reasonable, and frequent start and stop of equipment can be effectively avoided, so that the service life of the equipment is prolonged. The utility model further discloses the cold and warm water machine applying the temperature control system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cold and warm water machines and their matching components, in particular to a temperature control system. The utility model also relates to a cold and warm water machine using the temperature control system. Background Art

[0002] Please refer to Figure 1 , Figure 1 The present invention is a schematic diagram of a temperature control system of a typical heating, sanitary heat and cooling triple-purpose chiller in the prior art.

[0003] The currently existing heating-heating-refrigeration three-in-one machine consists of a high-temperature generator 101, an evaporator 102, an absorber 103, a low-temperature generator 104, a condenser 105, a heat exchanger 1058, a warm water heat exchanger 1059 and heating and cooling switching valves 1071, 1072, and 1073.

[0004] For general working conditions, considering that the heating demand and sanitary heat demand are far greater than the cooling demand, the high temperature generator 101 and the burner 1081 will be designed according to the working conditions of heating and sanitary heat. In the whole temperature control system, only one generator 101 and burner 1081 are set to cope with the adaptation and switching of various working conditions such as heating, sanitary heat and cooling.

[0005] In the cooling mode, the cold and warm switching valves 1071, 1072, and 1073 are all opened, and the refrigerant vapor 1020 generated by the high temperature generator 101 is used as the driving source of the low temperature generator 104, and condenses into refrigerant water 1021 after heat exchange and returns to the condenser 105. The refrigerant vapor 1028 generated by the low temperature generator 104 is condensed into refrigerant water by the condenser 105. Then, the two refrigerant waters 1022 of the condenser 105 are returned to the evaporator 102 by the condenser 105. In the evaporator 102, the evaporation absorbs heat to produce chilled water 107, so that the chilled water 107 can be sent to the downstream refrigeration equipment or the cold-using equipment as a cold source.

[0006] In the cooling and sanitary heating modes, the heating and cooling switching valves 1071, 1072, and 1073 are all opened, and the refrigerant steam generated by the high-temperature generator 101 is divided into two streams. One stream is steam 1020, which serves as the driving source of the low-temperature generator 104 to produce cold water, and the other stream is steam 1055 which enters the sanitary heating heat exchanger 1058 to produce sanitary hot water 1054.

[0007] In the heating and sanitary heating modes, the heating and cooling switching valves 1071, 1072, and 1073 are all closed, and the refrigerant steam 1055 generated by the high-temperature generator 101 enters the warm water heat exchanger 59 and the sanitary heating heat exchanger 1058 respectively to produce heating water 1052 and sanitary hot water 1054. The refrigerants 1056 and 1057 after heat exchange flow back to the high-temperature generator 101.

[0008] It is not difficult to see that although the existing temperature control system can meet the normal operating requirements of the chiller, its single high-temperature generator 101 needs to take into account the comprehensive requirements of heating and cooling conditions at the same time. Since the high-temperature generator 101 and its supporting equipment such as burner 1081 are designed based on the total heat demand of heating and sanitary heat conditions, the equipment combustion load and the volume of the high-temperature generator are large, and the equipment specifications are high. When the temperature control system designed and arranged in this way is running at partial load under cooling conditions, the burner 1081 will need to be started and stopped frequently, which seriously affects the service life of the related high-temperature generator 101 and burner 1081 and other supporting devices.

[0009] In addition, when the system cooling load is low, it is difficult for the temperature control system to enter a stable operating state after the overall startup, resulting in an unsatisfactory operating state of the temperature control system, which cannot guarantee the cold source supply demand of downstream refrigeration equipment or cold-using equipment, and has an adverse effect on the operating efficiency and adaptability of the corresponding chillers and warm water machines.

[0010] In view of this, how to optimize the component layout of the temperature control system of the chiller to avoid frequent start and stop of the equipment and extend the service life of the equipment is an important technical problem that technicians in this field currently need to solve. Utility Model Content

[0011] The purpose of the utility model is to provide a temperature control system, the component layout of the temperature control system is relatively reasonable, which can effectively avoid frequent start and stop of the equipment, thereby extending the service life of the equipment. Another purpose of the utility model is to provide a water chiller and warmer using the above temperature control system.

[0012] In order to solve the above technical problems, the utility model provides a temperature control system, comprising a first high temperature generator, a low temperature generator, a condenser, an evaporator, an absorber, a low temperature heat exchanger and a high temperature heat exchanger which are circulated and connected through a first pipeline loop, wherein the first pipeline loop is connected to the upstream of an external refrigeration device through a cold water switching valve;

[0013] It also includes a second high temperature generator and a hot water heat exchanger which are connected through a second pipeline loop circulation, the first high temperature generator is connected to a first burner and a first regulating valve, and the second high temperature generator is connected to a second burner and a second regulating valve.

[0014] Preferably, the first pipeline loop includes a first refrigerant steam pipeline connected between the top of the first high temperature generator and the low temperature generator to supply refrigerant steam from the first high temperature generator to the low temperature generator;

[0015] A first cooling and heating switching pipe is connected between the first refrigerant steam pipeline and the absorber, and the first cooling and heating switching pipe is connected in parallel with the low-temperature generator, and a first cooling and heating switching valve is provided on the first cooling and heating switching pipe;

[0016] A second cooling and heating switching pipe is connected between the absorber and the evaporator for high-temperature liquid flow from the absorber to the evaporator, and a second cooling and heating switching valve is provided on the second cooling and heating switching pipe;

[0017] A warm water supply pipe group for circulating warm water is connected between the evaporator and the hot water heat exchanger.

[0018] Preferably, the warm water supply pipe group includes any one of a forward warm water pipeline that supplies warm water from the evaporator to the hot water heat exchanger, a reverse warm water pipeline that supplies warm water from the hot water heat exchanger to the evaporator, or a two-way warm water pipeline that supplies warm water in parallel into the hot water heat exchanger and the evaporator.

[0019] Preferably, the first pipeline loop is connected to a buffer tank, a reflux pipe is connected between the buffer tank and the absorber, and a liquid inlet of the reflux pipe is not lower than the top of the inner cavity of the absorber.

[0020] Preferably, the liquid inlet end of the reflux pipe has a drainage section that bends upward and extends into the buffer tank, and the liquid inlet of the reflux pipe is located at the top of the drainage section.

[0021] Preferably, it further comprises a heat exchanger which is cyclically connected to the second high-temperature generator through the second pipeline loop, and the heat exchanger is connected in parallel with the hot water heat exchanger.

[0022] The utility model also provides a cold and warm water machine, comprising a machine body and a temperature control system located inside the machine body, wherein the temperature control system is the temperature control system as described in any one of the above items.

[0023] Compared with the above-mentioned background technology, the temperature control system provided by the present invention, during its operation, utilizes the first high-temperature generator in conjunction with the connection adapter of each device on the first pipeline loop, so that the cold water output from the evaporator can be passed to the downstream refrigeration equipment through the cold water switching valve to be used as a cold source; and utilizes the second high-temperature generator in conjunction with the hot water heat exchanger on the second pipeline loop, so that the high-temperature steam output from the second high-temperature generator can be heat-exchanged with external water in the hot water exchanger, so as to heat the external water to the temperature required for the working conditions, thereby meeting the corresponding sanitary heat and heating needs. Thus, the refrigeration cycle operation can be realized by the first high temperature generator cooperating with the components of the first pipeline loop, and the sanitary heat and heating cycle operations can be realized by the second high temperature generator cooperating with the second pipeline loop. Thus, the first high temperature generator and the second high temperature generator can operate independently to meet the working conditions of refrigeration, heating and sanitary heat respectively. There is no need to rely on the reciprocating switching of a single high temperature generator device in the refrigeration and heating cycle operations as in the prior art to realize the corresponding refrigeration, heating and sanitary heat operation, which effectively avoids the frequent start and stop of a single high temperature generator, thereby extending the service life of each high temperature generator and its related supporting devices, so that the temperature control system as a whole is more durable and has stronger working condition tolerance.

[0024] In another preferred embodiment of the present invention, the first pipeline loop includes a first refrigerant steam pipeline connected between the top of the first high-temperature generator and the low-temperature generator to supply refrigerant steam from the first high-temperature generator to the low-temperature generator; a first cold-heat switching pipe is connected between the first refrigerant steam pipeline and the absorber to supply refrigerant steam from the first refrigerant steam pipeline to the absorber, the first cold-heat switching pipe is connected in parallel with the low-temperature generator, and a first cold-heat switching valve is opened and closed on the first cold-heat switching pipe; a second cold-heat switching pipe is connected between the absorber and the evaporator to supply high-temperature liquid flow from the absorber to the evaporator, and a second cold-heat switching valve is opened and closed on the second cold-heat switching pipe; a warm water supply pipe group for circulating warm water is connected between the evaporator and the hot water heat exchanger. During the operation of the equipment, if only the first high-temperature generator is needed to match the refrigeration operating condition, the first heating and cooling switching valve and the second heating and cooling switching valve are both closed, so that the basic refrigeration operation is achieved through the coordinated operation of the existing devices in the first pipeline loop, and cold water is output to the downstream from the cold water switching valve; if the first high-temperature generator is needed to participate in heating and other operating conditions that require hot water preparation, the first heating and cooling switching valve and the second heating and cooling switching valve can be fully opened, and the cold water switching valve can be closed. In this way, the refrigerant steam output from the first high-temperature generator can pass through the first refrigerant steam pipeline, the first heating and cooling switching pipe, the absorber and the second heating and cooling switching pipe in sequence, and then pass into the evaporator, and complete heat exchange in the evaporator, so as to heat the low-temperature water sent from the outside into high-temperature water, and then send the high-temperature water generated at the evaporator to the hot water exchanger through the warm water supply pipe group, so as to meet the high-temperature water supply demand of corresponding heating and other working conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 It is a schematic diagram of a typical temperature control system of a chiller and warm water machine for heating, sanitary heating and cooling in the prior art;

[0027] Figure 2 This is a schematic diagram of the device layout of the temperature control system provided in the first embodiment of the present utility model;

[0028] Figure 3 A schematic diagram of the device layout of the temperature control system provided in the second embodiment of the present utility model;

[0029] Figure 4This is a schematic diagram of the device layout of the temperature control system provided in the third embodiment of the present utility model;

[0030] Figure 5 This is a schematic diagram of the device layout of the temperature control system provided in Example 4 of the present utility model. DETAILED DESCRIPTION

[0031] The core of the utility model is to provide a temperature control system, the component layout of which is relatively reasonable, and can effectively avoid frequent start and stop of equipment, thereby extending the service life of the equipment; in addition, a cold and warm water machine using the above temperature control system is also provided.

[0032] In order to enable those skilled in the art to better understand the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0033] It should be noted in advance that, in the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] In addition, in the present invention, unless otherwise clearly stipulated and limited, a first feature “on” or “under” a second feature may include the first and second features being in direct contact, or the first and second features not being in direct contact but being in contact through another feature therebetween.

[0035] In addition, the first feature being "above", "above" and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature. The terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0036] Please refer to Figures 2 to 5 .

[0037] In a specific embodiment, the temperature control system provided by the present invention includes a first high temperature generator 1, a low temperature generator 4, a condenser 5, an evaporator 2, an absorber 3, a low temperature heat exchanger 51 and a high temperature heat exchanger 52 which are circulated and connected through a first pipeline loop, and the first pipeline loop is connected to the upstream of the external refrigeration equipment through a cold water switching valve 42;

[0038] It also includes a second high temperature generator 31 and a hot water heat exchanger 59 which are connected through a second pipeline loop circulation. The first high temperature generator 1 is connected to a first burner 81 and a first regulating valve 11, and the second high temperature generator 31 is connected to a second burner 82 and a second regulating valve 38.

[0039] During its operation, the first high-temperature generator 1 is used in conjunction with the connection adapter of each device on the first pipeline loop, so that the cold water output from the evaporator 2 can be passed to the downstream refrigeration equipment through the cold water switching valve 42 to be used as a cold source; and the second high-temperature generator 31 is used in conjunction with the hot water heat exchanger 59 on the second pipeline loop, so that the high-temperature steam output from the second high-temperature generator 31 can be heat exchanged with external water in the hot water exchanger to heat the external water to the temperature required for the working conditions, thereby meeting the corresponding sanitary heat and heating needs. Thus, the first high temperature generator 1 can cooperate with the components of the first pipeline loop to realize the refrigeration cycle operation, and the second high temperature generator 31 can cooperate with the second pipeline loop to realize the sanitary heat and heating cycle operations. Therefore, through the independent operation of the first high temperature generator 1 and the second high temperature generator 31, the working conditions of refrigeration, heating and sanitary heat can be met respectively. There is no need to rely on the reciprocating switching of a single high temperature generator device in the refrigeration and heating cycle operations as in the prior art to realize the corresponding refrigeration, heating and sanitary heat operations, which effectively avoids the frequent start and stop of a single high temperature generator, thereby extending the service life of each high temperature generator and its related supporting devices, so that the temperature control system as a whole is more durable and has stronger tolerance to working conditions.

[0040] In fact, by using the separately arranged first high temperature generator 1, the second high temperature generator 31 and the corresponding supporting pipeline loops of the two, it is possible to specifically respond to the two sets of working conditions of refrigeration and heating, so that there is no need to rely on a single high temperature generator to match the comprehensive operation requirements of multiple working conditions such as refrigeration and heating as in the prior art. Accordingly, there is no need to use a single high temperature generator with large capacity and high power. As a result, the first high temperature generator 1 and the second high temperature generator 31 can use high temperature generator equipment with smaller capacity and power that can meet the corresponding working conditions. This not only reduces the equipment energy consumption of the single high temperature generator and simplifies the corresponding single equipment layout space, but also makes the component layout of the temperature control system more flexible and free, the assembly space utilization rate is higher, and the working condition adaptability is better.

[0041] It should be particularly noted that, generally, the refrigerant selected in the first high temperature generator 1 and the second high temperature generator 31 is preferably a lithium bromide solution. After the high temperature generator is started, the burner starts to operate, and the lithium bromide solution evaporates due to heat to form a large amount of refrigerant vapor mainly composed of water vapor, which is then transported to the downstream device through a pipeline to participate in heat exchange and other operations.

[0042] Of course, taking into account the different operating conditions in actual applications, water can also be used as the refrigerant in the high-temperature generator, especially for the second high-temperature generator 31. Considering that the operating conditions it targets are single and the operating requirements are not high, water can be directly used as the refrigerant to match the operating requirements of the second high-temperature generator 31. Accordingly, a boiler can be directly selected as the specific equipment type of the second high-temperature generator 31 to match the actual application.

[0043] In addition, it should be explained that functional devices such as the low-temperature generator 4, condenser 5, evaporator 2, absorber 3, low-temperature heat exchanger 51 and high-temperature heat exchanger 52 mentioned above are all relatively common application devices in the field of HVAC hydraulics. Their specific functions and adaptation effects can be understood by referring to the structural layout shown in the accompanying drawings corresponding to each embodiment of the present scheme. Their corresponding connecting structures such as adapter pipelines are also basically consistent with the conventional arrangements in the prior art. Those skilled in the art can directly refer to them for understanding and application.

[0044] The absorber 3 can mix the refrigerant solution with the refrigerant water to restore the concentration of the refrigerant solution to a concentration that meets the operation requirements of the first high temperature generator. Generally, the absorber 3 and the evaporator 2 are appropriately connected to each other through a filter plate to meet the liquid exchange requirements between the two.

[0045] Of course, the specific layout of each pipeline structure in the first pipeline loop and the second pipeline loop and the layout of related conventional functional components can also be flexibly selected and adjusted according to actual working conditions. In principle, as long as it can meet the relevant operational application requirements of the first high-temperature generator 1 and the second high-temperature generator 31, and match the specific working conditions and usage requirements of the temperature control system.

[0046] Please pay attention to Figure 2 .

[0047] Specifically, the first pipeline loop includes a first refrigerant steam pipeline 20 connected between the top of the first high-temperature generator 1 and the low-temperature generator 4 to supply refrigerant steam from the first high-temperature generator 1 to the low-temperature generator 4; a first cold and warm switching pipe 24 is connected between the first refrigerant steam pipeline 20 and the absorber 3 to supply refrigerant steam from the first refrigerant steam pipeline 20 to the absorber 3, the first cold and warm switching pipe 24 is connected in parallel with the low-temperature generator 4, and a first cold and warm switching valve 26 is opened and closed on the first cold and warm switching pipe 24; a second cold and warm switching pipe 23 is connected between the absorber 3 and the evaporator 2 to supply high-temperature liquid flow from the absorber 3 to the evaporator 2, and a second cold and warm switching valve 25 is opened and closed on the second cold and warm switching pipe 23; a warm water supply pipe group for circulating warm water is connected between the evaporator 2 and the hot water heat exchanger 59. During the operation of the equipment, if only the first high temperature generator 1 is required to match the refrigeration operation condition, the first heating and cooling switching valve 26 and the second heating and cooling switching valve 25 are both closed, so that the basic refrigeration operation is realized through the coordinated operation of the existing devices in the first pipeline loop, and cold water is output to the downstream from the cold water switching valve 42; if the first high temperature generator 1 is required to participate in heating and other operating conditions that require hot water preparation, the first heating and cooling switching valve 26 and the second heating and cooling switching valve 25 can be fully opened, and the cold water switching valve 42 can be closed. In this way, the refrigerant steam output from the first high temperature generator 1 can pass through the first refrigerant steam pipeline 20, the first heating and cooling switching pipe 24, the absorber 3 and the second heating and cooling switching pipe 23 in sequence, and then pass into the evaporator 2, and complete heat exchange in the evaporator 2, so as to heat the low-temperature water sent from the outside into high-temperature water, and then send the high-temperature water generated at the evaporator 2 to the hot water exchanger through the warm water supply pipe group, so as to meet the high-temperature water supply demand of the corresponding heating and other working conditions.

[0048] More specifically, the first pipeline loop is connected with a buffer tank 71, and a return pipe 72 is connected between the buffer tank 71 and the absorber 3, and the liquid inlet of the return pipe 72 is not lower than the top of the inner cavity of the absorber 3. After the equipment is shut down, the pipelines in the first pipeline loop cooperate to form a liquid flow path connected between the first high temperature generator 1 and the absorber 3, so that a communicating device mechanism is formed between the first high temperature generator 1 and the absorber 3, thereby allowing part of the refrigerant in the first high temperature generator 1 to pass into the absorber 3 through the pipelines of the first pipeline loop until the liquid level in the absorber 3 is flush with the liquid level in the first high temperature generator 1.

[0049] On this basis, the reflux pipe 72 is used in conjunction with the buffer tank 71 as the main liquid flow path between the first high-temperature generator 1 and the absorber 3. Combined with the higher arrangement position of the liquid inlet of the reflux pipe 72, it helps to prevent the liquid level in the absorber 3 from being too high and flowing into the adjacent evaporator 2, thereby avoiding contamination of the liquid in the evaporator 2.

[0050] Furthermore, the liquid inlet end of the reflux pipe 72 has a drainage section that bends upward and extends into the buffer tank 71, and the liquid inlet of the reflux pipe 72 is located at the top of the drainage section. The drainage section bent upward can further optimize the structural adaptation effect of the reflux pipe 72 and the buffer tank 71, and combined with the buffer tank 71's own mitigation and diversion effect on the impact of the liquid flow in the pipeline, it can further alleviate the impact of the liquid flow entering the absorber 3, so that the liquid can be smoothly and efficiently passed into the absorber 3, avoiding damage to the internal structure of the absorber 3 due to the impact of the liquid flow, thereby extending the service life of the absorber 3.

[0051] Please focus on Figure 3 .

[0052] The temperature control system further includes a sanitary heat exchanger 58 which is cyclically connected to the second high temperature generator 31 through a second pipeline loop, and the sanitary heat exchanger 58 is connected in parallel with the hot water heat exchanger 59. The refrigerant vapor from the second high temperature generator 31 completes heat exchange with the external sanitary hot liquid in the sanitary heat exchanger 58, thereby heating the sanitary hot liquid to a required temperature, thereby meeting the water demand for sanitary hot water.

[0053] The sanitary liquid here generally refers to the warm water required for daily use in bathroom-related conditions such as washing, bathing or laundry; the heat exchange liquid corresponding to the heating condition mentioned in this article refers to the high-temperature liquid sent to heating equipment such as radiators or floor heating; as for the heat exchange liquid corresponding to the refrigeration condition mentioned in this article, it generally refers to the low-temperature cooling water sent to the air conditioner or refrigeration equipment as a refrigerant or cooling water.

[0054] Correspondingly, the outer wall where the bottom plate 13 and the outer baffle 15 meet is a rounded chamfered surface. The rounded chamfered surface structure enables the structure of the temperature control system related components after installation to meet the requirements of relevant regulations such as "GB 11566-2009 Passenger Car External Protrusions", and further avoids structural interference between the temperature control system and the roof assembly such as the top cover 20.

[0055] On the other hand, the warm water supply pipe group includes a forward warm water pipeline 41 for supplying warm water from the evaporator 2 to the hot water heat exchanger 59, so that the high-temperature water obtained by heat exchange at the evaporator 2 is used as a supplementary heat source and transported to the hot water heat exchanger 59 via the forward warm water pipeline 41, so as to cooperate with the refrigerant steam supplied to the hot water heat exchanger 59 at the second high-temperature generator 31 as a supplementary heat source at the hot water heat exchanger 59, so as to meet the needs of high-intensity heating conditions, improve the temperature control system's ability to cope with high-intensity conditions, and improve the overall performance and operating adaptability of the chiller and warm water machine accordingly.

[0056] Similarly, if Figure 4As shown, in actual application, the warm water supply pipe group may also include a reverse warm water pipe 37 for supplying warm water from the hot water heat exchanger 59 to the evaporator 2. In this way, the excess high-temperature water at the hot water heat exchanger 59 is sent to the evaporator 2 via the warm water supply pipe group as a supplement to the high-temperature medium in the heat exchange operation in the evaporator 2, thereby improving the operating efficiency of the evaporator 2 and optimizing its working performance.

[0057] Of course, you can also Figure 5 As shown in FIG. 1 , the warm water supply pipe group includes a forward warm water pipe 41 for supplying warm water from the evaporator 2 to the hot water heat exchanger 59, and a reverse warm water pipe 37 for supplying warm water from the hot water heat exchanger 59 to the evaporator 2. Thus, high-temperature water can complement each other between the hot water heat exchanger 59 and the evaporator 2 to meet the operating requirements under different working conditions, improve the working condition adaptability of the temperature control system, and improve the working performance of the chiller and warm water machine accordingly.

[0058] In order to facilitate the understanding of the working principle of the temperature control system in this scheme, the following is mainly based on Figure 3 For reference, the general operation process of the temperature control system is appropriately explained. Considering that the layout of most devices and pipelines is basically the same, the functions of the relevant devices and the layout of the pipelines in the remaining diagrams of this article can also be referred to and understood, and no further description will be given.

[0059] Under a single refrigeration condition, the first heating and cooling switching valve 26 and the second heating and cooling switching valve 25 are both closed, the warm water pipeline switching valve 41 is also closed, the second high temperature generator 31 is shut down, the first high temperature generator 1 is started, and the first burner 81 heats the solution in the first high temperature generator 1. The generated refrigerant steam is sent to the low temperature generator 4 via the first refrigerant steam pipeline 20 to complete the heat exchange. The generated refrigerant water is sent to the condenser 5 via the pipeline 21, and after merging with the refrigerant water generated after heat exchange and cooling in the condenser 5, it is passed into the evaporator 2 via the pipeline 22 to complete the heat exchange with the external water body, thereby cooling the external water body into low-temperature cold water. The low-temperature cold water is discharged from the temperature control system via the cold water switching valve 42 and passed into the downstream refrigeration equipment or cold-using equipment.

[0060] When both the cooling and heating modes are running, the first heating and cooling switching valve 26 and the second heating and cooling switching valve 25 are closed, the warm water pipeline switching valve 41 is also closed, the second high temperature generator 31 and the first high temperature generator 1 start running, the first burner 81 heats the solution in the first high temperature generator 1, and the generated refrigerant steam is sent to the low temperature generator 4 through the first refrigerant steam pipeline 20 to complete the heat exchange, and the generated refrigerant water is sent to the condenser 5 through the pipeline 21, and after merging with the refrigerant water generated after heat exchange and cooling in the condenser 5, it is passed into the evaporator 2 through the pipeline 22 to complete the heat exchange with the external water body, thereby cooling the external water body into low-temperature cold water, and the low-temperature cold water is discharged from the temperature control system through the cold water switching valve 42 and passed into the downstream refrigeration equipment or cold-using equipment to complete a refrigeration cycle. The second burner 82 heats the solution in the second high temperature generator 31, and the generated refrigerant steam enters the sanitary heat exchanger 58 through the steam pipeline 33, exchanges heat with the external sanitary water, so as to produce sanitary hot water and output the sanitary hot water through the pipeline 54. The refrigerant water 56 after heat exchange with the sanitary hot water returns to the second high temperature generator 31, completing a whole process of producing sanitary hot water.

[0061] When all heating and 5 sanitary heating modes are running, the working principle is as follows:

[0062] The first cold-heat switching valve 26 and the second cold-heat switching valve 25 are both opened, and the hot water pipeline switching valve 41 is opened. First, the second high-temperature generator 31 and the second burner 82 are opened. The refrigerant steam generated by the second high-temperature generator 31 enters the sanitary heat exchanger 58 and the hot water heat exchanger 59 through the pipeline 33, respectively, to produce sanitary hot water and output it through the pipeline 54, and to produce heating hot water and output it through the pipeline 37. The refrigerant condensed water after heat exchange returns to the second high-temperature generator 31 through the pipeline 56 and the pipeline 57 respectively. When the heat supply is insufficient, the first high-temperature generator 1 and the first burner 81 are opened again, and the refrigerant steam generated by the first high-temperature generator 1 enters the absorber 3 through the pipeline 20 and the cold-heat switching valve 26, and then enters the evaporator 2 through the absorber 3 and the evaporator 2 channel, so as to produce hot water through the heat exchange at the heat transfer pipe in the evaporator 2, and output the hot water through the pipeline 7. The refrigerant water after heat exchange is mixed with the concentrated solution in the absorber 3 through the second cold and warm switching valve 25 to form a dilute solution. The dilute solution generated here flows through pipeline 13, low-temperature heat exchanger 51, low-temperature generator 4, pipeline 15 high-temperature heat exchanger 52, and pipeline 16 in sequence, and then enters the first high-temperature generator 1, and is heated by the burner 81 to be concentrated into a concentrated solution. The concentrated solution generated here passes through pipeline 17, high-temperature solution heat exchanger 52, pipeline 18, low-temperature solution heat exchanger 51, and pipeline 19 in sequence and returns to the absorber 3 for spraying, and is finally mixed with the refrigerant from the evaporator 2 to generate a dilute solution again, forming a complete heating cycle.

[0063] The start-up sequence of the first high temperature generator and the second high temperature generator is as follows:

[0064] First, the second high temperature generator 31 is started to meet the sanitary heat demand and part of the heating demand. The control of the second burner 82 is divided into the following two cases. The first case: if the sanitary hot water demand is greater than the heating demand, the second regulating valve 38 of the second burner 82 is controlled by the sanitary heat outlet temperature 54. When the sanitary heat increases, the opening of the second regulating valve 38 of the second burner 82 increases; when the sanitary heat demand decreases, the opening of the second regulating valve 38 of the second burner 82 decreases. The temperature at the hot water outlet 37 is controlled by the opening of the hot water regulating valve 61. When the heating amount is small, the opening of the hot water regulating valve 61 decreases; when the heating amount is large, the opening of the hot water regulating valve 61 increases. The second case: if the heating amount is greater than the sanitary hot water demand, the opening valve 38 of the second burner 82 is controlled by the temperature feedback at the heating outlet 37. When the heating amount is low, the opening valve 38 of the second burner 82 decreases; when the heating amount is high, the opening valve 38 of the second burner 82 increases. The temperature at the sanitary hot water outlet 37 is controlled by the opening of the sanitary hot water regulating valve 60. When the demand for sanitary hot water is small, the opening of the sanitary hot water regulating valve 60 is reduced; when the demand for sanitary hot water is large, the opening of the sanitary hot water regulating valve 60 is increased. Whether in the first case or the second case, as long as the opening valve 38 of the second burner 82 reaches 100% opening and the heating demand is still increasing, the first high temperature generator 1 is started, and the first burner 81 is operated at a minimum opening of 12.5% ​​(the minimum burner adjustment ratio can reach 1:8). At this time, if the heating load is reduced, the opening of the first burner 81 remains unchanged, and only the opening of the second burner 82 is adjusted. Assume that the 100% opening of the second burner 82 is A, the actual opening of the second burner 82 is a, and the 100% opening of the first burner 81 is B. When a<A-0.2b (0.2b here is the 20% opening of the first burner 81, and the 20% is a preset value, which can be set according to the actual working conditions), if the heating amount continues to decrease, the first burner 81 stops running, and then the opening of the capacity valve 38 of the second burner 82 is reduced. This effectively avoids frequent start and stop of the first burner.

[0065] It is necessary to add that, if Figure 1In the actual operation of the existing equipment shown, in its refrigeration operation mode, the solution concentration in the high-temperature generator is the highest, and the high-temperature generator 101 is a full-liquid generator. The existing system is designed to use only a single high-temperature generator, which has a large cavity volume and a large amount of solution filling, resulting in energy waste. In the mode of both refrigeration and heat operation, the burner opening is controlled by the refrigeration load. When the refrigeration load is low, the burner opening is very small, and the heat cannot meet user needs. When the unit is shut down, part of the solution above the solution weir in the cavity of the high-temperature generator 101 needs to be returned to the absorber 103, which is prone to refrigerant contamination and affects the unit output.

[0066] The temperature control system provided in the present solution relies on the coordinated cooperation of various components and utilizes dual high-temperature generators to operate separately and cooperate with each other, effectively avoiding the problem of excessive solution concentration in a single high-temperature generator, and the solution filling amount in any high-temperature generator is moderate, eliminating energy waste; whether the refrigeration load is low or under other working conditions, the heating at supporting systems such as sanitary heat can guarantee the user needs under the corresponding working conditions; and when the unit is shut down, the solution in the cavity of each high-temperature generator in the present solution can be appropriately refluxed to the absorber under the action of the communicating vessel principle, and refrigerant contamination will not occur, thereby ensuring the overall operating reliability and safety of the temperature control system.

[0067] In a specific embodiment, the water chiller provided by the utility model includes a body and a temperature control system located inside the body, wherein the temperature control system is the temperature control system described above. The component layout of the temperature control system of the water chiller is relatively reasonable, which can effectively avoid frequent start and stop of the device, thereby extending the service life of the device.

[0068] In summary, it can be seen that during the operation of the temperature control system provided in the utility model, the first high-temperature generator is used in conjunction with the connection adapter of each device on the first pipeline loop, so that the cold water output from the evaporator can be passed to the downstream refrigeration equipment through the cold water switching valve to be used as a cold source; and the second high-temperature generator is used in conjunction with the hot water heat exchanger on the second pipeline loop, so that the high-temperature steam output from the second high-temperature generator can be heat exchanged with external water in the hot water exchanger, so as to heat the external water to the temperature required for the working conditions, thereby meeting the corresponding sanitary heat and heating needs. Thus, the refrigeration cycle operation can be realized by the first high temperature generator cooperating with the components of the first pipeline loop, and the sanitary heat and heating cycle operations can be realized by the second high temperature generator cooperating with the second pipeline loop. Thus, the first high temperature generator and the second high temperature generator can operate independently to meet the working conditions of refrigeration, heating and sanitary heat respectively. There is no need to rely on the reciprocating switching of a single high temperature generator device in the refrigeration and heating cycle operations as in the prior art to realize the corresponding refrigeration, heating and sanitary heat operation, which effectively avoids the frequent start and stop of a single high temperature generator, thereby extending the service life of each high temperature generator and its related supporting devices, so that the temperature control system as a whole is more durable and has stronger working condition tolerance.

[0069] The utility model also provides a cold and warm water machine, the component layout of the temperature control system of which is relatively reasonable, which can effectively avoid frequent start and stop of the equipment, thereby extending the service life of the equipment.

[0070] The temperature control system provided by the utility model and the water chiller and warmer using the temperature control system are introduced in detail above. The principle and implementation method of the utility model are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of ​​the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

Claims

1. A temperature control system, characterized in that: The heat exchanger comprises a first high-temperature generator, a low-temperature generator, a condenser, an evaporator, an absorber, a low-temperature heat exchanger and a high-temperature heat exchanger which are circulated and connected through a first pipeline loop, wherein the first pipeline loop is connected to the upstream of an external refrigeration device through a cold water switching valve; It also includes a second high temperature generator and a hot water heat exchanger which are connected through a second pipeline loop circulation, the first high temperature generator is connected to a first burner and a first regulating valve, and the second high temperature generator is connected to a second burner and a second regulating valve.

2. The temperature control system according to claim 1, characterized in that: The first pipeline loop includes a first refrigerant steam pipeline connected between the top of the first high temperature generator and the low temperature generator to supply refrigerant steam from the first high temperature generator to the low temperature generator; A first cooling and heating switching pipe is connected between the first refrigerant steam pipeline and the absorber, and the first cooling and heating switching pipe is connected in parallel with the low-temperature generator, and a first cooling and heating switching valve is provided on the first cooling and heating switching pipe; A second cooling and heating switching pipe is connected between the absorber and the evaporator for high-temperature liquid flow from the absorber to the evaporator, and a second cooling and heating switching valve is provided on the second cooling and heating switching pipe; A warm water supply pipe group for circulating warm water is connected between the evaporator and the hot water heat exchanger.

3. The temperature control system according to claim 2, characterized in that: The warm water supply pipe group includes any one of a forward warm water pipeline that supplies warm water from the evaporator to the hot water heat exchanger, a reverse warm water pipeline that supplies warm water from the hot water heat exchanger to the evaporator, or a two-way warm water pipeline that supplies warm water in parallel into the hot water heat exchanger and the evaporator.

4. The temperature control system according to claim 1, characterized in that: The first pipeline loop is connected with a buffer tank, a reflux pipe is connected between the buffer tank and the absorber, and the liquid inlet of the reflux pipe is not lower than the top of the inner cavity of the absorber.

5. The temperature control system according to claim 4, characterized in that: The liquid inlet end of the reflux pipe has a drainage section which is bent upward and extends into the buffer tank, and the liquid inlet of the reflux pipe is located at the top of the drainage section.

6. The temperature control system according to claim 1, characterized in that: It also includes a heat exchanger which is cyclically connected to the second high-temperature generator through the second pipeline loop, and the heat exchanger is connected in parallel with the hot water heat exchanger.

7. A water chiller and warmer, comprising a body and a temperature control system located inside the body, characterized in that: The temperature control system is the temperature control system according to any one of claims 1 to 6.

Citation Information

Cited By

  • Cold and warm water machine and temperature control system thereof

    CN117781600A