Waste recovery system

By using a combination technology of heat exchanger, multi-stage heat pump unit and cooling tower during the battery electrode coating process, the problems of stability and energy efficiency of the NMP recycling system are solved, and more efficient NMP recycling and cost reduction are achieved.

CN221975746UActive Publication Date: 2024-11-08QINGDAO HAIER AIR CONDITIONING ELECTRONICS CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420512187.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-11-08
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The NMP recycling system has poor operating stability and low energy efficiency during the coating process of existing battery pole.

Method used

The exhausted exhaust gas is condensed by combining heat exchangers, multi-stage heat pump units and cooling towers, and NMP is recovered and recycled for drying. The heat balance in the system is maintained through the cooling tower and the system energy consumption is reduced.

Benefits of technology

It improves the energy efficiency and stability of the recycling system, increases the recovery rate of NMP, and reduces the system cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221975746U_ABST
    Figure CN221975746U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of waste recovery, and particularly provides a waste recovery system. The waste recovery system comprises a heat exchanger, a circulating air duct, a multi-stage heat pump unit, a cooling tower heat exchanger and a cooling tower, the cooling tower heat exchanger is communicated with the cooling tower through a circulating water path, the cooling tower is communicated with the outside of the recovery system, and air in the circulating air duct is cooled and condensed through an evaporator step by step to recover waste. After the heat of the air is absorbed by the heat exchanger of the cooling tower, the heat is discharged out of the system through the cooling tower, the condensed air is heated by the condenser step by step and enters the coating machine again for drying, and the high-temperature air and the low-temperature air in the system exchange heat in the heat exchanger. According to the utility model, the discharged waste gas is condensed in a mode of combining the heat exchanger, the multi-stage heat pump unit and the cooling tower, so that NMP in the waste gas is recovered, the NMP recovery rate is improved, and the cooling tower takes away part of heat in the system, so that the heat in the system is balanced, and the energy efficiency of the heat pump unit is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of waste recycling, and specifically provides a waste recycling system. Background Art

[0002] In the coating process of lithium battery pole pieces, NMP solution (N-methylpyrrolidone) is used to dissolve the adhesive in the pole piece slurry, so that the adhesive is evenly distributed on the pole piece to ensure the quality of the pole piece. However, as NMP is an expensive organic solvent, in order to improve the recycling value and reduce costs, NMP is generally condensed and recovered by a heat pump unit after evaporation, and then the air is reheated and returned to the coater to continue drying the pole piece. However, due to the large pole piece coating drying load, the low concentration of NMP solvent in the hot air, and the poor operating stability of the heat pump unit, the recycling energy consumption is large, the energy efficiency is low, and the recovery rate is low.

[0003] Accordingly, the art needs a new waste recycling system to solve the problems of poor operating stability and low energy efficiency of the NMP recycling system in the existing battery pole piece coating process. Utility Model Content

[0004] The utility model aims to solve the above-mentioned technical problem, that is, to solve the problems of poor operating stability and low energy efficiency of the NMP recovery system in the existing battery pole piece coating process.

[0005] The utility model provides a waste recycling system, which comprises a heat exchanger, a circulating air duct, a multi-stage heat pump unit, a cooling tower heat exchanger and a cooling tower, wherein the cooling tower heat exchanger and the cooling tower are connected through a circulating water circuit, and the cooling tower is connected to the outside of the recycling system;

[0006] The multi-stage heat pump unit includes an evaporator and a condenser arranged on a refrigerant circulation loop, and the two ends of the circulation air duct are respectively connected to the air inlet and the air outlet of the coating machine, and the heat exchanger, the evaporator and the condenser are sequentially arranged between the air inlet and the air outlet, and the cooling tower heat exchanger is arranged between the air outlet and the condenser, so that the high-temperature air at the air outlet exchanges heat with the low-temperature air through the heat exchanger and then passes through the evaporator step by step to cool down and condense the waste to recover the waste, and after absorbing the heat of the air through the cooling tower heat exchanger, the heat is discharged to the outside of the recovery system through the cooling tower to maintain heat balance, and the condensed low-temperature air passes through the condenser and the heat exchanger step by step to be heated and then enters the air inlet for drying.

[0007] Under the condition of adopting the above technical scheme, the waste recovery system of the utility model adopts a combination of a heat exchanger, a multi-stage heat pump unit and a cooling tower to condense the discharged waste gas to recover the NMP therein, and recycle the heat for drying, thereby improving the recovery efficiency and reducing the energy consumption of the system. Limited by the temperature resistance of the existing compressor motor, it is difficult to achieve an ultra-high evaporation temperature. The utility model first heats the high-temperature air in the system with the condensed low-temperature air in the heat exchanger to reduce the temperature before entering the evaporator for condensation, which can reduce the evaporation temperature of the heat pump unit compressor and reduce the cost of the compressor. The inventor found that since the compressor continuously generates heat by working, and the required heat for drying the coating machine is certain, the heat generated during the closed-loop operation of the recovery system is increasing, which eventually leads to heat imbalance, making the system unstable and even causing the system to be unable to continue to operate. Therefore, a part of the heat in the system is taken away by the cooling tower to play a role in maintaining the heat balance in the system, ensuring that the heat pump unit always runs smoothly, and improving the energy efficiency of the recovery system. Therefore, the overall condensation effect of the recovery system of the utility model is better, the operation is more stable, the NMP recovery rate is high, and the cost of the recovery system is lower.

[0008] In the preferred technical solution of the above-mentioned waste recycling system, the multi-stage heat pump unit includes a first heat pump unit, a second heat pump unit and a third heat pump unit which are arranged in sequence; the first heat pump unit includes a first compressor, a first evaporator and a first condenser arranged on a first refrigerant circulation loop, the second heat pump unit includes a second compressor, a second evaporator and a second condenser arranged on a second refrigerant circulation loop, the third heat pump unit includes a third compressor, a third evaporator and a third condenser arranged on a third refrigerant circulation loop, and the heat exchanger is arranged between the coater and the first evaporator.

[0009] When the above technical solution is adopted, the three-stage heat pump can keep the three heat pump units within a reasonable temperature rise range, which can not only achieve higher energy efficiency, but also achieve a balance between energy efficiency and cost. In addition, compared with the two-stage heat pump, the three-stage heat pump can achieve a lower temperature to recover NMP, so the recovery rate of NMP is higher.

[0010] In a preferred technical solution of the above waste recycling system, the cooling tower heat exchanger is arranged between the second evaporator and the third evaporator.

[0011] When the above technical solution is adopted, the cooling tower is arranged between the second heat pump unit and the third heat pump unit, and the air temperature therebetween is not too high or too low. The cooling tower heat exchanger can condense the air only by relying on municipal water, which can prevent the air temperature from being lower than the cooling water temperature, causing the cooling tower to lose its function of cooling the air.

[0012] In the preferred technical solution of the above-mentioned waste recycling system, the multi-stage heat pump unit includes a first heat pump unit, a second heat pump unit and a third heat pump unit which are arranged in sequence; the first heat pump unit includes a first compressor, a first evaporator and a first condenser arranged on a first refrigerant circulation loop, the second heat pump unit includes a second compressor, a second evaporator and a second condenser arranged on a second refrigerant circulation loop, the third heat pump unit includes a third compressor, a third evaporator and a third condenser arranged on a third refrigerant circulation loop, and the heat exchanger is arranged between the second condenser and the first condenser.

[0013] When the above technical solution is adopted, the three-stage heat pump can keep the three heat pump units within a reasonable temperature rise range, which can not only achieve higher energy efficiency, but also achieve a balance between energy efficiency and cost. In addition, compared with the two-stage heat pump, the three-stage heat pump can achieve a lower temperature to recover NMP, so the recovery rate of NMP is higher.

[0014] In the preferred technical solution of the above-mentioned waste recycling system, the first heat pump unit also includes a first throttle valve arranged on the first refrigerant circulation loop, the second heat pump unit also includes a second throttle valve arranged on the second refrigerant circulation loop, and the third heat pump unit also includes a third throttle valve arranged on the third refrigerant circulation loop.

[0015] When the above technical solution is adopted, the throttle valve blocks the flow of refrigerant through its internal small hole, and works together with the compressor to generate high and low pressure areas in the system, ensuring the normal circulation of the refrigerant and playing the role of throttling and reducing pressure. The throttle valve can also control the valve opening according to the change of the refrigerant superheat at the outlet of the evaporator, thereby adjusting the refrigerant flow entering the evaporator, so that the refrigerant flow can match the heat load of the evaporator, and the compressor suction port has sufficient superheat. The throttle valve ensures the refrigeration effect while also ensuring the stable operation of the system. By accurately controlling the flow and pressure of the refrigerant and reasonably adjusting the flow of the refrigerant to avoid excessive or insufficient flow, energy waste can be reduced and the energy efficiency ratio of the heat pump system can be improved.

[0016] In the preferred technical solution of the above waste recycling system, the waste recycling system further includes a waste collecting device, and the waste collecting device is arranged in the circulating air duct.

[0017] When the above technical solution is adopted, the waste collection device is arranged in the circulating air duct, which is used to collect NMP waste precipitated after the air in the circulating air duct is condensed and filtered.

[0018] In the preferred technical solution of the above waste recycling system, the waste collecting device is a conveyor belt.

[0019] When the above technical solution is adopted, the waste is received by a conveyor belt and the NMP waste is sent out from the circulating air duct.

[0020] In the preferred technical solution of the above waste recycling system, the waste collecting device can also be a receiving tray, and the receiving tray is suspended in the circulating air duct.

[0021] When the above technical solution is adopted, the waste collection device can also be a receiving tray, which is suspended in the circulating air duct to receive the NMP waste.

[0022] In a preferred technical solution of the above waste recycling system, the waste recycling system further comprises a filtering device, and the filtering device is arranged between the evaporator and the condenser.

[0023] When the above technical solution is adopted, the condensed air is filtered through a filter device to filter out the NMP waste remaining in the air.

[0024] In a preferred technical solution of the above waste recycling system, an air valve is provided at the air inlet and / or the air outlet.

[0025] When the above technical solution is adopted, air can circulate after the air valve is opened. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings, in which:

[0027] Figure 1 is a schematic diagram of a waste recycling system of the utility model;

[0028] Figure 2 It is a flowchart of the steps of the first embodiment of the matching method for improving the energy efficiency of the waste recycling system of the utility model;

[0029] Figure 3 It is a flowchart of the steps of the second embodiment of the matching method for improving the energy efficiency of the waste recycling system of the utility model;

[0030] Figure 4 This is a flowchart of the steps of the third implementation method of the matching method for improving the energy efficiency of a waste recycling system of the present utility model.

[0031] List of reference numerals:

[0032] 1. First heat pump unit; 11. First compressor; 12. First evaporator; 13. First condenser; 14. First throttle valve; 2. Second heat pump unit; 21. Second compressor; 22. Second evaporator; 23. Second condenser; 24. Second throttle valve; 3. Third heat pump unit; 31. Third compressor; 32. Third evaporator; 33. Third condenser; 34. Third throttle valve; 41. Cooling tower heat exchanger; 42 Cooling tower;

[0033] 5. Coating machine; 6. Heat exchanger; 71. Air inlet; 72. Air outlet. DETAILED DESCRIPTION

[0034] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the scope of protection of the present invention. Those skilled in the art can make adjustments to them as needed to adapt to specific application scenarios.

[0035] It should be noted that in the description of the present invention, the terms "inside", "outside" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first", "second", "third" and "fourth" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0036] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the term "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] In order to solve the problems of poor operating stability and low energy efficiency of NMP recovery system in the existing battery pole coating process, Figure 1 The waste recycling system of the utility model includes a heat exchanger 6, a circulating air duct, a multi-stage heat pump unit, a cooling tower heat exchanger 41 and a cooling tower 42. The cooling tower heat exchanger 41 and the cooling tower 42 are connected through a circulating water circuit, and the cooling tower 42 is connected to the outside of the recycling system;

[0038] The multi-stage heat pump unit includes a compressor, an evaporator and a condenser arranged on a refrigerant circulation loop. The two ends of the circulating air duct are respectively connected to the air inlet 71 and the air outlet 72 of the coating machine. The heat exchanger 6, the evaporator and the condenser are arranged in sequence between the air inlet 71 and the air outlet 72, so that the high-temperature air at the air outlet 72 exchanges heat with the low-temperature air through the heat exchanger 6 and then passes through the evaporator step by step to cool and condense the waste to recover the waste. The cooling tower heat exchanger 41 absorbs the heat of the air and then discharges the heat to the outside of the recovery system through the cooling tower 42 to maintain the heat balance in the system. The condensed low-temperature air is then heated by the condenser and the heat exchanger 6 step by step and then returns to the air inlet 71 for drying.

[0039] The advantages of the above-mentioned setting method are: the waste recovery system of the utility model adopts a combination of a heat exchanger 6, a multi-stage heat pump unit and a cooling tower 42 to condense the discharged waste gas, so as to recover the NMP therein, and recycle the heat for drying, thereby improving the recovery efficiency and reducing the energy consumption of the system. Limited by the temperature resistance of the existing compressor motor, it is difficult to achieve an ultra-high evaporation temperature. The utility model first heats the high-temperature air in the system with the condensed low-temperature air in the heat exchanger 6 to reduce the temperature before entering the evaporator for condensation, which can reduce the evaporation temperature of the heat pump unit compressor and reduce the cost of the compressor. The inventor found that since the compressor continuously generates heat by working, and the required heat for drying the coating machine is certain, the heat generated during the closed-loop operation of the recovery system is increasing, which eventually leads to heat imbalance, making the system unstable and even causing the system to be unable to continue to operate. Therefore, a part of the heat in the system is taken away by the cooling tower 42 to play a role in maintaining the heat balance in the system, ensuring that the heat pump unit always runs smoothly, and improving the energy efficiency of the recovery system. Therefore, the overall condensation effect of the recovery system of the utility model is better, the operation is more stable, the NMP recovery rate is high, and the cost of the recovery system is lower.

[0040] Reference Figure 1 In a possible implementation, the waste recovery system of the utility model includes a heat exchanger 6, a circulating air duct, a three-stage heat pump unit, a cooling tower heat exchanger 41, a cooling tower 42 and a collection device. The cooling tower heat exchanger 41 and the cooling tower 42 are connected through a circulating water circuit, and the cooling tower 42 is connected to the outside of the recovery system to discharge excess heat in the system to the outside of the system to maintain the thermal balance in the system.

[0041] Further, the three-stage heat pump unit includes a first heat pump unit 1, a second heat pump unit 2 and a third heat pump unit 3 which are arranged in sequence, the first heat pump unit 1 includes a first compressor 11, a first evaporator 12, a first throttle valve 14 and a first condenser 13 arranged on a first refrigerant circulation loop, the second heat pump unit 2 includes a second compressor 21, a second evaporator 22, a second throttle valve 24 and a second condenser 23 arranged on a second refrigerant circulation loop, and the third heat pump unit 3 includes a third compressor 31, a third evaporator 32, a third throttle valve 34 and a third condenser 33 arranged on a third refrigerant circulation loop. The existing two-stage heat pump needs to increase the temperature rise to be relatively large, so that the energy efficiency of each heat pump unit is relatively low, while the three-stage heat pump can keep the three heat pump units within a reasonable temperature rise range, which can not only achieve higher energy efficiency, but also achieve a balance between energy efficiency and cost, and the three-stage heat pump can achieve a lower temperature to recover NMP compared to the two-stage heat pump, so the recovery rate of NMP is higher. The throttle valve blocks the flow of refrigerant through its internal small holes. Working together with the compressor, the system generates high and low pressure areas to ensure the normal circulation of the refrigerant, playing the role of throttling and reducing pressure. The throttle valve can also control the valve opening according to the change of the refrigerant superheat at the outlet of the evaporator, thereby adjusting the refrigerant flow entering the evaporator so that the refrigerant flow can match the heat load of the evaporator, and the compressor suction port has sufficient superheat. The throttle valve ensures the refrigeration effect while also ensuring the stable operation of the system. By accurately controlling the flow and pressure of the refrigerant and reasonably adjusting the flow of the refrigerant to avoid excessive or insufficient flow, energy waste can be reduced and the energy efficiency ratio of the heat pump system can be improved.

[0042] Furthermore, the two ends of the circulating air duct are respectively connected to the air inlet 71 and the air outlet 72 of the coating machine. Along the air flow direction, the heat exchanger 6, the first evaporator 12, the second evaporator 22, the cooling tower heat exchanger 41, the third evaporator 32, the third condenser 33, the second condenser 23 and the first condenser 13 are sequentially arranged between the air outlet 72 and the air inlet 71, so that the high-temperature air in the circulating air duct is cooled by the heat exchanger 6, and then gradually cooled and condensed by the evaporator to recover the NMP waste. When the air passes through the cooling tower heat exchanger 41, the cooling tower The heat exchanger 41 discharges the absorbed heat to the outside of the system through the cooling tower 42, maintaining the heat balance of the system so that the recovery system can run more smoothly. The condensed low-temperature air is then heated to the target temperature through the condenser step by step and then re-enters the coater for drying. The heat exchanger 6 is arranged between the coater 5 and the first evaporator 12 and between the second condenser 23 and the first condenser 13. The low-temperature air and the high-temperature air exchange heat in the heat exchanger 6. The high-temperature air in the heat exchanger 6 is reduced from T0 to T1, and the low-temperature air temperature is heated from T7 to T8.

[0043] Among them, the cooling tower 42 is arranged between the second heat pump unit 2 and the third heat pump unit 3, and the air temperature therebetween is not too high or too low. The cooling tower heat exchanger 41 can condense the air only by relying on municipal water, which can prevent the air temperature from being lower than the cooling water temperature, causing the cooling tower 42 to lose its function of cooling the air.

[0044] Furthermore, the waste recycling system further includes a filtering device and a waste collecting device, wherein the filtering device is disposed between the third evaporator 32 and the third condenser 33, and the condensed air is filtered through the filtering device to filter out the NMP waste remaining in the air, and the waste collecting device is disposed in the circulating air duct, and is used to collect the NMP waste precipitated after the air in the circulating air duct is condensed and filtered. For example, the waste collecting device is a conveyor belt, which receives the NMP waste and sends the NMP waste out of the circulating air duct through the conveyor belt, and the waste collecting device can also be a receiving tray, which is suspended in the circulating air duct to receive the NMP waste.

[0045] As stated in the first paragraph of this section, the above implementation mode is only used to illustrate the principle of the present invention and is not intended to limit the scope of protection of the present invention. Without departing from the principle of the present invention, those skilled in the art can adjust the above structure so that the present invention can be applied to more specific application scenarios.

[0046] In addition, the utility model also provides a matching method for improving the energy efficiency of a waste recycling system. The waste recycling system is the waste recycling system in the above-mentioned embodiment. The matching method is used to select the parameters of the heat pump unit and the cooling tower 42 in the recycling system, thereby matching a high-efficiency recycling system that matches the drying capacity of the coating machine, making NMP recycling more energy-efficient.

[0047] Reference Figure 2 Specifically, the matching methods for improving the energy efficiency of the waste recycling system include:

[0048] Step S11: Calculate T1 = (ET1max + (T0 - T5) / 4 + t);

[0049] Step S12: Calculate the heat exchange temperature difference ΔT of the heat exchanger 气 =T0-T1=T0-(ET1max+(T0-T5) / 4+t);

[0050] Wherein, T1 is the air temperature in the air outlet direction of the heat exchanger 6 to the evaporator, T0 is the air temperature at the air outlet 72 and the air inlet 71, ET1max is the maximum limit of the evaporation temperature of the first compressor 11, T5 is the air temperature in the air outlet direction of the third evaporator 32, and t is the heat exchange temperature difference; ET1max, T0, T5, and t are all set values, which are selected by those skilled in the art according to actual needs;

[0051] Step S13: Calculate the heat exchanger capacity Q of the heat exchanger 气 =m 风 (h0-h1); where h0 and h1 are the enthalpy values ​​of dry air at temperatures T0 and T1 respectively; m 风 It is the air quality in the circulating air duct;

[0052] m 风 =Q 风 ρ 风 ; where Q 风 is the air volume, ρ 风 is the air density; Q 风 is a set value, which is selected by those skilled in the art according to the drying requirements of the coater 5;

[0053] Step S14: According to Q 气 Match the heat exchanger with corresponding parameters.

[0054] According to the calculated heat exchange capacity Q of the heat exchanger 6 气 Select a type for heat exchanger 6.

[0055] Reference Figure 3 , step S21: calculating the total temperature rise △T=T0-T5+2t required for the three-stage heat pump system;

[0056] Step S22: Calculate the average temperature rise ΔT of each heat pump unit according to ΔT 均 =(T0-T5+2t) / 3.

[0057] Specifically, △T1=△T2=△T3=△T 均 , where △T1 is the temperature rise of the first heat pump unit, △T2 is the temperature rise of the second heat pump unit, and △T3 is the temperature rise of the third heat pump unit. The temperature rise of the heat pump is directly related to the difficulty of the compressor to do work, which is also directly related to the operating energy efficiency of the heat pump system. The greater the temperature difference that the heat pump needs to increase, the lower the heat pump efficiency, and the smaller the temperature difference that the heat pump needs to increase, the higher the heat pump efficiency. Therefore, by equalizing the temperature rise of the three heat pump units, the energy efficiency of the three heat pump units is balanced, and they can all be maintained under the optimal operating conditions. Taking T0 = 110 ° C, T5 = 15 ° C, t = 10 ° C as an example, the average temperature rise of each heat pump unit in the three-stage heat pump unit is 38.3 ° C. Under this temperature rise, the heating energy efficiency of the general heat pump system can be > 4.0, thereby making the comprehensive energy efficiency of the recovery system higher.

[0058] Step S23: According to ΔT1=CT1-ET1=ΔT 均 Calculate T2; wherein CT1 is the condensing temperature of the first heat pump unit, ET1 is the evaporating temperature of the first heat pump unit; T2 is the air temperature in the outlet direction of the first evaporator 12.

[0059] Specifically, according to CT1 = T0 + t; ET1 = T2 - t;

[0060] △T1=CT1-ET1=T0-T2+2t=△T 均 ;

[0061] T0-T2+2t=(T0-T5+2t) / 3;

[0062] Finally, we get T2=2T0 / 3+T5 / 3+4t / 3.

[0063] Step S24: Calculate the heat exchange capacity of the first evaporator QE1=m 风 (h1-h2); where h2 is the enthalpy of dry air at temperature T2; m 风 It is the air quality in the circulating air duct.

[0064] Step S25: Match the first evaporator, the first condenser and the first compressor of corresponding parameters for the recovery system according to QE1, ET1 and CT1.

[0065] The first evaporator 12, the first condenser 13 and the first compressor 11 are selected according to the specific values ​​of QE1, ET1 and CT1 obtained by calculation, so as to achieve the optimal system energy efficiency.

[0066] A person skilled in the art can obtain the air enthalpy value at the corresponding dry air temperature according to the physical parameters of the air by looking up a table. Since the circulating air has an extremely low humidity content and the NMP contained therein is negligible relative to the change in the large amount of air enthalpy value, it can be regarded as dry air to calculate the heat change. It should be noted that the dry air enthalpy value at the corresponding air temperature or the air temperature at the corresponding dry air enthalpy value can be obtained by looking up a table between the air temperature and the enthalpy value hereinafter, and no further description will be given.

[0067] Reference Figure 4 , further, step S31: according to the calculated QE1, ET1, CT1, the rated operating power W1 of the first compressor and the heating capacity QC1 of the first compressor are obtained by matching through the compressor working condition calculation sheet;

[0068] Step S32: According to QC1=m 风 (h0-h8) gives h8=h0-QC1 / m 风 ; Wherein, h8 is the enthalpy of dry air at temperature T8, and T8 is the air temperature in the air outlet direction of the heat exchanger 6 to the condenser;

[0069] Step S33: According to the temperature rise of the second heat pump unit ΔT2=CT2-ET2=ΔT 均Calculate T2; wherein CT2 is the condensing temperature of the second heat pump unit, ET2 is the evaporating temperature of the second heat pump unit; T2 is the air temperature in the air outlet direction of the second evaporator 22;

[0070] According to CT2 = T7 + t; ET2 = T3 - t;

[0071] T7-T3+2t=(T0-T5+2t) / 3; T7=T8-△T 气 ;

[0072] Finally, we get T3 = T8 - △T 气 +4 / 3t-1 / 3T0+1 / 3T5;

[0073] Step S34: Calculate the heat exchange capacity of the second evaporator QE2 = m 风 (h2-h3); wherein h3 is the enthalpy of dry air at temperature T3, T3 is the air temperature in the air outlet direction of the second evaporator, and T7 is the air temperature in the air outlet direction of the second condenser 23;

[0074] Step S35: Match the second evaporator, the second condenser and the second compressor with corresponding parameters for the recovery system according to QE2, ET2 and CT2.

[0075] The second evaporator 22, the second condenser 23 and the second compressor 21 are selected according to the specific values ​​of QE2, ET2 and CT2 obtained by calculation, so as to achieve the optimal system energy efficiency.

[0076] Step S41: According to the calculated QE2, ET2, and CT2, the rated operating power W2 of the second compressor and the heating capacity QC2 of the second compressor are obtained by matching the compressor working condition calculation sheet;

[0077] Step S42: According to QC2=m 风 (h7-h6) gives h6=h7-QC2 / m 风 ; Among them, h6 is the enthalpy value of dry air at temperature T6, T6 is the air temperature in the outlet direction of the third condenser 33, and h7 is the enthalpy value of dry air at temperature T7.

[0078] Step S43: Calculate the heat exchange capacity of the third condenser QC3 = m 风 (h6-h5); where h5 is the enthalpy of dry air at temperature T5;

[0079] Step S44: Match the third evaporator, the third condenser and the third compressor with corresponding parameters for the recovery system according to QE3, ET3 and CT3.

[0080] The third evaporator 32, the third condenser 33 and the third compressor 31 are selected according to the calculated specific values ​​of QE3, ET3 and CT3, so as to achieve the optimal system energy efficiency.

[0081] Step S51: According to the calculated QE3, ET3, and CT3, the rated operating power W3 of the third compressor and the heating capacity QC3 of the third compressor are obtained by matching the compressor working condition calculation sheet;

[0082] Step S52: According to QE3=m 风 (h4-h5) gives h4=h5+QE3 / m 风 ; Wherein, h4 is the enthalpy of dry air at temperature T4, and T4 is the air temperature in the outlet direction of the cooling tower heat exchanger 41;

[0083] Step S53: Calculate the heat Q that the cooling tower needs to remove 冷却 =m 风 (h3-h4);

[0084] Step S54: According to Q 冷却 Cooling towers and cooling tower heat exchangers with corresponding parameters are matched to the recovery system.

[0085] That is, according to the calculated Q 冷却 Select a type for the cooling tower 42 and the cooling tower heat exchanger 41 .

[0086] So far, the technical solution of the present invention has been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A waste recycling system, characterized in that: It includes a heat exchanger, a circulating air duct, a multi-stage heat pump unit, a cooling tower heat exchanger and a cooling tower, wherein the cooling tower heat exchanger and the cooling tower are connected through a circulating water circuit, and the cooling tower is connected to the outside of the recovery system; The multi-stage heat pump unit includes an evaporator and a condenser arranged on a refrigerant circulation loop, and the two ends of the circulation air duct are respectively connected to the air inlet and the air outlet of the coating machine, and the heat exchanger, the evaporator and the condenser are sequentially arranged between the air inlet and the air outlet, and the cooling tower heat exchanger is arranged between the air outlet and the condenser, so that the high-temperature air at the air outlet exchanges heat with the low-temperature air through the heat exchanger and then passes through the evaporator step by step to cool down and condense the waste to recover the waste, and after absorbing the heat of the air through the cooling tower heat exchanger, the heat is discharged to the outside of the recovery system through the cooling tower to maintain heat balance, and the condensed low-temperature air passes through the condenser and the heat exchanger step by step to be heated and then enters the air inlet for drying.

2. The waste recycling system according to claim 1, characterized in that: The multi-stage heat pump unit includes a first heat pump unit, a second heat pump unit and a third heat pump unit which are arranged in sequence; the first heat pump unit includes a first compressor, a first evaporator and a first condenser arranged on a first refrigerant circulation loop, the second heat pump unit includes a second compressor, a second evaporator and a second condenser arranged on a second refrigerant circulation loop, the third heat pump unit includes a third compressor, a third evaporator and a third condenser arranged on a third refrigerant circulation loop, and the heat exchanger is arranged between the coater and the first evaporator.

3. The waste recycling system according to claim 2, characterized in that: The cooling tower heat exchanger is disposed between the second evaporator and the third evaporator.

4. The waste recycling system according to claim 1, characterized in that: The multi-stage heat pump unit includes a first heat pump unit, a second heat pump unit and a third heat pump unit which are arranged in sequence; the first heat pump unit includes a first compressor, a first evaporator and a first condenser arranged on a first refrigerant circulation loop, the second heat pump unit includes a second compressor, a second evaporator and a second condenser arranged on a second refrigerant circulation loop, the third heat pump unit includes a third compressor, a third evaporator and a third condenser arranged on a third refrigerant circulation loop, and the heat exchanger is arranged between the second condenser and the first condenser.

5. The waste recycling system according to any one of claims 2 to 4, characterized in that: The first heat pump unit also includes a first throttle valve arranged on the first refrigerant circulation loop, the second heat pump unit also includes a second throttle valve arranged on the second refrigerant circulation loop, and the third heat pump unit also includes a third throttle valve arranged on the third refrigerant circulation loop.

6. The waste recycling system according to any one of claims 1 to 4, characterized in that: The waste recycling system also includes a waste collecting device, which is arranged in the circulating air duct.

7. The waste recycling system according to claim 6, characterized in that: The waste collection device is a conveyor belt.

8. The waste recycling system according to claim 6, characterized in that: The waste collection device may also be a receiving tray, and the receiving tray is suspended in the circulating air duct.

9. The waste recycling system according to claim 6, characterized in that: The waste recycling system further includes a filtering device, which is disposed between the evaporator and the condenser.

10. The waste recycling system according to any one of claims 1 to 4, characterized in that: An air valve is arranged at the air inlet and / or the air outlet.

Citation Information

Cited By

  • Energy-saving nmp recycling heat pump all-in-one device and working method thereof

    CN122774755A