Test system of battery management system

By designing an automatic switching test system, the problem of frequent switching modes in battery management system testing is solved, the cost and error rate are reduced, and the automation and accuracy of the test is improved.

CN221977004UActive Publication Date: 2024-11-08EVE ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323429015.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-11-08
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

The existing battery management system needs to frequently switch different test modes in testing, resulting in high dependence on manual operations and multiple sets of equipment, increasing the testing cost and error rate.

Method used

A test system including test port group, power supply module, time control module and control module is designed. By automatically switching the simulation status and timing supply and interrupt activation signals of the battery cell simulator, the test mode start and stop of the battery management system is realized. Automatic switching to reduce dependence on manual and multi-group devices.

Benefits of technology

Reduces testing costs and error rates, improves test automation and accuracy, and reduces the risk of errors for manual operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221977004U_ABST
    Figure CN221977004U_ABST
Patent Text Reader

Abstract

The utility model discloses a test system of a battery management system. In the test system of the battery management system, a power supply module is used for providing program-controlled direct current for the battery management system to be tested. The first end of the time control module is connected with the power supply positive port, the second end of the time control module is connected with the activation port, and the time control module is used for regularly controlling connection and disconnection between the first end and the second end so as to regularly supply and disconnect the activation signal. The battery cell simulator is used for simulating operation parameters of a real battery cell. The control module is connected with the cell simulator, the communication port and the control end of the power supply module, and the control module is used for controlling the simulation state of the cell simulator, determining the test result of the to-be-tested battery management system according to the working data of the to-be-tested battery management system, and controlling the voltage level of the direct current of the power supply module. Starting, stopping and automatic switching of the test mode of the battery management system are achieved, dependence on manpower and multiple sets of equipment is reduced, and the test cost and the test error rate are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiment of the utility model relates to the field of battery technology, and in particular to a test system for a battery management system. Background Art

[0002] In recent years, the new energy vehicle industry has flourished, and various electric and hybrid vehicle models have emerged one after another. In different models, the corresponding working modes of the battery management system are different. Combined with various test regulations, the test of the battery management system often requires frequent switching of multiple test modes.

[0003] In the prior art, according to different working modes and test regulations, the tester switches different test modes in sequence to complete the switching of the battery management system.

[0004] However, such a manual switching method is highly dependent on the operation of the tester, resulting in high testing costs and high test error rates. Utility Model Content

[0005] The utility model provides a test system for a battery management system, which reduces the reliance on manpower and multiple groups of equipment, and reduces the test cost and the test error rate.

[0006] The present invention provides a test system for a battery management system, the test system comprising a test port group, a power supply module, a time control module, a battery cell simulator and a control module;

[0007] The test port group includes an activation port, a detection port, a positive power supply port, a negative power supply port and a communication port, and the test port group is used to connect to the battery management system to be tested;

[0008] The first positive power supply electrode of the power supply module is connected to the positive power supply port, the first negative power supply electrode of the power supply module is connected to the negative power supply port, and the power supply module is used to provide program-controlled direct current for the battery management system to be tested;

[0009] The first end of the time control module is connected to the power supply positive port, the second end of the time control module is connected to the activation port, and the time control module is used to control the on and off between the first end and the second end in a timely manner to supply and disconnect the activation signal in a timely manner;

[0010] The battery cell simulator is connected to the detection port, and the battery cell simulator is used to simulate the operating parameters of a real battery cell;

[0011] The control module is respectively connected to the battery cell simulator, the communication port and the control end of the power supply module. The control module is used to control the simulation state of the battery cell simulator, determine the test results of the battery management system to be tested according to the working data of the battery management system to be tested, and control the voltage level of the DC power of the power supply module.

[0012] Optionally, the test port group further includes a front-end power supply positive port and a front-end power supply negative port;

[0013] The second positive power supply electrode of the power supply module is connected to the front-end positive power supply port, and the second negative power supply electrode of the power supply module is connected to the front-end negative power supply port. The power supply module is also used to provide stable direct current for the battery management system to be tested.

[0014] Optionally, the power supply module includes a programmable power supply and a stable power supply, the control end of the programmable power supply is connected to the control end of the power supply module, the positive output electrode of the programmable power supply serves as the first positive power supply electrode of the power supply module, and the negative output electrode of the programmable power supply serves as the first negative power supply electrode of the power supply module, and the programmable power supply is used to switch the voltage level of the programmable direct current according to the control signal of the control module;

[0015] The positive output electrode of the stable power supply serves as the second positive power supply electrode of the power supply module, and the negative output electrode of the stable power supply serves as the second negative power supply electrode of the power supply module. The stable power supply is used to provide stable direct current for the battery management system to be tested.

[0016] Optionally, the test system of the battery management system further comprises a program-controlled thermostatic box, which is connected to the control module and is used to provide a constant temperature test environment for the battery management system to be tested according to a control signal of the control module.

[0017] Optionally, the time control module includes an AC power supply, an intermediate relay and a timing relay; the AC power supply is connected to the control module, and the control module is also used to control the start and stop of the AC power supply;

[0018] The control end of the timing relay is connected to the AC power supply, and the timing relay is used to generate a switch control signal after a preset time period of power-on;

[0019] The control end of the intermediate relay is connected to the timing relay; the first end of the intermediate relay serves as the first end of the time control module and is connected to the positive power supply port; the second end of the intermediate relay serves as the second end of the time control module and is connected to the activation port, and the intermediate relay is used to control the connection between the first end and the second end of the time control module according to the switch control signal.

[0020] Optionally, the control module includes a host computer.

[0021] Optionally, the host computer includes a human-computer interaction device.

[0022] Optionally, the number of the test port groups is greater than 1, and the test port groups correspond to the battery management systems one by one.

[0023] Optionally, the power supply module is connected to the control module via an RS-485 serial port and / or a USB interface.

[0024] Optionally, the control module is connected to the communication port via a CAN bus.

[0025] In the test system of the battery management system provided in this embodiment, the first positive power supply electrode of the power supply module is connected to the positive power supply port, the first negative power supply electrode of the power supply module is connected to the negative power supply port, and the power supply module is used to provide program-controlled direct current for the battery management system to be tested. The first end of the time control module is connected to the positive power supply port, and the second end of the time control module is connected to the activation port. The time control module is used to control the on-off between the first end and the second end in a timely manner to supply and disconnect the activation signal in a timely manner. The battery cell simulator is connected to the detection port, and the battery cell simulator is used to simulate the operating parameters of the real battery cell. The control module is respectively connected to the battery cell simulator, the communication port and the control end of the power supply module. The control module is used to control the simulation state of the battery cell simulator, and determines the test results of the battery management system to be tested according to the working data of the battery management system to be tested, and also controls the voltage level of the direct current of the power supply module. On the one hand, the control module is used to automatically switch the simulation state of the battery cell simulator and determine the test results. On the other hand, the time controller supplies and disconnects the activation signal in a timely manner, realizing the start and stop and automatic switching of the test mode of the battery management system, reducing the dependence on manual labor and multiple groups of equipment, and reducing the test cost and test error rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A schematic diagram of the structure of a battery management system to be tested and a test system thereof provided in an embodiment of the utility model;

[0027] Figure 2 A structural schematic diagram of another battery management system to be tested and its test system provided by an embodiment of the utility model;

[0028] Figure 3 A structural schematic diagram of another battery management system to be tested and its test system provided by an embodiment of the utility model;

[0029] Figure 4 A schematic diagram of the structure of a time control module provided by an embodiment of the utility model;

[0030] Figure 5 A structural schematic diagram of another battery management system to be tested and a test system thereof provided in an embodiment of the utility model. DETAILED DESCRIPTION

[0031] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0032] As described in the background technology, the working modes (including working voltages) corresponding to the battery management system are different in different models of hybrid vehicles and electric vehicles. There are also a variety of test standards applicable to the testing of battery management systems, such as national standards, international standards, and corporate standards. Combined with the above factors, this leads to the need for the battery management system to frequently switch between multiple test modes during testing. If the existing technology is still used, testers are required to participate in the mode switching work intensively, and the test equipment also needs to include multiple power supplies to provide different working voltages. Such a test solution requires large hardware resources and human resources, and testers are prone to misoperation under high-intensity work, affecting the accuracy of the test.

[0033] In order to solve the aforementioned problems, an embodiment of the utility model provides a test system for a battery management system. Figure 1 A schematic diagram of a battery management system to be tested and a test system thereof provided by the embodiment of the utility model, referring to Figure 1The test system of the battery management system includes a test port group, a power supply module 101, a time control module 102, a battery simulator 103 and a control module 104. The test port group includes an activation port A, a detection port B, a positive power supply port C+, a negative power supply port C- and a communication port D. The test port group is used to connect the battery management system BMS to be tested, provide an activation signal, simulated operating parameters and power supply for the battery management system BMS to be tested, and also collect the working data of the battery management system BMS to be tested, so as to facilitate the determination of the test results. The first positive power supply electrode E+ of the power supply module 101 is connected to the positive power supply port C+, and the first negative power supply electrode E- of the power supply module 101 is connected to the negative power supply port C-. The power supply module 101 is used to provide program-controlled direct current for the battery management system BMS to be tested. The first end F+ of the time control module 102 is connected to the positive power supply port C+, and the second end F- of the time control module 102 is connected to the activation port A. The time control module 102 is used to control the on-off between the first end and the second end in a timely manner to supply and disconnect the activation signal in a timely manner. The cell simulator 103 is connected to the detection port B, and the cell simulator 103 is used to simulate the operating parameters of the real cell. The control module 104 is respectively connected to the cell simulator 103, the communication port D and the control terminal G of the power supply module 101, and the control module 104 is used to control the simulation state of the cell simulator 103, determine the test result of the battery management system BMS to be tested according to the working data of the battery management system BMS to be tested, and control the voltage level of the DC power of the power supply module 101.

[0034] Specifically, the test port group refers to an interface combination used to connect the battery management system BMS to be tested in the test system, and the test port group includes an activation port A, a positive power supply port C+, a negative power supply port C-, a detection port B and a communication port D. The activation port A can be connected to the activation terminal of the battery management system BMS to be tested, and can provide an activation signal for the battery management system BMS to be tested. The activation terminal is a terminal on the battery management system BMS to be tested for accessing the activation signal. The positive power supply port C+ and the negative power supply port C- are respectively connected to the positive power supply terminal and the negative power supply terminal of the battery management system BMS to be tested, and can provide the battery management system BMS to be tested with program-controlled direct current for testing. The positive power supply terminal and the negative power supply terminal are terminals in the battery management system BMS to be tested for accessing the power supply. The detection port B can be connected to the detection terminal of the battery management system BMS to be tested, and can provide simulated operating parameters for the battery management system BMS to be tested. The detection terminal is a terminal used to collect the operating parameters of the battery cell. In actual application scenarios, it is connected to the battery cell managed by the battery management system BMS to be tested. The communication port D can realize the communication connection with the battery management system BMS to be tested, can detect the status of the battery management system BMS to be tested, and can also obtain the working data of the battery management system BMS to be tested, and determine whether the test is passed according to the status and working data.

[0035] The power supply module 101 refers to a DC power supply component of a test system of a battery management system, which can provide programmable DC power to the battery management system BMS to be tested through a positive power supply port C+ and a negative power supply port C-. The programmable DC power refers to a DC power whose voltage value can be switched. Exemplarily, the power supply module 101 can include a programmable DC power supply.

[0036] The time control module 102 refers to a relay component that can control the timing on and off between the first end and the second end, and can start timing according to the control of the control module 104 or in response to the programmable direct current output by the power supply module 101. The first end F+ of the time control module 102 is connected to the positive power supply port C+, and the second end F- of the time control module 102 is connected to the activation port A. When the first end F+ of the time control module 102 is connected to the second end, the activation port A can detect a positive electrical signal consistent with the positive power supply port C+. When the positive electrical signal is at a preset voltage level, a normal battery management system BMS to be tested can detect an activation signal (that is, a positive electrical signal of a preset voltage level) at the activation terminal, be activated by the activation signal and enter the working mode.

[0037] The battery cell simulator 103 refers to a battery cell simulation device that can simulate the operating parameters of the battery cell under various working conditions. For example, the battery cell simulator 103 can simulate the voltage, current, resistance and other parameters of the battery cell under various working conditions such as normal power supply, short circuit and open circuit.

[0038] The control module 104 is the main control center of the test system, which can control the switching of the voltage level of the programmable direct current output by the power module, control the switching of the simulation state of the battery simulator 103, and obtain the working data of the battery management system BMS to be tested based on the communication information with the battery management system BMS to be tested, so as to determine whether the battery management system BMS to be tested has passed the test. Exemplarily, the control module 104 may include at least one of a central processing unit, a programmable processor and a host computer. Each simulation state of the battery simulator 103 may correspond to a set of preset working data of the battery management system BMS to be tested. If during the test, when the battery simulator 103 switches to a working state, the working data collected by the control module 104 does not meet the preset working data corresponding to the simulation state of the current battery simulator 103, then the control module 104 can determine that the test result of the battery management system is failed. If during the test, when the cell simulator 103 switches to various working states, the working data collected by the control module 104 all conform to the preset working data corresponding to the simulation state of the current cell simulator 103, then the control module 104 can determine that the test result of the battery management system is passed.

[0039] In the test system of the battery management system provided in this embodiment, the first positive power supply electrode of the power supply module is connected to the positive power supply port, the first negative power supply electrode of the power supply module is connected to the negative power supply port, and the power supply module is used to provide program-controlled direct current for the battery management system to be tested. The first end of the time control module is connected to the positive power supply port, the second end of the time control module is connected to the activation port, and the time control module is used to control the on-off between the first end and the second end in a timely manner to supply and disconnect the activation signal in a timely manner. The battery cell simulator is connected to the detection port, and the battery cell simulator is used to simulate the operating parameters of the real battery cell. The control module is respectively connected to the battery cell simulator, the communication port and the control end of the power supply module, and the control module is used to control the simulation state of the battery cell simulator, and determine the test results of the battery management system to be tested according to the working data of the battery management system to be tested, and also control the voltage level of the direct current of the power supply module. On the one hand, the control module is used to automatically switch the simulation state of the battery cell simulator and determine the test results, and on the other hand, the time controller supplies and disconnects the activation signal in a timely manner, so as to realize the start and stop and automatic switching of the test mode of the battery management system, reduce the dependence on manual labor and multiple groups of equipment, and reduce the test cost and test error rate.

[0040] Optionally, Figure 2 A schematic diagram of another battery management system to be tested and its test system provided by the embodiment of the utility model, based on the above embodiment, referring to Figure 2 , the battery management system BMS to be tested includes an analog front end. During the test process, the analog front end requires a stable DC power supply. Based on this, the test system of the battery management system in the present application is also provided with a front-end power supply positive port H+ and a front-end power supply negative port H-. The second power supply positive pole I+ of the power supply module 101 is connected to the front-end power supply positive port H+, and the second power supply negative pole I- of the power supply module 101 is connected to the front-end power supply negative port H-. The power supply module 101 is also used to provide stable DC power for the battery management system BMS to be tested.

[0041] The power supply module 101 includes a programmable power supply 201 and a stable power supply 202. The control end of the programmable power supply 201 is connected to the control end G of the power supply module 101. The positive output electrode of the programmable power supply 201 serves as the first positive power supply electrode E+ of the power supply module 101, and the negative output electrode of the programmable power supply 201 serves as the first negative power supply electrode E- of the power supply module 101. The programmable power supply 201 is used to switch the voltage level of the programmable direct current according to the control signal of the control module 104. The positive output electrode of the stable power supply 202 serves as the second positive power supply electrode I+ of the power supply module 101, and the negative output electrode of the stable power supply 202 serves as the second negative power supply electrode I- of the power supply module 101. The stable power supply 202 is used to provide stable direct current for the battery management system BMS to be tested.

[0042] Specifically, the front-end power supply positive port H+ and the front-end power supply negative port H- are ports for providing DC power to the analog front end of the battery management system BMS to be tested, and can be respectively connected to the front-end power supply positive terminal and the front-end power supply negative terminal of the analog front end in the battery management system BMS to be tested, so as to provide stable DC power to the analog front end. The programmable power supply 201 refers to a power supply whose output DC power supply can be switched according to the control signal of the control module 104 or a preset program. For example, the programmable power supply 201 can output 3.3V and 5V DC power in sequence according to a preset local program after receiving the start signal of the control module 104, and the duration of different voltage levels can be a preset value. The stable power supply 202 refers to a power supply that can provide stable DC power. The stable power supply 202 can provide DC power with a single voltage level and stable output according to the needs of the analog front end. The negative output electrode of the stable power supply 202 is short-circuited with the negative electrode of the battery cell simulator 103. The programmable power supply 201 and the stable power supply 202 can respectively power different parts of the battery management system BMS to be tested. On the basis of ensuring the power supply of the analog front end, the programmable power supply 201 is adjusted to realize the functional test of the battery management system BMS to be tested.

[0043] Optionally, Figure 3 A schematic diagram of a battery management system to be tested and a test system thereof provided in an embodiment of the utility model is provided. Based on the above embodiment, Figure 3 The test system of the battery management system also includes a program-controlled thermostat 301, which is connected to the control module 104. The program-controlled thermostat 301 is used to provide a constant temperature test environment for the battery management system BMS to be tested according to the control signal of the control module 104.

[0044] Specifically, the program-controlled thermostat 301 refers to a thermostat whose temperature can be switched between preset gears, and can provide a constant temperature test environment for the battery management system BMS to be tested. The program-controlled thermostat 301 is connected to the control module 104, and can switch gears according to the control signal of the control module 104, thereby changing the temperature in the program-controlled thermostat 301, making the test environment more controllable, and further improving the reliability of the test results.

[0045] Optionally, Figure 4 A schematic diagram of a time control module provided in an embodiment of the utility model, based on the above embodiment, combined with Figure 3 and Figure 4The time control module 102 includes an AC power supply 401, an intermediate relay 402 and a timing relay 403; the AC power supply 401 is connected to the control module 104, and the control module 104 is also used to control the start and stop of the AC power supply 401. The control end of the timing relay 403 is connected to the AC power supply 401, and the timing relay 403 is used to generate a switch control signal after a preset time of power-on.

[0046] The control end of the intermediate relay 402 is connected to the timing relay 403; the first end of the intermediate relay 402 serves as the first end F+ of the time control module 102, and is connected to the positive power supply port C+; the second end of the intermediate relay 402 serves as the second end F- of the time control module 102, and is connected to the activation port A. The intermediate relay 402 is used to control the connection between the first end F+ and the second end of the time control module 102 according to the switch control signal.

[0047] Specifically, the AC power supply 401 refers to a device that provides an AC control signal to the intermediate relay 402 and the timing relay 403, and the start and stop of the AC power supply 401 can be controlled by the control module 104. The timing relay 403 refers to a relay that can be turned on and off at a fixed time, and its on and off timing is controlled by its own structural setting and the start and stop timing of the AC power supply voltage. Exemplarily, the timing relay 403 can be a normally open relay, and the output end and the control end can be short-circuited 10 seconds after the control end receives the AC power supply 401, and the AC power supply 401 is transmitted to the control end of the intermediate relay 402. After the coil of the intermediate relay 402 receives the AC power supply signal, it can short-circuit the power supply positive port C+ and the activation port A, so that the activation terminal of the battery management system BMS to be tested detects a high level, thereby putting the battery management system BMS to be tested into a working state.

[0048] In the test system of the battery management system provided in this embodiment, the time control module includes an AC power supply 401, an intermediate relay and a timing relay, and the control module is also used to control the start and stop of the power supply of the AC power supply 401. The control end of the timing relay is connected to the AC power supply 401, and the timing relay is used to generate a switch control signal after a preset time of power-on. The control end of the intermediate relay is connected to the timing relay; the first end of the intermediate relay is connected to the positive power supply port as the first end of the time relay; the second end of the intermediate relay is connected to the activation port as the second end of the time relay, and the intermediate relay is used to control the connection between the first end and the second end of the time relay according to the switch control signal, which can detect the state of the battery management system in the sleep mode, and can also detect the state of normal operation after activation, thereby realizing a more comprehensive detection of the battery management system and further improving the reliability of the test system.

[0049] Optionally, Figure 5A schematic diagram of a battery management system to be tested and a test system thereof provided in an embodiment of the utility model is provided. Based on the above embodiment, combined with Figure 5 The control module 104 includes a host computer 501. The host computer 501 includes a human-computer interaction device, which can display a visualization window (also referred to as a control interface of the host computer 501) developed by using development tools such as Labview.

[0050] The number of test port groups is greater than 1, and the test port groups correspond to the battery management system BMS one by one, so that multiple battery management systems BMS to be tested can be tested simultaneously. The power supply module 101 is connected to the control module 104 via an RS-485 serial port or / and a USB interface. The control module 104 is connected to the communication port D via a CAN bus.

[0051] Exemplarily, the test position can be set in a programmable thermostat 301. When the battery management system needs to be tested, the host computer 501 adjusts the programmable thermostat 301 to the test temperature in advance. After the battery management system BMS to be tested is placed in the corresponding test position and the corresponding connection between the terminal and the test port group is completed, the host computer 501 controls the programmable power supply 201 to output the first DC power supply, controls the battery cell simulator 103 to simulate the first operating parameter, and controls the time control module 102 to start timing. When the first DC power supply is supplied, a normal battery management system should be in a dormant state. At this time, if the host computer 501 determines that the battery management system BMS to be tested is in a dormant state based on the working data of the battery management system BMS to be tested, then the dormancy test passes and the next activation test can be performed.

[0052] In the next activation test, the host computer 501 switches the programmable power supply 201 to output the second DC power supply. After the timing of the time control module 102 ends (the timing ends after the programmable power supply 201 switches to output the second DC power supply), the power supply positive port C+ and the activation port A are short-circuited through the time control module 102, and the battery management system BMS to be tested receives the activation signal. Before and after the timing of the time control module 102 ends, if the host computer 501 determines that the battery management system BMS to be tested has changed from sleep to activation based on the working data of the battery management system BMS to be tested, and starts to work normally, then the activation test passes.

[0053] During the normal operation of the battery management system BMS to be tested, the host computer 501 can also switch the simulation state of the battery simulator 103, and determine whether the battery management system is normal during normal operation according to whether the working data of the battery management system to be tested matches the preset working data corresponding to the simulation state. If all tests pass, it can be determined that the test result of the battery management system BMS to be tested is passed.

[0054] In the test system of the battery management system provided by the utility model, the first positive power supply electrode of the power supply module is connected to the positive power supply port, the first negative power supply electrode of the power supply module is connected to the negative power supply port, and the power supply module is used to provide program-controlled direct current for the battery management system to be tested. The first end of the time control module is connected to the positive power supply port, the second end of the time control module is connected to the activation port, and the time control module is used to control the on-off between the first end and the second end in a timely manner to supply and disconnect the activation signal in a timely manner. The battery cell simulator is connected to the detection port, and the battery cell simulator is used to simulate the operating parameters of the real battery cell. The control module is respectively connected to the battery cell simulator, the communication port and the control end of the power supply module, and the control module is used to control the simulation state of the battery cell simulator, and determine the test result of the battery management system to be tested according to the working data of the battery management system to be tested, and also control the voltage level of the direct current of the power supply module. On the one hand, the control module is used to automatically switch the simulation state of the battery cell simulator and determine the test result, and on the other hand, the time controller supplies and disconnects the activation signal in a timely manner, so as to realize the start and stop and automatic switching of the test mode of the battery management system, reduce the dependence on manual labor and multiple groups of equipment, and reduce the test cost and test error rate.

[0055] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments, combinations and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention is described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A battery management system test system, characterized in that: The test system includes a test port group, a power supply module, a time control module, a battery cell simulator and a control module; The test port group includes an activation port, a detection port, a positive power supply port, a negative power supply port and a communication port, and the test port group is used to connect to the battery management system to be tested; The first positive power supply electrode of the power supply module is connected to the positive power supply port, the first negative power supply electrode of the power supply module is connected to the negative power supply port, and the power supply module is used to provide program-controlled direct current for the battery management system to be tested; The first end of the time control module is connected to the power supply positive port, the second end of the time control module is connected to the activation port, and the time control module is used to control the on and off between the first end and the second end in a timely manner to supply and disconnect the activation signal in a timely manner; The battery cell simulator is connected to the detection port, and the battery cell simulator is used to simulate the operating parameters of a real battery cell; The control module is respectively connected to the battery cell simulator, the communication port and the control end of the power supply module. The control module is used to control the simulation state of the battery cell simulator, determine the test results of the battery management system to be tested according to the working data of the battery management system to be tested, and control the voltage level of the DC power of the power supply module.

2. The battery management system test system according to claim 1, characterized in that: The test port group also includes a front-end power supply positive port and a front-end power supply negative port; The second positive power supply electrode of the power supply module is connected to the front-end positive power supply port, and the second negative power supply electrode of the power supply module is connected to the front-end negative power supply port. The power supply module is also used to provide stable direct current for the battery management system to be tested.

3. The battery management system test system according to claim 2, characterized in that: The power supply module includes a programmable power supply and a stable power supply, the control end of the programmable power supply is connected to the control end of the power supply module, the positive output electrode of the programmable power supply serves as the first positive power supply electrode of the power supply module, and the negative output electrode of the programmable power supply serves as the first negative power supply electrode of the power supply module, and the programmable power supply is used to switch the voltage level of the programmable direct current according to the control signal of the control module; The positive output electrode of the stable power supply serves as the second positive power supply electrode of the power supply module, and the negative output electrode of the stable power supply serves as the second negative power supply electrode of the power supply module. The stable power supply is used to provide stable direct current for the battery management system to be tested.

4. The battery management system test system according to claim 1, characterized in that: It also includes a program-controlled thermostatic box, which is connected to the control module and is used to provide a constant temperature test environment for the battery management system to be tested according to a control signal of the control module.

5. The battery management system test system according to claim 1, characterized in that: The time control module includes an AC power supply, an intermediate relay and a timing relay; the AC power supply is connected to the control module, and the control module is also used to control the start and stop of the AC power supply; The control end of the timing relay is connected to the AC power supply, and the timing relay is used to generate a switch control signal after a preset time period of power-on; The control end of the intermediate relay is connected to the timing relay; the first end of the intermediate relay serves as the first end of the time control module and is connected to the positive power supply port; the second end of the intermediate relay serves as the second end of the time control module and is connected to the activation port, and the intermediate relay is used to control the connection between the first end and the second end of the time control module according to the switch control signal.

6. The battery management system test system according to any one of claims 1 to 5, characterized in that: The control module includes a host computer.

7. The battery management system test system according to claim 6, characterized in that: The host computer includes a human-computer interaction device.

8. The battery management system test system according to any one of claims 1 to 5, characterized in that: The number of the test port groups is greater than 1, and the test port groups correspond to the battery management systems one by one.

9. The battery management system test system according to any one of claims 1 to 5, characterized in that: The power supply module is connected to the control module via an RS-485 serial port and / or a USB interface.

10. The battery management system test system according to any one of claims 1 to 5, characterized in that: The control module is connected to the communication port via a CAN bus.