Fabricated piling platform
By designing a detachable prefabricated pile driving platform, combining skeleton components, platform components and drilling components, the problem of road traffic safety hazards after pile foundation construction is solved, and the comfort of traffic and construction safety is improved. A flexible and convenient auxiliary measures for municipal engineering construction.
Patent Information
- Application Number
- CN202420543995.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-20
AI Technical Summary
In municipal road renovation projects, there are safety hazards in road traffic after pile foundation construction, and it is necessary to withstand heavy traffic loads without stopping traffic during construction. The existing technology is difficult to ensure the comfort of traffic and the safety of construction work.
Design a prefabricated pile driving platform, including skeleton components, platform components and drilling components. The platform components or drilling components can be detached and connected within the skeleton components and replaced according to construction needs, ensuring traffic passage while improving safety and construction work. Safety.
While ensuring traffic passage, it improves the comfort and construction safety of traffic passage, improves the traffic conditions on site, is convenient to operate and economical and environmentally friendly, and is more flexible and convenient than other methods.
Smart Images

Figure CN221989056U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an assembled piling platform. Background Art
[0002] The piling work platform is an operating platform used in the construction of bored piles. It is usually composed of support piles, longitudinal and transverse beams, panels, etc. It was originally widely used in bridge engineering, especially in underwater bored pile construction.
[0003] When carrying out pile foundation construction in the reconstruction of existing municipal roads, it is often necessary to break the existing road pavement structure layer before the pile foundation drilling or drilling operation can be carried out. However, since there is no pavement structure layer on the road after the pile foundation construction is broken, the road near the pile position cannot be affected by the load after the pile foundation construction, and the road traffic still needs to be guaranteed during the construction process, especially the need to withstand heavy traffic loads without stopping traffic, the traffic conditions of the existing roads have safety hazards, which may not meet the safe passage of heavy-loaded vehicles, and often cannot guarantee the safety of pile foundation construction operations. Therefore, a prefabricated piling platform is proposed to address the above problems. Utility Model Content
[0004] The purpose of the utility model is to overcome the existing defects and provide an assembled piling platform, improve traffic conditions, and greatly enhance the comfort and safety of traffic and the degree of guarantee of construction work safety.
[0005] The technical solution to achieve the above object is: an assembled piling platform, including a skeleton component, a platform component and a drilling component;
[0006] The skeleton assembly includes a plurality of groups of frame assemblies, and the skeleton assembly is formed by splicing a plurality of groups of the frame assemblies; each of the skeleton assemblies is detachably connected to a platform assembly or a drilling assembly.
[0007] Preferably, the square frame assembly includes four angle steels and four first steel plates; the four angle steels are connected to form a square frame, and the inner sides of the four angle steels are each connected to one of the first steel plates; two reserved bolt locking holes are provided on the angle steels located at the top and right, and two bolts are each connected to the angle steels at the left and bottom.
[0008] Preferably, the platform assembly includes two complete second steel plates on the top and bottom surfaces, four fifth steel plates on the sides, and a plurality of first I-beams; the plurality of first I-beams are spliced into a frame, which is welded and fixed to the two complete second steel plates to support them.
[0009] Preferably, the drilling assembly includes two third steel plates on the top and bottom surfaces, four fourth steel plates on the side surfaces, and four second I-beams; the four second I-beams are spliced into a frame, the third steel plate is connected to the inner side of the frame, and is welded and fixed to the two third steel plates to support them. A through hole reserved for drilling is opened in the middle of the third steel plate.
[0010] Preferably, the platform assembly is connected to the inner sides of the four first steel plates.
[0011] Preferably, the drilling assembly is connected to the inner sides of the four first steel plates.
[0012] The beneficial effects of the utility model are as follows: the assembled piling platform can be replaced with a drilling component by setting a detachable platform component or a drilling component in the frame component, so that the pile foundation project can be constructed according to the designed position. After the construction is completed, the drilling component is replaced with the platform component, which can ensure continuous open traffic while improving the comfort, safety and safety of traffic and the degree of guarantee of construction work safety, greatly improving the traffic conditions on site. It is easy to operate, economical and environmentally friendly, and more flexible and convenient than other ways to improve work safety and improve traffic, and can be used as an auxiliary measure for traffic guidance in municipal engineering construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the assembled piling platform of the utility model;
[0014] Figure 2 It is a detailed diagram of the frame assembly of the utility model;
[0015] Figure 3 It is a detailed view of the platform assembly of the utility model;
[0016] Figure 4 It is a detailed view of the drilling assembly of the utility model;
[0017] Figure 5 It is a transverse cross-sectional view of the frame assembly of the utility model;
[0018] Figure 6 It is a vertical cross-sectional view of the frame assembly of the utility model;
[0019] In the figure: 1. Skeleton assembly; 11. Frame assembly; 111. Angle steel; 112. First steel plate; 113. Reserved bolt locking hole; 114. Bolt; 2. Platform assembly; 21. Second steel plate; 22. First I-beam; 23. Fifth steel plate; 3. Drilling assembly; 31. Third steel plate; 32. Second I-beam; 33. Through hole; 34. Fourth steel plate. DETAILED DESCRIPTION
[0020] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0021] The utility model will be further described below in conjunction with the accompanying drawings.
[0022] like Figure 1-6 As shown, an assembled piling platform includes a skeleton component 1, a platform component 2 and a drilling component 3; the skeleton component 1 includes a plurality of groups of frame components 11, and the skeleton component 1 is spliced by the plurality of groups of frame components 11; a platform component 2 or a drilling component 3 is detachably connected in each skeleton component 1.
[0023] Specifically, the frame assembly 11 includes four angle steels 111 and four first steel plates 112; the four angle steels 111 are connected to form a frame, and the inner sides of the four angle steels 111 are each connected to a first steel plate 112; two reserved bolt lock holes 113 are provided on the upper and right angle steels 111, and two bolts 114 are each connected to the left and lower angle steels 111. The frame assembly 11 is used to position the platform assembly 2 and the drilling assembly 3, and to limit the displacement of the platform assembly 2 and the drilling assembly 3 under load.
[0024] The two adjacent groups of frame assemblies 11 above and below are connected to the reserved bolt locking holes 113 above the adjacent frame assemblies 11 through the bolts 114 connected at the bottom to achieve staggered anchoring connection; the two adjacent groups of frame assemblies 11 on the left and right are connected to the reserved bolt locking holes 113 on the right side of the adjacent frame assemblies 11 through the bolts 114 connected on the left to achieve staggered anchoring connection.
[0025] Specifically, the platform assembly 2 includes two complete second steel plates 21 on the top and bottom, four fifth steel plates 23 on the side, and a plurality of first I-beams 22; the plurality of first I-beams 22 are spliced into a frame, which is welded and fixed to the two complete second steel plates 21 to support them. The platform assembly 2 is assembled into a whole by the frame assembly 11, replacing the road surface structure layer to improve the smoothness and safety of vehicle traffic. When installing the platform assembly 2, the whole connected by the plurality of second steel plates 21 and the plurality of first I-beams 22 is placed inside the four first steel plates 112 of the frame assembly 11.
[0026] Specifically, the drilling assembly 3 includes two third steel plates 31 on the top and bottom surfaces, four fourth steel plates 34 on the sides, and four second I-beams 32; the four second I-beams 32 are spliced into a frame, the third steel plate 31 is connected to the inner side of the frame, and the two third steel plates 31 are welded and fixed to support it. A through hole 33 reserved for drilling is provided in the middle of the third steel plate 31. The drilling assembly 3 provides a working surface for the pile foundation machinery to construct on the platform, and also has the functions of construction positioning, guiding and protecting the pile foundation structure. When installing the drilling assembly 3, the whole connected by the third steel plate 31 and the four second I-beams 32 is placed on the inner side of the four first steel plates 112 of the frame assembly 11.
[0027] Specifically, according to the plan layout of the pile positions of the project and the design dimensions of the pile foundation (such as the pile diameter and the plan dimensions of the pile), the frame component 11, the platform component 2 and the drilling component 3 are manufactured. Safety warnings or temporary enclosures are set up at the construction site. After the road surface of the existing road is broken, the survey and layout are carried out, and the assembled frame component 11, the platform component 2 and the drilling component 3 are installed according to the center position of the pile foundation. A platform component 2 should be arranged on each pile foundation in the platform coverage area, and the platform component 2 should be ensured to coincide with the design center of the pile foundation, so that the platform component 2 can be replaced with the drilling component 3 during the pile foundation construction, so that the pile foundation project can be constructed according to the designed position.
[0028] After the pile foundation machinery is in place, the platform assembly 2 at the intended pile position is replaced with the drilling assembly 3. After each pile foundation is constructed, the pile foundation machinery is moved, and the drilling assembly 3 at the constructed pile position is replaced with the platform assembly 2.
[0029] This assembled piling platform is provided with a detachable platform component 2 or a drilling component 3 in the frame component 1. During construction, the platform component 2 can be replaced with the drilling component 3, so that the pile foundation project can be constructed according to the designed position. After the construction is completed, the drilling component 3 is replaced with the platform component 2, which can ensure continuous open traffic while improving the comfort, safety of traffic and the degree of guarantee of construction safety, greatly improving the traffic conditions on site. It is easy to operate, economical and environmentally friendly. Compared with other ways to improve operation safety and traffic, it is more flexible and convenient, and can be used as an auxiliary measure for traffic guidance in municipal engineering construction.
[0030] The above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model is described in detail with reference to the above embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the above embodiments, or replace some or all of the technical features therein with equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model.
Claims
1. An assembled piling platform, characterized in that: It comprises a skeleton component (1), a platform component (2) and a drilling component (3); The skeleton component (1) comprises a plurality of groups of frame components (11), and the skeleton component (1) is formed by splicing a plurality of groups of frame components (11); each of the skeleton components (1) is detachably connected to a platform component (2) or a drilling component (3).
2. The assembled piling platform according to claim 1, characterized in that: The frame assembly (11) comprises four angle steels (111) and four first steel plates (112); the four angle steels (111) are connected to form a frame, and the inner sides of the four angle steels (111) are each connected to one of the first steel plates (112); two reserved bolt locking holes (113) are provided on the upper and right angle steels (111), and two bolts (114) are each connected to the left and lower angle steels (111).
3. The assembled piling platform according to claim 2, characterized in that: The platform assembly (2) comprises two complete second steel plates (21) on the top and bottom surfaces, four fifth steel plates (23) on the side surfaces, and a plurality of first I-beams (22); the plurality of first I-beams (22) are spliced into a frame, which is welded and fixed to the two complete second steel plates (21) to support them.
4. The assembled piling platform according to claim 2, characterized in that: The drilling assembly (3) comprises two third steel plates (31) on the top and bottom surfaces, four fourth steel plates (34) on the side surfaces, and four second I-beams (32); the four second I-beams (32) are spliced into a frame, the third steel plate (31) is connected to the inner side of the frame, and is welded and fixed to the two third steel plates (31) to support them; a through hole (33) reserved for drilling is opened in the middle of the third steel plate (31).
5. The assembled piling platform according to claim 3, characterized in that: The platform assembly (2) is connected to the inner sides of the four first steel plates (112).
6. The assembled piling platform according to claim 4, characterized in that: The drilling assembly (3) is connected to the inner sides of the four first steel plates (112).