Operating platform for assisting bridge girder erection machine in installing steel box girder

By designing an operating platform for bridge stairs, the problem that the bridge stairs cannot perform beam bottom operations after the bridge stairs are lifted into place, and safe and efficient operation at high places is achieved, suitable for crossing existing lines Or a high-altitude bridge construction environment.

CN221989121UActive Publication Date: 2024-11-12CHINA METALLURGICAL CONSTR ENG GRP CHONGQING CONSTR IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420567378.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-11-12
Estimated Expiration
2034-03-22

Smart Images

  • Figure CN221989121U_ABST
    Figure CN221989121U_ABST
Patent Text Reader

Abstract

The utility model discloses an operating platform for assisting a bridge girder erection machine in installing a steel box girder, which comprises a supporting structure and an operating structure, the supporting structure comprises a bridge deck moving cross beam and a vertical connecting section, and the operating structure comprises a fixed section operating platform connected with the bridge deck moving cross beam through the vertical connecting section. The bridge floor moving cross beam and the fixed section operation platform are correspondingly connected to the top end and the bottom end of the vertical connecting section in the vertical direction respectively, and the bridge floor moving cross beam and the fixed section operation platform are located on the same side of the vertical connecting section in the transverse direction, so that the bridge floor moving cross beam, the vertical connecting section and the fixed section operation platform form a U shape; the movable #-shaped frame can be movably arranged on the fixed section operation platform and / or the standard section operation platform in a limited manner; the problem of how to carry out beam bottom operation after a bridge girder erection machine erects a steel box beam is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, and particularly relates to an operation platform for assisting a bridge erection machine to install a steel box girder. Background Art

[0002] Steel box girders have the advantages of high strength, light self-weight, being fabricated in factories and installed on-site, easy quality assurance, and fast construction speed. In bridge engineering, especially in long-span bridges, they are widely used. With the development of bridge construction technology, in addition to using conventional lifting equipment such as truck cranes and crawler cranes for segmented hoisting and installation, construction technologies with high levels of automation and intelligence such as jacking construction and bridge erection machine erection are gradually adopted in the construction of steel box girder bridges. Especially when crossing existing line traffic or when the lifting height is more than 40m across high mountains and deep valleys and it is impossible to use lifting and hoisting for segmented installation, the bridge erection machine can be used for such projects because it has the advantages of avoiding the impact on existing line traffic and extremely strong adaptability to construction height. However, after the bridge erection machine erects the steel box girder in place, when the bridge crosses an existing line or the construction height is too high, the traditional articulated boom truck cannot reach such a high position for bottom beam operation, and the scaffolding cannot be erected or is uneconomical and thus cannot be used.

[0003] Therefore, in the environment where the bridge crosses an existing line or the construction height is too high, solving the problem of how to perform bottom beam operation after the bridge erection machine erects the steel box girder has become a technical problem that those skilled in the art expect to solve. Summary of the Utility Model

[0004] In view of this, the purpose of the utility model is to overcome the defects in the prior art and provide an operation platform for assisting a bridge erection machine to install a steel box girder, which can solve the problem that bottom beam operation cannot be carried out after the bridge erection machine hoists and positions the steel box girder. With this platform, bottom beam operations such as steel box girder welding assistance, high-strength bolt tightening, and painting operations can be carried out safely and efficiently.

[0005] The operation platform for assisting a bridge erection machine to install a steel box girder of the utility model includes a support structure and an operation structure. The support structure includes a bridge deck moving cross beam and a vertical connection section. The operation structure includes a fixed-section operation platform connected to the bridge deck moving cross beam through the vertical connection section. The bridge deck moving cross beam and the fixed-section operation platform are respectively connected to the top and bottom of the vertical connection section in the vertical direction, and the bridge deck moving cross beam and the fixed-section operation platform are located on the same side of the vertical connection section in the horizontal direction, so that the bridge deck moving cross beam, the vertical connection section, and the fixed-section operation platform form a "C" shape;

[0006] The operation structure further includes a standard-section operation platform connected to the fixed-section operation platform. The standard-section operation platform is composed of several sections, and several sections of the standard-section operation platform are connected in sequence along the horizontal direction;

[0007] It further includes a movable cross-shaped frame which is movably arranged on the fixed-section working platform and / or the standard-section working platform in a limited way.

[0008] Furthermore, the bridge deck moving cross beam, the vertical connecting section and the fixed-section working platform which form a "C"-shaped structure are a set of functional arms. There are two sets of such functional arms respectively connected to the two transverse ends of the standard-section working platform, and the openings of the two sets of functional arms face each other.

[0009] Furthermore, walking wheels are installed on the bridge deck moving cross beam.

[0010] Furthermore, the movable cross-shaped frame is located between the bridge deck moving cross beam and the fixed-section working platform.

[0011] Furthermore, the bridge deck moving cross beam is a truss Ⅰ with a rectangular longitudinal section, and the truss Ⅰ is connected to the vertical connecting section through a pin shaft.

[0012] Furthermore, the vertical connecting section is a truss Ⅱ with a rectangular cross section, and a ladder cage is arranged inside the truss Ⅱ; the truss Ⅱ is connected to the fixed-section working platform through bolts.

[0013] Furthermore, the fixed-section working platform and the standard-section working platform are trusses Ⅲ with the same structure. The longitudinal section of the truss Ⅲ is rectangular, and adjacent fixed-section working platforms and standard-section working platforms as well as adjacent standard-section working platforms are connected through bolts.

[0014] Furthermore, a kick plate Ⅰ is arranged on the fixed-section working platform, and a kick plate Ⅱ is arranged on the standard-section working platform.

[0015] Furthermore, the movable cross-shaped frame includes a connecting seat fixed to the fixed-section working platform and / or the standard-section working platform through U-shaped bolts, and the movable cross-shaped frame further includes a ladder main body fixed to the connecting seat through bolts.

[0016] The beneficial effects of the present utility model are as follows: An operating platform for assisting a bridge erection machine to install a steel box girder disclosed by the present utility model is applied to bridge construction using a bridge erection machine when crossing an existing line or when the construction height is too high. It effectively solves the drawback that the beam bottom operation cannot be carried out after the steel box girder is erected by the bridge erection machine in a complex environment. By using this operating platform, since the operating platform is located on the steel box girder and can slide on the bridge deck, beam bottom operations such as tightening high-strength bolts and painting on the transverse diaphragms of each box girder can be carried out along with the installation process. Moreover, this device is stable and reliable, flexible in walking, can be reused repeatedly, and has good economy. Description of the Drawings

[0017] The following further describes the present utility model in conjunction with the drawings and embodiments:

[0018] Figure 1Structural schematic diagram of the present utility model;

[0019] Figure 2 For the present utility model Figure 1 Structural schematic diagram in the A-A direction;

[0020] Figure 3 Structural schematic diagram of the bridge deck moving cross beam of the present utility model;

[0021] Figure 4 For the present utility model Figure 3 Structural schematic diagram in the B-B direction;

[0022] Figure 5 Structural schematic diagram of the vertical connection section of the present utility model;

[0023] Figure 6 For the present utility model Figure 5 Structural schematic diagram in the C-C direction;

[0024] Figure 7 Structural schematic diagram of Truss III of the present utility model;

[0025] Figure 8 For the present utility model Figure 7 Structural schematic diagram in the D-D direction;

[0026] Fig. 9 For the present utility model Figure 7 Structural schematic diagram in the E-E direction. Specific embodiments

[0027] Figure 1 Structural schematic diagram of the present utility model. As shown in the figure, the horizontal direction is the width direction of the bridge, and the longitudinal direction is the extension direction of the bridge, which will not be elaborated here. The operation platform for assisting the erection machine to install the steel box girder in this embodiment includes a support structure and an operation structure. The support structure includes a bridge deck moving cross beam 1 and a vertical connection section 2. The operation structure includes a fixed section operation platform 31 connected to the bridge deck moving cross beam 1 through the vertical connection section 2. The bridge deck moving cross beam 1 and the fixed section operation platform 31 are respectively connected to the top and bottom of the vertical connection section 2 in the vertical direction, and the bridge deck moving cross beam 1 and the fixed section operation platform 31 are located on the same side of the vertical connection section 2 in the horizontal direction, so that the bridge deck moving cross beam 1, the vertical connection section 2 and the fixed section operation platform 31 form a "C" shape; as Figure 1 shown, the bridge deck moving cross beam 1, the vertical connection section 2 and the fixed section operation platform 31 forming a "C" shape are a group of functional arms. The functional arms are two groups respectively connected to the two transverse ends of the standard section operation platform 32. The openings of the two groups of functional arms face each other, improving the reliability of the structure use and facilitating the guarantee of operation safety.

[0028] As Figure 1 and Figure 3 and Figure 4 As shown, the bridge deck movable cross beam 1 is a truss Ⅰ with a rectangular longitudinal section, and the truss Ⅰ includes a triangular truss system assembled by a plurality of chord rods Ⅰ11, a plurality of vertical rods Ⅰ12 and a plurality of diagonal web rods Ⅰ13. The bottom of the truss Ⅰ is connected to the vertical connection section 2 through two ears with pins;

[0029] The bridge deck movable cross beam 1 is provided with a walking wheel 14, and a diagonal web member Ⅰ 13 for structural reinforcement is provided at the installation position of the walking wheel 14; the walking wheel 14 in this scheme is installed at the bottom of the bridge deck movable cross beam 1, and is used to drive the entire operating platform to walk along the extension direction of the bridge body, and then drive the working structure to shift along the extension direction of the bridge body, so as to meet the requirements of fast and effective construction of the preset position. More specifically, the bridge deck movable cross beam 1 is provided with a walking wheel 14 at the front end position of the bottom, and the walking wheel 14 is placed on the steel box girder that has been erected by the bridge erection machine, and an electric hoist is used to pull and move the entire operating platform along the direction of the bridge; it can solve the problem that after the bridge erection machine hoists the steel box girder into place, it is impossible to perform beam bottom operations. The platform can be used to safely and efficiently perform beam bottom operations such as steel box girder welding assistance, high bolt tightening and painting operations.

[0030] like Figure 1 and Figure 5 and Figure 6 As shown, the vertical connection section 2 is a truss II with a rectangular cross section, and a ladder cage 21 is arranged in the truss II; the top of the truss II has an ear piece connected to the truss I, and the truss I and the truss II are connected by a pin shaft, and the bottom of the truss II is connected to the fixed section working platform 31 by bolts; the truss II is assembled by a plurality of chord rods II 22, a plurality of vertical rods II 23 and a plurality of diagonal web rods II 24, and the truss II is equipped with a ladder cage 21, which is convenient for construction personnel to go down from the bridge deck to the working structure to perform beam bottom operations.

[0031] like Figure 1 and Figure 7 and Figure 8 and Fig. 9 As shown, the working structure further includes a standard section working platform 32 connected to the fixed section working platform 31. The standard section working platform 32 is composed of several sections, and the several sections of the standard section working platform 32 are sequentially connected in the transverse direction, so that the transverse length of the fixed section working platform 31 is extended. More specifically, the fixed section working platforms 31 located at the transverse ends of the bridge body are connected by several sections of the standard section working platforms 32.

[0032] In this scheme, the fixed section work platform 31 and the standard section work platform 32 are trusses III with the same structure. The longitudinal section of the truss III is rectangular. The adjacent fixed section work platforms 31 and standard section work platforms 32 and the adjacent standard section work platforms 32 are connected by bolts. The truss III is composed of a plurality of chord rods III 33, a plurality of vertical rods III 34 and a plurality of diagonal web rods III 35. The top surface of the truss III is paved with a steel plate 36 to form a platform for construction. A skirting board 37 is provided according to the safety protection requirements. The skirting board 37 includes a skirting board I provided on the fixed section work platform 31 and a skirting board II provided on the standard section work platform 32. The skirting board I and the skirting board II have the same structure. At the same time, the fixed section work platform 31 and the standard section work platform 32 with the same structure are also convenient for production, transportation and installation. The adjacent sections of the truss III are connected by bolts, and the section positions are locally strengthened to facilitate assembly of different widths according to the bridge type.

[0033] like Figure 1 and Figure 2 As shown, the present scheme also includes a movable cross-shaped frame 4, which can be movably set on the fixed section working platform 31 and / or the standard section working platform 32 by limiting position, so as to meet the operation height requirements of the steel box girder diaphragm. The and / or meanings are that they can be set on both the fixed section working platform 31 and the standard section working platform 32 at the same time, or can be set on either the fixed section working platform 31 or the standard section working platform 32 separately, which will not be described in detail here; the movable cross-shaped frame 4 is located between the bridge deck moving cross beam 1 and the fixed section working platform 31 ... The height of the frame 4 is set as required by the standard segments with a modulus of 0.5m, and the standard segments are assembled by bolt connection; the movable frame 4 includes a connection seat 41 fixed to the fixed section work platform 31 and / or the standard section work platform 32 by U-bolts, and the connection method of the U-bolts is convenient for installation and removal, which is convenient for moving the movable frame 4 along the installation position during the construction process, and for moving the movable frame 4 along the bridge direction by the operating platform device; the movable frame 4 also includes a ladder body 42 fixed on the connection seat 41 by bolts. The ladder body 42 is made of lightweight equilateral angle steel, the connection seat 41 is made of full-length rectangular tube, and the ladder body 42 and the connection seat 41 are connected to the node plate by ordinary bolts.

[0034] This embodiment also includes the steps of setting up an operating platform for assisting the bridge erection machine in installing the steel box girder: first, the movable crossbeam and the vertical connecting section 2 are assembled and connected on the bridge deck, and then two lifting equipment with preset tonnages are used on the bridge deck to lift the assembled movable crossbeam and the vertical connecting section 2 as a whole into place; then a winch is installed on the bridge deck to lift and tow the lower working platform (fixed section working platform 31 or standard section working platform 32), and after reaching the specified height, it is bolted to complete the installation of the operating platform device.

[0035] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. An operating platform for assisting a bridge erecting machine in installing a steel box girder, Characterized in that: It includes a support structure and an operation structure. The support structure includes a bridge deck moving cross beam and a vertical connecting section. The operation structure includes a fixed-section operation platform connected to the bridge deck moving cross beam through the vertical connecting section. The bridge deck moving cross beam and the fixed-section operation platform are respectively connected to the top and bottom of the vertical connecting section in the vertical direction, and the bridge deck moving cross beam and the fixed-section operation platform are located on the same side of the vertical connecting section in the transverse direction, so that the bridge deck moving cross beam, the vertical connecting section and the fixed-section operation platform form a "C" shape; The operation structure further includes a standard-section operation platform connected to the fixed-section operation platform. The standard-section operation platform is composed of several sections, and several sections of the standard-section operation platform are connected in sequence along the transverse direction; It further includes a movable cross-jack, and the movable cross-jack is movably arranged on the fixed-section operation platform and / or the standard-section operation platform in a limited manner.

2. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 1, Characterized in that: The bridge deck moving cross beam, the vertical connecting section and the fixed-section operation platform forming a "C" shape are a set of functional arms. There are two sets of such functional arms respectively connected to the two transverse ends of the standard-section operation platform, and the openings of the two sets of functional arms are opposite to each other.

3. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 1, Characterized in that: Traveling wheels are installed on the bridge deck moving cross beam.

4. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 1, Characterized in that: The movable cross-jack is located between the bridge deck moving cross beam and the fixed-section operation platform.

5. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 1, Characterized in that: The bridge deck moving cross beam is a truss I with a rectangular longitudinal section, and the truss I is connected to the vertical connecting section through a pin shaft.

6. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 5, Characterized in that: The vertical connecting section is a truss II with a rectangular cross section. A ladder cage is arranged inside the truss II; the truss II is connected to the fixed-section operation platform through bolts.

7. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 6, Characterized in that: The fixed-section operation platform and the standard-section operation platform are trusses III with the same structure. The longitudinal section of the truss III is rectangular, and the adjacent fixed-section operation platform and standard-section operation platform and the adjacent standard-section operation platforms are connected through bolts.

8. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 7, Characterized in that: A kick plate I is arranged on the fixed-section operation platform, and a kick plate II is arranged on the standard-section operation platform.

9. The operating platform for assisting a bridge erecting machine in installing a steel box girder according to claim 1, Characterized in that: The movable cross-jack includes a connecting seat fixed to the fixed-section operation platform and / or the standard-section operation platform through U-shaped bolts, and the movable cross-jack further includes a ladder main body fixed to the connecting seat through bolts.