Workshop expansion joint mounting structure
By adopting a combination structure of bent design installation plates and fixing bolts, slots, and waterproof cloth at the joints of the house, the problem of force twisting of the plate parts after the house settles is solved, and stable connection and efficient waterproofing are achieved.
Patent Information
- Application Number
- CN202323658809.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-29
AI Technical Summary
The existing house connection method may cause the bolts at the connection between the plate parts and the building main body to be pulled and stressed after the house settles, resulting in the board being twisted or even broken, and it is impossible to effectively deal with the connection problems under different house settlement situations.
The first and second mounting plates are abutted through bending design, and the combination structures such as fixing bolts, clamp slots and clamp strips, waterproof cloths, decorative surfaces and fillers are used at the connection to reduce stress, improve waterproofing and Aesthetic, enhanced connection strength and sealing.
It effectively reduces the stress at the factory connection, improves waterproof performance and aesthetics, and enhances the connection strength and sealing of the installation structure, ensuring the stability and waterproofing effect of the connection when the house settles.
Smart Images

Figure CN221989598U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of house connection, and in particular to a factory building expansion joint installation structure. Background Art
[0002] At present, when constructing a factory, different buildings are built separately. After the construction is completed, the factory buildings, office areas, or office areas are connected by linking structures. The existing connection method usually uses a plate to be installed between the two buildings. The two layers of plates are usually fixed between the two buildings using a connection structure such as bolts, and a filling structure is added between the plates. The plates and the filling structure are used to achieve functions such as rain protection, heat preservation, and connecting the factory buildings.
[0003] Regarding the above-mentioned related technologies, since there will be a certain amount of settlement after the house is built, and the settlement conditions of different houses may be different, settlement joints will appear. Using the existing installation method may cause the bolts at the connection between the sheet metal parts and the main body of the building to be pulled, causing the sheet metal to be twisted or even broken. Utility Model Content
[0004] In order to reduce the stress on the connection points of factory buildings, the present application provides a factory building expansion joint installation structure.
[0005] The present application provides a plant expansion joint installation structure, which adopts the following technical solution:
[0006] A factory expansion joint installation structure includes a first mounting plate and a second mounting plate, wherein one end of the first mounting plate is fixedly connected to the factory on one side, and the second mounting plate is fixedly connected to the factory on the other side, a side of the first mounting plate close to the second mounting plate is bent toward the outside of the factory and has a first bend, and a side of the second mounting plate close to the first mounting plate is bent toward the inside of the factory and has a second bend, and the inner side of the first bend abuts against the inner side of the second bend.
[0007] By adopting the above technical solution, during installation, the first mounting plate is installed on the wall of the factory building, and then the second mounting plate is installed on the wall of the factory building on the other side. At this time, the first bend of the first mounting plate abuts against the second bend of the second mounting plate. When the factories on both sides sink to different degrees, the first mounting plate and the second mounting plate sink along with their respective factories, and the connection is still abutted, which effectively reduces the stress condition at the connection of the factories.
[0008] Optionally, a water retaining cloth is provided on one side of the first mounting plate and the second mounting plate close to the interior of the factory building.
[0009] By adopting the above technical solution, a water retaining cloth is installed on the side of the first mounting plate and the second mounting plate close to the factory building to block rainwater that penetrates due to factors such as wind pressure, thereby effectively improving the waterproof performance of the mounting structure.
[0010] Optionally, the first bend is provided with a card slot extending in the vertical direction, and the second bend is provided with a card strip adapted to the card slot.
[0011] By adopting the above technical solution, a card groove and a card strip are used at the abutting position of the first mounting plate and the second mounting plate to realize the card connection between the first mounting plate and the second mounting plate, so that the connection between the first mounting plate and the second mounting plate is more stable, and when the first mounting plate and the second mounting plate move relative to each other, they are guided, thereby effectively improving the connection strength between the first mounting plate and the second mounting plate.
[0012] Optionally, the first mounting plate is provided with a connecting portion, and the connecting portion is provided with a mounting groove for accommodating the second bend.
[0013] By adopting the above technical solution and providing a connection portion on the first mounting plate for placing the second bend, the entire wall does not have obvious protrusions when viewed from the outside of the factory building, thereby effectively improving the aesthetics of the mounting structure.
[0014] Optionally, a filler for filling the gap is provided in the installation groove.
[0015] By adopting the above technical solution, the redundant gap of the mounting groove is blocked by a filler in the mounting groove, thereby effectively improving the sealing strength between the first mounting plate and the second mounting plate.
[0016] Optionally, the first mounting plate and the second mounting plate are provided as baffles for shielding the mounting grooves.
[0017] By adopting the above technical solution, the installation baffle blocks the gap above the first installation plate and the second installation plate, making it difficult for rainwater to penetrate into the factory building from the connection between the first installation plate and the second installation plate, thereby effectively improving the waterproof performance of the installation structure.
[0018] Optionally, a decorative surface is provided on one side of the first mounting plate and the second mounting plate close to the outside of the factory building.
[0019] By adopting the above technical solution, decorative surfaces are installed on the outer sides of the first mounting plate and the second mounting plate, so that the outer sides are integrated, thereby effectively improving the aesthetics of the outer sides.
[0020] Optionally, the first mounting plate and the second mounting plate are provided with fixing bolts for connecting to the factory building.
[0021] By adopting the above technical solution, the first mounting plate and the second mounting plate are installed in the factory building using fixing bolts, which facilitates the later disassembly and replacement of the first mounting plate and the second mounting plate while ensuring the installation strength, making the installation structure more flexible.
[0022] In summary, the present application includes at least one of the following beneficial technical effects of the plant expansion joint installation structure:
[0023] 1. During installation, install the first mounting plate on the wall of the factory building, and then install the second mounting plate on the wall of the factory building on the other side. At this time, the first bend of the first mounting plate abuts against the second bend of the second mounting plate. When the factories on both sides sink to different degrees, the first mounting plate and the second mounting plate sink along with their respective factories, and the connection is still abutted, which effectively reduces the stress on the connection of the factories;
[0024] 2. Install water-retaining cloth on the side of the first mounting plate and the second mounting plate close to the factory building to block rainwater that penetrates due to wind pressure and other factors, effectively improving the waterproof performance of the mounting structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of a factory building expansion joint installation structure.
[0026] Figure 2 It is a cross-sectional schematic diagram of the overall structure.
[0027] Figure 3 It is a schematic diagram of the overall structure with a decorative surface.
[0028] Explanation of the reference numerals: 101, factory building; 1, first mounting plate; 11, first bend; 111, slot; 12, mounting groove; 13, filler; 14, fixing bolt; 2, second mounting plate; 21, second bend; 211, strip; 3, water retaining cloth; 4, baffle; 5, decorative surface. DETAILED DESCRIPTION
[0029] The present application is further described in detail below in conjunction with all the accompanying drawings.
[0030] An embodiment of the present application discloses a factory building expansion joint installation structure.
[0031] Embodiment 1:
[0032] Reference Figure 1 A factory expansion joint installation structure includes a first installation plate 1 and a second installation plate 2. The original commonly used installation method is to connect the entire large plate, but now two plates are used to splice and then connect. When the houses on both sides have different degrees of settlement, they move up and down with the factory buildings 101 installed respectively.
[0033] Reference Figure 2In this embodiment, it is preferred that both the first mounting plate 1 and the second mounting plate 2 are installed using fixing bolts 14. During installation, the first mounting plate 1 is first installed on the wall of the factory building 101 using the fixing bolts 14, and the second mounting plate is then installed on the other side of the factory building 101 using the fixing bolts 14. Since the fixing bolts 14 are strong enough to install the first mounting plate 1 and the second mounting plate 2, and the fixing bolts 14 are also easy to disassemble. When the first mounting plate 1 or the second mounting plate 2 is damaged, it only needs to remove the fixing bolts 14 to complete the disassembly and replacement.
[0034] Reference Figure 2 When installing the first mounting plate 1 and the second mounting plate 2, put the second bend 21 into the mounting groove 12, adjust it so that the first bend 11 on the first mounting plate 1 abuts against the second bend 21 installed on the second mounting plate 2, and then tighten the fixing bolt 14. The abutment between the first bend 11 and the second bend 21 forms a good waterproof structure between the first mounting plate 1 and the second mounting plate 2, and it is difficult for water outside the factory building 101 to enter the factory building 101 through the gap between the first bend 11 and the second bend 21. If the factory buildings 101 on both sides have different degrees of settlement at this time, since the first mounting plate 1 and the second mounting plate 2 are not the same plate, and there is no fixed connection or other strong connection between the first mounting plate 1 and the second mounting plate 2, the first mounting plate 1 and the second mounting plate 2 will settle along with the factory buildings 101 where they are installed. At this time, since the settlement is a vertical descent, after the first mounting plate 1 and the second mounting plate 2 settle with the factory building 101, there will be a vertical misalignment between the first mounting plate 1 and the second mounting plate 2, but it will not affect the abutment between the first mounting plate 1 and the second mounting plate 2.
[0035] Reference Figure 2 , a vertically extending slot 111 is provided at the first bend 11 of the first mounting plate 1, and a clip strip 211 adapted to the slot 111 is provided at the second bend 21 of the second mounting plate 2. When the first bend 11 and the second bend 21 are abutted, the clip strip 211 is embedded in the slot 111, which effectively enhances the stability of the connection. When the factory buildings 101 on both sides sink, the sliding between the first mounting plate 1 and the second mounting plate 2 will be vertically slid along the slot 111 by the clip strip 211. The clip strip 211 and the slot 111 not only enhance the connection strength between the first mounting plate 1 and the second mounting plate 2, but also guide the relative sliding between the first mounting plate 1 and the second mounting plate 2 when sinking occurs.
[0036] Reference Figure 2Since the second bend 21 is installed in the installation groove 12 formed by the bending of the first mounting plate 1 during installation, the first mounting plate 1 and the second mounting plate 2 can be in the same plane and when observed from the outside of the factory building 101, the first mounting plate 1 and the second mounting plate 2 are in the same vertical plane, and the overall appearance is good.
[0037] Reference Figure 2 After the first mounting plate 1 and the second mounting plate 2 are installed, a filler 13 is installed at the mounting groove 12 for filling. In this example, foam glue is preferably used to fill the gap in the mounting groove 12. The foam glue can provide good support to keep the first mounting plate 1 and the second mounting plate 2 in contact. When the first mounting plate 1 or the second mounting plate 2 moves up and down, the foam glue will not affect the up and down movement of the first mounting plate 1 and the second mounting plate 2.
[0038] Reference Figure 3 After the first mounting plate 1 and the second mounting plate 2 are installed, a baffle 4 is installed on the upper side of the mounting groove 12. The shape of the baffle 4 is the same as that of the mounting groove 12. The baffle 4 serves to block rainwater from above. When rainwater flows downward from above, the baffle 4 blocks the rainwater from above, and can effectively isolate and block rainwater flowing toward the mounting groove 12, further reducing the possibility of rainwater infiltration.
[0039] Reference Figure 2 A water retaining cloth 3 is installed on one side of the first mounting plate 1 and the second mounting plate 2 close to the interior of the factory building 101. The water retaining cloth 3 is made of waterproof material. If rainwater penetrates inward through the gap between the first mounting plate 1 and the second mounting plate 2 due to wind pressure or other factors, the water retaining cloth 3 can isolate the infiltrated rainwater, making it difficult for the rainwater to pass through the water retaining cloth 3 and enter the interior of the factory building 101.
[0040] Embodiment 2:
[0041] Reference Figure 3 The biggest difference in this embodiment is that after the installation of the first mounting plate 1 and the second mounting plate 2 is completed, the decorative surface 5 is installed on the outer layer. By installing the decorative surface 5 on the outer sides of the first mounting plate 1 and the second mounting plate 2, and extending the decorative surface 5 to the factory buildings 101 on both sides, the outer wall after the decorative surface 5 is installed is unified and overall flat, which greatly improves the appearance of the outer side.
[0042] The implementation principle of the expansion joint installation structure of a factory building in the embodiment of the present application is as follows: the sealing is performed by abutting the first bend 11 of the first mounting plate 1 with the second bend 21 of the second mounting plate, and when the factory building 101 sinks, the first mounting plate 1 and the second mounting plate 2 will move with their respective factory buildings 101, thereby causing the first mounting plate 1 and the second mounting plate 2 to move up and down along the direction of the card slot 111 without causing the wall to twist or even tear, and the overall wall is made uniform, flat and beautiful through the mounting slot, filler 13 and decorative surface 5. The rainwater from above is blocked by the block, and the water-retaining cloth 3 is installed to finally block the small amount of rainwater that may penetrate.
[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A factory expansion joint installation structure, comprising a first installation plate (1) and a second installation plate (2), characterized in that: One end of the first mounting plate (1) is fixedly connected to a factory building (101) on one side, and the second mounting plate (2) is fixedly connected to the factory building (101) on the other side; a side of the first mounting plate (1) close to the second mounting plate (2) is bent toward the outside of the factory building (101) to form a first bend (11); a side of the second mounting plate (2) close to the first mounting plate (1) is bent toward the inside of the factory building (101) to form a second bend (21); the inner side of the first bend (11) abuts against the inner side of the second bend (21).
2. A plant expansion joint installation structure according to claim 1, characterized in that: A water retaining cloth (3) is provided on one side of the first mounting plate (1) and the second mounting plate (2) close to the interior of the factory building (101).
3. The plant expansion joint installation structure according to claim 1, characterized in that: The first bend (11) is provided with a clamping groove (111) extending in a vertical direction, and the second bend (21) is provided with a clamping strip (211) adapted to the clamping groove (111).
4. The factory expansion joint installation structure according to claim 1, characterized in that: The first mounting plate (1) is provided with a connecting portion, and the connecting portion is provided with a mounting groove (12) for accommodating the second bend (21).
5. The factory expansion joint installation structure according to claim 4 is characterized in that: A filler (13) for filling the gap is arranged in the installation groove (12).
6. The factory expansion joint installation structure according to claim 4 is characterized in that: The first mounting plate (1) and the second mounting plate (2) are provided with a baffle (4) for shielding the mounting groove (12).
7. The factory expansion joint installation structure according to claim 1 is characterized by: A decorative surface (5) is provided on one side of the first mounting plate (1) and the second mounting plate (2) close to the outside of the factory building (101).
8. The factory expansion joint installation structure according to claim 1, characterized in that: The first mounting plate (1) and the second mounting plate (2) are provided with fixing bolts (14) for connecting to the factory building (101).