Unloading platform for building construction

By using a firm connection between the suspended steel platform and the structural beam and tie rod assembly in prefabricated buildings, the safety hazards of the anchor structure of the traditional unloading platform are solved, achieving higher installation safety and construction without affecting indoor construction.

CN221989933UActive Publication Date: 2024-11-12CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420013060.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-11-12
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

In prefabricated buildings, the anchoring structure of the traditional unloading platform causes the connection strength to be safely guaranteed, which poses a major safety hazard.

Method used

A discharge platform for construction is designed, a suspended steel platform is used and firmly connected by structural beams and tie rod components to ensure the safety of the platform and be installed externally to avoid affecting indoor construction.

Benefits of technology

Improve the installation safety of the unloading platform, avoid the impact on indoor masonry and decoration construction, and ensure the reliability of anchor connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989933U_ABST
    Figure CN221989933U_ABST
Patent Text Reader

Abstract

The utility model discloses a discharging platform for building construction, and relates to the technical field of building construction. The discharging platform for building construction comprises a suspended steel platform arranged on the outer side of a first floor slab layer, one end of the suspended steel platform is connected with a first structural beam of the first floor slab layer, and the two sides of the suspended steel platform are connected with a second structural beam of a second floor slab layer above the first floor slab layer through pull rod assemblies respectively. According to the unloading platform for building construction, the first structural beam and the second structural beam which are high in structural strength are used for firmly and reliably supporting the suspended steel platform, the safety of the suspended steel platform after installation is improved, the suspended steel platform is completely located outside the first floor layer, and the safety of the suspended steel platform is improved. And the influence on indoor masonry and decoration construction is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a material unloading platform for building construction. Background Art

[0002] During the construction of high-rise buildings, tower cranes are needed to transport formwork, pipe racks and other materials to the construction floors. However, tower cranes cannot be directly extended into the building. In order to facilitate the transportation of formwork, pipe racks and other materials, generally, an extended unloading platform is set on the building to transfer the materials through the unloading platform.

[0003] Traditional unloading platforms use pre-buried anchor rings in the floor slab as the anchor end of the unloading platform, but this anchor structure causes the support to extend into the room, affecting the masonry and decoration construction. When this structure is applied to prefabricated buildings, it is difficult to pre-buried anchor rings in the floor slab because prefabricated buildings use composite floors, and the full cast-in-place pre-buried effect cannot be achieved. The connection strength of the anchor end cannot be safely guaranteed, and there are great safety hazards. Utility Model Content

[0004] The purpose of the present application is to provide a material unloading platform for construction, so as to solve the problem of great potential safety hazards of material unloading platforms installed in existing prefabricated buildings.

[0005] The technical solution adopted by the present application to solve its technical problems is: a unloading platform for construction, comprising a suspended steel platform arranged on the outside of a first floor layer, one end of the suspended steel platform is connected to the first structural beam of the first floor layer, and both sides of the suspended steel platform are connected to the second structural beam of the second floor layer above the first floor layer through a tie rod assembly.

[0006] Furthermore, the suspended steel platform includes two main beams arranged in parallel, a plurality of cross beams fixed on the two main beams, and patterned steel plates laid on the plurality of cross beams; a main beam connecting plate is fixed to one end of the main beam, and the main beam connecting plate is connected to the first structural beam through a first fastening assembly.

[0007] Furthermore, the first fastening assembly includes a first bolt for passing through the first structural beam and the main beam connecting plate, and a first nut connected to an end of the first bolt.

[0008] Furthermore, a first sleeve with openings at both ends is pre-buried in the first structural beam, and the first bolt is used to pass through the first sleeve.

[0009] Furthermore, the tie rod assembly includes a first tie rod connected to the suspended steel platform, a second tie rod connected to the second structural beam, and a turnbuckle bolt connected between the first tie rod and the second tie rod.

[0010] Furthermore, the second pull rod is connected to the second structural beam through a second fastening assembly.

[0011] Furthermore, the second fastening assembly includes a second connecting plate connected to the second pull rod, a second bolt passing through the second structural beam and the second connecting plate, and a second nut connected to the end of the second bolt.

[0012] Furthermore, a second sleeve with openings at both ends is pre-buried in the second structural beam, and the second bolt is used to pass through the second sleeve.

[0013] Furthermore, a guardrail is arranged around the suspended steel platform.

[0014] Furthermore, the guardrail includes a vertically arranged support frame, and iron sheets and / or steel plate mesh arranged on the support frame.

[0015] Beneficial effects of this application:

[0016] The unloading platform for construction provided in the embodiment of the present application is achieved by arranging a suspended steel platform on the outside of the first floor layer, connecting one end of the suspended steel platform to the first structural beam of the first floor layer, and connecting both sides of the suspended steel platform to the second structural beam of the second floor layer through a tie rod assembly. The first structural beam and the second structural beam with high structural strength are used to firmly and reliably support the suspended steel platform, thereby improving the safety of the suspended steel platform after installation. In addition, the suspended steel platform is entirely located outside the first floor layer to avoid affecting indoor masonry and decoration construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a simplified schematic diagram of a material unloading platform for construction provided in an embodiment of the present application;

[0019] Figure 2 It is a schematic diagram of the side structure of a material unloading platform for construction provided in an embodiment of the present application;

[0020] Figure 3 It is a partial structural diagram of the suspended steel platform;

[0021] Figure 4 is a structural schematic diagram of a first fastening assembly;

[0022] Figure 5 is a structural schematic diagram of a second fastening assembly;

[0023] Figure 6 It is a schematic diagram of the structure of the guardrail.

[0024] Reference numerals:

[0025] 10-first floor layer; 101-first structural beam; 102-first floor; 103-first casing;

[0026] 11-suspended steel platform; 111-main beam; 112-cross beam; 113-patterned steel plate; 114-main beam connecting plate;

[0027] 12-tie rod assembly; 121-first tie rod; 122-second tie rod; 123-basket bolt;

[0028] 13-second floor layer; 131-second structural beam; 132-second floor; 133-second casing;

[0029] 14-first fastening assembly; 141-first bolt; 142-first nut;

[0030] 15-second fastening assembly; 151-second connecting plate; 152-second bolt; 153-second nut;

[0031] 16-Guardrail; 161-Support frame; 162-Iron sheet; 163-Steel mesh. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.

[0033] It should be noted that similar numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the embodiments and features in the embodiments of this application can be combined with each other without conflict.

[0034] In the description of the embodiments of the present application, the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, or is the orientation or positional relationship in which the product of the application is usually placed when in use, or is the orientation or positional relationship commonly understood by those skilled in the art. The terms "disposed", "opened", "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, and an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal connection of two elements.

[0035] See also Figure 1 , Figure 2 An unloading platform for construction provided in an embodiment of the present application includes a suspended steel platform 11 arranged on the outside of a first floor layer 10, one end of the suspended steel platform 11 is connected to a first structural beam 101 of the first floor layer 10, and both sides of the suspended steel platform 11 are connected to a second structural beam 131 of a second floor layer 13 above the first floor layer 10 through a tie rod assembly 12.

[0036] The floor layer mainly includes structural beams and floor slabs supported on the structural beams. For example, the first floor layer 10 includes a first structural beam 101 and a first floor slab 102 supported on the first structural beam 101; the second floor layer 13 includes a second structural beam 131 and a second floor slab 132 supported on the second structural beam 131. In this embodiment, the first floor layer 10 refers to a floor layer used for unloading, and the second floor layer 13 refers to a floor layer located above the unloading floor layer.

[0037] The unloading platform for construction provided in the embodiment of the present application is provided by arranging the suspended steel platform 11 on the outside of the first floor slab layer 10, connecting one end of the suspended steel platform 11 to the first structural beam 101 of the first floor slab layer 10, and connecting the two sides of the suspended steel platform 11 to the second structural beam 131 of the second floor slab layer 13 through the tie rod assembly 12, and using the first structural beam 101 and the second structural beam 131 with high structural strength to firmly and reliably support the suspended steel platform 11, thereby improving the safety of the suspended steel platform 11 after installation, and the suspended steel platform 11 is entirely located outside the first floor slab layer 10, avoiding affecting the indoor masonry and decoration construction. Compared with the prior art, the present application solves the problem that the connection strength of the anchor end cannot be safely guaranteed when the unloading platform is placed on the floor slab by pre-embedded anchor rings in prefabricated buildings.

[0038] See also Figure 2 , Figure 3The suspended steel platform 11 includes two parallel main beams 111, a plurality of cross beams 112 fixed on the two main beams 111, and a patterned steel plate 113 laid on the plurality of cross beams 112; a main beam connecting plate 114 is fixed to one end of the main beam 111, and the main beam connecting plate 114 is connected to the first structural beam 101 through a first fastening assembly 14.

[0039] Among them, the main beam 111 of the suspended steel platform 11 is connected to the second structural beam 131 through the tie rod assembly 12. In order to further improve the firmness of the main beam 111 after installation, each main beam 111 is respectively connected to the two layers of second structural beams 131 through two sets of tie rod assemblies 12. Both the main beam 111 and the cross beam 112 can be made of I-beams, channel steels, H-beams and other steel sections. The two ends of the cross beam 112 are respectively supported on the two main beams 111, and the cross beam 112 and the main beam 111 can be connected by welding or by fasteners such as bolts. The patterned steel plate 113 can be directly laid on a number of cross beams 112, or it can be fixedly connected to the cross beam 112 by fasteners such as screws.

[0040] The installation process of the suspended steel platform 11 is as follows: main beam connecting plates 114 are respectively welded at the ends of the two main beams 111, the two main beams 111 are arranged on the outside of the first floor layer 10, and the main beam connecting plates 114 at the ends of the main beams 111 are fixedly connected to the first structural beam 101 through the first fastening assembly 14, and then the main beam 111 is connected to the second structural beam 131 through the tie rod assembly 12; a plurality of cross beams 112 are supported on the two main beams 111 and fixedly connected to the main beams 111, and then the patterned steel plates 113 are laid on the plurality of cross beams 112.

[0041] See also Figure 4 The first fastening assembly 14 includes a first bolt 141 for passing through the first structural beam 101 and the main beam connecting plate 114, and a first nut 142 connected to the end of the first bolt 141. The first structural beam 101 and the main beam connecting plate 114 are both provided with a first bolt hole for the first bolt 141 to pass through. The number of the first bolts 141 can be one, two, or more than two. The more the number of the first bolts 141, the more firmly the first structural beam 101 is connected to the main beam connecting plate 114.

[0042] During installation, it is only necessary to align the first bolt hole of the main beam connecting plate 114 with the first bolt hole of the first structural beam 101, then pass the first bolt 141 through the corresponding first bolt hole, and then screw the first nut 142 on the end of the first bolt 141. After tightening the first nut 142, the fixed connection between the first structural beam 101 and the main beam connecting plate 114 is achieved.

[0043] See also Figure 4A first sleeve 103 with openings at both ends is pre-buried in the first structural beam 101 , and the first bolt 141 is used to pass through the first sleeve 103 .

[0044] The first sleeve 103 can be pre-buried in the first structural beam 101 during the construction of the first structural beam 101. When the construction of the first structural beam 101 is completed, the inner hole of the first sleeve 103 forms a first bolt hole for the first bolt 141 to pass through. In this way, when installing the unloading platform, it is no longer necessary to drill the first bolt hole on the first structural beam 101, thereby improving the installation efficiency of the unloading platform.

[0045] In other embodiments, the first fastening assembly 14 may also include a nut assembly embedded in the first structural beam 101, and a bolt passing through the main beam connecting plate 114 and threadedly connected to the nut assembly. The first fastening assembly 14 may also be other existing structures, which are not specifically limited here.

[0046] See also Figure 2 The tie rod assembly 12 includes a first tie rod 121 connected to the suspended steel platform 11, a second tie rod 122 connected to the second structural beam 131, and a turnbuckle 123 connected between the first tie rod 121 and the second tie rod 122. The first tie rod 121 is connected to the main beam 111 of the suspended steel platform 11 through a hinge structure, and the second tie rod 122 is connected to the second structural beam 131 through a second fastening assembly 15. After the tie rod assembly 12 is installed, not only the length of the tie rod assembly 12 can be adjusted by the turnbuckle 123, but also the pulling force of the tie rod assembly 12 on the suspended steel platform 11 can be adjusted by the turnbuckle 123.

[0047] See also Figure 5 The second fastening assembly 15 includes a second connecting plate 151 connected to the second tie rod 122, a second bolt 152 passing through the second structural beam 131 and the second connecting plate 151, and a second nut 153 connected to the end of the second bolt 152. The second connecting plate 151 and the second structural beam 131 are both provided with a second bolt hole for the second bolt 152 to pass through. The second tie rod 122 and the second connecting plate 151 can be fixedly connected or movably connected, which is not specifically limited here.

[0048] During installation, it is only necessary to align the second bolt hole of the second connecting plate 151 with the second bolt hole of the second structural beam 131, then pass the second bolt 152 through the second bolt hole, and then screw the second nut 153 on the end of the second bolt 152. After tightening the second nut 153, the second connecting plate 151 and the second structural beam 131 are fixedly connected.

[0049] See also Figure 5A second sleeve 133 with openings at both ends is pre-buried in the second structural beam 131 , and the second bolt 152 is used to pass through the second sleeve 133 .

[0050] The second sleeve 133 can be embedded in the second structural beam 131 during the construction of the second structural beam 131. After the construction of the second structural beam 131 is completed, the inner hole of the second sleeve 133 forms a second bolt hole for the second bolt 152 to pass through. In this way, when installing the unloading platform, it is no longer necessary to drill the second bolt hole on the second structural beam 131, thereby improving the installation efficiency of the unloading platform.

[0051] See also Figure 1 , Figure 2 In order to improve the safety of workers when performing unloading operations on the suspended steel platform 11, a guardrail 16 is arranged around the suspended steel platform 11.

[0052] For example, see Figure 6 The guardrail 16 includes a vertically arranged support frame 161, and an iron sheet 162 and / or a steel plate mesh 163 arranged on the support frame 161. For example, the support frame 161 is welded from steel pipes, the lower end of the support frame 161 is welded to the suspended steel platform 11, the iron sheet 162 is installed on the lower section of the support frame 161, and the steel plate mesh 163 is installed on the upper section of the support frame 161.

[0053] The above is only a preferred embodiment of the present application and does not constitute any form of limitation to the present application. Based on the technical essence of the present application and within the spirit and principles of the present application, any simple modification, equivalent replacement and improvement of the above embodiments shall still fall within the protection scope of the technical solution of the present application.

Claims

1. A material unloading platform for construction, characterized in that: It comprises a suspended steel platform (11) arranged outside a first floor layer (10), one end of the suspended steel platform (11) is connected to a first structural beam (101) of the first floor layer (10), and both sides of the suspended steel platform (11) are connected to a second structural beam (131) of a second floor layer (13) above the first floor layer (10) via a tie rod assembly (12).

2. The unloading platform for construction according to claim 1, characterized in that: The suspended steel platform (11) comprises two main beams (111) arranged in parallel, a plurality of cross beams (112) fixed on the two main beams (111), and a patterned steel plate (113) laid on the plurality of cross beams (112); a main beam connecting plate (114) is fixed to one end of the main beam (111), and the main beam connecting plate (114) is connected to the first structural beam (101) via a first fastening assembly (14).

3. The unloading platform for construction according to claim 2, characterized in that: The first fastening assembly (14) comprises a first bolt (141) for passing through the first structural beam (101) and the main beam connecting plate (114), and a first nut (142) connected to the end of the first bolt (141).

4. The unloading platform for construction according to claim 3, characterized in that: A first sleeve (103) with openings at both ends is pre-buried in the first structural beam (101), and the first bolt (141) is used to pass through the first sleeve (103).

5. The unloading platform for construction according to claim 1, characterized in that: The tie rod assembly (12) includes a first tie rod (121) connected to the suspended steel platform (11), a second tie rod (122) connected to the second structural beam (131), and a turnbuckle bolt (123) connected between the first tie rod (121) and the second tie rod (122).

6. The unloading platform for construction according to claim 5, characterized in that: The second pull rod (122) is connected to the second structural beam (131) via a second fastening assembly (15).

7. The unloading platform for construction according to claim 6, characterized in that: The second fastening assembly (15) includes a second connecting plate (151) connected to the second pull rod (122), a second bolt (152) passing through the second structural beam (131) and the second connecting plate (151), and a second nut (153) connected to the end of the second bolt (152).

8. The unloading platform for construction according to claim 7, characterized in that: A second sleeve (133) with openings at both ends is pre-buried in the second structural beam (131), and the second bolt (152) is used to pass through the second sleeve (133).

9. The unloading platform for construction according to claim 1, characterized in that: A guardrail (16) is arranged around the suspended steel platform (11).

10. The unloading platform for construction according to claim 9, characterized in that: The guardrail (16) comprises a vertically arranged support frame (161), and an iron sheet (162) and / or a steel plate mesh (163) arranged on the support frame (161).