Tunnel steel arch joint structure and steel arch
By using the sawtooth splicing and connecting sleeves of the arc-shaped steel arch frame, the stress concentration problem caused by bolt fixing was solved, achieving uniform stress distribution on the steel arch frame and simplifying construction, thus improving the stability of the tunnel's initial support structure.
Patent Information
- Application Number
- CN202323551320.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-26
AI Technical Summary
The bolt fixing method of traditional steel arch frames leads to local stress concentration in the bolts, which is prone to failure and causes large deformation of the initial support structure.
The left and right steel arch frames are spliced together in a symmetrical arc shape. A continuous transition is achieved through sawtooth splicing joints, connecting sleeves and fixing pins to avoid shear stress concentration. Temporary pads are used to distribute the pressure.
This approach achieves uniform stress distribution on the steel arch frame, reduces deformation, simplifies construction steps, and improves the stability and construction efficiency of the initial support structure.
Smart Images

Figure CN221990396U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tunnel construction, and in particular relates to a tunnel steel arch frame joint structure and a steel arch frame. Background Art
[0002] Steel arch is a kind of primary support structure of tunnel, which is suitable for shallow buried section, tunnel entrance section or tunnel section with poor stratum lithology and high surrounding rock pressure. It has the advantages of strong anti-deformation ability and uniform force, and can effectively improve the bearing capacity of the initial support structure. Currently, there are two commonly used steel arches: steel frame and grid frame. The steel frame is made of H-shaped steel or I-shaped steel, and the grid frame is welded by a series of steel bars according to a certain structure.
[0003] Traditional steel arches are spliced with splicing plates and bolts, that is, square steel plates are welded at both ends of a section of steel arch, and bolt holes are set at the four corners of the steel plate. During installation, the splicing plates of the two sections of steel arches are aligned, screws are passed through the bolt holes, and nuts are tightened to achieve splicing. Since the steel arch structure is discontinuous at the splicing plate, the force between the steel arches is transmitted only by bolts, which often causes shear failure of the bolts due to the shear stress concentration at the splicing, and then causes large deformation of the primary support structure. Utility Model Content
[0004] The utility model provides a tunnel steel arch frame joint structure and a steel arch frame, aiming to solve the problem that the local stress of the bolts is large and the bolts are easy to fail when the steel arch frame is fixed with conventional bolts.
[0005] To this end, the utility model adopts the following technical solutions:
[0006] A tunnel steel arch frame joint structure and a steel arch frame, wherein the steel arch frame comprises a left steel arch frame and a right steel arch frame which are symmetrical on both sides, the left steel arch frame and the right steel arch frame are arc-shaped respectively, and the left steel arch frame and the right steel arch frame are spliced to form a complete arched steel arch frame, and the arched steel arch frame fits the tunnel lining;
[0007] The head end of the left steel arch frame forms a serrated joint, and the head end of the right steel arch frame also forms a serrated joint, and the left steel arch frame and the right steel arch frame are engaged with each other through the serrated joint; a notch is provided at the engagement point of the left steel arch frame and the right steel arch frame; a connecting sleeve is sleeved at the joint of the left steel arch frame and the right steel arch frame, and the inner cavity of the connecting sleeve is in contact with the outer side surface of the left steel arch frame and the right steel arch frame, and a through pin hole is opened on the connecting sleeve, and the pin hole corresponds to the notch; a fixing pin block is installed in the pin hole, and the fixing pin block is installed and fixed in the notch to fix the left steel arch frame and the right steel arch frame.
[0008] Furthermore, the cross section of the steel arch frame is an I-beam structure, the connecting sleeve is arc-shaped and has the same curvature as the steel arch frame, and the inner cavity of the adjusting sleeve is also I-shaped.
[0009] Furthermore, the notch on the steel arch frame is rectangular, the fixing pin block is also rectangular, and the fixing pin hole is welded and fixed to the connecting sleeve.
[0010] Furthermore, it also includes a temporary pad, which is used to connect to the tail ends of the left steel arch frame and the right steel arch frame; the temporary pad includes a fixed bottom plate of the connecting sleeve, and the fixed bottom plate is welded and fixed to the connecting sleeve.
[0011] The beneficial effects of the utility model are:
[0012] 1. Compared with the existing steel arch connection form, the utility model can effectively eliminate the problem of shear stress concentration on the bolts at the joint of two adjacent steel arch units;
[0013] By setting a connecting sleeve, the splicing between two adjacent steel arch frame units forms a continuous transition. When the surrounding rock pressure is transmitted from one unit to another, it is no longer concentrated only on the bolts between the splicing plates (because the cross-sectional area of the bolts is much smaller than that of the steel arch frame, the shear stress increases accordingly). The cross-sectional area at the splicing does not change significantly, and the shear stress will not increase. This can make the steel arch frame more evenly stressed, reduce deformation, and ensure the stability of the primary support structure.
[0014] 2. Compared with the existing steel arch connection form, the connection of the utility model is faster, does not require a bolt structure, and the alignment of the two steel arch units is also simpler;
[0015] By setting the connecting sleeve, the splicing between the steel arch frames is restricted within the cavity of the connecting sleeve, which makes alignment simpler. Due to the displacement limiting effect of the fixed pin block, no bolt structure is required, and the construction is faster.
[0016] 3. Compared with the existing steel arch structure, the temporary pad can disperse the pressure and prevent debris from entering the cavity of the connecting sleeve before connecting to the next level of steel arch unit. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the steel arch frame of the utility model;
[0018] Figure 2 It is a connection schematic diagram of the connection sleeve structure of the utility model;
[0019] Figure 3 It is a connection diagram of the steel arch frame of the utility model;
[0020] In the figure: 1-connecting sleeve, 2-steel arch frame, 3-temporary pad, 4-fixing pin block;
[0021] 11-connecting sleeve body, 12-pin hole;
[0022] 21-right steel arch, 22-lower tooth groove, 23-upper tooth groove. DETAILED DESCRIPTION
[0023] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments:
[0024] like Figure 1 As shown, a tunnel steel arch frame joint structure and a steel arch frame, the steel arch frame 2 includes a left steel arch frame and a right steel arch frame 21 which are symmetrical on the left and right. The left steel arch frame and the right steel arch frame 21 are respectively arc-shaped. The left steel arch frame and the right steel arch frame 21 are spliced to form a complete arched steel arch frame 2, and the arched steel arch frame 2 fits the tunnel lining.
[0025] like Figure 2 and 3 As shown, a serrated joint is formed at the head end of the left steel arch frame, and a serrated joint is also formed at the head end of the right steel arch frame 21, and the left steel arch frame and the right steel arch frame 21 are engaged with each other through the serrated joint; a rectangular notch is provided at the engagement point of the left steel arch frame and the right steel arch frame 21; a connecting sleeve 1 is sleeved at the joint of the left steel arch frame and the right steel arch frame 21, and the inner cavity of the connecting sleeve 1 is fitted with the outer side surface of the left steel arch frame and the right steel arch frame 21, and a through pin hole 12 is opened on the connecting sleeve 1, and the pin hole 12 corresponds to the notch; a fixing pin block 4 is installed in the pin hole 12, and the fixing pin block 4 is installed and fixed in the notch, so as to fix the left steel arch frame and the right steel arch frame 21.
[0026] The cross section of the steel arch is an I-beam structure, the connecting sleeve 1 is arc-shaped and has the same curvature as the steel arch, and the inner cavity of the adjusting sleeve is also I-shaped. The notch on the steel arch is rectangular, and the fixing pin block 4 is also rectangular. The fixing pin hole is welded and fixed on the connecting sleeve 1.
[0027] like Figure 1 As shown, it also includes a temporary pad 3, which is used to connect to the tail ends of the left steel arch frame and the right steel arch frame 21; the temporary pad 3 includes a fixed bottom plate of the connecting sleeve 1, and the fixed bottom plate is welded and fixed to the connecting sleeve 1.
[0028] During construction, the joints of two adjacent unit steel arch frames are fixed by connecting sleeves 1 and fixing pin blocks 4. In addition, the two ends can be combined with temporary pads 3 and inserted into fixing pin blocks 4 to form temporary supports. After the shotcrete is fixed and the next step is excavated, the fixing pin blocks 4 at both ends are pulled out, the temporary pads 3 are removed, the lower steel arch frame is inserted, the fixing pin blocks 4 are reinserted to fix, the concrete is shotcrete fixed, and the next step is excavated. The above steps are repeated until it is completely closed.
Claims
1. A tunnel steel arch joint structure, characterized in that: The steel arch frame joint comprises a left steel arch frame and a right steel arch frame (21) which are symmetrical with each other. The left steel arch frame and the right steel arch frame (21) are respectively arc-shaped. After the left steel arch frame and the right steel arch frame (21) are spliced together, a complete arched steel arch frame is formed. The arched steel arch frame fits the tunnel lining. The head end of the left steel arch frame forms a sawtooth joint, and the head end of the right steel arch frame (21) also forms a sawtooth joint. The left steel arch frame and the right steel arch frame (21) are engaged with each other through the sawtooth joint. A notch is provided at the engagement point between the left steel arch frame and the right steel arch frame (21). A connecting sleeve (1) is sleeved at the joint of the left steel arch frame and the right steel arch frame (21). The inner cavity of the connecting sleeve (1) is in contact with the outer side surfaces of the left steel arch frame and the right steel arch frame (21). A through latch hole (12) is provided on the connecting sleeve (1), and the latch hole (12) corresponds to the notch. A fixing pin block (4) is installed in the latch hole (12), and the fixing pin block (4) is installed and fixed in the notch to fix the left steel arch frame and the right steel arch frame (21).
2. The tunnel steel arch joint structure according to claim 1, characterized in that: The cross section of the steel arch frame is an I-beam structure, the connecting sleeve (1) is arc-shaped and has the same arc as the steel arch frame, and the inner cavity of the adjustment sleeve is also I-shaped.
3. The tunnel steel arch joint structure according to claim 1, characterized in that: The notch on the steel arch is rectangular, the fixing pin block (4) is also rectangular, and the fixing pin hole is welded and fixed to the connecting sleeve (1).
4. The tunnel steel arch joint structure according to claim 1, characterized in that: It also includes a temporary pad, which is used to connect to the tail ends of the left steel arch frame and the right steel arch frame (21); the temporary pad includes a fixed bottom plate of the connecting sleeve (1), and the fixed bottom plate is welded and fixed to the connecting sleeve (1).
5. A tunnel steel arch frame, characterized in that: It comprises the steel arch frame joint described in any one of claims 1-4.
Citation Information
Cited By
Combined corrugated plate self-adaptive yielding joint for soft rock large-deformation tunnel and design method of combined corrugated plate self-adaptive yielding joint
CN122610893A