Water mixing test system for primary pipe network of heat pump station
By designing the primary pipeline water mixing test system of the heat pump station, using the water mixer and PID controller to simulate the heating process, the problem of mutual constraints on flow and temperature regulation in the existing heating system is solved, and stable operation during heating is achieved and Energy saving and consumption reduction effect.
Patent Information
- Application Number
- CN202420670300.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-04-03
AI Technical Summary
During the heating process, existing heating systems have problems such as waste of resources, serious pollution and low heating efficiency. Especially due to the mutual constraints of flow and temperature regulation, the maximum value cannot be reached, resulting in unstable operation of the heating unit.
A heat pump station primary pipeline water mixing test system was designed, and the heating process was simulated through components such as heaters, water mixers, heat exchangers and PID controllers, and the flow rate and temperature of the primary and secondary pipelines were adjusted. The water mixing pipe is used to achieve temperature regulation and flow control, and test data are collected to optimize heating efficiency.
By simulating the heating system, flow and temperature regulation during heating is achieved, the stable operation of the heating unit is ensured, the goal of energy saving and consumption reduction is achieved, and the heating efficiency and resource utilization are improved.
Smart Images

Figure CN221993033U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of heating, and more specifically to a primary pipe network water mixing test system for a heat pump station. Background Art
[0002] In the cold winter in the north, residential areas generally need heating. Most of the existing residential areas are heated by centralized heating. The management level of heating companies is generally low, and there are problems such as waste of resources, serious pollution and low heating efficiency.
[0003] At present, the working principle of the existing heat exchange station is to transport the water supply of the heat exchange station to the heat user through the water supply pipeline of the external pipe network, and then supply heat to the user through the heat user radiator. The return water from the user radiator is then input into the heat exchanger through the return water pipeline in the heat exchange station through the input water pump, and then heat is exchanged by the heat exchanger, and then water is supplied to the external network through the pipeline, and the cycle repeats. This heating method will cause the flow and temperature regulation to affect each other during the heating process. When the flow increases, the temperature decreases, and when the temperature increases, the flow decreases. The flow and temperature regulation restrict each other, and it is impossible to make the flow and temperature regulation reach the maximum value.
[0004] In order to solve the above problems, a water mixing system is introduced to mix the heating water into the heating water supply pipe to ensure the temperature of the water supply. That is, when the water temperature on the primary side exceeds the set temperature, the water flow rate is reduced so that the system return water enters the primary side for repeated circulation to achieve the cooling and water mixing function. However, before the actual application, the temperature and flow adjustment range needs to be tested to obtain the relevant adjustment data to ensure that the goal of energy saving and consumption reduction can be achieved during the heating period. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide a primary pipe network water mixing test system for a heat pump station, to simulate an actual heating system, to obtain test data for temperature and flow regulation, so as to ensure stable operation of the heating unit during heating.
[0006] In order to solve the above technical problems, the technical solutions adopted by the present utility model are as follows.
[0007] A primary pipe network water mixing test system for a heat pump station comprises a heater for providing a heat source, a primary pipe network water inlet pipe and a primary pipe network water return pipe are respectively connected to the heater, the primary pipe network water inlet pipe is connected to a secondary pipe network water inlet pipe through a water mixer, the primary pipe network water return pipe is connected to the secondary pipe network water return pipe, a heat exchanger for simulating a heat unit is arranged between the secondary pipe network water inlet pipe and the secondary pipe network water return pipe, a mixing pipe is arranged between the water mixer and the primary pipe network water return pipe and the secondary pipe network water return pipe; the primary pipe network water inlet pipe is provided with a first pump for sending hot water into the secondary pipe network and a primary pipe network water inlet for detecting the primary pipe network water inlet temperature. thermometer; the secondary pipe network water inlet pipe is provided with a circulation pump for sending water in the secondary pipe network into the heat exchanger for circulation and a secondary pipe network water inlet thermometer for detecting the secondary pipe network water inlet temperature; the mixing water pipe is provided with a second pump for sending mixed water into the water mixer and a mixing water thermometer for detecting the mixed water temperature; the system also includes a PID controller for controlling heating, the output ends of the first pipe network water inlet thermometer, the second pipe network water inlet thermometer and the mixing water thermometer are respectively connected to the input end of the PID controller, and the output end of the PID controller is respectively connected to the input end of the first pump, the circulation pump and the second pump.
[0008] To further optimize the technical solution, the primary network water inlet pipe is provided with a primary network flow control valve for adjusting the primary network water inlet flow and a primary network water inlet flow meter for collecting the primary network water inlet flow, the output end of the primary network water inlet flow meter is connected to the input end of the PID controller, and the output end of the PID controller is connected to the input end of the primary network flow control valve.
[0009] To further optimize the technical solution, the secondary pipe network water inlet pipe is provided with a secondary pipe network flow control valve for adjusting the secondary pipe network water inlet flow and a secondary pipe network water inlet flow meter for collecting the secondary pipe network water inlet flow, the output end of the secondary pipe network water inlet flow meter is connected to the input end of the PID controller, and the output end of the PID controller is connected to the input end of the secondary pipe network flow control valve.
[0010] To further optimize the technical solution, the mixing water pipe is provided with a mixing water flow regulating valve for adjusting the mixing water flow and a mixing water flow meter for collecting the water inlet flow of the mixing water pipe, the output end of the mixing water flow meter is connected to the input end of the PID controller, and the output end of the PID controller is connected to the input end of the mixing water flow regulating valve.
[0011] To further optimize the technical solution, a primary pipe network return water thermometer for collecting the primary pipe network return water temperature is provided on the primary pipe network return water pipe, and the output end of the primary pipe network return water thermometer is connected to the input end of the PID controller.
[0012] To further optimize the technical solution, a secondary pipe network return water thermometer for collecting the secondary pipe network return water temperature is provided on the secondary pipe network return water pipe, and the output end of the secondary pipe network return water thermometer is connected to the input end of the PID controller.
[0013] Due to the adoption of the above technical scheme, the technical progress achieved by the present invention is as follows.
[0014] The utility model provides a primary pipe network water mixing test system for a heat pump station. By simulating an actual heating system, after the water supply temperature of the primary pipe network exceeds the set temperature, the water supply flow of the primary pipe network is reduced. At this time, mixed water is introduced from the mixing pipe through a water mixer to achieve the purpose of cooling, thereby obtaining test data for adjustment during the heating period to ensure the stable operation of the heating unit during the heating period. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the utility model.
[0016] Among them: 1. Heater, 2. Primary pipe network inlet pipe, 3. Primary pipe network return pipe, 4. Primary pipe network flow control valve, 5. Primary pipe network inlet thermometer, 6. Primary pipe network inlet flowmeter, 7. First pump, 8. Water mixer, 9. Secondary pipe network flow control valve, 10. Circulation pump, 11. Secondary pipe network inlet thermometer, 12. Secondary pipe network inlet flowmeter, 13. Secondary pipe network inlet pipe, 14. Heat exchanger, 15. Secondary pipe network return thermometer, 16. Secondary pipe network return pipe, 17. Mixing water flow control valve, 18. Secondary pump, 19. Mixing water thermometer, 20. Mixing water flowmeter, 21. Mixing water pipe, 22. Primary pipe network return water thermometer, 23. PID controller. DETAILED DESCRIPTION
[0017] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0018] A heat pump station primary pipe network mixing water test system, combined with Figure 1 As shown, the system comprises a heater 1, to which a primary network water inlet pipe 2 and a primary network water return pipe 3 are respectively connected, the primary network water inlet pipe 2 is connected to a secondary network water inlet pipe 13 through a water mixer 8, the primary network water return pipe 3 is connected to a secondary network water return pipe 16, a heat exchanger 14 is arranged between the secondary network water inlet pipe and the secondary network water return pipe to simulate a heat unit, and a mixing water pipe 21 is arranged between the mixing water pipe 8 and the primary network water return pipe and the secondary network water return pipe. The system also comprises a PID controller 23 to control the heating supply.
[0019] A primary network flow control valve 4, a primary network water inlet thermometer 5, a primary network water inlet flowmeter 6 and a first pump 7 are provided on the primary network water inlet pipe 2. The primary network flow control valve 4 is used to adjust the primary network water inlet flow, the primary network water inlet thermometer 5 is used to detect the water inlet temperature of the primary network, the primary network water inlet flowmeter 6 is used to collect the primary network water inlet flow, and the first pump 7 is used to deliver the hot water of the heater into the secondary network. The output ends of the primary network water inlet thermometer and the primary network water inlet flowmeter are connected to the input end of the PID controller, and the output end of the PID controller is connected to the primary network flow control valve and the input end of the first pump.
[0020] A primary pipe network return water thermometer 22 is provided on the primary pipe network return water pipe for collecting the primary pipe network return water temperature. The output end of the primary pipe network return water thermometer is connected to the input end of the PID controller.
[0021] A secondary pipe network water inlet pipe 13 is provided with a secondary pipe network flow control valve 9, a circulation pump 10, a secondary pipe network water inlet thermometer 11 and a secondary pipe network water inlet flowmeter 12. The secondary pipe network flow control valve 9 is used to adjust the water inlet flow of the secondary pipe network. The circulation pump 10 is used to send the water in the secondary pipe network into the heat exchanger for circulation. The secondary pipe network water inlet thermometer 11 is used to detect the secondary pipe network water inlet temperature. The secondary pipe network water inlet flowmeter 12 is used to collect the secondary pipe network water inlet flow. The output ends of the secondary pipe network water inlet thermometer and the secondary pipe network water inlet flowmeter are respectively connected to the input ends of the PID controller, and the output ends of the PID controller are respectively connected to the input ends of the secondary pipe network flow control valve and the circulation pump.
[0022] A secondary pipe network return water thermometer 15 is provided on the secondary pipe network return water pipe 16 for collecting the return water temperature of the secondary pipe network. The output end of the secondary pipe network return water thermometer is connected to the input end of the PID controller.
[0023] The mixing water pipe 21 is provided with a mixing water flow regulating valve 17, a second pump 18, a mixing water thermometer 19 and a mixing water flowmeter 20. The mixing water flow regulating valve 17 is used to regulate the mixing water flow, the second pump is used to deliver mixed water into the mixer, the mixing water thermometer is used to detect the mixed water temperature, and the mixing water flowmeter is used to collect the water flow rate entering the mixing water pipe. The output ends of the mixing water thermometer and the mixing water flowmeter are respectively connected to the input ends of the PID controller, and the output ends of the PID controller are respectively connected to the input ends of the mixing water flow regulating valve and the second pump.
[0024] When the utility model is working, water heated by the heater is sent into the water inlet pipe of the primary pipe network through the first pump, and the water inlet pipe of the primary pipe network is sent into the water inlet pipe of the secondary pipe network through the water mixer. Under the action of the circulating pump, the water flows back to the heater through the secondary pipe network return pipe and the primary pipe network return pipe via the heat exchanger to be heated again. In the heating process, the primary pipe network inlet thermometer, the secondary pipe network inlet thermometer, the primary pipe network return water thermometer and the secondary pipe network return water thermometer monitor the water temperature in real time, and the water supply flow is monitored in real time through each flow meter. However, after the water supply temperature of the primary pipe network exceeds the set temperature, the water supply flow of the primary pipe network is reduced. At this time, mixed water is introduced from the mixing pipe through the water mixer to achieve the purpose of cooling, thereby obtaining experimental data to ensure that the goal of energy saving and consumption reduction is achieved during the heating period.
Claims
1. A heat pump station primary pipe network water mixing test system, characterized by: The invention comprises a heater (1) for providing a heat source, wherein the heater (1) is respectively connected to a primary pipe network water inlet pipe (2) and a primary pipe network water return pipe (3), the primary pipe network water inlet pipe (2) is connected to a secondary pipe network water inlet pipe (13) via a water mixer (8), the primary pipe network water return pipe (3) is connected to a secondary pipe network water return pipe (16), a heat exchanger (14) for simulating a heat unit is arranged between the secondary pipe network water inlet pipe and the secondary pipe network water return pipe, and a mixing pipe (21) is arranged between the water mixer (8) and the primary pipe network water return pipe and the secondary pipe network water return pipe; the primary pipe network water inlet pipe (2) is provided with a first pump (7) for sending hot water into the secondary pipe network and a primary pipe network water inlet pipe for detecting the primary pipe network water inlet temperature. Thermometer (5); the secondary pipe network water inlet pipe (13) is provided with a circulation pump (10) for sending water in the secondary pipe network into the heat exchanger for circulation and a secondary pipe network water inlet thermometer (11) for detecting the secondary pipe network water inlet temperature; the mixing water pipe (21) is provided with a second pump (18) for sending mixed water into the water mixer and a mixed water thermometer (19) for detecting the mixed water temperature; the system also includes a PID controller (23) for controlling heat supply, the output ends of the first pipe network water inlet thermometer, the second pipe network water inlet thermometer and the mixed water thermometer are respectively connected to the input end of the PID controller, and the output end of the PID controller is respectively connected to the input end of the first pump, the circulation pump and the second pump.
2. A heat pump station primary pipe network water mixing test system according to claim 1, characterized in that: The primary pipe network water inlet pipe (2) is provided with a primary pipe network flow control valve (4) for adjusting the primary pipe network water inlet flow rate and a primary pipe network water inlet flow meter (6) for collecting the primary pipe network water inlet flow rate, the output end of the primary pipe network water inlet flow meter is connected to the input end of the PID controller, and the output end of the PID controller is connected to the input end of the primary pipe network flow control valve.
3. A heat pump station primary pipe network water mixing test system according to claim 1, characterized in that: The secondary pipe network water inlet pipe (13) is provided with a secondary pipe network flow control valve (9) for adjusting the secondary pipe network water inlet flow rate and a secondary pipe network water inlet flow meter (12) for collecting the secondary pipe network water inlet flow rate, the output end of the secondary pipe network water inlet flow meter is connected to the input end of the PID controller, and the output end of the PID controller is connected to the input end of the secondary pipe network flow control valve.
4. A heat pump station primary pipe network water mixing test system according to claim 1, characterized in that: The mixing water pipe (21) is provided with a mixing water flow regulating valve (17) for regulating the mixing water flow and a mixing water flow meter (20) for collecting the water flow rate of the mixing water pipe, the output end of the mixing water flow meter is connected to the input end of the PID controller, and the output end of the PID controller is connected to the input end of the mixing water flow regulating valve.
5. A heat pump station primary pipe network water mixing test system according to claim 1, characterized in that: The primary pipe network return water pipe (3) is provided with a primary pipe network return water thermometer (22) for collecting the primary pipe network return water temperature, and the output end of the primary pipe network return water thermometer is connected to the input end of the PID controller.
6. A heat pump station primary pipe network water mixing test system according to claim 1, characterized in that: The secondary pipe network return water pipe (16) is provided with a secondary pipe network return water thermometer (15) for collecting the secondary pipe network return water temperature, and the output end of the secondary pipe network return water thermometer is connected to the input end of the PID controller.