Automatic control device applied to greenhouse gas downcast long pipe sampling

By designing automatic control devices, using balloons and parachutes to achieve vertical profile sampling of greenhouse gases, the problems of complex structure and high cost in the prior art are solved, and efficient and low-cost greenhouse gas detection and data acquisition are achieved.

CN221993137UActive Publication Date: 2024-11-12CMA METEOROLOGICAL OBSERVATION CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323309281.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-05
Publication Date
2024-11-12
Estimated Expiration
2033-12-05

AI Technical Summary

Technical Problem

In the prior art, the greenhouse gas vertical profile detection device has a complex structure and high control cost, which cannot meet my country's high-precision detection needs, especially in the observation of vertical profiles of atmospheric factors and the monitoring and early warning of urban heavy precipitation.

Method used

An automatic control device applied to sampling of greenhouse gas under-casting long tubes is designed, including balloons, automatic tangent mechanisms, pods and sampling metal tubes. The balloons are automatically cut off and open the parachute after they are lifted off, and the gravity drop is achieved at different heights. Gas vertical profile sampling, using battery control board and fuse coil to achieve balloon cutting, and combining communication modules, GPS positioning modules and sensors for automatic detection and data transmission.

Benefits of technology

It realizes low-cost, simple operation automated gas sampling and detection, can sample vertical profiles at different heights, monitor and store data in real time, and provides real-time communication and GPS positioning information, reducing the control cost and operation complexity of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221993137U_ABST
    Figure CN221993137U_ABST
Patent Text Reader

Abstract

The utility model relates to a greenhouse effect gas detection device, in particular to an automatic control device applied to greenhouse gas downcast long pipe sampling. The device structurally comprises a sampling control device, the upper portion of the sampling control device is connected with a balloon through a balloon connecting line and connected with a parachute, and the sampling control device is connected with the balloon connecting line through an automatic line cutting mechanism. And a controller for controlling the automatic wire cutting mechanism to automatically cut off the balloon connecting wire is arranged in the sampling control device. The device is low in manufacturing cost, simple to operate and good in stability, and can automatically judge air pressure and height, actively cut off the balloon, automatically open the balloon, automatically detect and collect gas and automatically and manually close the gas sampling pipe of the electromagnetic valve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a greenhouse effect gas detection device, in particular to an automatic control device used for greenhouse gas long-tube sampling. Background Art

[0002] GHG (Greenhouse Gas, GHG) or greenhouse gas refers to those natural and artificial gaseous components in the atmosphere that absorb and re-emit infrared radiation, including more than 30 gases such as carbon dioxide, methane, carbon monoxide, chlorofluorocarbons and ozone, which are transparent to solar shortwave radiation (absorb very little) and have strong absorption effects on longwave radiation.

[0003] With the rapid development of my country's economy and global warming, the international public opinion pressure on the reduction of greenhouse gas emissions is increasing. my country's existing high-precision atmospheric greenhouse gas detection equipment is in great demand and almost completely relies on imports. Carrying out vertical profile observations of atmospheric temperature, humidity, wind, hydrometeors and aerosols, and obtaining the thermodynamic state and evolution process in the atmospheric boundary layer have become important prerequisites for urban heavy rainfall monitoring and early warning. Under the existing technology, my country's vertical profile detection devices generally have the shortcomings of complex structure and high control cost. Summary of the invention

[0004] In order to solve the problems of the prior art, the utility model provides an automatic control device for long-tube sampling of greenhouse gases. It has low production cost, simple operation and good stability. It can automatically judge the air pressure and altitude, actively cut off the balloon and automatically open the parachute, automatically detect and collect gas, and automatically and manually close the solenoid valve gas sampling tube.

[0005] The technical solution adopted by the utility model is as follows:

[0006] An automatic control device for greenhouse gas long-tube sampling includes a sampling control device, a balloon is connected to the sampling control device via a balloon connecting line, and a parachute is connected to the sampling control device, the sampling control device is connected to the balloon connecting line via an automatic tangent mechanism, and a controller is provided in the sampling control device for controlling the automatic tangent mechanism to automatically cut off the balloon connecting line.

[0007] Preferably, the automatic wire cutting mechanism includes a battery, a wire harness opening is provided on the outer side of the battery, the balloon connecting wire passes through the wire harness opening, and the battery is connected to a fuse coil provided outside the balloon connecting wire through a wire on a battery control panel.

[0008] Preferably, the sampling control device includes a pod, a sampling metal tube is arranged in the pod, an atmosphere collection port is arranged at one end of the sampling metal tube, the atmosphere collection port is placed outside the pod, a switch valve is arranged at the atmosphere collection port, a protection valve is arranged at the other end of the sampling metal tube, the switch valve is electrically connected to the controller, and the controller is also electrically connected to a communication module, an alarm module, a GPS positioning module, a temperature and humidity sensor and a pressure sensor.

[0009] Preferably, a drying tube is provided at the atmosphere collection port.

[0010] Preferably, the sampling metal tube is 100 meters long and is spirally coiled in the nacelle.

[0011] The beneficial effects brought by the technical solution provided by the utility model are:

[0012] The utility model discloses an automatic control device for greenhouse gas long tube sampling, which can use balloons to raise the sampling long tube and related detection devices to high altitudes, automatically cut off the balloon when the altitude reaches the required level, open a parachute, and descend by gravity, and realize vertical profile sampling and detection of atmospheric gases at different altitudes during the descent. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0014] Figure 1 It is a structural schematic diagram of an automatic control device for greenhouse gas long-tube sampling in the utility model;

[0015] Figure 2 This is a structural principle diagram of a sampling control device of an automatic control device for greenhouse gas long-tube sampling in the utility model;

[0016] Figure 3 The utility model is a structural principle diagram of an automatic tangent mechanism of an automatic control device for greenhouse gas long-tube sampling. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.

[0018] Embodiment 1

[0019] As attached Figure 1 As shown, the present embodiment is an automatic control device for greenhouse gas long tube sampling, including a sampling control device, wherein the sampling control device is connected to a balloon 2 via a balloon connecting line 1 and is also connected to a parachute 3, the sampling control device is connected to the balloon connecting line 1 via an automatic tangent mechanism 16, and the sampling control device is provided with a controller 4 for controlling the automatic tangent mechanism to automatically cut off the balloon connecting line 1.

[0020] The sampling control device of this embodiment includes a pod 5, a sampling metal tube 6 is arranged in the pod 5, an air collection port 7 is arranged at one end of the sampling metal tube 6, the air collection port 7 is placed outside the pod 5, a switch valve 8 is arranged at the air collection port 7, a protection valve 9 is arranged at the other end of the sampling metal tube 6, the switch valve 8 is electrically connected to the controller 4, and the controller 4 is also electrically connected to a communication module 10, an alarm module 11, a GPS positioning module 12, a temperature and humidity sensor 13 and a pressure sensor 14.

[0021] The communication module adopts the Iridium JT007 data transmission terminal, the sound and light alarm module adopts the CMC600-SG sound and light alarm device, the GPS positioning module adopts the ublox-6 positioning module, the temperature and humidity sensor adopts the SHT75 temperature and humidity sensor, and the pressure sensor adopts the XGZP6828 pressure sensor.

[0022] As attached Figure 3 As shown, the automatic wire cutting mechanism 16 of this embodiment includes a battery 161, and a wire harness opening 162 is arranged on the outer side of the battery 161. The balloon connecting wire 1 passes through the wire harness opening 162, and the battery 161 is connected to a fuse coil 165 arranged outside the balloon connecting wire 1 through a wire 164 on a battery control board 163.

[0023] When the air pressure reaches a certain intensity, the battery control board 163 gives a signal, the positive and negative poles of the battery are short-circuited through the fuse coil, and when the fuse coil reaches a certain temperature, the balloon connecting line 1 is melted and then cut. When it is judged that the air pressure is reduced, in order to protect the battery, the control board gives a signal to disconnect the positive and negative poles and the signal board.

[0024] A drying pipe 15 is provided at the atmosphere collecting port 7 .

[0025] The sampling metal tube of this embodiment is 100 meters long and is spirally coiled in the pod 5 .

[0026] This embodiment automatically monitors and stores various data of the external temperature, humidity, and pressure of the device during the measurement and sampling process, and can automatically monitor and store the temperature of different points of the long tube.

[0027] In this embodiment, a communication module is provided during the measurement and sampling process, which can communicate and send various collected data and GPS location information to the ground in real time, and can track the sampling device in real time. Two modes of real-time storage and real-time transmission are used in parallel for all parameters.

[0028] In the measurement and sampling process of this embodiment, a 100-meter hollow and slender sampling metal tube 6 is placed, and standard gas (nitrogen) is filled on the ground. The sampling tube is emptied as the air pressure changes during the ascent of the balloon. When it rises to a certain height, the battery control board 163 controls the fuse coil 165 to heat and fuse the balloon connecting line 1. After the balloon is cut off and the balloon is descended by parachute, the gases at different heights are sampled and stored in the sampling metal tube 6 due to the change in external gas pressure.

[0029] The sampling metal tube 6 is provided with a switch valve 8 and a pressure sensor 14 to automatically detect changes in the external pressure value. When the pressure value reaches P=10kPa, the ground computer terminal software will automatically prompt that the specified pressure altitude has been reached and confirm whether to cut off the balloon. After confirmation, the balloon will be automatically cut off and the parachute will be automatically opened.

[0030] A switch valve 8 is installed on one side of the air inlet of the sampling metal tube 6 to filter the water vapor in the sampled gas, ensure the dryness of the sampled gas, and facilitate analysis after sampling.

[0031] When the sampling automatic control device determines that the pressure change is less than 10Pa / s after landing, the sampling tube solenoid valve can be closed remotely and automatically or manually, and meteorological parameters and GPS positioning data can be continuously sent.

[0032] This embodiment is provided with an audible and visual alarm, which automatically initiates an audible and visual alarm 3 hours after landing to prevent the GPS signal near the device from being weak or inaccurate, so that the device can be found by sound and light.

[0033] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An automatic control device for greenhouse gas long tube sampling, comprising a sampling control device, wherein a balloon is connected to the sampling control device via a balloon connecting line and a parachute is connected to the sampling control device. It is characterized in that The sampling control device is connected to the balloon connection line through an automatic cutting mechanism, and a controller for controlling the automatic cutting mechanism to automatically cut off the balloon connection line is provided in the sampling control device.

2. An automatic control device for greenhouse gas long-tube sampling according to claim 1, It is characterized in that The automatic wire cutting mechanism includes a battery, a wire harness opening is arranged on the outer side of the battery, the balloon connecting wire passes through the wire harness opening, and the battery is connected to a fuse coil arranged outside the balloon connecting wire through a wire on a battery control panel.

3. An automatic control device for greenhouse gas long-tube sampling according to claim 1, It is characterized in that The sampling control device includes a pod, a sampling metal tube is arranged in the pod, an atmosphere collection port is arranged at one end of the sampling metal tube, the atmosphere collection port is placed outside the pod, a switch valve is arranged at the atmosphere collection port, a protection valve is arranged at the other end of the sampling metal tube, the switch valve is electrically connected to the controller, and the controller is also electrically connected to a communication module, an alarm module, a GPS positioning module, a temperature and humidity sensor and a pressure sensor.

4. An automatic control device for greenhouse gas long-tube sampling according to claim 3, It is characterized in that The atmosphere collection port is provided with a drying tube.

5. The automatic control device for greenhouse gas long-tube sampling according to claim 3, It is characterized in that The sampling metal tube is 100 meters long and is spirally coiled in the nacelle.