Three-station flaring device
By designing a three-station flaring device, using the coordinated work of components such as installation plates and loading motors, the problem of low automation of the existing flaring device is solved, efficient and accurate pipe processing is achieved, and production efficiency and quality are improved. .
Patent Information
- Application Number
- CN202323578764.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-27
AI Technical Summary
The existing flaring devices are only equipped with flaring equipment, and the degree of automation of processing is low, making it difficult to meet the manufacturing industry's needs for high efficiency and precise processing.
A three-station flaring device is designed, including a mounting plate, a feeding motor, a storage box, a feeding table, a station displacement cylinder, a punching needle, a punching cylinder, a positioning cylinder, a pipe clamping table and a feeding cylinder. Through the collaborative work of these components, automated loading, primary and secondary flaring processing of pipes is achieved.
It improves the degree of automation of processing, is simple to operate and easy to adjust, can achieve processing of a variety of pipe specifications, improves production efficiency and product quality, and reduces material waste and costs.
Smart Images

Figure CN222001568U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of mechanical processing, in particular to a three-station expanding device. Background Art
[0002] Nowadays, the goal of pursuing higher efficiency and more precise processing in the manufacturing industry has become increasingly prominent. In this context, factories and manufacturing companies are faced with the challenge of constantly seeking innovation and automation solutions. Among them, the improvement of pipe processing technology and the use of automated devices have become one of the focuses of the manufacturing industry. Pipe processing sometimes requires expansion processing, which requires the use of expansion devices.
[0003] China Utility Model Patent Publication No.: CN 209035317 U, discloses: a flaring device, which has a simple structure, is easy to operate, is suitable for metal pipes of various specifications, and is formed in one step without rework, thereby speeding up production efficiency and quality, avoiding material waste, and saving costs. However, the flaring device is only provided with a flaring device, and the degree of automation of the processing is low. Summary of the invention
[0004] The technical problem to be solved by the utility model is to provide a three-station expanding device, which can effectively solve the problems that the expanding device in the prior art is only provided with expanding equipment and the degree of automation of processing is low.
[0005] The technical solution adopted by the utility model is: a three-station expanding device, comprising a mounting plate, a material displacing motor is arranged above the mounting plate, a material storage box is arranged at the upper end of the mounting plate, a material receiving table is arranged at the lower end of the material storage box, a station shifting cylinder is arranged at the upper end of the mounting plate, a punching needle is arranged above the mounting plate, the upper end of the mounting plate is fixedly connected to a punching cylinder, two punching needles are arranged above the mounting plate, the upper end of the mounting plate is fixedly connected to the two punching cylinders, a positioning cylinder is arranged at the upper end of the mounting plate, a pipe clamping table is arranged at the upper end of the mounting plate, the upper end of the mounting plate is fixedly connected to the pipe pressing cylinder, and the upper end of the mounting plate is fixedly connected to the feeding cylinder.
[0006] Preferably, the rear end of the material storage box is fixedly connected to the material discharging motor, and the lower end of the material storage box is provided with a material discharge trough corresponding to the material receiving platform.
[0007] Through the above technical scheme, a material storage box and a material shifting motor are set up. When in use, the pipes to be processed are placed in the material storage box. Under the slow rotation of the material shifting motor, the pipes are evenly discharged into the material discharge trough of the material storage box, and the pipe at the bottom falls onto the receiving platform.
[0008] Preferably, a feed opening is provided at the upper end of the mounting plate, and the feed opening is arranged in front of the storage box.
[0009] Through the above technical solution, a feed opening is provided to facilitate the discharge of processed pipes from the feed opening.
[0010] Preferably, the output end of the workstation shift cylinder is fixedly connected to the right side of the pipe clamping platform, and the output end of the positioning cylinder is fixedly connected to the left side of the pipe clamping platform.
[0011] Through the above technical scheme, a work-station shift cylinder and a positioning cylinder are set up, which cooperate with each other to make the movement of the pipe clamping table more stable and accurate. When in use, the feeding cylinder moves forward to push the pipe on the upper end of the receiving table to the upper end of the pipe clamping table, the work-station shift cylinder moves forward, and the positioning cylinder moves backward, driving the pipe clamping table to align with a punching cylinder for easy processing.
[0012] Preferably, the output end of the first punch cylinder is fixedly connected to the first punch needle, and the output end of the second punch cylinder is fixedly connected to the second punch needle.
[0013] Through the above technical scheme, the first punch cylinder moves forward, through the first punch needle, the first stage expansion is performed on the pipe, and it returns after the punch is in place, the positioning cylinder retreats, and the work shift cylinder moves forward to align the pipe clamping table with the second punch cylinder, and the second punch cylinder moves forward, through the second punch needle, the second stage expansion is performed on the pipe, and it returns after the punch is in place.
[0014] Preferably, the output end of the feeding cylinder corresponds to the outlet of the feeding chute of the material storage box, and the output end of the pipe clamping cylinder corresponds to the pipe clamping platform.
[0015] Through the above technical solution, a pipe pressing cylinder is provided. When in use, the pipe pressing cylinder presses down to press the pipe on the upper end of the pipe clamping table, which is convenient for processing.
[0016] Preferably, the pipe clamping platform is at the No. 1 station when it is aligned with the receiving platform, the pipe clamping platform is at the No. 2 station when it is aligned with the first punching cylinder, and the pipe clamping platform is at the No. 3 station when it is aligned with the second punching cylinder.
[0017] Through the above technical scheme, the pipe clamping table automatically loads materials at station No. 1, performs primary expansion at station No. 2, performs secondary expansion at station No. 3, and then returns to station No. 1. The feeding cylinder moves forward to feed the next pipe into the pipe clamping table, while pushing the finished secondary expanded pipe into the unloading port to complete the secondary expansion process.
[0018] Compared with the prior art, the utility model provides a three-station expansion device, which has the following beneficial effects:
[0019] 1. The three-station expansion device can be moved and positioned horizontally, is easy to operate, convenient to adjust, easy to master, has a high degree of automation, and one person can take care of multiple units;
[0020] 2. The three-station expanding device can process various pipe specifications. By simply replacing the tools and dies on the stations, the process requirements of expanding, deep drawing, closing, and calibrating can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The three-dimensional structure of the utility model is shown in FIG. Figure 1 ;
[0022] Figure 2 The three-dimensional structure of the utility model is shown in FIG. Figure 2 ;
[0023] Figure 3 The three-dimensional structure of the utility model is shown in FIG. Figure 3 ;
[0024] Figure 4 The three-dimensional structure of the utility model is shown in FIG. Figure 4 ;
[0025] Figure 5 The three-dimensional structure of the utility model is shown in FIG. Figure 5 .
[0026] Among them: 1. Mounting plate; 2. Material shifting motor; 3. Material storage box; 4. Material receiving platform; 5. Workstation displacement cylinder; 6. One punch needle; 7. One punch cylinder; 8. Two punch needles; 9. Two punch cylinders; 10. Positioning cylinder; 11. Pipe clamping platform; 12. Pipe pressing cylinder; 13. Material feeding cylinder. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] Embodiment 1: Figure 1-5 As shown, the utility model provides a three-station expanding device, including a mounting plate 1, a material displacing motor 2 is arranged above the mounting plate 1, a material storage box 3 is arranged at the upper end of the mounting plate 1, a material receiving platform 4 is arranged at the lower end of the material storage box 3, a station shifting cylinder 5 is arranged at the upper end of the mounting plate 1, a punching needle 6 is arranged above the mounting plate 1, a punching cylinder 7 is fixedly connected to the upper end of the mounting plate 1, a second punching needle 8 is arranged above the mounting plate 1, and the upper end of the mounting plate 1 is fixedly connected to the second punching cylinder 9, a positioning cylinder 10 is arranged at the upper end of the mounting plate 1, a pipe clamping platform 11 is arranged at the upper end of the mounting plate 1, a pipe pressing cylinder 12 is fixedly connected to the upper end of the mounting plate 1, and a feeding cylinder 13 is fixedly connected to the upper end of the mounting plate 1.
[0029] Specifically, the rear end of the material storage box 3 is fixedly connected to the material shifting motor 2, and the lower end of the material storage box 3 is provided with a material discharge trough corresponding to the material receiving platform 4. The advantage is that the material storage box 3 and the material shifting motor 2 are provided, and when in use, the pipes to be processed are placed in the material storage box 3, and under the slow rotation of the material shifting motor 2, the pipes are evenly discharged into the material discharge trough of the material storage box 3, and the bottom pipe falls onto the material receiving platform 4.
[0030] Specifically, a feeding port is provided at the upper end of the mounting plate 1, and the feeding port is arranged in front of the material storage box 3. The advantage is that the feeding port is provided, so that the processed pipe can be discharged from the feeding port.
[0031] Specifically, the output end of the workstation shift cylinder 5 is fixedly connected to the right side of the pipe clamping platform 11, and the output end of the positioning cylinder 10 is fixedly connected to the left side of the pipe clamping platform 11. The advantage is that the workstation shift cylinder 5 and the positioning cylinder 10 are provided, and the mutual cooperation makes the movement of the pipe clamping platform 11 more stable and accurate. When in use, the feeding cylinder 13 moves forward to push the pipe on the upper end of the receiving platform 4 to the upper end of the pipe clamping platform 11, the workstation shift cylinder 5 moves forward, and the positioning cylinder 10 moves backward, driving the pipe clamping platform 11 to align with the punching cylinder 7, which is convenient for processing.
[0032] Embodiment 2: Figure 2-5 As shown, as an improvement to the previous embodiment.
[0033] Specifically, the output end of the first punch cylinder 7 is fixedly connected to the first punch needle 6, and the output end of the second punch cylinder 9 is fixedly connected to the second punch needle 8. The advantage is that the first punch cylinder 7 moves forward, through the first punch needle 6, the first stage of expansion of the pipe is performed, and it returns after being punched in place, the positioning cylinder 10 retreats, and the work shift cylinder 5 moves forward to align the pipe clamping platform 11 with the second punch cylinder 9, and the second punch cylinder 9 moves forward, through the second punch needle 8, the second stage of expansion of the pipe is performed, and it returns after being punched in place.
[0034] Specifically, the output end of the feeding cylinder 13 corresponds to the outlet of the material storage box 3, and the output end of the pipe clamping cylinder 12 corresponds to the pipe clamping platform 11. The advantage is that the pipe clamping cylinder 12 is provided, and when in use, the pipe clamping cylinder 12 presses down to clamp the pipe on the upper end of the pipe clamping platform 11, which is convenient for processing.
[0035] Specifically, the pipe clamping platform 11 is at the No. 1 station when it is aligned with the receiving platform 4, at the No. 2 station when it is aligned with the first punching cylinder 7, and at the No. 3 station when it is aligned with the second punching cylinder 9. The advantage is that the pipe clamping platform 11 automatically loads at the No. 1 station, performs primary expansion at the No. 2 station, performs secondary expansion at the No. 3 station, and then returns to the No. 1 station. The feeding cylinder 13 moves forward to feed the next pipe into the pipe clamping platform 11, and at the same time, pushes the finished pipe with secondary expansion into the unloading port to complete the secondary expansion process.
[0036] Working principle: When in use, put the pipe to be processed into the storage box 3, and under the slow rotation of the material-dispensing motor 2, the pipe is evenly discharged into the unloading trough of the storage box 3, and the bottom pipe falls onto the receiving platform 4, the positioning cylinder 10 moves forward, the work shift cylinder 5 retreats to drive the pipe clamping platform 11 to the No. 1 work station, the feeding cylinder 13 moves forward, and the bottom pipe is sent into the pipe clamping platform 11, and the pipe clamping cylinder 12 presses down to clamp the pipe on the upper end of the pipe clamping platform 11 for easy processing, and the positioning cylinder 10 and the work shift cylinder 5 start to drive the pipe clamping platform 11 to the No. 2 work station , the first punch cylinder 7 moves forward, passes through a punch needle 6, performs the first-level expansion on the pipe, and returns after being in place. The positioning cylinder 10 and the work shift cylinder 5 start to drive the pipe clamping platform 11 to the third station. The second punch cylinder 9 moves forward, passes through the second punch needle 8, performs the second-level expansion on the pipe, and returns after being in place. The positioning cylinder 10 and the work shift cylinder 5 start to drive the pipe clamping platform 11 back to the first station, the pipe clamping cylinder 12 relaxes, and the feeding cylinder 13 moves forward. While feeding the next pipe into the pipe clamping platform 11, the finished pipe with the second expansion is pushed into the discharge port to complete the secondary expansion process.
[0037] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A three-station expansion device, comprising a mounting plate (1), characterized in that: A material shifting motor (2) is arranged above the mounting plate (1), a material storage box (3) is arranged at the upper end of the mounting plate (1), a material receiving platform (4) is arranged at the lower end of the material storage box (3), a work shifting cylinder (5) is arranged at the upper end of the mounting plate (1), a punching needle (6) is arranged above the mounting plate (1), a punching cylinder (7) is fixedly connected to the upper end of the mounting plate (1), a second punching needle (8) is arranged above the mounting plate (1), a second punching cylinder (9) is fixedly connected to the upper end of the mounting plate (1), a positioning cylinder (10) is arranged at the upper end of the mounting plate (1), a pipe clamping platform (11) is arranged at the upper end of the mounting plate (1), a pipe pressing cylinder (12) is fixedly connected to the upper end of the mounting plate (1), and a feeding cylinder (13) is fixedly connected to the upper end of the mounting plate (1).
2. A three-station expansion device according to claim 1, characterized in that: The rear end of the material storage box (3) is fixedly connected to the material dispensing motor (2), and the lower end of the material storage box (3) is provided with a material discharge trough corresponding to the material receiving platform (4).
3. A three-station expansion device according to claim 1, characterized in that: The upper end of the mounting plate (1) is provided with a material discharge opening, and the material discharge opening is arranged in front of the material storage box (3).
4. A three-station expansion device according to claim 1, characterized in that: The output end of the workstation shift cylinder (5) is fixedly connected to the right side of the pipe clamping platform (11), and the output end of the positioning cylinder (10) is fixedly connected to the left side of the pipe clamping platform (11).
5. A three-station expansion device according to claim 1, characterized in that: The output end of the first punch cylinder (7) is fixedly connected to the first punch needle (6), and the output end of the second punch cylinder (9) is fixedly connected to the second punch needle (8).
6. A three-station expansion device according to claim 1, characterized in that: The output end of the feeding cylinder (13) corresponds to the outlet of the material discharge chute of the material storage box (3), and the output end of the pipe clamping cylinder (12) corresponds to the pipe clamping platform (11).
7. A three-station expansion device according to claim 1, characterized in that: When the pipe clamping platform (11) is aligned with the receiving platform (4), it is at the first workstation; when the pipe clamping platform (11) is aligned with the first punching cylinder (7), it is at the second workstation; when the pipe clamping platform (11) is aligned with the second punching cylinder (9), it is at the third workstation.