Tower drum stacking tool
By stacking tower tooling in the yard and installing it in the whole transport, the problems of transportation waste caused by single-layer transportation of fan towers and long dock occupation time are solved, the transit efficiency and yard capacity are improved, and the transportation cost is reduced. .
Patent Information
- Application Number
- CN202420016417.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-01-03
AI Technical Summary
In the prior art, single-layer transportation of fan towers causes the transport ship to increase tonnage, resulting in waste of transportation capacity. During stacking and transport, the process of crossing to the transport ship one by one takes up a long time on the dock and is less efficient.
A tower stacking tool is designed, by stacking and placing multiple fan towers in the height direction of the yard, and using the lifting part and support structure to form a through passageway, allowing the hoisting transportation device to be reversed and rolled tower stacked as a whole. Put workloads on the transport ship to reduce the time taken to the dock.
It improves the efficiency of the fan tower, reduces the time it takes to occupy the dock, makes full use of the yard height space, improves the yard capacity, and reduces transportation costs through overall transportation.
Smart Images

Figure CN222005752U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wind turbine tower transportation, in particular to a tower stacking tool. Background Art
[0002] At present, the domestic offshore wind turbine tower transportation is mainly single-layer transportation, and the transport ships generally use 3000-5000t deck barges. However, with the development of offshore wind power, the installation water depth is getting deeper and deeper, the offshore distance is getting farther and farther, and the sea conditions are getting worse and worse. Owners usually require transport ships to be no less than 8000t. Single-layer transportation causes a huge waste of transportation capacity. Stacked transportation is about to become a route to reduce transportation costs.
[0003] At present, in the stacking transportation plan, the process of transferring wind turbine towers to transport ships generally uses a special low-bed truck for towers to transport the wind turbine towers one by one from the yard to the front of the dock, and then uses a crane to lift the wind turbine towers one by one onto the transport ship. This takes a long time to occupy the dock and has low transfer efficiency. Utility Model Content
[0004] The main purpose of the utility model is to provide a tower stacking tool, aiming to solve the problem that the process of transferring wind turbine towers one by one to a transport ship currently takes a long time at the dock.
[0005] In order to achieve the above-mentioned purpose, the tower stacking tooling proposed by the utility model comprises:
[0006] A storage structure is formed with a plurality of storage portions arranged at intervals along the height direction, and the plurality of storage portions are extended in the width direction for accommodating the tower support; and
[0007] The supporting structure comprises two lifting parts, which are arranged at intervals in the width direction at the bottom of the storage structure to define a passage therebetween, and the passage can allow the lifting and transporting device to pass through.
[0008] Optionally, two support columns are further arranged between two adjacent storage portions, the two support columns are arranged at intervals along the width direction, and the support structure includes the support columns;
[0009] Wherein, the two lifting parts are installed on the storage part at the bottom.
[0010] Optionally, the two lifting parts are respectively arranged corresponding to the two supporting columns.
[0011] Optionally, the storage portion is detachably connected to the support column and / or the lifting portion.
[0012] Optionally, the length of the storage portion in the width direction is adjustable; and / or,
[0013] The length of the support column in the height direction is adjustable.
[0014] Optionally, a tying pull ring is respectively provided on the two support columns.
[0015] Optionally, the tying pull rings correspond one to one to form a tying group, and two groups of the tying groups are arranged in the length direction of the tower stacking tooling.
[0016] Optionally, a plurality of limiting portions are provided on the storage portion, and the plurality of limiting portions are arranged at intervals in the width direction for connecting to corresponding matching portions on the tower support.
[0017] Optionally, the positions of the plurality of limiting portions in the width direction are adjustable.
[0018] Optionally, the plurality of storage portions include a top storage portion at the top, and the top storage portion is provided with hanging ears at both ends of the width direction.
[0019] In the technical solution provided by the utility model, the storage structure can stack and place multiple wind turbine towers in the yard in the height direction through multiple storage parts, fully utilizing the height space of the yard and improving the capacity of the yard; in the process of transferring the wind turbine tower to the transport ship, the lifting part lifts the storage structure, so that the jacking and transportation device can enter the passage at the bottom thereof, and the tower stacking tooling is separated from the ground by the self-lifting action of the jacking and transportation device, and the jacking and transportation device can transport the tower stacking tooling and multiple wind turbine towers as a whole to the front of the wharf, after which the tower stacking tooling and multiple wind turbine towers can be continued to be rolled onto the transport ship as a whole through the jacking and transportation device, or the tower stacking tooling and multiple wind turbine towers can be hoisted onto the transport ship as a whole through the lifting slings. This scheme of stacking and installing multiple wind turbine towers in the yard with the help of the tower stacking tooling and then transferring them as a whole greatly improves the transfer efficiency of the wind turbine towers and reduces the occupation time of the wharf. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0021] Figure 1 A schematic diagram of the planar structure of the tower stacking tooling provided by the utility model storing the wind turbine towers;
[0022] Figure 2 for Figure 1 Schematic diagram of the three-dimensional structure of the tower stacking tooling.
[0023] Description of Figure Numbers:
[0024] Label name Label name 100 Tower stacking tooling 3 Tie-off ring 1 Storage structure 4 Limiting part 11 Storage Department 5 Lifting lugs 2 Support structure 200 Tower bracket 21 Support column 300 Wind turbine tower 22 Lifting part
[0025] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] It should be noted that if a directional indication is involved in the embodiments of the present invention, the directional indication is only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0028] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.
[0029] At present, the domestic offshore wind turbine tower transportation is mainly single-layer transportation, and the transport ships generally use 3000-5000t deck barges. However, with the development of offshore wind power, the installation water depth is getting deeper and deeper, the offshore distance is getting farther and farther, and the sea conditions are getting worse and worse. Owners usually require transport ships to be no less than 8000t. Single-layer transportation causes a huge waste of transportation capacity. Stacked transportation is about to become a route to reduce transportation costs.
[0030] At present, in the stacking transportation plan, the process of transferring wind turbine towers to transport ships generally uses a special low-bed truck for towers to transport the wind turbine towers one by one from the yard to the front of the dock, and then uses a crane to lift the wind turbine towers one by one onto the transport ship. This takes a long time to occupy the dock and has low transfer efficiency.
[0031] Analysis of the causes of the above problems shows that after individual wind turbine towers are transferred to the transport ship one by one, they need to be stacked and installed layer by layer to finally form a stable multi-layer structure. It is possible to consider pre-installing multiple wind turbine towers into a multi-layer structure in the yard, and then transporting and transferring them as a whole.
[0032] In view of this, the main purpose of the utility model is to propose a tower stacking tool, which aims to solve the problem that the process of transferring wind turbine towers one by one to transport ships currently takes up a long time at the dock.
[0033] See also Figure 1 and Figure 2 ,in, Figure 1 A schematic diagram of the planar structure of the tower stacking tooling provided by the utility model storing the wind turbine towers; Figure 2 for Figure 1 Schematic diagram of the three-dimensional structure of the tower stacking tooling.
[0034] The tower stacking tool 100 proposed in the utility model includes a storage structure 1 and a supporting structure 2. The storage structure 1 is formed with a plurality of storage portions 11 arranged at intervals along the height direction. The plurality of storage portions 11 are extended in the width direction for placing the tower support 200. The supporting structure 2 includes two lifting portions 22. The two lifting portions 22 are arranged at intervals in the width direction at the bottom of the storage structure 1 to define a passage therebetween, and the passage can allow the lifting and transportation device to pass through.
[0035] It should be noted that in the technical solution of the present application, the height direction, width direction and length direction are all based on the tower stacking tooling 100 as a reference;
[0036] The wind turbine tower 300 usually needs to use the tower support 200 during storage and transportation. The wind turbine tower 300 can be stably placed on a transportation device or a storage device through the tower support 200. The specific structure of the tower support 200 is not described in detail in the embodiment of the present application.
[0037] The storage part 11 is used to place the tower support 200. The wind turbine tower 300 is mainly stably held on the storage part 11 by its own weight. The specific shape of the storage part 11 can be various, as long as enough accommodation space can be formed between two adjacent storage parts 11 for placing the wind turbine tower 300 and the tower support 200. The storage direction of the multiple wind turbine towers 300 is the same direction, that is, the length direction of the tower stacking tool 100.
[0038] The function of the lifting part 22 is to lift the storage structure 1, so that a sufficient passage can be defined between the two lifting parts 22, and the passage can be passed through by the jacking and transportation device. When the jacking and transportation device enters the passage, it can lift the storage structure 1 as a whole off the ground through the jacking effect, so that it can carry the tower stacking tooling 100 and multiple wind turbine towers 300 and tower supports 200 and move as a whole. The specific structure of the jacking and transportation device is not elaborated in the embodiment of the present application, which generally includes a hydraulic axle vehicle.
[0039] In the technical solution provided by the utility model, the storage structure 1 can stack multiple wind turbine towers 300 in the height direction at the yard through multiple storage parts 11, making full use of the height space of the yard and improving the capacity of the yard; in the process of transferring the wind turbine tower 300 to the transport ship, the lifting part 22 lifts the storage structure 1, so that the jacking and transportation device can enter the passage at the bottom thereof, and the tower stacking tool 100 is separated from the ground by the self-lifting effect of the jacking and transportation device, and the jacking and transportation device can lift the tower stacking tool 1 00 and multiple wind turbine towers 300 are transported as a whole to the front of the wharf. After that, the tower stacking tooling 100 and multiple wind turbine towers 300 can be rolled onto the transport ship as a whole through the jacking and transportation device, or the tower stacking tooling 100 and multiple wind turbine towers 300 can be hoisted onto the transport ship as a whole through the lifting slings. This solution of stacking and installing multiple wind turbine towers 300 in the yard with the help of the tower stacking tooling 100 and then transferring them as a whole has greatly improved the transfer efficiency of the wind turbine towers 300 and reduced the occupation time of the wharf.
[0040] In some embodiments, two support columns 21 are further arranged between two adjacent storage portions 11, and the two support columns 21 are arranged at intervals along the width direction. The support structure 2 includes the support columns 21; wherein the two lifting portions 22 are installed on the storage portion 11 at the bottom. By setting the two support columns 21, a storage space can be formed between the two support columns 21 and the two adjacent storage portions 11 for placing the wind turbine tower 300. On the one hand, the support columns 21 can support the two storage portions 11 and play a role in force transmission. On the other hand, the support columns 21 can also play a role in limiting, which can prevent the wind turbine tower 300 from falling sideways.
[0041] Furthermore, in some embodiments, the two lifting parts 22 are respectively arranged corresponding to the two supporting columns 21. In this way, the gravity of the multiple wind turbine towers 300 acting on the storage part 11 can be directly transmitted to the ground through the supporting columns 21 and the lifting parts 22, and the tower stacking tool 100 can carry wind turbine towers 300 of greater weight.
[0042] Furthermore, in some embodiments, the storage portion 11 is detachably connected to the support column 21 and / or the lifting portion 22 .
[0043] It should be noted that there are many ways to detachably connect the storage portion 11 and the support column 21, and the storage portion 11 and the lifting portion 22. For example, they can be connected by a bolt connection structure or a latch connection structure, which is not limited in this embodiment.
[0044] According to the above technical solution, when the tower stacking tool 100 is not needed, the storage part 11 and the support column 21, and the storage part 11 and the lifting part 22 can be disassembled to facilitate the transportation and storage of the tower stacking tool 100.
[0045] In some embodiments, the length of the storage portion 11 in the width direction is adjustable; and / or the length of the support column 21 in the height direction is adjustable.
[0046] It should be noted that there are many length adjustment schemes for the support column 21 and the storage portion 11. For example, it can be set to a structural form in which a telescopic rod is set inside an outer sleeve, and the length of the support column 21 or the storage portion 11 is adjusted by pulling the telescopic rod. It can also be set to a scissor-type telescopic structure, and the length of the support column 21 or the storage portion 11 can be adjusted by its internal hinged rotation. The embodiments of the present application are not limited to this. It is worth mentioning that since the support column 21 has a supporting function, at least the length adjustment of the support column 21 has a locking function to keep the support column 21 at the target length.
[0047] The present embodiment includes three technical solutions, namely, "the storage portion 11 is adjustable in length in the width direction", "the support column 21 is adjustable in length in the height direction" and "the storage portion 11 is adjustable in length in the width direction and the support column 21 is adjustable in length in the height direction". Obviously, the technical solution of "the storage portion 11 is adjustable in length in the width direction and the support column 21 is adjustable in length in the height direction" has more features and better effects.
[0048] According to the above technical scheme, by adjusting the length of the storage portion 11 in the width direction, the storage portion 11 can store wind turbine towers 300 with larger radial dimensions, which can improve the versatility of the tower stacking tool 100; by adjusting the length of the support column 21 in the height direction, the wind turbine tower 300 with larger radial dimensions can be stored between the two storage portions 11, which can also improve the versatility of the tower stacking tool 100. Since the wind turbine tower 300 is generally a cylindrical structure, therefore, when the present embodiment is set so that the length of the storage portion 11 in the width direction is adjustable and the length of the support column 21 in the height direction is adjustable, the tower stacking tool 100 can better adapt to the appearance of most wind turbine towers 300.
[0049] During the transportation of the lifting and transporting device, when acceleration, deceleration or bumping occurs, the wind turbine tower 300 may fall over due to the large inertia of the tower stacking tool 100 and the multiple wind turbine towers 300 as a whole. In view of this, in some embodiments, a binding ring 3 is respectively provided on the two support columns 21. By providing the binding ring 3, before the lifting and transporting device is transported, the tower stacking tool 100 and the lifting and transporting device can be tied and fixed with a strap, thereby reducing the probability of the tower stacking tool 100 falling over.
[0050] Furthermore, in this embodiment, the tying pull rings 3 correspond one by one to form a tying group, and two tying groups are arranged in the length direction of the tower stacking tool 100. Since there are two tying groups, the tying pull rings 3 in the two tying groups can be tied to the lifting and transporting device on both sides of the length direction of the tower stacking tool 100 through the binding belt. This tying method is more stable for the binding of the tower stacking tool 100, and can prevent the tower stacking tool 100 from tipping over on both sides in the length direction.
[0051] The tower support 200 can be placed directly on the storage portion 11 without any connecting and positioning structure. However, during the transportation process of the lifting and transporting device, when acceleration, deceleration or bumps occur, the wind turbine tower 300 has a large inertia and may slide off the storage portion 11. In view of this, in some embodiments, a plurality of limiting portions 4 are provided on the storage portion 11, and the plurality of limiting portions 4 are arranged at intervals in the width direction for connecting to corresponding mating portions on the tower support 200. It should be noted that there are many ways to connect the limiting portion 4 and the matching portion, for example, it can be a plug-in connection between a pin shaft and a pin hole, it can also be a threaded connection between a bolt and a screw hole, or it can be other forms of connection, which is not limited in the embodiments of the present application; generally speaking, a matching portion for connecting with the storage portion 11 is generally provided on the tower bracket 200. Through the setting of the limiting portion 4, when the tower bracket 200 is correctly placed on the storage portion 11, the matching portion on the tower bracket 200 can be matched and connected with the limiting portion 4 on the storage portion 11, thereby stably limiting the tower bracket 200 in the designed position, preventing the wind turbine tower 300 and the tower bracket 200 from sliding off the storage portion 11, and improving the transportation safety of the tower stacking tooling 100.
[0052] Since the diameters of wind turbine towers 300 of different specifications are not the same, the setting positions of the matching parts on the tower bracket 200 that match the wind turbine tower 300 are also different. In order to improve the applicable scope of the tower stacking tool 100 for the tower bracket 200, further, in some embodiments, the positions of the multiple limiting parts 4 in the width direction are adjustable. It should be explained that there are many ways to adjust the limiting part 4 in the width direction. For example, a screw that rotates along the axis in the width direction can be set on the storage part 11, and the limiting part 4 is connected to the screw through a screw sleeve, and the position of the limiting part 4 in the width direction can be adjusted by screwing the screw. According to the above technical solution, according to tower brackets 200 of different specifications, by adjusting the positions of the multiple limiting parts 4, it can be aligned with the matching parts on the tower bracket 200, so as to realize the limiting connection between the tower stacking tool 100 and tower brackets 200 of different specifications, and expand the applicable scope of the tower stacking tool 100.
[0053] The tower stacking tool 100 can be transferred to the transport ship by rolling or hoisting. The multiple storage parts 11 include a top storage part 11 at the top, and the top storage part 11 is respectively provided with lifting ears 5 at both ends in the width direction. Through the connection between the lifting sling and the two lifting ears 5, the tower stacking tool 100 and the multiple wind turbine towers 300 can be hoisted to the transport ship as a whole, without waiting for the jacking transport device to be evacuated from the transport ship, thereby improving the transfer efficiency of the wind turbine towers 300.
[0054] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made under the concept of the present invention using the contents of the specification and drawings of the present invention, or direct / indirect application in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A tower stacking tool, characterized in that: include: A storage structure (1) is formed with a plurality of storage portions (11) arranged at intervals in a height direction, wherein the plurality of storage portions (11) are extended in a width direction and are used to store tower supports; and The supporting structure (2) comprises two lifting parts (22), wherein the two lifting parts (22) are arranged at intervals at the bottom of the storage structure (1) in the width direction to define a passage therebetween, wherein the passage can allow a lifting and transporting device to pass through.
2. The tower stacking tool as claimed in claim 1, characterized in that: Two support columns (21) are further arranged between two adjacent storage portions (11), the two support columns (21) being arranged at intervals along the width direction, and the support structure (2) comprises the support columns (21); The two lifting parts (22) are installed on the storage part (11) at the bottom.
3. The tower stacking tool as claimed in claim 2, characterized in that: The two lifting portions (22) are respectively arranged corresponding to the two supporting columns (21).
4. The tower stacking tool as claimed in claim 2, characterized in that: The storage portion (11) is detachably connected to the support column (21) and / or the lifting portion (22).
5. The tower stacking tool as claimed in claim 2, characterized in that: The length of the storage portion (11) in the width direction is adjustable; and / or, The length of the support column (21) in the height direction is adjustable.
6. The tower stacking tool as claimed in claim 2, characterized in that: The two support columns (21) are respectively provided with binding pull rings (3).
7. The tower stacking tool as claimed in claim 6, characterized in that: The tying pull rings (3) correspond one to one to form a tying group, and two groups of the tying groups are arranged in the length direction of the tower stacking tooling.
8. The tower stacking tool as claimed in claim 1, characterized in that: A plurality of limiting portions (4) are arranged on the storage portion (11), and the plurality of limiting portions (4) are arranged at intervals in the width direction for connecting to corresponding matching portions on the tower support.
9. The tower stacking tool as claimed in claim 8, characterized in that: The positions of the plurality of limiting portions (4) in the width direction are adjustable.
10. The tower stacking tool according to claim 1, characterized in that: The plurality of storage portions (11) include a top storage portion (11) at the top end, and the top storage portion (11) is provided with hanging ears (5) at both ends in the width direction.