Water seepage roadbed rubber-tyred vehicle road structure

By designing drainage ditches and permeable layer structures in the underground rubber-tired vehicle roads of coal mines, the problem of pavement damage in permeable roadbed sections was solved, achieving long service life of the pavement layer and efficient transportation.

CN222008527UActive Publication Date: 2024-11-15YANKUANG ENERGY GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420418223.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-15
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

The concrete pavement of existing underground rubber-tired vehicle roads in coal mines is prone to damage in water-permeable sections, leading to vehicle idling and frequent maintenance, which affects transportation efficiency.

Method used

Design a permeable roadbed structure, including drainage ditches, permeable layers, and pavement layers. The drainage ditch consists of a collection ditch and a main ditch, which are set parallel to each other. The collection ditch is paved with crushed stone and the water is diverted to a reservoir. Combined with water-guiding sleepers and ditch walls, it prevents water from eroding the pavement.

Benefits of technology

It effectively extends the service life of the road surface layer, reduces maintenance workload, and improves the economic benefits of the mine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008527U_ABST
    Figure CN222008527U_ABST
Patent Text Reader

Abstract

The utility model relates to a water seepage subgrade rubber-tyred vehicle road structure which sequentially comprises a drainage ditch, a water seepage layer and a road surface layer from bottom to top, the drainage ditch is formed in a water seepage subgrade and comprises a water collecting ditch and a main ditch, the main ditch is located on the side of the water seepage subgrade and is parallel to the water seepage subgrade, and the water seepage subgrade is arranged on the water collecting ditch. According to the utility model, the technical problems in the prior art that the road surface is damaged due to water seepage of the roadbed, the vehicle is damaged due to collision, and frequent maintenance is needed can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of mine tunnel structures, and in particular relates to a water seepage roadbed rubber-wheeled vehicle highway structure. Background Art

[0002] C20 and C30 concrete are widely used in underground coal mine rubber-wheeled road construction. For horizontal and inclined lanes, open ditches are set on one or both sides for road drainage to prevent water from eroding the roadbed and causing soft and damaged concrete pavement. However, for mudstone lanes with seepage on the roadbed, bottom drum phenomenon will soon appear after the concrete pavement is constructed. When heavy trucks of more than 8 tons are running, the concrete pavement is very easy to break, causing vehicle jams and damage, and frequent repairs are required, which seriously restricts the efficiency of mine material transportation. Utility Model Content

[0003] In view of the various deficiencies in the prior art, a water-permeable roadbed rubber-wheeled vehicle highway structure is proposed to solve the technical problems in the prior art of road surface damage and vehicle damage caused by roadbed seepage, which requires frequent maintenance.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A seepage roadbed rubber-wheeled vehicle highway structure comprises, from bottom to top, a drainage ditch, a seepage layer and a pavement layer. The drainage ditch is opened on the seepage roadbed. The drainage ditch comprises a collecting ditch and a main ditch. The main ditch is located at the side of the seepage roadbed, and the main ditch is parallel to the seepage roadbed. The end of the collecting ditch intersects with the main ditch.

[0006] The technical solution is further configured such that the bottom surface of the water collecting ditch and the bottom surface of the main ditch are paved with gravel or pebbles.

[0007] The technical solution is further configured such that a plurality of drainage ditches are provided at intervals along the direction of the seepage roadbed.

[0008] The technical solution is further configured such that the distance between the water collection ditch and the water outlet point on the seepage roadbed is 5m-10m.

[0009] The technical solution is further configured such that a water-guiding sleeper is provided at the junction of the water collecting ditch and the seepage roadbed.

[0010] The technical solution is further configured such that a ditch wall is provided at the junction of the water collecting ditch and the seepage roadbed.

[0011] The technical solution is further configured such that a water reservoir connected to the main ditch is provided on the side of the seepage roadbed.

[0012] The technical solution is further configured such that, when the tunnel is a flat tunnel, the seepage roadbed is a structure with a high middle and low sides, the collecting ditch is arranged along the width direction of the seepage roadbed, water-guiding sleepers are provided at the junction of the collecting ditch and the seepage roadbed, and the top of the main ditch is flush with the top surface of the pavement layer.

[0013] The technical solution is further configured such that, when the tunnel is an inclined tunnel, the seepage roadbed is configured as an inclined structure along the direction of the inclined tunnel, an angle is formed between the water collecting ditch and the seepage roadbed in the width direction, a water guide rail and a ditch wall are provided at the junction of the water collecting ditch and the seepage roadbed, and the main ditch is located below the seepage layer.

[0014] The technical solution is further configured such that the angle between the water collecting ditch and the seepage roadbed in the width direction is 45°-60°.

[0015] The beneficial effects of the utility model are:

[0016] By setting up drainage ditches and main ditches, the water seeping from the seepage roadbed can be drained to the reservoir to protect the road surface layer from water erosion. At the same time, the accumulated water in the road surface layer can be collected to the main ditches on both sides through the water flow slope, thereby extending the service life of the road surface layer, reducing the workload of highway maintenance, and improving the economic benefits of the mine. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of an implementation method of a water seepage roadbed rubber-wheeled vehicle highway structure in an embodiment of the utility model;

[0018] Figure 2 yes Figure 1 Schematic diagram of the cross section of the middle drainage ditch;

[0019] Figure 3 yes Figure 1 Schematic diagram of cross section of rubber-tyred road structure with medium seepage subgrade;

[0020] Figure 4 It is a schematic diagram of another implementation method of the water seepage roadbed rubber-wheeled vehicle highway structure in the embodiment of the utility model;

[0021] Figure 5 yes Figure 4 Schematic diagram of the cross section of the middle drainage ditch;

[0022] Figure 6 yes Figure 4 Schematic diagram of the cross section of the rubber-tyred road structure with medium-seepage roadbed.

[0023] In the attached figure: 1. Drainage ditch; 2. Main ditch; 3. Reservoir; 4. Lane side; 5. Water-guiding sleeper; 6. Seepage roadbed; 7. Seepage layer; 8. Pavement layer; 9. Ditch wall; 10. Main reservoir. DETAILED DESCRIPTION

[0024] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is clearly and completely described below in conjunction with the drawings of the present invention. Based on the embodiments in this application, other similar embodiments obtained by ordinary technicians in this field without making creative work should all fall within the scope of protection of this application. In addition, the directional words mentioned in the following embodiments, such as "up", "down", "left", "right", etc., are only referenced to the directions of the drawings. Therefore, the directional words used are used to illustrate rather than limit the invention.

[0025] The utility model is further described below in conjunction with the accompanying drawings and preferred embodiments.

[0026] According to the embodiment of the utility model, a water seepage roadbed rubber wheel vehicle road structure is provided. Figures 1 to 3 , from bottom to top, it includes a drainage ditch, a seepage layer 7 and a pavement layer 8. The drainage ditch is opened on the seepage roadbed 6. The drainage ditch includes a collecting ditch 1 and a main ditch 2. The main ditch 2 is located on the side of the seepage roadbed 6, and the main ditch 2 is parallel to the seepage roadbed 6. The end of the collecting ditch 1 intersects with the main ditch 2.

[0027] It should be noted that, by setting up the collecting ditch 1 and the main ditch 2, the water seeping out of the seepage roadbed 6 is drained to the reservoir 3 to protect the pavement layer 8 from water seepage erosion. At the same time, the accumulated water in the pavement layer 8 can be collected into the main ditch 2 through the pavement layer 8 flow slope of 3‰, thereby extending the service life of the pavement layer 8, reducing the workload of highway maintenance, and improving the economic benefits of the mine.

[0028] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 1 to 3 A water reservoir 3 connected to the main ditch 2 is provided on the side of the seepage roadbed 6.

[0029] It should be noted that the water reservoir 3 is arranged close to the lane wall 4. At the same time, the water reservoir 3 is used as a temporary water reservoir. Depending on the amount of water, multiple water reservoirs 3 can be arranged.

[0030] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 1 to 3 The bottom surface of the water collecting ditch 1 and the bottom surface of the main water ditch 2 are paved with gravel or pebbles.

[0031] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 1 to 3 Along the direction of the seepage roadbed 6, a plurality of drainage ditches 1 are provided at intervals.

[0032] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 1 to 3The distance between the water collection ditch 1 and the water outlet point on the seepage roadbed is 5m-10m.

[0033] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 1 to 3 A water guide sleeper 5 is provided at the junction of the water collecting ditch 1 and the seepage roadbed 6.

[0034] It should be noted that the water-guiding sleeper 5 can guide the water seeping out of the seepage roadbed 6 to the water collection ditch 1 .

[0035] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 4 to 6 A ditch wall 9 is provided at the junction of the ditch 1 and the seepage roadbed 6 , and the ditch wall 9 can intercept water in the ditch 1 .

[0036] Specifically, the water-conducting sleeper 5, the road surface layer 8 and the ditch wall 9 are made of concrete, and the water seepage layer 7 is made of stone powder.

[0037] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 1 to 3 When the tunnel is a flat tunnel, the seepage roadbed 6 is a structure with a high middle and low sides, the collecting ditch 1 is arranged along the width direction of the seepage roadbed 6, and water guide sleepers 5 are provided at the junction of the collecting ditch 1 and the seepage roadbed 6. The top of the main ditch 2 is flush with the top surface of the pavement layer 8, that is, the main ditch 2 is an open ditch.

[0038] In the present embodiment of the seepage roadbed rubber wheel vehicle highway structure, please refer to Figures 4 to 6 When the tunnel is an inclined tunnel, the seepage roadbed 6 is set as an inclined structure along the direction of the inclined tunnel, and there is an angle between the water collecting ditch 1 and the seepage roadbed 6 in the width direction. A water guide rail sleeper 5 and a ditch wall 9 are provided at the junction of the water collecting ditch 1 and the seepage roadbed 6. The main ditch 2 is located below the seepage layer 7, that is, the main ditch 2 is a hidden ditch.

[0039] Specifically, the water guide rail sleeper 5 is located at a position higher than the ditch wall 9 . Meanwhile, a main water reservoir 10 communicating with the main ditch 2 is provided at the end of the inclined tunnel.

[0040] Preferably, the angle between the water collecting ditch 1 and the seepage roadbed 6 in the width direction is 45°-60°.

[0041] The present invention has been described in detail above. The above description is only a preferred embodiment of the present invention and should not limit the scope of implementation of the present invention. That is, all equivalent changes and modifications made within the scope of this application should still fall within the scope of the present invention.

Claims

1. A water-permeable roadbed rubber-wheeled vehicle highway structure, characterized in that: From bottom to top, it includes a drainage ditch, a seepage layer and a road surface layer. The drainage ditch is opened on the seepage roadbed. The drainage ditch includes a collecting ditch and a main ditch. The main ditch is located on the side of the seepage roadbed, and the main ditch is parallel to the seepage roadbed. The end of the collecting ditch intersects with the main ditch.

2. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 1 is characterized in that: The bottom surface of the water collection ditch and the bottom surface of the main ditch are paved with crushed stones or pebbles.

3. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 1 is characterized in that: Along the direction of the seepage roadbed, a plurality of water collecting ditches are arranged at intervals.

4. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 3 is characterized in that: The distance between the water collection ditch and the water outlet point on the seepage roadbed is 5m-10m.

5. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 1 is characterized in that: A water guide sleeper is provided at the junction of the water collecting ditch and the water seepage roadbed.

6. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 1, characterized in that: A ditch wall is provided at the junction of the water collecting ditch and the water seepage roadbed.

7. The water-permeable roadbed rubber-tyred vehicle highway structure according to any one of claims 1 to 6, characterized in that: A water reservoir connected to the main ditch is provided on the side of the seepage roadbed.

8. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 7 is characterized in that: When the tunnel is a flat tunnel, the seepage roadbed is a structure with a high middle and low sides, the collecting ditch is arranged along the width direction of the seepage roadbed, water guide sleepers are provided at the junction of the collecting ditch and the seepage roadbed, and the top of the main ditch is flush with the top surface of the pavement layer.

9. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 7, characterized in that: When the tunnel is an inclined tunnel, the seepage roadbed is set as an inclined structure along the direction of the inclined tunnel, there is an angle between the water collecting ditch and the seepage roadbed in the width direction, water guide rails and ditch walls are provided at the junction of the water collecting ditch and the seepage roadbed, and the main ditch is located below the seepage layer.

10. The water-permeable roadbed rubber-tyred vehicle highway structure according to claim 9, characterized in that: The angle between the water collecting ditch and the width direction of the seepage roadbed is 45°-60°.