Mould for laying landscape ceramsite

By designing landscape ceramic laying molds and using the engagement structure and spring push rod structure, the problems of long laying time and poor binding capacity of trail decorative materials in the existing technology are solved, and rapid, large-area laying and high-quality ceramic grains are achieved. The decorative effect extends the service life of the mold.

CN222008563UActive Publication Date: 2024-11-15武夷学院 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420175702.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-15
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

In the prior art, the decorative materials on both sides of the trail use natural stone or ceramics to be manually arranged, resulting in long construction time, high cost, poor bonding capacity, and difficult patterns to realize, which poses safety hazards and short service life.

Method used

Design a mold for laying landscape ceramic granules, including a first connecting plate, a second connecting plate and a third connecting plate. The ceramic granules are adhered through double-sided adhesives and the mold is used to embed the ceramic granules into the concrete and rotate and detach them. After the installation is quickly laid, the ceramic particles are fixed with additional bonding materials, and the spring and push rod structures are used to facilitate the disassembly and replacement of the mold, extending the service life.

Benefits of technology

It realizes rapid and simple large-area ceramic laying, shortens the construction period, improves the quality and service life of the set, and reduces the risks and costs of manual layout.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008563U_ABST
    Figure CN222008563U_ABST
Patent Text Reader

Abstract

The utility model discloses a mold for laying landscape ceramsite, which relates to the technical field of molds and comprises a first connecting plate and a second connecting plate, and one side of the first connecting plate is fixedly connected with a handle. According to the mold for laying the landscape ceramsite, a double-faced adhesive tape plastic mold adhered to a grid groove in the bottom of a second connecting plate is torn off, then the landscape ceramsite is arranged and bonded according to a designed pattern, a prefabricated plate part is completed, and then a convex block in the middle of the bottom of a first connecting plate and a connecting groove in the top of the second connecting plate are in butt joint and clamped; then one side of the grid groove of the second connecting plate is pressed into the surface of concrete, ceramsite can be embedded into the concrete, then the first connecting plate is rotated to drive the protruding block to be disengaged from the second connecting plate, the first connecting plate is lifted, other second connecting plates continue to be spliced, the ceramsite laying work is completed, and the second connecting plates are reserved on the surface of the concrete; and after the concrete forms a certain strength, the second connecting plate can be taken out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of molds, in particular to a mold for laying landscape ceramsite. Background Art

[0002] At present, the decorative materials commonly used on the market on both sides of the trail mainly include natural stone and lighting beautification. The natural stone scenery is similar to ceramsite and can be roughly divided into two types: plane and three-dimensional. The plane type is that the cement and the scenery material are combined in a plane after pouring and smoothing, and do not enter the poured concrete; the three-dimensional type is that part of the volume of the scenery material enters the concrete when it is combined with the concrete. However, natural stones are expensive and their shapes are mostly irregular, making it difficult to use one tool for systematic construction, which leads to an increase in the overall cost of the project. And because of the hydration of cement itself, the long-term manual method will lead to a decrease in the bonding ability between cement and the placement during the construction process, causing it to fall off and be lost in the subsequent use stage.

[0003] The main construction method at present is manual arrangement, in which workers arrange manually according to the designed pattern. Often, due to a long time, the cement will be slightly solidified during the layout, and it cannot be well combined with expanded clay and other placement objects. It is easy to fall off during subsequent use, thereby reducing the service life of the project. It is even a safety hazard for the elderly and children. At the same time, due to personal reasons, manual arrangement may also cause the pattern in the actual construction to be inconsistent with the design drawing, and the expected effect cannot be achieved. Utility Model Content

[0004] The utility model aims to provide a mold for laying landscape clay aggregate to solve the problem that the manual arrangement method is used for decorating the two sides of the existing trails proposed in the above-mentioned background technology, and the expected effect cannot be achieved.

[0005] To achieve the above purpose, the utility model provides the following technical solution: a mold for laying landscape ceramsite, comprising: a first connecting plate and a second connecting plate,

[0006] A handle is fixedly connected to one side of the first connecting plate, a protrusion is fixedly connected to the side of the first connecting plate away from the handle, a fan-shaped plate is welded and fixed to the outer side of the protrusion, a second connecting plate is connected to the outer side of the protrusion, a connecting groove is opened inside the second connecting plate, and a limiting plate is fixedly connected to one side of the connecting groove.

[0007] Preferably, a third connecting plate is provided on a side of the second connecting plate away from the first connecting plate, and a grid groove is provided on one side of the third connecting plate.

[0008] Preferably, the limiting plate and the second connecting plate are both made of acrylic plates, and the first connecting plate, the handle and the protrusion are all made of alloy plates.

[0009] Preferably, a positioning groove matching the positioning block is formed inside the second connecting plate, and the positioning groove is connected through the positioning block.

[0010] Preferably, a sliding groove matching the limiting rod is formed inside the first connecting plate and the second connecting plate, and the sliding groove is slidably connected to the limiting rod.

[0011] Preferably, a spring is fixedly connected to one side of the limiting rod, one end of the spring is fixedly connected to the second connecting plate, and a push rod is welded and fixed to the side of the limiting rod away from the spring.

[0012] Preferably, a push plate is welded and fixed to one side of the push rod, and one side of the positioning block is welded and fixed to the third connecting plate.

[0013] Compared with the prior art, the beneficial effect of the mold for laying landscape ceramsite is as follows: tear off the double-sided adhesive plastic mold adhered to the grid groove at the bottom of the second connecting plate, then arrange and bond the landscape ceramsite according to the designed pattern to complete the prefabricated plate part, then dock and engage the protrusion in the middle of the bottom of the first connecting plate with the connecting groove at the top of the second connecting plate, and then press one side of the grid groove of the second connecting plate into the concrete surface, so that the ceramsite can be embedded in the concrete, and then the first connecting plate is rotated to drive the protrusion to disengage from the engagement with the second connecting plate, and the first connecting plate is lifted, and other second connecting plates are continuously spliced ​​to complete the laying of the ceramsite, and the second connecting plate is retained on the concrete surface. After the concrete forms a certain strength, the second connecting plate can be taken out, so that through the above operation, additional bonding materials can be used to combine with the ceramsite to be arranged, and it can be made before the actual scenery, which is different from the difficulty of modification after arrangement on the concrete. It is simple to operate on the preliminary scenery board, and multiple plates can be arranged at the same time, so that it can be constructed quickly and over a large area after the cement pouring is completed, and at the same time, the scenery quality can be guaranteed while shortening the construction period.

[0014] 1. When decorating both sides of the trail, it is necessary to lay the landscape ceramsite in the cement. After the cement solidifies, the landscape ceramsite can be fixed with the cement for decoration. When laying the landscape ceramsite, in order to quickly carry out the construction, tear off the double-sided adhesive plastic mold adhered to the grid groove at the bottom of the second connecting plate, and then arrange and bond the landscape ceramsite according to the designed pattern to complete the prefabricated plate part, and then dock and engage the protrusion in the middle of the bottom of the first connecting plate with the connecting groove at the top of the second connecting plate. After completion, press one side of the grid groove of the second connecting plate into the concrete surface to embed the ceramsite into the concrete, and then rotate the first connecting plate to drive the protrusion Disengage from the second connecting plate, lift the first connecting plate, continue to splice other second connecting plates, complete the laying of the expanded clay, keep the second connecting plate on the concrete surface, and take out the second connecting plate after the concrete has formed a certain strength. In this way, through the above operation, additional bonding materials can be used to combine with the expanded clay that needs to be arranged, and it can be made before the actual scenery is set. Unlike the difficult modification after arrangement on the concrete, the operation on the preliminary scenery board is simple, and multiple plates can be arranged at the same time, so that it can be constructed quickly and on a large area after the cement pouring is completed. At the same time, it can also shorten the construction period while ensuring the quality of the scenery.

[0015] 2. When decorating both sides of the trail, it is necessary to lay the landscape ceramsite in the cement. After the cement solidifies, the landscape ceramsite can be fixed with the cement for decoration. After the third connecting plate is used for a long time, the third connecting plate will be eroded by the concrete. At the same time, more impurities will appear in the grid groove. In order to ensure the use effect of the landscape ceramsite paving mold, it is moved by pushing the push plate. When the push plate moves, it will push the spring on one side to contract. When the limit rod is out of the interior of the positioning block, the push rod will enter the positioning block, and the movable second connecting plate is separated from the third connecting plate. The push rod will pass through the positioning block through the through slot on the top of the positioning block to complete the disassembly of the third connecting plate. The above operation can facilitate the replacement of the third connecting plate and extend the service life of the second connecting plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is the main cross-sectional view of the utility model;

[0017] Figure 2 This is a three-dimensional schematic diagram of the first connecting plate of the utility model;

[0018] Figure 3 This is a three-dimensional schematic diagram of the second connecting plate of the utility model;

[0019] Figure 4 This is a bottom view of the third connecting plate of the utility model;

[0020] Figure 5 This is a schematic cross-sectional front view of the second connecting plate of the utility model;

[0021] Figure 6 This is a schematic diagram of the connection between the limit rod and the positioning block of the utility model;

[0022] Figure 7 It is an enlarged schematic diagram of A of the present utility model.

[0023] In the figure: 1. first connecting plate; 2. handle; 3. protrusion; 4. second connecting plate; 5. connecting groove; 6. limit plate; 7. third connecting plate; 8. grid groove; 9. positioning block; 10. push rod; 11. limit rod; 12. spring; 13. push plate; 14. fan plate. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 7 The utility model provides a technical solution: a mold for laying landscape ceramsite, comprising: a first connecting plate 1 and a second connecting plate 4,

[0026] A handle 2 is fixedly connected to one side of the first connecting plate 1, a protrusion 3 is fixedly connected to the side of the first connecting plate 1 away from the handle 2, a fan-shaped plate 14 is welded and fixed to the outer side of the protrusion 3, a second connecting plate 4 is penetrated and connected to the outer side of the protrusion 3, a connecting groove 5 is provided inside the second connecting plate 4, and a limiting plate 6 is fixedly connected to one side of the connecting groove 5; a third connecting plate 7 is provided on the side of the second connecting plate 4 away from the first connecting plate 1, and a grid groove 8 is provided on one side of the third connecting plate 7; the limiting plate 6 and the second connecting plate 4 are both made of acrylic plates, and the first connecting plate 1, the handle 2 and the protrusion 3 are all made of alloy plates.

[0027] In specific implementation, when decorating both sides of the walkway, it is necessary to lay the landscape ceramsite in the cement. After the cement solidifies, the landscape ceramsite can be fixed with the cement for decoration. When laying the landscape ceramsite, in order to quickly carry out the construction, the double-sided adhesive plastic mold adhered to the grid groove 8 at the bottom of the second connecting plate 4 is torn off, and then the landscape ceramsite is arranged and bonded according to the designed pattern to complete the prefabricated plate part, and then the protrusion 3 in the middle of the bottom of the first connecting plate 1 is docked with the connecting groove 5 at the top of the second connecting plate 4. After the docking is completed, the first connecting plate 1 is rotated to drive the protrusion 3 to rotate, and the protrusion 3 will drive the fan-shaped plate 14 to rotate and align with the limiting plate 6 in the connecting groove 5. At this time, the limiting plate 6 can limit the protrusion 3, completing the snap-fit ​​connection between the first connecting plate 1 and the second connecting plate 4, and pressing one side of the grid groove 8 of the second connecting plate 4 into the concrete surface can embed the ceramsite into the concrete. Then rotate the first connecting plate 1 to drive the protrusion 3 to disengage from the engagement with the second connecting plate 4. After completion, lift the first connecting plate 1, and the first connecting plate 1 continues to splice other second connecting plates 4 to complete the laying of the expanded clay, leaving the second connecting plate 4 on the concrete surface. After the concrete has formed a certain strength, the second connecting plate 4 can be taken out. If the double-sided tape still has adhesive ability, continue to use it. If most of it has lost its adhesiveness, use a shovel to scrape off the residual tape on the surface, update the tape and reuse the second connecting plate 4. In this way, through the above operation, additional bonding materials can be used to combine with the expanded clay that needs to be arranged, and it can be made before the actual scenery. Unlike the difficult modification after arrangement on the concrete, it is simple to operate on the preliminary scenery board, and multiple plates can be arranged at the same time, so that it can be constructed quickly and over a large area after the cement pouring is completed. At the same time, it can also ensure the scenery quality while shortening the construction period.

[0028] See also Figure 1 , Figure 3 , Figure 5 and Figure 6 The first connecting plate 1 and the second connecting plate 4 are both provided with sliding grooves matching the limiting rod 11, and the sliding grooves are slidably connected to the limiting rod 11; a spring 12 is fixedly connected to one side of the limiting rod 11, one end of the spring 12 is fixedly connected to the second connecting plate 4, and a push rod 10 is welded and fixed to the side of the limiting rod 11 away from the spring 12; a push plate 13 is welded and fixed to one side of the push rod 10, and one side of the positioning block 9 is welded and fixed to the third connecting plate 7, the limiting rod 11 and the second connecting plate 4 constitute a sliding structure, and the second connecting plate 4, the limiting rod 11 and the spring 12 constitute an elastic telescopic structure.

[0029] In the specific implementation, when decorating both sides of the walkway, it is necessary to lay the landscape ceramsite in the cement. After the cement solidifies, the landscape ceramsite can be fixed with the cement for decoration. After the third connecting plate 7 is used for a long time, the third connecting plate 7 will be eroded by the concrete. At the same time, more impurities will appear in the grid groove 8. In order to ensure the use effect of the landscape ceramsite paving mold, the push plate 13 is pushed to move. When the push plate 13 moves, it will push the spring 12 on one side to contract. When the limit rod 11 is separated from the interior of the positioning block 9, the push rod 10 will enter the positioning block 9, and the second connecting plate can be moved. When the plate 4 is separated from the third connecting plate 7, the push rod 10 will pass through the positioning block 9 through the through slot at the top of the positioning block 9 to complete the disassembly of the third connecting plate 7. At this time, a new third connecting plate 7 can be replaced by pressing the push plate 13 and moving the second connecting plate 4 to dock with the positioning block 9. After the docking is completed, the push plate 13 is released. At this time, the spring 12 will reset and push the limit rod 11 to move, so that the limit rod 11 enters the limit groove inside the positioning block 9 to complete the installation of the third connecting plate 7. In this way, the above operation can facilitate the replacement of the third connecting plate 7 and extend the service life of the second connecting plate 4.

[0030] To sum up: in the mold for paving landscape ceramsite, first adhere double-sided tape to the bottom of the grid groove 8, then tear off the plastic film of the double-sided tape, and adhere the landscape ceramsite to the double-sided tape in the grid groove 8, engage the first connecting plate 1 with the second connecting plate 4, and then press the second connecting plate 4 into the cement to lay the landscape ceramsite. After the paving is completed, take out the first connecting plate 1 and perform the same operation on the second connecting plate 4 for another group. After the cement solidifies, the second connecting plate 4 can be taken out. This is the characteristic of the mold for paving landscape ceramsite. The content not described in detail in this description belongs to the prior art known to professional and technical personnel in this field.

[0031] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A mold for laying landscape ceramsite, comprising: The first connecting plate (1) and the second connecting plate (4) are characterized by: A handle (2) is fixedly connected to one side of the first connecting plate (1), a protrusion (3) is fixedly connected to the side of the first connecting plate (1) away from the handle (2), a fan-shaped plate (14) is welded and fixed to the outer side of the protrusion (3), a second connecting plate (4) is connected through the outer side of the protrusion (3), a connecting groove (5) is provided inside the second connecting plate (4), a limiting plate (6) is fixedly connected to one side of the connecting groove (5), a third connecting plate (7) is provided on the side of the second connecting plate (4) away from the first connecting plate (1), and a grid groove (8) is provided on one side of the third connecting plate (7).

2. A mold for laying landscape ceramsite according to claim 1, characterized in that: The materials of the limiting plate (6) and the second connecting plate (4) are both acrylic plates, and the materials of the first connecting plate (1), the handle (2) and the protrusion (3) are all alloy plates.

3. A mold for laying landscape ceramsite according to claim 1, characterized in that: A positioning groove matching the positioning block (9) is provided inside the second connecting plate (4), and the positioning groove is connected to the positioning block (9) through and through.

4. A mold for laying landscape ceramsite according to claim 3, characterized in that: The first connecting plate (1) and the second connecting plate (4) are both provided with sliding grooves matching the limiting rod (11), and the sliding grooves are slidably connected to the limiting rod (11).

5. A mold for laying landscape ceramsite according to claim 4, characterized in that: A spring (12) is fixedly connected to one side of the limiting rod (11), one end of the spring (12) is fixedly connected to the second connecting plate (4), and a push rod (10) is welded and fixed to the side of the limiting rod (11) away from the spring (12).

6. A mold for laying landscape ceramsite according to claim 5, characterized in that: A push plate (13) is welded and fixed to one side of the push rod (10), and one side of the positioning block (9) is welded and fixed to the third connecting plate (7).