Steel cross beam structure of bilateral box prestressed concrete extradosed cable-stayed bridge

By using the interlaced connection between steel structure beams and concrete side boxes in the concrete low tower cable-stayed bridge, the problem of easy cracking of traditional concrete beams is solved, the durability and construction convenience of the bridge are improved, and the efficient tension and pressure bearing effect is achieved .

CN222008626UActive Publication Date: 2024-11-15ANHUI TRANSPORT CONSULTING & DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420592117.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The concrete beams of traditional concrete low tower cable-stayed bridges are prone to cracks when the span is large, resulting in a decrease in the durability and visual sensitivity of the bridge. Moreover, due to the large surface area and volume of the beam, the shrinkage creep effect is very different, making it difficult to pre-tension by tensioning. Stress compensation.

Method used

The steel structure cross beam is used, and is connected to the prestressed concrete side box through shear nails and open-hole plate connections. The steel cross beam top plate and bottom plate are arranged intertwined by the transverse rib plate and vertical rib plate, and the extension section is connected to the stirrup hole. The embedded steel plate and shear nails are fixed to form an efficient tension and pressure bearing structure.

Benefits of technology

The tensile pressure resistance of the beam structure is greatly improved, the cracking of concrete beams is avoided, the durability and construction convenience of the bridge are ensured, and the tension prestressing is not required.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008626U_ABST
    Figure CN222008626U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of buildings, in particular to a steel cross beam structure of a bilateral box prestressed concrete extradosed cable-stayed bridge, which comprises a steel cross beam top plate arranged below a bridge deck between two box girders, and the steel cross beam top plate is connected with the bridge deck through top plate shear nails. The bottoms of every two adjacent box girders are connected through a steel cross beam bottom plate, and the steel cross beam top plates and the steel cross beam bottom plates are connected through steel cross beam webs arranged in the vertical direction. The tension and compression bearing performance of the cross beam structure is greatly improved, and the problem that a traditional concrete cross beam is prone to cracking is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction, in particular to a steel cross beam structure of a double-sided box prestressed concrete low-tower cable-stayed bridge. Background Art

[0002] In prestressed concrete low-tower cable-stayed bridges, the double-sided box structure is very economical and practical. The concrete consumption is concentrated in the two side boxes, the force is clear, and the indicators are low.

[0003] The conventional concrete low-tower cable-stayed bridge as described in patent number "CN216040610U" comprises hollow piers, an upper chord box girder, a lower chord box arch supporting the upper chord box girder, a cable tower located directly above the hollow piers and the upper chord box girder, and cables distributed along the cable tower in the beam-arch joint section formed by the intersection of the upper chord box girder and the lower chord box arch. The upper chord box girder, the lower chord box arch and the hollow pier intersect to form a beam-arch triangle. The upper chord box girder is supported by the hollow piers and the columns on the arch in the beam-arch triangle. The hollow pier intersects with the arch feet of the lower chord box arch of the side span and the middle span. The columns on the arch are evenly distributed on the facade perpendicular to the lower chord box arch. Since the prestressed concrete double-sided box has great stiffness, when the span is large, the beam height can reach more than 7m, and the two double-sided boxes are connected by a relatively slender concrete crossbeam. The thickness of the concrete crossbeam is relatively thin, only 30-50cm. Even if the lower end is horseshoe-shaped, it is still a large-volume concrete structure with a large height and width ratio. Due to the large surface area and volume of the crossbeam, its shrinkage and creep effect is very different from that of the thick longitudinal concrete box girder. If the maintenance is not timely and in place, it is easy to cause cracks in the crossbeam under tension, and the cracks will continue to develop over time, seriously affecting the durability and appearance of the bridge, so it is urgent to solve it.

[0004] Shrinkage cracks even appeared before the hanging basket moved forward, so that it was impossible to compensate by prestressing. Therefore, it is necessary to design a steel structure beam, which is connected to the prestressed concrete side box through shear nails and perforated plate connectors. Since the steel beam structure has excellent tensile and compressive performance, it can well solve the problem of concrete beam cracking. Summary of the invention

[0005] In order to avoid and overcome the technical problems existing in the prior art, the utility model provides a double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure. The utility model greatly improves the tensile and compressive bearing performance of the beam structure and solves the problem that traditional concrete beams are prone to cracking.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A steel crossbeam structure of a double-sided box prestressed concrete low-tower cable-stayed bridge comprises a steel crossbeam top plate arranged below a bridge deck between two box girders, wherein the steel crossbeam top plate and the bridge deck are connected via top plate shear nails; the bottoms of two adjacent box girders are connected via a steel crossbeam bottom plate, and the steel crossbeam top plate and the steel crossbeam bottom plate are connected via a steel crossbeam web plate arranged along a vertical direction.

[0008] As a further solution of the utility model: transverse ribs and vertical ribs are arranged on both sides of the plate surface of the steel beam web, the transverse ribs and vertical ribs are arranged in a cross-staggered manner, and the plate surfaces of the transverse ribs and the vertical ribs are perpendicular to the plate surface of the steel beam web.

[0009] As a further solution of the utility model: the ends of the steel beam top plate and the steel beam bottom plate are arranged with extension sections extending into the box beam, and the extension sections of the steel beam top plate and the steel beam bottom plate are respectively provided with top plate hoop reinforcement holes and bottom plate hoop reinforcement holes, and the extension sections of the steel beam top plate and the steel beam bottom plate are connected and fixed to the box beam through the beam stirrups.

[0010] As a further solution of the utility model: the width of the steel beam top plate and the steel beam bottom plate are both 0.5-0.8m, and the extension length of the steel beam top plate and the steel beam bottom plate is not less than 0.8m.

[0011] As a further solution of the utility model: the top width of the vertical rib plate is equal to the top width of the steel beam, the bottom width of the vertical rib plate is equal to the width of the transverse rib plate, and the top and bottom surfaces of the vertical rib plate are evenly transitioned through a transition section.

[0012] As a further solution of the utility model: along the direction away from the box beam, the longitudinal spacing between adjacent vertical ribs is uniformly increased from 1.2m to 1.5m; along the vertical direction, the transverse ribs are uniformly arranged in four layers.

[0013] As a further solution of the utility model: an embedded steel plate fitted with the box beam is arranged at one end of the steel cross beam web adjacent to the box beam, and the embedded steel plate and the box beam are connected and fixed by steel plate shear nails.

[0014] As a further solution of the utility model: horizontal short ribs are evenly arranged on the plate surface of the embedded steel plate away from the box girder side, and the horizontal short ribs are symmetrically arranged on both sides of the web of the steel cross beam, and along the height direction, the spacing between adjacent horizontal short ribs is smaller than the spacing between adjacent cross ribs.

[0015] As a further solution of the utility model: the longitudinal spacing between adjacent top plate shear nails gradually increases in the direction away from the box beam.

[0016] As a further solution of the utility model: the lateral spacing between each top plate shear nail is 0.15m, and the longitudinal spacing between adjacent top plate shear nails is uniformly increased from 0.15m to 0.2m in the direction away from the box girder.

[0017] Compared with the prior art, the beneficial effects of the utility model are:

[0018] 1. The utility model adopts steel structure beams to replace the traditional concrete structure beams, which plays the role of transverse connection and transverse force. The structure is light and will not produce shrinkage creep, which greatly improves the tensile and compressive performance of the beam structure and solves the problem of easy cracking of traditional concrete beams.

[0019] 2. The arrangement of shear nails with different spacings on the top plate of the steel beam of the utility model ensures a reliable connection between the steel beam and the bridge deck; the box beam is connected to the web of the steel beam by the embedded steel plate, and the shear force is effectively transmitted to the beam by the steel plate shear nails, preventing the web of the steel beam from detaching from the concrete box under the pulling action of the box beam.

[0020] 3. The steel beam top plate and the steel beam bottom plate of the utility model are extended into the box beam through the extension section. By opening stirrup holes in the extension section, the stirrups are perforated to form a perforated plate connector, ensuring that the steel beam top plate and the steel beam bottom plate can effectively resist extrusion and pulling, thereby completing an effective connection with the concrete box beam.

[0021] 4. The steel cross beam of the utility model is pre-buried synchronously when the concrete box beam is erected. After the formwork is removed, the double-sided concrete box beam is connected as a whole. There is no need to tension the cross beam prestress, the construction is convenient, and the application prospect is broad. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the utility model.

[0023] Figure 2 It is a structural schematic diagram of the steel crossbeam top plate in the utility model.

[0024] Figure 3 It is a structural schematic diagram of the steel crossbeam bottom plate in the utility model.

[0025] Figure 4 for Figure 1 Cross-sectional view of plane A1.

[0026] Figure 5 for Figure 1 Cross-sectional view of the A2 surface.

[0027] Figure 6 for Figure 1 Sectional view of the A3 surface.

[0028] In the figure:

[0029] 1. Steel beam top plate; 11. Top plate shear nails; 12. Top plate stirrup holes;

[0030] 2. Steel beam web; 21. Transverse ribs; 22. Vertical ribs;

[0031] 23. Embedded steel plate; 231. Horizontal short rib plate; 232. Steel plate shear nails;

[0032] 3. Bottom plate of steel beam; 31. Holes for stirrups of bottom plate;

[0033] 4. Box girder; 41. Crossbeam stirrups. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0035] See also Figures 1 to 6 In an embodiment of the utility model, a double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure is provided, and a steel beam top plate 1 which is arranged in close contact with the bridge deck is arranged under the bridge deck of two adjacent box beams 4, and the steel beam top plate 1 is connected to the bridge deck by a top plate shear nail 11.

[0036] The top plate shear nails 11 are evenly arranged on the surface of the steel beam top plate 1. Along the direction away from the box beam 4, the longitudinal spacing between adjacent top plate shear nails 11 is evenly increased from 0.15m to 0.2m, and the transverse spacing between each top plate shear nail 11 is 0.15m. Since the shear force in the mid-span area of ​​the beam is small and the shear force in the area close to the box beam 4 is large, the top plate shear nails 11 are densely arranged.

[0037] The width of the steel beam top plate 1 is between 0.5 and 0.8 m, and it bends as the box beam 4 is armpited, and fits closely with the bridge deck.

[0038] The ends of the steel beam top plate 1 and the steel beam bottom plate 3 are arranged with extension sections extending into the box beam 4, and the extension sections of the steel beam top plate 1 and the steel beam bottom plate 3 are respectively provided with top plate stirrup holes 12 and bottom plate stirrup holes 31, and the extension sections of the steel beam top plate 1 and the steel beam bottom plate 3 are connected and fixed to the box beam 4 through beam stirrups 41; the steel beam bottom plate 3 is connected to the steel beam web 2 by full penetration welding, and the steel beam web 2 is arranged vertically to connect the steel beam top plate 1 and the steel beam bottom plate 3.

[0039] The width of the steel beam top plate 1 and the steel beam bottom plate 3 are both 0.5-0.8m, and the extension length of the steel beam top plate 1 and the steel beam bottom plate 3 is not less than 0.8m. The diameter of the top plate stirrup holes 12 and the bottom plate stirrup holes 31 is 65mm, the hole spacing is 150mm, and they are connected to the box beam 4 as a whole through the cross beam stirrups 41.

[0040] Transverse ribs 21 are arranged horizontally on both sides of the plate surface of the steel beam web 2, and vertical ribs 22 are arranged in the vertical direction. The transverse ribs 21 and the vertical ribs 22 are arranged in a cross-staggered manner, and the plate surfaces of the transverse ribs 21 and the vertical ribs 22 are perpendicular to the plate surface of the steel beam web 2. With the beam height of the steel beam web 2 being h, the transverse ribs 21 are arranged at intervals of 0.2h in the height direction. Due to the large local pulling effect of the box beam 2, the longitudinal spacing between adjacent vertical ribs 22 is uniformly increased from 1.2m to 1.5m in the direction away from the box beam 4.

[0041] The width of the transverse rib 21 is between 150-200mm, the width of the vertical rib 22 near the steel beam top plate 1 is equal to the width of the steel beam top plate 1, the width of the vertical rib 22 transitions to between 150-200mm in the middle and lower part of the beam, corresponding to the width of the transverse rib to save material consumption, and the slope of the transition section is between 1.5:3 and 1:3 to obtain good transition force transmission performance; the top of the vertical rib 22 is welded flush with the steel beam top plate 1, and the bottom of the vertical rib 22 is 50-100mm away from the steel beam bottom plate 3.

[0042] The connection between the steel beam web 2 and the box beam 4 is welded with an embedded steel plate 23 of the same width as the steel beam top plate 1, and is welded to the steel beam top plate 1 and the steel beam bottom plate 3. It is effectively connected to the box beam 4 through the steel plate shear nails 232 to prevent the steel beam web 2 from being pulled out. At the same time, the embedded steel plate 23 is provided with a plurality of horizontal short ribs 231 near the box beam 4 to resist the local extrusion and drawing effect of the box beam 4 on the steel beam web 2. The vertical spacing of the horizontal short ribs 231 is 0.1h; the horizontal short ribs 231 are symmetrically arranged on both sides of the steel beam web 2, and the width of the horizontal short ribs 231 is between 200-250mm, and is fully welded with the embedded steel plate 23 to meet the local force at this location and prevent the local buckling of the steel beam web 2.

[0043] During installation, the steel crossbeam structure without the concrete box beam is prefabricated in the factory and transported to the site, where it is hoisted between the steel skeletons of the double-sided concrete box beam segments, and the crossbeam stirrups 41 are passed through the stirrup holes 12 of the top plate and the stirrup holes 31 of the bottom plate, and concrete is poured. After the concrete reaches the design strength requirement, the steel crossbeam is connected through shear nails and perforated plate connectors to form a strong transverse connection structure between the double-sided concrete box beams.

[0044] The basic principles of the present application are described above in conjunction with specific embodiments. However, it should be noted that the advantages, strengths, effects, etc. mentioned in the present application are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. are required by each embodiment of the present application. In addition, the specific details disclosed above are only for the purpose of illustration and ease of understanding, not for limitation, and the above details do not limit the present application to being implemented by adopting the above specific details.

[0045] The above description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present application. Various modifications to these aspects will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other aspects without departing from the scope of the present application. Therefore, the present application is not intended to be limited to the aspects shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

[0046] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. A double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure, characterized in that: The invention comprises a steel cross beam top plate (1) arranged below the bridge deck between two box beams (4), wherein the steel cross beam top plate (1) and the bridge deck are connected via a top plate shear nail (11); the bottoms of two adjacent box beams (4) are connected via a steel cross beam bottom plate (3), and the steel cross beam top plate (1) and the steel cross beam bottom plate (3) are connected via a steel cross beam web plate (2) arranged in a vertical direction.

2. The double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to claim 1 is characterized in that: Transverse ribs (21) and vertical ribs (22) are arranged on both sides of the plate surface of the steel cross beam web (2), the transverse ribs (21) and the vertical ribs (22) are arranged in a cross-staggered manner, and the plate surfaces of the transverse ribs (21) and the vertical ribs (22) are perpendicular to the plate surface of the steel cross beam web (2).

3. The double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to claim 2 is characterized in that: The ends of the steel cross beam top plate (1) and the steel cross beam bottom plate (3) are both provided with extension sections extending into the box beam (4); the extension sections of the steel cross beam top plate (1) and the steel cross beam bottom plate (3) are respectively provided with top plate stirrup holes (12) and bottom plate stirrup holes (31); the extension sections of the steel cross beam top plate (1) and the steel cross beam bottom plate (3) are connected and fixed to the box beam (4) via cross beam stirrups (41).

4. The double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to claim 3 is characterized in that: The width of the steel beam top plate (1) and the steel beam bottom plate (3) are both 0.5 to 0.8 m, and the extension length of the steel beam top plate (1) and the steel beam bottom plate (3) is not less than 0.8 m.

5. A double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to any one of claims 2 to 4, characterized in that: The top width of the vertical rib plate (22) is equal to the width of the steel beam top plate (1), the bottom width of the vertical rib plate (22) is equal to the width of the transverse rib plate (21), and the top and bottom surfaces of the vertical rib plate (22) are evenly transitioned through a transition section.

6. A double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to any one of claims 2 to 4, characterized in that: Along the direction away from the box beam (4), the longitudinal spacing between adjacent vertical ribs (22) is uniformly increased from 1.2m to 1.5m; along the vertical direction, the transverse ribs (21) are uniformly arranged in four layers.

7. A double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to any one of claims 1 to 4, characterized in that: An embedded steel plate (23) that fits the box beam (4) is arranged at one end of the steel cross beam web (2) adjacent to the box beam (4), and the embedded steel plate (23) and the box beam (4) are connected and fixed by steel plate shear nails (232).

8. The double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to claim 7, characterized in that: Horizontal short ribs (231) are evenly arranged on the plate surface of the embedded steel plate (23) on the side away from the box beam (4), and the horizontal short ribs (231) are symmetrically arranged on both sides of the steel cross beam web (2), and along the height direction, the spacing between adjacent horizontal short ribs (231) is smaller than the spacing between adjacent cross ribs (21).

9. A double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to any one of claims 1 to 4, characterized in that: Along the direction away from the box beam (4), the longitudinal spacing between adjacent top plate shear nails (11) gradually increases.

10. The double-sided box prestressed concrete low-tower cable-stayed bridge steel beam structure according to claim 9, characterized in that: The transverse spacing between the top plate shear studs (11) is 0.15 m, and the longitudinal spacing between adjacent top plate shear studs (11) increases uniformly from 0.15 m to 0.2 m in the direction away from the box beam (4).