Large-span steel box girder walking type incremental launching construction system

By using multi-directional jacks and adjustment mechanisms in the step-by-step push construction system of large-span steel box girders, the problem of difficulty in adjusting and positioning of steel box girders is solved, and the rapid and accurate positioning of steel box girders is achieved, and the construction is improved Safety and efficiency.

CN222008670UInactive Publication Date: 2024-11-15CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420583339.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the step-by-step overhang construction of large-span steel box girders, the position adjustment and positioning of the steel box girders are difficult to complete quickly, resulting in bridge installation errors and position deviations, affecting construction safety and efficiency.

Method used

A construction system including pier columns, temporary support and pushing unit is designed. The pushing unit consists of longitudinal, transverse and vertical jack mechanisms, combining adjustment mechanisms and sliding bases to realize the steel box beam using jacks and elastic parts. multi-directional movement and precise positioning.

Benefits of technology

It realizes rapid adjustment and precise positioning of steel box girders, reduces installation errors and position deviations, and improves construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008670U_ABST
    Figure CN222008670U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of bridge engineering, and particularly discloses a large-span steel box girder walking type pushing construction system which comprises a pier column, a temporary support and a pushing unit. The pushing unit comprises two sets of jack mechanisms, a set of adjusting mechanism and a sliding base; the jack mechanism comprises a longitudinal fixed base, a longitudinal pushing jack, a first transverse pushing jack and a first vertical pushing jack; the adjusting mechanism comprises a second vertical jack and a second transverse jack. The sliding base is arranged at the output end of the first vertical jack. And the interior of the sliding base is hollow, a ball mechanism and a plurality of elastic pieces are arranged on the inner bottom wall of the sliding base, the ball mechanism comprises a first bearing platform, a supporting plate and a movable ball, and the bottom of the supporting plate is connected with the output end of the second vertical jack. The utility model aims to solve the technical problem of how to quickly adjust the position of the steel box girder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge engineering, and specifically discloses a walking type jacking construction system for a large-span steel box girder. Background Art

[0002] The jacking method is an advanced self-erection construction method without or with few supports. It has been promoted due to its advantages of not affecting navigation, shortening construction period and reducing construction costs. The jacking method construction can be divided into two categories according to the form of jacking force: dragging jacking and walking jacking. At present, the research on jacking construction technology is relatively mature, but in the process of jacking construction, there are still several problems that need to be studied in detail in the future: (1) Optimization of jacking construction scheme and temporary structure: The design optimization of jacking construction scheme and temporary structure has a great impact on the main structure. The design of guide beams and temporary piers has a great impact on the stress state and safety of the main structure during the jacking process. It is necessary to conduct in-depth analysis and optimization of the scheme design and temporary structure design in the early stage of jacking construction. (2) Reasonable length of steel guide beam: The influence of the reasonable length of steel guide beam on the stress of the main beam has been fully analyzed. However, for large-span continuous steel tie arch bridges, other auxiliary measures are adopted, such as setting struts between arch beams, the influence of guide beam stiffness and temporary pier stiffness on the stress of the main structure. (3) Local stress analysis: During the jacking process, the temporary fulcrums and supports of the steel box girder bridge cause local stress, which has a great impact on the overall safety. There are few studies on local problems during the jacking process. In the construction plan and temporary structure optimization, the positioning of the steel box girder is very important. Each section of the steel box girder may have installation errors during installation. Excessive installation errors will lead to bridge position deviations, so how to quickly adjust / position the steel box girder is very important. Utility Model Content

[0003] In view of this, the purpose of the utility model is to provide a walking-type jacking construction system for a large-span steel box girder to solve the technical problem of how to quickly adjust the position of the steel box girder.

[0004] In order to achieve the above object, the utility model provides the following technical solutions:

[0005] A walking-type jacking construction system for a large-span steel box girder comprises a pier, a temporary support and a jacking unit, wherein the temporary support and the jacking unit are both arranged on the pier; the jacking unit comprises two sets of jack mechanisms, an adjusting mechanism and a sliding base; the jack mechanisms are arranged on both sides of the adjusting mechanism, the jack mechanisms comprise a longitudinal fixed base, a longitudinal jacking jack, a first transverse jacking jack and a first vertical jacking jack, a longitudinal sliding base is slidably arranged on the longitudinal fixed base, the longitudinal jacking jack is fixedly arranged in the longitudinal fixed base and its output end is fixedly connected to the longitudinal sliding base, the first transverse jacking jack is arranged on the longitudinal sliding base, and the first vertical jacking jack is arranged on the output end of the first transverse jacking jack; the adjusting mechanism comprises a second vertical The sliding base is provided with a first vertical jack and a second horizontal jack, wherein the second vertical jack is provided on the output end of the second horizontal jack; the sliding base is provided with a first vertical jack; the interior of the sliding base is hollow, and a vertical through groove is formed in the middle thereof; a ball mechanism and a plurality of elastic members are provided on the inner bottom wall of the sliding base; the ball mechanism comprises a first support platform, a support plate and a movable ball; the first support platform is fixedly provided on the inner side wall of the sliding base; a first groove is provided around the support plate for the first support platform to pass through; a second groove is provided on the inner wall of the through groove for the support plate to pass through and move; the movable ball is provided on the support plate; the bottom of the support plate is connected to the output end of the second vertical jack; a third groove is provided on the top of the inner wall of the sliding base for the movable ball to pass through and move.

[0006] Optionally, the elastic member includes a damper and a spring.

[0007] Optionally, a plurality of first circular holes and second circular holes are provided on the support plate, wherein the diameter of the first circular holes is larger than that of the second circular holes, and the first circular holes and the second circular holes are both for elastic members to pass through, and an annular second support platform is provided in the second circular hole, and the movable ball is provided on the second support platform, and the top of the elastic member can pass through the second circular hole and contact the movable ball.

[0008] Optionally, a ball bearing is provided on the second supporting platform, a spherical groove is formed on the ball bearing, and the movable ball is movably arranged in the groove.

[0009] Optionally, a cross slot is provided at the bottom of the support plate, and a cross connecting block is provided at the top of the second vertical jack, and the cross connecting block is vertically slidably connected to the cross slot.

[0010] The working principle and beneficial effects of this solution are:

[0011] In this scheme, a jacking unit is provided, and the jacking unit includes three types of jacks: vertical, longitudinal and transverse, so the entire jacking unit can drive the steel box girder in the vertical, longitudinal and transverse directions. During the jacking process, the steel box girder is first lifted vertically, and then the steel box girder is moved longitudinally to make it move forward. Repeated operations can move the steel box girder to the specified position. The transverse jack can be used to adjust the transverse position of the steel box girder, mainly for positioning and fine adjustment. An adjustment mechanism is also provided in the jacking unit. The main function of the adjustment mechanism is to move the support plate so that it contacts the elastic member, and move the movable ball on the support plate upward to the outside of the sliding base, and the steel box girder is supported by the movable ball. A steel box girder has at least two jacking units, one of which is supported by the sliding base, and the other is supported by the movable ball. When the jacking unit supported by the sliding base moves horizontally, the jacking unit of the movable ball does not move, so the angle of the steel box girder can be adjusted for accurate positioning. After the positioning is completed, the jacking process is carried out.

[0012] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and will be apparent to those skilled in the art based on the following examination and research, or can be taught from the practice of the present invention to some extent. The objectives and other advantages of the present invention can be achieved and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of an embodiment;

[0014] Figure 2 It is a structural schematic diagram of the push unit;

[0015] Figure 3 It is a schematic diagram of the structure inside the sliding base;

[0016] Figure 4 It is a schematic diagram of the structure of the first circular hole and the second circular hole.

[0017] The markings in the accompanying drawings are as follows: pier 1, temporary support 2, pushing unit 3, longitudinal fixed base 4, longitudinal sliding base 5, first transverse jack 6, first longitudinal pushing jack 7, second transverse jack 8, second vertical jack 9, sliding base 10, support plate 11, third trough 12, through trough 13, first circular hole 14, second circular hole 15, first trough 16, second trough 17, damper 18, first support platform 19, second support platform 20, ball bearing 21, movable ball 22. DETAILED DESCRIPTION

[0018] The following is further described in detail through specific implementation methods:

[0019] Example

[0020] A walking top-pushing construction system for large-span steel box girders, such as Figure 1-Figure 4 As shown, it includes a pier column 1, a temporary support 2 and a jacking unit 3, wherein the temporary support 2 and the jacking unit 3 are both arranged on the pier column 1.

[0021] The pushing unit 3 includes two sets of jack mechanisms, one set of adjustment mechanism and a sliding base 10 .

[0022] The jack mechanism is arranged on both sides of the adjustment mechanism. The jack mechanism includes a longitudinal fixed base 4, a longitudinal jacking jack, a first transverse jacking jack and a first vertical jacking jack. The longitudinal fixed base 4 is arranged at the top of the pier 1 along the length direction of the pier 1. A longitudinal sliding base 5 is slidably arranged on the longitudinal fixed base 4, and the longitudinal jacking jack is fixedly arranged in the longitudinal fixed base 4 and its output end is fixedly connected to the longitudinal sliding base 5. The first transverse jacking jack is fixedly arranged on the longitudinal sliding base 5, and the first vertical jacking jack is fixedly arranged on the output end of the first transverse jacking jack.

[0023] The adjustment mechanism comprises a second vertical jack 9 and a second transverse jack 8. The second vertical jack 9 is arranged on the output end of the second transverse jack 8.

[0024] The sliding base 10 is arranged on the output end of the first vertical jack. The sliding base 10 is rectangular in shape as a whole and hollow inside, and a vertical through groove 13 is formed in the middle thereof, and the side wall of the through groove 13 is the inner side wall of the sliding base 10. A ball mechanism and a plurality of elastic members are arranged on the inner bottom wall of the sliding base 10, and the elastic member can be a damper 18 or a spring, preferably a damper 18. The ball mechanism includes a first support 19, a support plate 11 and a movable ball 22. The first support 19 is fixedly arranged on the inner side wall of the sliding base 10, and its main function is to provide a support point for the support plate 11. The first groove 16 for the first support 19 to pass through is arranged around the support plate 11, and the inner wall of the through groove 13 is provided with a second groove 17 for the support plate 11 to pass through. The movable ball 22 is arranged on the support plate 11. The movable ball 22 and the support plate 11 are arranged as follows: a plurality of first circular holes 14 and second circular holes 15 are opened on the support plate 11, the aperture of the first circular hole 14 is larger than that of the second circular hole 15, and the first circular hole 14 and the second circular hole 15 are both for the damper 18 to pass through, and an annular second support 20 is arranged in the second circular hole 15, and a ball support 21 is arranged on the second support 20, and a spherical groove is formed on the ball support 21, and the movable ball 22 is movably arranged in the groove; the top of the damper 18 can pass through the second circular hole 15 and contact with the movable ball 22.

[0025] The bottom of the support plate 11 is connected to the output end of the second vertical jack 9, and the top of the inner wall of the sliding base 10 is provided with a third slot 12 for the movable ball 22 to pass through and move. The bottom of the support plate 11 is provided with a cross slot, and the top of the second vertical jack 9 is provided with a cross connection block, which is vertically slidably connected to the cross slot. The structure of the cross slot and the cross connection block is simple, so they are not drawn in the attached drawings.

[0026] When implementing:

[0027] First, the steel box girder is hoisted to the designated position by the hoisting equipment, and the position positioning is required in the process. After the steel box girder is hoisted in place, the jacking unit 3 is started, and the vertical jack of the jacking unit 3 first lifts the steel box girder, and then the lateral position of the steel box girder is adjusted by the lateral jack to complete the lateral positioning. If the steel box girder has an angular deviation, first completely reset the pushing unit 3, then start the pushing unit 3 on the bottom side of the steel box girder, extend the second vertical jack 9 and push the support plate 11 upward, at this time the damper 18 withdraws from the first circular hole 14, and then the second transverse jack 8 drives the second vertical jack 9 and the support plate 11 thereon to move laterally, at this time the damper 18 is aligned with the second circular hole 15, and then control the second vertical jack 9 to descend, at this time the damper 18 contacts the ball bearing 21 in the second circular hole 15 and pushes it out of the sliding base 10, at this time the highest point of the movable ball 22 is higher than the sliding base 10, and the support plate 11 is still supported by the first support platform 19. After completing the above operations, the steel box girder is lifted up by controlling the first vertical jack. However, at this time, the steel box girder is in contact with the movable ball 22, and the jacking unit 3 on the other side also lifts up the steel box girder. However, the other side of the steel box girder is in contact with the sliding base 10. The first transverse jack 6 of the jacking unit 3 on the other side controls the transverse movement of the steel box girder to adjust the angle of the steel box girder. After the adjustment is completed, all the jacking units 3 are reset, and then the jacking process is carried out.

[0028] The above is only an embodiment of the utility model, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the utility model.

Claims

1. A walking type jacking construction system for a large-span steel box girder, characterized in that: It includes a pier column, a temporary support and a jacking unit, wherein the temporary support and the jacking unit are both arranged on the pier column; The pushing unit includes two sets of jack mechanisms, one set of adjustment mechanism and a sliding base; The jack mechanism is arranged on both sides of the adjustment mechanism, and the jack mechanism includes a longitudinal fixed base, a longitudinal jacking jack, a first transverse jacking jack and a first vertical jacking jack. A longitudinal sliding base is slidably arranged on the longitudinal fixed base, the longitudinal jacking jack is fixedly arranged in the longitudinal fixed base and its output end is fixedly connected to the longitudinal sliding base, the first transverse jacking jack is arranged on the longitudinal sliding base, and the first vertical jacking jack is arranged on the output end of the first transverse jacking jack; The adjustment mechanism includes a second vertical jack and a second transverse jack, wherein the second vertical jack is arranged on the output end of the second transverse jack; The sliding base is arranged on the output end of the first vertical jack; the interior of the sliding base is hollow, and a vertical through groove is formed in the middle thereof, a ball mechanism and a plurality of elastic parts are arranged on the inner bottom wall of the sliding base, the ball mechanism includes a first support platform, a support plate and a movable ball, the first support platform is fixedly arranged on the inner side wall of the sliding base, a first groove for the first support platform to pass through is arranged around the support plate, a second groove for the support plate to pass through and move is arranged on the inner wall of the through groove, the movable ball is arranged on the support plate, the bottom of the support plate is connected to the output end of the second vertical jack, and a third groove for the movable ball to pass through and move is arranged on the top of the inner wall of the sliding base.

2. The walking type jacking construction system for a large-span steel box girder according to claim 1 is characterized in that: The elastic member includes a damper and a spring.

3. The walking type jacking construction system for a large-span steel box girder according to claim 2 is characterized in that: The support plate is provided with a plurality of first circular holes and second circular holes, wherein the diameter of the first circular holes is larger than that of the second circular holes, and the first circular holes and the second circular holes are both for elastic members to pass through, and an annular second support platform is provided in the second circular hole, and the movable ball is provided on the second support platform, and the top of the elastic member can pass through the second circular hole and contact the movable ball.

4. The walking type jacking construction system for a large-span steel box girder according to claim 3 is characterized in that: A ball bearing is arranged on the second supporting platform, a spherical groove is formed on the ball bearing, and the movable ball is movably arranged in the groove.

5. The walking type jacking construction system for a large-span steel box girder according to claim 4 is characterized in that: A cross slot is arranged at the bottom of the support plate, and a cross connecting block is arranged at the top of the second vertical jack, and the cross connecting block is vertically slidably connected with the cross slot.