Adjustable inner hanging basket for highway bridge wet joint construction

By designing the structure of the adjustable inner hanging basket, including the adjustment frame and the fixing knob, the problem of the inability to adjust the height of the wet joint inner hanging basket in the prior art is solved, the safety and stability of the construction are improved, and the tool replacement is facilitated. .

CN222008672UInactive Publication Date: 2024-11-15陆志高
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420629910.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing folding inner hanging basket for wet joint construction of highway bridges has a protective net fixedly connected between the two supporting rods, and the space height cannot be adjusted according to actual needs, which increases the difficulty of operation and reduces the implementability.

Method used

An adjustable inner hanging basket including a first bracket, a working plate, a second bracket, a connecting plate, a load-bearing rod, a clamping plate, an adjustment frame and a fixing knob are designed. The height is adjusted by rotating the fixing knob and a slide frame, and the The draw rope maintains the balance of the inner hanging basket, increasing the stress area and stability.

Benefits of technology

The height of the inner hanging basket is adjusted according to actual needs, which increases the safety and implementability of the operation, avoids the shaking of the inner hanging basket, improves the stability of construction and facilitates tool replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008672U_ABST
    Figure CN222008672U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of highway bridge wet joint construction, and discloses an adjustable inner hanging basket for highway bridge wet joint construction. The adjustable inner hanging basket for highway bridge wet joint construction comprises a first support, a working plate, a second support, a connecting plate, a bearing rod and a first clamping plate, the working plate is rotationally arranged at the bottom of the first support, the second support is arranged on the front side of the working plate, and the connecting plate is arranged on the second support. A plurality of connecting plates are rotatably arranged between the first support and the second support, a bearing rod is fixedly connected onto the first support, a first clamping plate is mounted at the top of the bearing rod, the adjusting frame is slidably arranged on the second support, and the two fixing knobs are arranged on the second support in a threaded manner. And the fixed knob is rotated, and then the adjusting frame is moved upwards, so that the space height of the inner hanging basket can be adjusted according to the actual use requirement, and the safety and the feasibility of operation are further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wet joint construction of highway bridges and discloses an adjustable inner hanging basket for wet joint construction of highway bridges. Background Art

[0002] The wet joints of highway bridges refer to the parts connected by cast-in-place concrete between precast concrete beam sections or between precast beam sections and cast-in-place beam sections during bridge construction. This connection method not only plays the role of connecting the structure, but also can transfer stress, waterproof, lubricate and anchor steel bars.

[0003] The patent with the patent authorization publication number CN211872672U discloses a foldable inner hanging basket for wet joint construction of highway bridges, including a fixed frame, and the front and rear sides of the lower surface of the fixed frame are fixedly connected to a mobile frame. Although the above patent can complete the folding and recovery of the inner hanging basket by pulling the mobile handle, there are still some shortcomings in the use of the above. Since a protective net is fixedly connected between the two support rods, the spatial height of the inner hanging basket cannot be adjusted according to the actual use needs, thereby increasing the difficulty of the operation and reducing the feasibility of the operation.

[0004] Therefore, there is a need for an adjustable inner hanging basket for wet joint construction of highway bridges, wherein the hanging basket is height-adjustable by setting an adjustment frame and a fixing knob. Utility Model Content

[0005] In order to overcome the shortcomings of the existing patent that the spatial height of the inner hanging basket cannot be adjusted according to the actual use requirements due to the fixed connection of a protective net between the two support rods, thereby increasing the difficulty of operation and reducing the feasibility of operation, the utility model provides an adjustable inner hanging basket for wet joint construction of highway bridges, which achieves the purpose through the setting of an adjustment frame and a fixing knob.

[0006] In order to achieve the purpose of adjustable height, the utility model provides the following technical solutions: an adjustable inner hanging basket for wet joint construction of highway bridges, comprising a first bracket, a work plate, a second bracket, a connecting plate, a load-bearing rod and a first clamping plate, a work plate rotatably arranged at the bottom of the first bracket, a second bracket is arranged on the front side of the work plate, a plurality of connecting plates are rotatably arranged between the first bracket and the second bracket, a load-bearing rod is fixedly connected to the first bracket, a first clamping plate is installed on the top of the load-bearing rod, and also comprises an adjustment frame and a fixing knob, an adjustment frame is slidably arranged on the second bracket, and two fixing knobs are threadedly arranged on the second bracket.

[0007] More preferably, the inner hanging basket is foldable.

[0008] More preferably, it also includes a sliding frame, a push rod, a support plate and a limit plate, two sliding frames are slidably arranged on the first card plate, push rods are rotatably arranged on the left and right sides of the sliding frames, the left and right sides of the first card plate are fixedly connected to the limit plates, the support plates are rotatably arranged on the limit plates, and the end of the push rod away from the sliding frame is connected to the support plate.

[0009] More preferably, it further includes a rope fixing plate, a pull rope and a second clamping plate, two rope fixing plates are arranged on the second bracket, the pull rope is connected to the rope fixing plate, and the two pull ropes are jointly provided with a second clamping plate.

[0010] More preferably, it further includes a mounting plate, a tool frame and a limiting wire, two mounting plates are mounted on the first bracket, the tool frame is fixedly connected to the lower part of the mounting plate, and the limiting wire is rotatably arranged on the mounting plate.

[0011] More preferably, it further comprises a tripod, and two sets of tripods are arranged on the carrying rod.

[0012] More preferably, it further includes anti-skid pads, and the tripod is provided with anti-skid pads.

[0013] More preferably, a tool fixing clamp is further included, and a plurality of tool fixing clamps are arranged on the mounting plate.

[0014] Compared with the prior art, the utility model provides an adjustable inner hanging basket for wet joint construction of highway bridges, which has the following beneficial effects: 1. When the height of the inner hanging basket needs to be adjusted, turn the fixed knob and then move the adjustment frame upward, so that the spatial height of the inner hanging basket can be adjusted according to actual use needs, thereby increasing the safety and feasibility of the operation.

[0015] 2. Push the sliding frame to the side away from each other to make the support plate rotate outward in a straight line, and then insert the first clamping plate and the push rod into the fixed plate to increase the force-bearing area of ​​the inner hanging basket, thereby reinforcing the inner hanging basket at the bottom of the bridge.

[0016] 3. By pulling the pull rope upwards, the second clamping plate is clamped with the fixed plate, so that the front and rear ends of the inner hanging basket are kept balanced, thereby avoiding the shaking of the inner hanging basket during wet seam operation and increasing stability.

[0017] 4. Place the tools needed for wet joints in the tool box to facilitate tool replacement during construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.

[0019] Figure 2 It is a three-dimensional structural schematic diagram of the load-bearing rod, the first clamping plate and the tripod of the utility model.

[0020] Figure 3 It is a three-dimensional cross-sectional structural schematic diagram of the tripod, adjustment frame and fixing knob of the utility model.

[0021] Figure 4 It is a three-dimensional cross-sectional structural schematic diagram of the sliding frame, the push rod and the support plate of the utility model.

[0022] Figure 5 It is a schematic diagram of the three-dimensional structure of the rope fixing plate, the pull rope and the second clamping plate of the utility model.

[0023] Figure 6 It is a three-dimensional structural schematic diagram of the mounting plate, tool frame and limiting steel wire of the utility model.

[0024] The markings of the components in the accompanying drawings are as follows: 1: first bracket, 2: work plate, 3: second bracket, 4: connecting plate, 5: load-bearing rod, 6: first clamping plate, 7: tripod, 8: adjustment frame, 9: fixing knob, 10: sliding frame, 11: push rod, 12: support plate, 13: limiting plate, 14: rope fixing plate, 15: pull rope, 16: second clamping plate, 17: mounting plate, 18: tool frame, 19: limiting steel wire, 20: anti-slip foot pad, 21: tool fixing clamp. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] Example 1: An adjustable inner hanging basket for wet joint construction of highway bridges, please refer to Figure 1-Figure 5 , including a first bracket 1, a work plate 2, a second bracket 3, a connecting plate 4, a bearing rod 5 and a first card plate 6. The work plate 2 is rotatably arranged at the bottom of the first bracket 1, and the second bracket 3 is arranged on the front side of the work plate 2. Four connecting plates 4 are rotatably arranged between the first bracket 1 and the second bracket 3. The bearing rod 5 is fixedly connected to the first bracket 1, and the first card plate 6 is arranged on the top of the bearing rod 5 by bolt connection. An adjustment bracket 8 is slidably arranged on the second bracket 3, and two fixing knobs 9 are threadedly arranged on the second bracket 3. The inner hanging basket is foldable. When it is not needed, the work plate 2 can be rotated upward to fold the inner hanging basket. Two sets of tripods 7 are arranged on the front bearing rod 5, and also include anti-slip foot pads 20. Anti-slip foot pads 20 are arranged on the tripod 7. The anti-slip foot pads 20 increase the friction between the tripod 7 and the sole, thereby avoiding slipping.

[0027] When it is necessary to perform wet joint operations on highway bridges, the first bracket 1 is moved to a suitable position so that the first clamping plate 6 is clamped with the fixed plate, and the inner basket is fixed. Then the staff enters the inner basket to perform wet joint operations. When it is necessary to adjust the height of the inner basket, turn the fixing knob 9 and then move the adjustment frame 8 upward, so that the spatial height of the inner basket can be adjusted according to actual use needs, thereby increasing the safety and feasibility of the operation. After adjusting the height of the inner basket to a suitable height, reverse the fixing knob 9 to fix the adjustment frame 8. When the inner basket is not needed, remove the inner basket, turn the bolts on the second bracket 3, disengage the connecting plate 4 from the second bracket 3, and then turn the working plate 2 upward to fold the inner basket, thereby reducing the space occupied by the inner basket and facilitating the recovery and transportation of the inner basket.

[0028] Example 2: Based on Example 1, please refer to Figure 1 , Figure 2 and Figure 4 Two sliding frames 10 are slidably arranged on the first card plate 6, and push rods 11 are rotatably arranged on the left and right sides of the sliding frames 10. Limiting plates 13 are fixedly connected to the left and right sides of the first card plate 6, and a support plate 12 is rotatably arranged on the limiting plate 13. The end of the push rod 11 away from the sliding frame 10 is connected to the support plate 12, and the sliding frame 10 is pushed to the side away from each other, so that the push rod 11 squeezes the support plate 12 to rotate outward.

[0029] When fixing the inner hanging basket, push the sliding frame 10 to the side away from each other, thereby expanding the push rod 11, causing the support plate 12 to rotate outward in a straight line, and then clamp the first clamping plate 6 and the push rod 11 into the fixing plate, thereby increasing the force-bearing area of ​​the inner hanging basket, thereby reinforcing the inner hanging basket at the bottom of the bridge.

[0030] See also Figure 2 and Figure 5 Two rope fixing plates 14 are arranged on the second bracket 3 , and a pull rope 15 is connected to the rope fixing plates 14 . The two pull ropes 15 are jointly provided with a second clamping plate 16 .

[0031] After the first clamping plate 6 is clamped with the fixed plate, the pull rope 15 is pulled upward to clamp the second clamping plate 16 with the fixed plate, thereby keeping the front and rear ends of the inner hanging basket balanced, thereby avoiding the shaking of the inner hanging basket during wet seam operation and increasing stability.

[0032] See also Figure 1 and Figure 6 Two mounting plates 17 are provided on the first bracket 1 by bolt connection, a tool frame 18 is fixedly connected to the lower part of the mounting plate 17, a limiting wire 19 is rotatably provided on the mounting plate 17, and six tool fixing clamps 21 are provided on the mounting plate 17 to clamp the rod-shaped tools to prevent the rod-shaped tools from falling.

[0033] Before using the inner hanging basket, the limiting wire 19 is turned upwards, and the tools needed for the wet joint are placed in the tool frame 18, so as to facilitate the replacement of tools during the construction process. After the tools are placed, the limiting wire 19 is turned downwards to limit the tools.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An adjustable inner hanging basket for wet joint construction of highway bridges, comprising a first bracket (1), a work plate (2), a second bracket (3), a connecting plate (4), a bearing rod (5) and a first clamping plate (6), wherein the work plate (2) is rotatably arranged at the bottom of the first bracket (1), the second bracket (3) is arranged at the front side of the work plate (2), a plurality of connecting plates (4) are rotatably arranged between the first bracket (1) and the second bracket (3), the bearing rod (5) is fixedly connected to the first bracket (1), and the first clamping plate (6) is installed on the top of the bearing rod (5), wherein: It also comprises an adjustment frame (8) and a fixed knob (9); the adjustment frame (8) is slidably arranged on the second bracket (3), and two fixed knobs (9) are threadedly arranged on the second bracket (3).

2. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 1 is characterized in that: The inner hanging basket is foldable.

3. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 1 is characterized in that: The invention also comprises a sliding frame (10), a push rod (11), a support plate (12) and a limit plate (13); two sliding frames (10) are slidably arranged on the first clamping plate (6); push rods (11) are rotatably arranged on the left and right sides of the sliding frames (10); the limit plates (13) are fixedly connected to the left and right sides of the first clamping plate (6); a support plate (12) is rotatably arranged on the limit plate (13); and one end of the push rod (11) away from the sliding frame (10) is connected to the support plate (12).

4. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 1 is characterized in that: It also includes a rope fixing plate (14), a pull rope (15) and a second clamping plate (16); two rope fixing plates (14) are arranged on the second bracket (3); the pull rope (15) is connected to the rope fixing plate (14); and the two pull ropes (15) are jointly provided with the second clamping plate (16).

5. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 1 is characterized in that: It also comprises a mounting plate (17), a tool frame (18) and a limiting steel wire (19); two mounting plates (17) are mounted on the first bracket (1); the tool frame (18) is fixedly connected to the lower part of the mounting plate (17); and the limiting steel wire (19) is rotatably arranged on the mounting plate (17).

6. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 1 is characterized in that: It also includes a tripod (7), and two groups of tripods (7) are arranged on the bearing rod (5).

7. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 6 is characterized in that: It also includes an anti-skid foot pad (20), and the anti-skid foot pad (20) is arranged on the tripod (7).

8. The adjustable inner hanging basket for wet joint construction of highway bridges according to claim 5 is characterized in that: It also includes a tool fixing clamp (21), and a plurality of tool fixing clamps (21) are arranged on the mounting plate (17).