Inspection well

By integrating gate valves and water-sealed tee fittings in the inspection well, combined with the ground operation of the extended control rod, the problems of insufficient construction progress and reusability of the existing inspection well were solved, and rapid construction and functional improvements were achieved in cold areas.

CN222009118UActive Publication Date: 2024-11-15SINOPEC NINGBO ENG +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420018302.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-11-15
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

The existing inspection wells have shortcomings in construction progress and reusability, especially in cold areas, and the lack of valve cutting and water sealing functions, which affects the project progress and cost.

Method used

A inspection well including well ring, manhole cover, wellbore, gate valve and water-sealed tee pipe fitting was designed. The inlet of the gate valve is connected to the through-well casing and the outlet is connected to the water-sealed tee pipe fitting, and the cutting control is achieved through the extended control rod. Moreover, the cutting handwheel of the gate valve operates on the ground and has the functions of cutting and water sealing.

Benefits of technology

It has achieved rapid construction in cold areas, improved the reusability and functionality of inspection wells, reduced the demand for additional facilities, and shortened construction time and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009118U_ABST
    Figure CN222009118U_ABST
Patent Text Reader

Abstract

The utility model relates to an inspection well which comprises a well ring, a well cover arranged at the top of the well ring, a well cylinder connected with the bottom of the well ring through a middle partition plate and a well penetrating sleeve connected to the side wall of the well cylinder in a sealed mode, and is characterized in that a gate valve and a water seal three-way pipe fitting are further arranged in the well cylinder, and an inlet of the gate valve is communicated with the well penetrating sleeve; an outlet of the gate valve is communicated with a first port of the water seal three-way pipe fitting, a cut-off control end of the gate valve is connected with a lengthened control rod, the upper end of the lengthened control rod penetrates through a middle partition plate at the upper end of the shaft and then is exposed, and a second port of the water seal three-way pipe fitting is opened downwards. And a third port of the water seal three-way pipe fitting is arranged upwards and is in sealing connection with a sealing cover. Compared with the prior art, the utility model has the advantages that the cut-off and water seal functions are realized, and the cut-off control end of the gate valve in the inspection well is connected with the lengthened control rod, so that an operator can stand on the ground to operate and does not need to go down to the inside of the well body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an inspection well which can be used for buried water supply and drainage systems in the fields of municipal engineering, electric power and petrochemical engineering. Background Art

[0002] The buried water supply and drainage network is an important part of underground engineering. The on-site buried pipe network inspection well is an important part of the buried water supply and drainage network. Its construction progress affects the construction period of the overall pipe network. At present, the inspection wells of the water supply and drainage network can usually be made of reinforced concrete inspection wells, brick inspection wells, and plastic inspection wells.

[0003] Reinforced concrete inspection wells and brick inspection wells are the more traditional types of buried pipe network inspection wells. Their design standards and construction methods also have national unified standard practice atlases and construction atlases issued by various localities. However, the construction progress of reinforced concrete inspection wells and brick inspection wells is greatly affected by the weather and the proficiency of operators, especially in cold areas in winter. Due to the cold weather, on-site prefabrication and construction personnel are often unable to work normally, which seriously affects the construction progress.

[0004] As a new type of inspection well in recent years, plastic inspection wells are widely used in the field of drainage pipe networks due to their one-time injection molding method. However, due to the one-piece molding characteristics of plastic inspection wells, if the elevation of this type is modified or the connection pipe mouth is adjusted during on-site construction, the manufacturer needs to re-manufacture it. The reusability of the original plastic inspection well is low, and re-manufacturing means affecting the project schedule and cost.

[0005] In addition, most of the existing single inspection wells do not have the valve cut-off function and water seal function at the same time. In actual application, it is usually necessary to set up two inspection wells independently, which puts high demands on on-site construction and space requirements. Utility Model Content

[0006] The technical problem to be solved by the utility model is to provide an inspection well which is easy to operate and has valve cut-off function and water seal function in view of the above-mentioned prior art.

[0007] The technical solution adopted by the utility model to solve the above-mentioned technical problems is: an inspection well, including a well ring, a well cover arranged on the top of the well ring, a wellbore connected to the bottom of the well ring through an intermediate partition, and a well casing sealed and connected to the side wall of the wellbore, characterized in that: a gate valve and a water-sealing three-way pipe fitting are also provided in the wellbore, wherein the inlet of the gate valve is communicated with the well casing, the outlet of the gate valve is communicated with the first port of the water-sealing three-way pipe fitting, the cut-off control end of the gate valve is connected with an extended control rod, and the upper end of the extended control rod is exposed after passing through the intermediate partition at the upper end of the wellbore, the second port of the water-sealing three-way pipe fitting is open downward, and the third port of the water-sealing three-way pipe fitting is upward and sealed and connected with a sealing cover.

[0008] As an improvement, the exposed length of the upper end of the extended control rod after passing through the middle partition at the upper end of the wellbore is greater than or equal to the height of the wellbore ring.

[0009] As a further improvement, the utility model further comprises a gate valve cut-off hand wheel which is drivingly connected to the upper end of the lengthened control rod. When the inspection well is buried underground, the gate valve cut-off hand wheel is arranged on the ground.

[0010] As a further improvement, there is a gap between the gate valve and the bottom of the wellbore, and the gate valve is fixed to the bottom of the wellbore by a bracket.

[0011] As a further improvement, two well-penetrating casings are provided on the side wall of the wellbore, one of which is used for water inlet and the other for water outlet, and the inlet of the gate valve is connected to the well-penetrating casing for water inlet.

[0012] As a further improvement, there is a gap between the second port of the water seal three-way pipe fitting and the bottom of the wellbore.

[0013] As a further improvement, a ladder is provided on the inner wall of the shaft.

[0014] Preferably, the diameter of the middle partition is greater than the diameter of the well ring by more than 200 mm.

[0015] Preferably, the wellbore is made of a DN1200 steel pipe or a DN1500 steel pipe, and the bottom of the wellbore is connected to a base plate.

[0016] Preferably, the bottom plate is square, and its side length is more than 300 mm greater than the wellbore diameter.

[0017] Compared with the prior art, the advantages of the utility model are: by arranging a gate valve and a water-seal three-way pipe fitting in the wellbore, the inlet of the gate valve is connected with the well casing, and the outlet of the gate valve is connected with the first port of the water-seal three-way pipe fitting; by connecting the cut-off control end of the gate valve to the extended control rod, the upper end of the extended control rod is exposed after passing through the middle partition at the upper end of the wellbore, the second port of the water-seal three-way pipe fitting is open downward, and the third port of the water-seal three-way pipe fitting is upward and sealed with a sealing cover, so that the inspection well has the functions of cutting off and water sealing, and the cut-off control end of the gate valve in the inspection well is connected to the extended control rod, so that the operator can operate on the ground without going down to the inside of the well body. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the inspection well in the embodiment of the utility model.

[0019] Figure 2 for Figure 1 AA section view.

[0020] Figure 3 for Figure 1Middle BB section view.

[0021] Figure 4 for Figure 1 CC section view. DETAILED DESCRIPTION

[0022] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0023] like Figures 1 to 4 The inspection well shown in the figure comprises a well ring 1, a well cover 2 arranged on the top of the well ring 1, a wellbore 4 connected to the bottom of the wellbore 1 through a middle partition 3, a first well casing 5 for water inlet and a second well casing 6 for water outlet which are sealed and connected to the side wall of the wellbore, a gate valve 7 and a water seal three-way pipe 8 are also arranged in the wellbore 4, wherein the inlet of the gate valve 7 is communicated with the first well casing 5, the outlet of the gate valve 7 is communicated with the first port of the water seal three-way pipe 8, the cut-off control end of the gate valve 7 is connected with an extended control rod 9, and the upper end of the extended control rod 9 is exposed after passing through the middle partition 3 at the upper end of the wellbore 4, the second port of the water seal three-way pipe 8 is open downward, and there is a gap between the second port and the bottom of the wellbore; the third port of the water seal three-way pipe 8 is arranged upward and is sealed and connected with a sealing cover 10. A ladder 13 is arranged on the inner wall of the wellbore 4.

[0024] In this embodiment, the upper end of the extended control rod 9 passes through the middle partition 3 at the upper end of the shaft 4, and the exposed length is greater than or equal to the height of the well ring 1. The upper end of the extended control rod 9 is also driven and connected to the gate valve cut-off hand wheel 11. When the inspection well is buried underground, the gate valve cut-off hand wheel 11 is set on the ground. There is a gap between the gate valve 7 and the bottom of the shaft 4, and the gate valve 7 is fixed to the bottom of the shaft 4 by a bracket 12.

[0025] Combined with the actual needs of the project, the manhole cover 2 can be selected as a light manhole cover or a heavy manhole cover; the manhole ring 1 part can be selected as a unified height of 800mm, which is convenient for the prefabrication plant to perform overall cutting and welding; the diameter of the middle partition 3 can be selected in combination with the diameter of the shaft 4. According to the diameter of the inspection well connecting pipe, for inspection wells with a connecting pipe diameter of less than DN600, the shaft 4 can choose to use a DN1200 steel pipe, and for inspection wells with a connecting pipe diameter of less than DN1000, the shaft 4 can choose to use a DN1500 steel pipe. The diameter of the middle partition 3 is greater than the diameter of the shaft ring 1 by more than 200mm. The bottom of the shaft is connected to the bottom plate 5. The bottom plate 5 can be a square plate with a side length greater than the diameter of the shaft ring 1 by more than 300mm, and M12 anchor bolt holes are reserved at the four corners of the bottom plate 5. At the same time, combined with the diameter of the connecting pipe, holes are reserved on the shaft ring 1. After the holes are opened, the first well casing and the second well casing are welded. The prefabrication plant fully welds and connects the well ring, the middle partition, the tube, and the bottom plate end faces, and applies anti-corrosion paint on the inner and outer walls of the well. The gate valve 7 and the water seal tee pipe 8 are installed in the wellbore 4 to meet the functions of cutting off and water sealing the multifunctional well. After the steel pipe inspection well is transported to the construction site, it is hoisted to the concrete fixing plate 14 by a crane, fixed to the concrete fixing plate 14 by anchor bolts, connected to the well pipe, and the soil around the inspection well is backfilled and compacted to complete the installation of the on-site inspection well.

[0026] The inspection well in this embodiment can be prefabricated simultaneously with the steel pipe inspection well in the prefabrication plant in the early stage of on-site pipeline excavation, saving engineering time. In the later stage, the inspection well can be hoisted as a whole on the construction site to shorten the time for on-site concrete prefabrication and simultaneously solve the problem that concrete wells cannot be constructed in cold areas in winter. In addition, by using finished large-diameter steel pipes in batches as the main material for steel pipe inspection wells, it is more conducive to controlling procurement costs. At the same time, it has the functions of valve cut-off and water seal, reducing additional water seal wells and valve well shafts, and reducing the floor area and excavation.

Claims

1. An inspection well, comprising a well ring, a well cover arranged on the top of the well ring, a wellbore connected to the bottom of the well ring through an intermediate partition, and a well casing sealedly connected to the side wall of the wellbore, characterized in that: A gate valve and a water-seal three-way pipe fitting are also provided in the wellbore, wherein the inlet of the gate valve is connected to the well casing, the outlet of the gate valve is connected to the first port of the water-seal three-way pipe fitting, the cut-off control end of the gate valve is connected to an extended control rod, and the upper end of the extended control rod is exposed after passing through the middle partition at the upper end of the wellbore, the second port of the water-seal three-way pipe fitting is open downward, and the third port of the water-seal three-way pipe fitting is arranged upward and is sealed with a sealing cover.

2. The inspection well according to claim 1, characterized in that: The exposed length of the upper end of the lengthened control rod after passing through the middle partition at the upper end of the wellbore is greater than or equal to the height of the wellbore.

3. The inspection well according to claim 2, characterized in that: It also includes a gate valve cut-off hand wheel which is drivingly connected to the upper end of the extended control rod. When the inspection well is buried underground, the gate valve cut-off hand wheel is arranged on the ground.

4. The inspection well according to claim 1, characterized in that: There is a gap between the gate valve and the bottom of the wellbore, and the gate valve is fixed to the bottom of the wellbore through a bracket.

5. The inspection well according to claim 1, characterized in that: There are two well-penetrating casings on the side wall of the wellbore, one of which is used for water inlet and the other is used for water outlet, and the inlet of the gate valve is communicated with the well-penetrating casing for water inlet.

6. The inspection well according to claim 1, characterized in that: There is a gap between the second port of the water seal three-way pipe and the bottom of the wellbore.

7. The inspection well according to claim 1, characterized in that: A ladder is provided on the inner wall of the shaft.

8. The inspection well according to claim 1, characterized in that: The diameter of the middle partition is greater than the diameter of the well ring by more than 200 mm.

9. The inspection well according to claim 8, characterized in that: The wellbore is made of a DN1200 steel pipe or a DN1500 steel pipe, and a bottom plate is connected to the bottom of the wellbore.

10. The inspection well according to claim 9, characterized in that: The bottom plate is square, and its side length is more than 300mm greater than the well circle diameter.