Super high-rise shear wall climbing frame with fixing mode
By designing a variety of connection and sliding structures in the super high-rise shear wall climbing frame, the problem of convenience of fixing and moving is solved, and the efficient use of the climbing frame and the improvement of construction efficiency is achieved.
Patent Information
- Application Number
- CN202420582739.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing ultra-high-rise shear wall climbing frames are troublesome and time-consuming when they are fixed and moved, and lack convenient fixing methods.
A climbing frame structure including outer plate, transverse plate, lifting rod, load-bearing oblique rod, engaging port, engaging track, connecting wedge plate, telescopic rod, sliding block, positioning slider and rotating column is designed, through spring and sliding The grooves, engaging tracks and rotating chambers achieve fixed and mobile functions, and use the winding motor and lifting chain to provide kinetic energy, combining soft pads and fixing plates to improve operational convenience.
It realizes the convenient fixing and movement of climbing frames, improves construction efficiency, ensures that construction personnel can operate on different floors safely and conveniently, and reduces the time and effort of dismantling and installation.
Smart Images

Figure CN222009547U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, and more specifically to a super high-rise shear wall climbing frame with a fixing method. Background Art
[0002] The climbing frame is also called the lifting frame. It can be divided into several main categories according to its power source, such as hydraulic, electric, and manual. It is a new type of scaffolding system developed in recent years. It is mainly used in high-rise shear wall buildings. It can climb up or down along the building. This system has completely changed the scaffolding technology: first, there is no need to turn over the frame; second, it eliminates the disassembly and assembly process of the scaffolding (once assembled, it is used until the construction is completed), and it is not limited by the height of the building. It can be used for super high-rise shear walls, which greatly saves manpower and materials. And from the perspective of safety, it is also a big improvement on traditional scaffolding. It has great development advantages in high-rise buildings;
[0003] Conventional climbing frames are fixed with bolts or other means after they are raised to a certain height. However, such fixing methods are too troublesome, time-consuming and labor-intensive to disassemble. Therefore, it is necessary to set up a climbing frame with a special fixing method that can easily change its moving position. Utility Model Content
[0004] The main technical problem solved by the utility model is to provide a super-high-rise shear wall climbing frame with a fixing method, which can solve the problem that the fixing method is special and the moving position can be changed conveniently.
[0005] To solve the above technical problems, according to one aspect of the utility model, more specifically, a super-high-rise shear wall climbing frame with a fixing method includes an outer plate, a horizontal plate is fixedly connected to the right side of the outer plate, a lifting rod is fixedly connected to the right side of the horizontal plate, a load-bearing diagonal rod is fixedly connected between the lifting rod and the outer plate, a snap-fitting opening is provided on the left side of the lifting rod, a fixing groove is provided on the left side of the snap-fitting opening, and a snap-fitting rail is symmetrically fixedly connected to the inside of the snap-fitting opening.
[0006] Furthermore, a connecting wedge plate is rotatably connected to the lower surface of the left side of the lifting rod via a rotating shaft, an extension rod is fixedly connected to the lower surface of the lifting rod, a telescopic rod is rotatably connected to the right side of the extension rod via a rotating shaft, a telescopic bar is slidably connected to the inside of the telescopic rod, a spring is fixedly connected between the telescopic bar and the telescopic rod, a sliding groove is provided on the lower surface of the connecting wedge plate, the right side of the telescopic bar extends into the interior of the sliding groove, and is slidably connected to a sliding block.
[0007] The locking plate is provided with a locking plate on one side of the locking plate, and the locking plate is locked with the locking plate in the locking cam.
[0008] Furthermore, a lifting plate is fixedly connected to the right side of the lifting rod, a pull ring is fixedly connected to the upper surface of the lifting plate, a winding motor is provided above the right side of the lifting rod, a lifting chain is wound around the outer wall of the winding motor, a hook is fixedly connected to the end of the lifting chain away from the winding motor, and the hook is engaged with the inside of the pull ring.
[0009] Furthermore, a handle is fixedly connected to the right side of the rotating column, and a cushion is provided on the outer side wall of the handle.
[0010] Furthermore, a fixing plate is fixedly connected to the outer side of the positioning slide block, a fixing hole is opened on the left side of the fixing plate, and a fixing bolt is arranged inside the fixing hole.
[0011] The beneficial effects of the super high-rise shear wall climbing frame with a fixing method of the utility model are:
[0012] Through the provided connecting inclined plate, when it rises and contacts the floor, it will be squeezed to the left, the provided sliding block will slide to the left along the sliding groove, the telescopic strip will shrink into the inside of the telescopic rod, and the provided spring will make the connecting inclined plate pop out after reaching the fixed position, and connect with the surface of the required floor. Construction workers can enter the climbing frame through the connecting inclined plate and work on the construction site, thus realizing the connection construction range function of the device;
[0013] When the climbing frame needs to be moved, multiple positioning sliders need to be fixed on the left side of each floor slab of the upper layer. When the set slide rail is slidably connected with the engaging rail, the positioning slider can be lifted and lowered along the lifting rod. When it rises, the wedge block in the wedge-shaped positioning cavity can be engaged with the inside of different fixing grooves, so that it is fixed and cannot move downward. When it is necessary to move downward, the rotating column set is squeezed to the left side, and the positioning column and the positioning hole are no longer engaged. Then it is rotated to reverse the wedge-shaped positioning cavity. At this time, the positioning slider can descend along the lifting rod and cannot rise, thereby realizing the up and down sliding positioning function of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The utility model is further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0015] Figure 1 This is a schematic diagram of the overall structure of a super high-rise shear wall climbing frame with a fixing method according to the utility model;
[0016] Figure 2 It is a schematic diagram of the overall structure of a lifting rod of a super high-rise shear wall climbing frame with a fixing method according to the utility model;
[0017] Figure 3 It is a cross-sectional structural schematic diagram of a lifting rod of a super high-rise shear wall climbing frame with a fixing method according to the utility model;
[0018] Figure 4 This is a schematic diagram of the overall structure of a positioning slider of a super high-rise shear wall climbing frame with a fixing method according to the utility model;
[0019] Figure 5 It is a cross-sectional structural schematic diagram of a super high-rise shear wall climbing frame with a fixing method according to the utility model;
[0020] Figure 6 The utility model is a super high shear wall climbing frame with a fixed mode Figure 1 A schematic diagram of the enlarged structure at point A;
[0021] Figure 7 The utility model is a super high shear wall climbing frame with a fixed mode Figure 1 A schematic diagram of the enlarged structure at B;
[0022] Figure 8 The utility model is a schematic cross-sectional structure diagram of a telescopic rod of a super high-rise shear wall climbing frame with a fixing method.
[0023] In the figure: 1. outer plate; 2. horizontal plate; 3. lifting rod; 4. load-bearing diagonal rod; 5. snap-fitting mouth; 6. fixing groove; 7. snap-fitting track; 8. connecting wedge plate; 9. extension rod; 10. telescopic rod; 11. telescopic strip; 12. spring one; 13. sliding groove; 14. sliding block; 15. positioning slider; 16. slide rail; 17. rotating cavity; 18. rotating column; 19. sliding groove; 20. sliding rod; 21. spring three; 22. wedge-shaped positioning cavity; 23. positioning column; 24. positioning hole; 25. spring cavity; 26. wedge-shaped block; 27. spring four; 28. lifting plate; 29. pull ring; 30. winding motor; 31. lifting chain; 32. hook; 33. handle; 34. cushion; 35. fixing plate; 36. fixing hole; 37. fixing bolt. DETAILED DESCRIPTION
[0024] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0025] According to one aspect of the present invention, Figure 1-8 As shown, a super high-rise shear wall climbing frame with a fixed mode is provided, comprising an outer plate 1, a horizontal plate 2 is fixedly connected to the right side of the outer plate 1, a lifting rod 3 is fixedly connected to the right side of the horizontal plate 2, a load-bearing oblique rod 4 is fixedly connected between the lifting rod 3 and the outer plate 1, a clamping opening 5 is opened on the left side of the lifting rod 3, a fixing groove 6 is opened on the left side of the clamping opening 5, and a clamping track 7 is symmetrically fixedly connected to the inside of the clamping opening 5;
[0026] The load-bearing function of the device is achieved by the outer plate 1, cross plate 2, lifting rod 3, load-bearing diagonal rod 4, snap-fitting mouth 5, fixing groove 6 and snap-fitting rail 7. The outer plate 1 can be firmly fixed on the left side of the lifting rod 3 by the multiple load-bearing diagonal rods 4. The construction workers can move the climbing frame on each level through the cross plate 2 to achieve the load-bearing function of the device.
[0027] In this embodiment, the lower surface of the left side of the lifting rod 3 is rotatably connected to a connecting wedge plate 8 via a rotating shaft, the lower surface of the lifting rod 3 is fixedly connected to an extension rod 9, the right side of the extension rod 9 is rotatably connected to a telescopic rod 10 via a rotating shaft, a telescopic bar 11 is slidably connected inside the telescopic rod 10, a spring 12 is fixedly connected between the telescopic bar 11 and the telescopic rod 10, a sliding groove 13 is opened on the lower surface of the connecting wedge plate 8, the right side of the telescopic bar 11 extends into the interior of the sliding groove 13, and is slidably connected to a sliding block 14;
[0028] The connection construction range function of the device is realized by setting the engaging track 7, connecting wedge plate 8, extension rod 9, telescopic rod 10, telescopic strip 11, spring 12, sliding groove 13 and sliding block 14. The connection inclined plate 8 is set, so that it will be squeezed to the left when it rises and contacts with the floor. The set sliding block 14 will slide to the left along the sliding groove 13, and the telescopic strip 11 will shrink into the inside of the telescopic rod 10. The set spring 12 will make the connection inclined plate 8 pop out after reaching the fixed position and connect with the surface of the required floor. Construction personnel can enter the climbing frame through the connecting inclined plate 8 to work on the construction site, thereby realizing the connection construction range function of the device.
[0029] In this embodiment, a positioning slider 15 is slidably connected inside the snap-fitting opening 5, and slide rails 16 are symmetrically provided on both sides of the positioning slider 15. The snap-fitting track 7 is snap-fitted and connected inside the slide rails 16. A through-type rotating cavity 17 is provided on the left side of the positioning slider 15. A rotating column 18 is rotatably connected inside the rotating cavity 17. A sliding groove 19 is provided on the outer wall of the rotating column 18, and is located inside the rotating cavity 17. A sliding rod 20 is symmetrically slidably connected inside the sliding groove 19. A spring 3 is fixedly connected between the sliding rod 20 and the rotating cavity 17. 21, the left side of the rotating column 18 passes through the rotating cavity 17, and is fixedly connected with a wedge-shaped positioning cavity 22, the right side of the wedge-shaped positioning cavity 22 is symmetrically fixedly connected with a positioning column 23, the left side of the positioning slider 15 is symmetrically provided with positioning holes 24, the positioning columns 23 are all engaged with the inside of the positioning holes 24, the inside of the wedge-shaped positioning cavity 22 is provided with an elastic cavity 25, the inside of the elastic cavity 25 is slidably connected with a wedge block 26, the left side of the wedge block 26 passes through the wedge-shaped positioning cavity 22, and a spring 27 is fixedly connected between the wedge block 26 and the wedge-shaped positioning cavity 22;
[0030] The device realizes the up and down sliding positioning function by means of the provided lifting rod 3, positioning slider 15, slide rail 16, rotating cavity 17, rotating column 18, slide groove 19, slide rod 20, spring three 21, wedge-shaped positioning cavity 22, positioning column 23, positioning hole 24, spring cavity 25, wedge block 26 and spring four 27;
[0031] When the climbing frame needs to be moved, the positioning slider 15 needs to be fixed on the left side of each floor slab on the upper layer. When the set slide rail 16 is slidably connected with the engaging track 7, the positioning slider 15 can be lifted and lowered along the lifting rod 3. When it rises, the wedge block 26 in the wedge-shaped positioning cavity 22 can be engaged with the inside of different fixing grooves 6, so that it is fixed and cannot move downward. When it is necessary to move downward, the set rotating column 18 is squeezed to the left side, and the positioning column 23 and the positioning hole 24 are no longer engaged. Then it is rotated to reverse the wedge-shaped positioning cavity 22. At this time, the positioning slider 15 can descend along the lifting rod 3 and cannot rise, thereby realizing the up and down sliding positioning function of the device.
[0032] In this embodiment, a lifting plate 28 is fixedly connected to the right side of the lifting rod 3, and a pull ring 29 is fixedly connected to the upper surface of the lifting plate 28. A winding motor 30 is arranged above the right side of the lifting rod 3, and a lifting iron chain 31 is wound around the outer side wall of the winding motor 30. A hook 32 is fixedly connected to the end of the lifting iron chain 31 away from the winding motor 30, and the hook 32 is engaged with the inside of the pull ring 29;
[0033] The kinetic energy providing effect of the device is achieved by means of the lifting plate 28, pull ring 29, winding motor 30, lifting chain 31 and hook 32. The winding motor 30 can provide the function of lifting the lifting rod 3. The winding motor 30 can wind up the lifting chain 31 and drive the lifting plate 28 to achieve the kinetic energy lifting effect of the device.
[0034] In this embodiment, a handle 33 is fixedly connected to the right side of the rotating column 18, and a cushion 34 is provided on the outer wall of the handle 33. The rotating column 18 can be rotated more conveniently by holding the handle 33, and the cushion 34 can make the user more comfortable when using it.
[0035] In this embodiment, the outer side of the positioning slider 15 is fixedly connected to a fixing plate 35, and a fixing hole 36 is opened on the left side of the fixing plate 35. A fixing bolt 37 is arranged inside the fixing hole 36. Through the set fixing hole 36, the positioning slider 15 can be fixedly installed on the left side of the floor to be constructed.
[0036] The working principle of this device is: when the climbing frame needs to be moved, the positioning sliders 15 need to be fixed on the left side of each floor slab on the upper layer, so that the engaging track 7 and the slide rail 16 are all in a horizontal line, and the load-bearing function of this device is realized by setting the outer plate 1, the horizontal plate 2, the lifting rod 3, the load-bearing diagonal rod 4, the engaging mouth 5, the fixing groove 6 and the engaging track 7. The outer plate 1 can be firmly fixed on the left side of the lifting rod 3 by setting multiple load-bearing diagonal rods 4, and the construction personnel can move the climbing frame on each layer through the horizontal plate 2 to realize the load-bearing function of this device.
[0037] The connection construction range function of the device is realized by setting the engaging track 7, connecting wedge plate 8, extension rod 9, telescopic rod 10, telescopic strip 11, spring 12, sliding groove 13 and sliding block 14. The connection inclined plate 8 is set, so that it will be squeezed to the left after contacting the floor when it rises, and the sliding block 14 will slide to the left along the sliding groove 13, and the telescopic strip 11 will shrink into the inside of the telescopic rod 10. The spring 12 will make the connection inclined plate 8 pop out after reaching the fixed position and connect with the surface of the required floor. The construction personnel can enter the climbing frame through the connection inclined plate 8 to work on the construction site, so as to realize the connection construction range function of the device;
[0038] When the set slide rail 16 is slidably connected with the engaging track 7, the positioning slider 15 can be lifted and lowered along the lifting rod 3. When rising toward it, the wedge block 26 in the wedge-shaped positioning cavity 22 can be engaged with the inside of different fixing grooves 6, so that it is fixed and cannot move downward. When it is necessary to move downward, the set rotating column 18 is squeezed to the left side, and the positioning column 23 and the positioning hole 24 are no longer engaged. Then it is rotated, so that the wedge-shaped positioning cavity 22 is reversed. At this time, the positioning slider 15 can descend along the lifting rod 3 and cannot rise, thereby realizing the up and down sliding positioning function of the device.
[0039] The electrical components that appear in this article are all electrical components that exist in reality.
[0040] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.
Claims
1. A super high-rise shear wall climbing frame with a fixing method, comprising an outer plate (1), characterized in that: The right side of the outer plate (1) is fixedly connected to a transverse plate (2), the right side of the transverse plate (2) is fixedly connected to a lifting rod (3), a load-bearing inclined rod (4) is fixedly connected between the lifting rod (3) and the outer plate (1), a snap-fitting opening (5) is provided on the left side of the lifting rod (3), a fixing groove (6) is provided on the left side inside the snap-fitting opening (5), and a snap-fitting track (7) is symmetrically fixedly connected inside the snap-fitting opening (5).
2. The ultra-high-rise shear wall climbing frame with a fixing method according to claim 1 is characterized in that: The lower left surface of the lifting rod (3) is rotatably connected to a connecting wedge plate (8) via a rotating shaft, the lower surface of the lifting rod (3) is fixedly connected to an extension rod (9), the right side of the extension rod (9) is rotatably connected to a telescopic rod (10) via a rotating shaft, the interior of the telescopic rod (10) is slidably connected to a telescopic bar (11), a spring (12) is fixedly connected between the telescopic bar (11) and the telescopic rod (10), a sliding groove (13) is formed on the lower surface of the connecting wedge plate (8), the right side of the telescopic bar (11) extends into the interior of the sliding groove (13), and is slidably connected to a sliding block (14).
3. The ultra-high-rise shear wall climbing frame with a fixing method according to claim 1 is characterized in that: The locking opening (5) is internally slidably connected to a positioning slider (15), and slide rails (16) are symmetrically provided on both sides of the positioning slider (15). The locking rails (7) are snap-fitted to the inside of the slide rails (16). A through-type rotating cavity (17) is provided on the left side of the positioning slider (15), and a rotating column (18) is rotatably connected to the inside of the rotating cavity (17). The outer wall of the rotating column (18) is located inside the rotating cavity (17) and is provided with a sliding groove (19). A sliding rod (20) is symmetrically slidably connected to the inside of the sliding groove (19), and a spring (21) is fixedly connected between the sliding rod (20) and the rotating cavity (17). The left side of the rotating column (18) passes through the rotating cavity (17) and is fixedly connected to a wedge-shaped positioning cavity (22); the right side of the wedge-shaped positioning cavity (22) is symmetrically fixedly connected to a positioning column (23); the left side of the positioning slide block (15) is symmetrically provided with positioning holes (24); the positioning columns (23) are all engaged with the inside of the positioning holes (24); the inside of the wedge-shaped positioning cavity (22) is provided with an elastic cavity (25); the inside of the elastic cavity (25) is slidably connected to a wedge-shaped block (26); the left side of the wedge-shaped block (26) passes through the wedge-shaped positioning cavity (22); a spring (27) is fixedly connected between the wedge-shaped block (26) and the wedge-shaped positioning cavity (22).
4. The super high-rise shear wall climbing frame with a fixing method according to claim 1 is characterized in that: A lifting plate (28) is fixedly connected to the right side of the lifting rod (3), and a pull ring (29) is fixedly connected to the upper surface of the lifting plate (28). A winding motor (30) is arranged above the right side of the lifting rod (3), and a lifting chain (31) is wound around the outer wall of the winding motor (30). A hook (32) is fixedly connected to one end of the lifting chain (31) away from the winding motor (30), and the hook (32) is engaged with the inside of the pull ring (29).
5. The ultra-high-rise shear wall climbing frame with a fixing method according to claim 3 is characterized in that: A handle (33) is fixedly connected to the right side of the rotating column (18), and a soft cushion (34) is provided on the outer side wall of the handle (33).
6. The ultra-high-rise shear wall climbing frame with a fixing method according to claim 3 is characterized in that: The outer sides of the positioning slide blocks (15) are fixedly connected to fixing plates (35), the left sides of the fixing plates (35) are provided with fixing holes (36), and fixing bolts (37) are arranged inside the fixing holes (36).