Stackable double-spliced steel pipe joist supporting structure
By adopting a superimposed double-piece steel pipe joists structure, the connection and clamping parts fixing mechanisms of the first and second horizontal pipes are used to solve the problems of inconvenience and high cost of installation of traditional joists, and the efficiency of joists is achieved Installation and security improvements.
Patent Information
- Application Number
- CN202420552886.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-20
AI Technical Summary
In the construction of concrete structures, the installation of traditional channel steel and I-steel joists has problems such as high labor intensity, inconvenient installation and high cost, which increases safety risks and construction costs.
Using a superimposed double-piece steel pipe joists support structure, the joists are formed through the first horizontal pipe and the second horizontal pipe, and clamping parts are fixed to the support member to achieve rapid installation and disassembly of the joists and reduce manpower. Transport labor intensity and installation risks.
It realizes strong integrity, convenient material selection and light weight of the joists, reduces construction costs and safety risks, and improves installation efficiency and load-bearing capacity of the joists.
Smart Images

Figure CN222009607U_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application relate to the field of concrete structure formwork support beam support components, and in particular to a stackable double-piece steel pipe beam support structure. Background Art
[0002] During the construction of the main concrete structure, the socket-type disc-type steel pipe support can be used as a new formwork support system for the floor beam and slab structure due to its large bearing capacity, good stability and high safety.
[0003] When the socket-and-spigot type disc-type steel pipe bracket supports the floor beam structure, the socket-and-spigot type disc-type steel pipe bracket includes a number of vertical poles, which are the supporting basic components of the socket-and-spigot type disc-type steel pipe bracket. A joist is arranged at the bottom of the vertical pole at the bottom of the floor beam structure. The joist is usually made of steel such as channel steel and I-beam. The joist and the vertical pole are combined to support and support the floor beam structure.
[0004] However, when installing joists made of channel steel and I-beam, there are usually problems with high labor intensity of manual handling, inconvenient installation, and high cost, which increases the safety risks and construction costs during the installation of socket-type disc-type steel pipe support joists. Utility Model Content
[0005] The purpose of the utility model is to provide a stackable double-piece steel pipe joist supporting structure, in which a double-piece steel pipe joist is formed by connecting a first transverse tube and a second transverse tube, the joist is placed on a supporting member, and a clamping member fixes the joist on the supporting member. The stackable double-piece steel pipe joist is easy to select materials, light in weight and easy to install, and can improve the problems of high labor intensity of manual handling and inconvenient installation, thereby ensuring the safety of installation of socket-type disc-locked steel pipe bracket joists and reducing construction costs.
[0006] The utility model discloses a stackable double-jointed steel pipe joist support structure, comprising:
[0007] A plurality of vertical poles are provided, the plurality of vertical poles are distributed at intervals, and a supporting member is provided on the vertical poles;
[0008] A supporting beam is arranged on the supporting member, and the supporting beam includes a first transverse tube and a second transverse tube; the first transverse tube and the second transverse tube are both placed on the supporting member and are used to cooperate in clamping the vertical pole; a connecting short tube for connecting and fixing is provided between the first transverse tube and the second transverse tube; and a clamping member is arranged on the supporting beam and is used to clamp and fix the first transverse tube and the second transverse tube.
[0009] In a preferred embodiment, a connection area is formed between the first transverse tube and the second transverse tube, and the connecting short tube is arranged in the connection area.
[0010] In a further preferred embodiment, a fork is formed in the area for placing the vertical poles, the fork is located at one side of the connecting area, and a plurality of the vertical poles are inserted into the fork.
[0011] In a further preferred embodiment, a plurality of connecting short pipes are provided, and the plurality of connecting short pipes are distributed at intervals in the connecting area.
[0012] In a further preferred embodiment, the support beam is provided with a force transmission support member for supporting the formwork.
[0013] In a further preferred embodiment, the force transmission support member includes an adjustable support, and the adjustable support is passed through the connecting short tube and is detachably connected to the connecting short tube.
[0014] In a preferred embodiment, both the first transverse tube and the second transverse tube are provided with anti-slip protrusions for limiting the disengagement of the clamping member.
[0015] In a preferred embodiment, the supporting member includes a plurality of connecting plates, and the plurality of connecting plates are spaced apart and arranged on the fixed member on the vertical pole.
[0016] In a preferred embodiment, it is characterized in that the joists are provided with several layers, several joists are stacked on the supporting member, and the clamping member clamps and fixes the joists.
[0017] In a preferred embodiment, the connecting short pipe and the first transverse pipe, and the connecting short pipe and the second transverse pipe are welded.
[0018] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0019] The utility model discloses a stackable double-jointed steel pipe joist support structure. The first transverse tube and the second transverse tube are connected by a connecting short tube to assemble a joist. After the joist is assembled, it is placed on a supporting member and the relative position of the joist and the vertical pole is appropriately adjusted so that the joist can support the template in the floor beam structure. The first transverse tube and the second transverse tube clamp the vertical pole through a clamping member, and the joist is limited and fixed.
[0020] Compared with the traditional socket-type disc-type steel pipe bracket joist, the joist formed by the first transverse tube, the second transverse tube and the connecting short tube is an integrated type, with good integrity and strong bearing capacity, convenient material selection, simple production and light weight, which can reduce the overall weight of the formwork support system, thereby reducing the labor intensity of manual handling and installation safety risks. At the same time, the joist can be quickly installed and disassembled with the vertical pole only through the clamping parts. The disassembly and assembly process of the joist is flexible and convenient, which is conducive to saving labor and improving installation efficiency.
[0021] Compared with the traditional socket-type disc-locked steel pipe support beam, the utility model is a stackable double-piece steel pipe support beam support structure, which can adopt the method of stacking multiple double-piece steel pipe support beams to increase the load-bearing capacity of the support beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a front view of a stackable double-jointed steel pipe joist support structure of a specific embodiment in Example 1;
[0023] Figure 2 It is a top view of a stackable double-jointed steel pipe joist support structure in a specific embodiment of the utility model;
[0024] Figure 3 It is a front view of a stackable double-jointed steel pipe joist support structure in a specific embodiment of the utility model;
[0025] Figure 4 It is a front view of a stackable double steel pipe joist support structure of the specific embodiment in Example 2.
[0026] Reference numerals:
[0027] 1-vertical pole; 11-connecting plate; 2-support beam; 21-first horizontal tube; 22-second horizontal tube; 23-connecting short tube; 231-connecting area; 24-fork; 25-anti-slip protrusion; 3-clamping piece; 4-adjustable support; 5-support keel; 51-template outer rib; 52-template; 6-horizontal rod. DETAILED DESCRIPTION
[0028] It should be noted that, in the absence of conflict, the embodiments and technical features in the embodiments of the present application can be combined with each other, and the detailed description in the specific implementation method should be understood as an explanation of the purpose of the present application and should not be regarded as an improper limitation on the present application.
[0029] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the specific technical scheme of the present application will be further described in detail below in conjunction with the drawings in the embodiments of the present application. The following embodiments are used to illustrate the present application, but are not used to limit the scope of the present application.
[0030] Embodiment 1:
[0031] The utility model discloses a stackable double-jointed steel pipe joist supporting structure, which can adapt to the changing cross-section of floor beams and slabs to support the floor beams and slabs.
[0032] Reference Figure 1The utility model is a stackable double-jointed steel pipe joist support structure, comprising a vertical pole 1, wherein the vertical pole 1 is provided with a plurality of vertical poles 1, and the plurality of vertical poles 1 are distributed in an array with a certain modulus. As shown in some specific embodiments, the spacing between two adjacent vertical poles 1 is 600 mm. It can be understood that this is not a specific limitation on the spacing between the vertical poles 1, and the relevant technical personnel can replace it according to the actual load-bearing conditions. A horizontal rod 6 is provided between two adjacent vertical poles 1, and the horizontal rod 6 is perpendicular to the vertical pole 1 to achieve the connection between the adjacent vertical poles 1.
[0033] A supporting member is provided on the vertical pole 1, and the supporting member includes a connecting plate 11. A plurality of connecting plates 11 are provided. Specifically, the plurality of connecting plates 11 are arranged at intervals of a module of 500 mm along the vertical direction of the vertical pole 1. In some specific embodiments as shown, the connecting plates 11 can be welded to the vertical pole 1.
[0034] Reference Figure 2 The connecting plate 11 is provided with a joist 2 for supporting the formwork 52 and transferring the load to the vertical pole 1. The joist 2 includes a first transverse tube 21 and a second transverse tube 22. The first transverse tube 21 is horizontally arranged relative to the vertical pole 1 and spans between two adjacent vertical poles 1. The first transverse tube 21 is placed on the connecting plate 11. The second transverse tube 22 is parallelly arranged relative to the first transverse tube 21 and spans between two adjacent vertical poles 1. The second transverse tube 22 is placed on the connecting plate 11. The first transverse tube 21 and the second transverse tube 22 cooperate to clamp the two adjacent vertical poles 1. In a preferred embodiment, the spacing between the first transverse tube 21 and the second transverse tube 22 is 50-53 mm. In some specific embodiments shown, the spacing between the first transverse tube 21 and the second transverse tube 22 is preferably 50 mm.
[0035] A connection area 231 is formed between the first transverse tube 21 and the second transverse tube 22. Figure 2 The connection area 231 is the area within the two dotted lines. Specifically, the connection area 231 is located between the middle of the first transverse tube 21 and the middle of the second transverse tube 22. The joist 2 is provided with a connecting short tube 23 in the connection area 231 for connecting the first transverse tube 21 and the second transverse tube 22. The connecting short tube 23 is arranged parallel to the vertical pole 1.
[0036] Further, a plurality of connecting short tubes 23 are provided, and the plurality of connecting short tubes 23 are all located in the connecting area 231 and are arranged at predetermined module intervals along the length direction of the first transverse tube 21. In some specific embodiments shown, three connecting short tubes 23 are provided, and the spacing between two adjacent connecting short tubes 23 is 150 mm. It can be understood that the spacing between two adjacent connecting short tubes 23 is not specifically limited here, and relevant technical personnel can replace it based on this according to the actual load bearing conditions.
[0037] Reference Figure 1 and Figure 3 , an adjustable support 4 is inserted into the connecting short tube 23. Specifically, a supporting keel 5 is arranged on the adjustable support 4. A template outer rib 51 is arranged on the side of the supporting keel 5 away from the adjustable support 4. A template 52 is arranged on the side of the template outer rib 51 away from the supporting keel 5. The adjustable support 4 is supported between the template 52 and the joist 2 to transfer the load to the joist 2. The adjustable support 4 is detachably connected to the connecting short tube 23. The number of the adjustable support 4 can be adjusted according to the position of the template 52, and the position of the adjustable support 4 can be adjusted by inserting the connecting short tube 23 at different positions, so that the adjustable support 4 can remain stable and safe under stress and reduce the occurrence of eccentric stress. In some specific embodiments shown, an adjustable support 4 is inserted into the middle connecting short tube 23 to support the template 52.
[0038] Reference Figure 2 A fork 24 is formed between the end of the first transverse tube 21, the end of the second transverse tube 22 and the connecting short tube 23. The fork 24 is located on the side of the imaginary line away from the connecting area 231, and the vertical poles 1 are all inserted into the fork 24. The fork 24 is provided so that the joist 2 forms a space for position adjustment during the installation process. The joist 2 can be moved in the horizontal direction and rotated in the vertical plane to adjust the relative position of the joist 2 and the vertical pole 1 without disassembling.
[0039] The joist 2 is provided with a clamping member 3 for clamping and fixing the first transverse tube 21 and the second transverse tube 22. Specifically, the clamping member 3 is preferably, but not limited to, tightened step by step to clamp the ends of the first transverse tube 21 and the ends of the second transverse tube 22 so that the first transverse tube 21 and the second transverse tube 22 clamp the vertical pole 1 and limit the horizontal movement of the joist 2 and the vertical pole 1 so that the first transverse tube 21 and the second transverse tube 22 are fixed on the connecting plate 11.
[0040] During the installation of the joist 2, first connect the first transverse tube 21, the second transverse tube 22 and the connecting short tube 23, and the first transverse tube 21 and the second transverse tube 22 are combined side by side to form a double-steel pipe joist 2. The joist 2 is adjusted at the fork 24. At this time, the joist 2 is placed on the corresponding connection plate 11, and the first transverse tube 21 and the second transverse tube 22 are clamped using the clamp 3, so that the joist 2 is fixed. Then insert the adjustable support 4 into the corresponding connecting short tube 23, and the adjustable support 4 is supported between the template 52 and the joist 2. When the joist 2 is disassembled, remove the tightening member, return the adjustable support 4 to its original position, move one end of the joist 2 in the horizontal direction and lift the other end of the joist 2, so that the vertical pole 1 is separated from the fork 24, and the joist 2 is separated from the vertical pole 1.
[0041] The support beam 2 is easy to install and light in weight, which can reduce the overall weight of the template 52 support system, thereby reducing the labor intensity of manual handling and the safety risk of installation. At the same time, clamping and loosening the support beam 2 by the clamping member 3 is conducive to improving the convenience and flexibility of disassembly and assembly of the support beam 2.
[0042] Embodiment 2:
[0043] In order to make the joist 2 adapt to the bearing capacity requirements of different templates 52, the difference between this embodiment and the above embodiment is that Figure 4 Specifically, the distance between two adjacent uprights 1 is 900 mm. It is understandable that this is not a specific limitation on the distance between the uprights 1. Personnel in the relevant technical field can replace them based on the actual load-bearing conditions. In a preferred embodiment, the joists 2 are stacked in several layers, and the joists 2 are stacked on the connecting plate 11 in the vertical direction.
[0044] Specifically, two adjustable supports 4 are provided, and the two adjustable supports 4 are respectively inserted into corresponding connecting short pipes 23 to support the formwork 52. By adjusting the support beam 2 and the adjustable supports 4, the support beam 2 can support different floor beam sections to adapt to the bearing capacity requirements of different formworks 52.
[0045] Embodiment 3:
[0046] In order to reduce the possibility of the clamping member 3 slipping out, the difference between this embodiment and the above embodiment is that Figure 2 The connecting short tube 23 and the first transverse tube 21, and the connecting short tube 23 and the second transverse tube 22 are rigidly connected by welding. The connecting short tube 23 is welded to the first transverse tube 21 and the second transverse tube 22 respectively, so that the joist 2 has good integrity, which is beneficial to improve the rigidity and bearing capacity of the joist 2. The side of the first transverse tube 21 away from the fork 24 and the side of the second transverse tube 22 away from the fork 24 are both installed with anti-slip protrusions 25. Specifically, the anti-slip protrusions 25 are preferably but not limited to steel bar heads or iron blocks. The clamping member 3 is arranged between the anti-slip protrusions 25 and the vertical pole 1. The anti-slip protrusions 25 can reduce the possibility of relative sliding and slipping of the clamping member 3 and the joist 2, and improve the stability of the clamping member 3 when clamping.
[0047] In the embodiments of the present application, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "left", "right", "front", "rear", etc. are based on the directions or positional relationships shown in the accompanying drawings, or the directions or positional relationships in which the utility model product is usually placed when in use, rather than indicating or implying that the structure or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the utility model, let alone an indication or implication of relative importance. In addition, the terms "first", "second", etc. are used only for descriptive purposes and are only for the convenience of distinction, and cannot be understood as indicating or implying relative importance.
[0048] In the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.
[0049] The serial numbers of the embodiments of the present application are only for description and do not represent the advantages and disadvantages of the embodiments. The above are only preferred embodiments of the present application, and do not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made by using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A stackable double steel pipe joist support structure, characterized in that: include: A plurality of vertical poles (1) are provided, wherein the vertical poles (1) are spaced apart and a supporting member is provided on the vertical poles (1); A joist (2) is arranged on the supporting member, and the joist (2) comprises a first transverse tube (21) and a second transverse tube (22); the first transverse tube (21) and the second transverse tube (22) are both placed on the supporting member and are used to cooperate and clamp the vertical pole (1); a connecting short tube (23) is provided between the first transverse tube (21) and the second transverse tube (22) for connecting and fixing; as well as A clamping member (3) is provided on the supporting beam (2) and is used for clamping the first transverse tube (21) and the second transverse tube (22).
2. A stackable double steel pipe joist support structure according to claim 1, characterized in that: A connection area (231) is formed between the first transverse tube (21) and the second transverse tube (22), and the connecting short tube (23) is arranged in the connection area (231).
3. A stackable double steel pipe joist support structure according to claim 2, characterized in that: A fork (24) is formed in the area for placing the upright pole (1), and the fork (24) is located on one side of the connection area (231).
4. The stackable double steel pipe joist support structure according to claim 2, characterized in that: A plurality of the connecting short pipes (23) are provided, and the plurality of the connecting short pipes (23) are distributed at intervals in the connecting area (231).
5. The stackable double steel pipe joist support structure according to claim 4, characterized in that: The support beam (2) is provided with a force transmission support member for supporting the template (52).
6. A stackable double steel pipe joist support structure according to claim 5, characterized in that: The force transmission support member comprises an adjustable support (4), wherein the adjustable support (4) is inserted into the connecting short tube (23) and is detachably connected to the connecting short tube (23).
7. The stackable double steel pipe joist support structure according to claim 1, characterized in that: The first transverse tube (21) and the second transverse tube (22) are both provided with anti-slip protrusions (25) for limiting the detachment of the clamping member (3).
8. The stackable double steel pipe joist support structure according to claim 1, characterized in that: The supporting member comprises a plurality of connection plates (11), and the plurality of connection plates (11) are arranged on the vertical pole (1) at intervals.
9. The stackable double steel pipe joist support structure according to claim 1, characterized in that: The supporting beam (2) is provided with a plurality of layers, a plurality of the supporting beams (2) are stacked on the supporting member, and the clamping member (3) clamps and fixes the plurality of the supporting beams (2).
10. The stackable double steel pipe joist support structure according to claim 1, characterized in that: The connecting short pipe (23) and the first transverse pipe (21), as well as the connecting short pipe (23) and the second transverse pipe (22) are welded.
