Tunnel material level height monitoring and vibrating system
By using a system of strip sensing modules and control units in the secondary lining construction of tunnels, precise detection and vibration of material level height is achieved, and the difficulty in monitoring and controlling the vibration part in the prior art is solved. Problems, improving construction quality and reducing costs.
Patent Information
- Application Number
- CN202420597944.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-26
AI Technical Summary
In the construction of secondary lining of tunnels, it is difficult for the prior art to accurately monitor the concrete level height and control the vibration part, resulting in poor construction quality.
A tunnel level height monitoring and vibration system is designed, including lining trolleys, hydraulic rods, formwork components, sensor units and control units. The concrete pressure is detected by a strip sensing module arranged on the outer wall of the formwork components, and Control the vibrator to vibrate to ensure accurate detection and vibration of material level height.
Accurate detection and vibration of the material level height of the secondary lining layer is achieved, construction quality is improved, sensor damage is avoided, production costs are reduced, and excessive vibration is avoided.
Smart Images

Figure CN222010228U_ABST
Abstract
Description
Technical Field
[0001] The embodiment of the utility model belongs to the technical field of tunnel secondary lining construction, and more specifically, relates to a tunnel material level height monitoring and vibration system. Background Art
[0002] During the construction of the secondary lining of the tunnel, in order to ensure the quality of the project, it is necessary to ensure that the concrete is poured to the tunnel vault without leaving any gaps, and the concrete must be tamped to ensure that it is vibrated and compacted. The above process of eliminating bubbles and tamping the concrete. The secondary lining is a cast concrete or reinforced concrete lining applied on the inner side of the initial support during tunnel construction, which together with the initial support constitutes a composite lining. The quality control of the secondary lining of the tunnel is currently mainly achieved by ensuring the pouring quality of the concrete through timely vibration technology. Concrete vibration means that when the concrete mixed by a concrete mixer is poured into components, it must be vibrated and compacted in time to eliminate the honeycombed surface of the concrete, so as to improve its strength and ensure the quality of the concrete components.
[0003] At present, concrete vibration is mainly carried out by manually opening a vibrator. This vibration method has some non-standard problems, mainly manifested in no vibration, excessive vibration, or untimely vibration. In addition, due to the obstruction of the formwork, it is difficult to see the material level with the naked eye, and it is difficult to judge whether the concrete has been poured to the tunnel vault.
[0004] Therefore, at this stage, there is an urgent need for a tunnel material level monitoring and vibration system that can monitor the secondary lining concrete level and vibrate the concrete at the corresponding height to improve the construction quality. Summary of the invention
[0005] Aiming at the problems that the secondary lining concrete material level height is difficult to monitor and the vibration position is difficult to control in the prior art, the utility model provides a tunnel material level height monitoring and vibration system to solve such problems.
[0006] In order to achieve the above-mentioned purpose, the utility model provides a tunnel material level height monitoring and vibration system, including a lining trolley; a template assembly connected to the lining trolley through a hydraulic rod, which includes a left positioning template, a right positioning template and a top positioning template; a sensor unit circumferentially arranged on the outer wall surface of the template assembly, which detects the concrete slurry pressure of the corresponding material level and transmits the detection signal to a control unit; a vibrator that is communicatively connected to the control unit and arranged in an array on the inner wall surface of the template assembly; the material level height is detected by the sensor unit, and the control unit controls the vibrator of the corresponding casting section to vibrate, and vibrates the concrete at the corresponding height to improve the construction quality.
[0007] Furthermore, a first mounting groove is opened in the middle of the outer wall surface of the left positioning template, and the arc curvature of the first mounting groove is the same as the arc curvature of the left positioning template; a second mounting groove is opened in the middle of the outer wall surface of the right positioning template, and the arc curvature of the second mounting groove is the same as the arc curvature of the right positioning template; a third mounting groove is opened in the middle of the outer wall surface of the top positioning template, and the arc curvature of the third mounting groove is the same as the arc curvature of the top positioning template.
[0008] Furthermore, the sensor unit includes a first strip-shaped sensor module arranged in the first installation slot, a second strip-shaped sensor module arranged in the second installation slot, and a third strip-shaped sensor module arranged in the third installation slot.
[0009] Furthermore, the first belt-shaped sensor module, the second belt-shaped sensor module and the third belt-shaped sensor module have the same structure, wherein the third belt-shaped sensor module comprises a belt body, and a plurality of pressure sensors fixedly arranged at intervals in the belt body.
[0010] Furthermore, a coating layer is provided at the openings of the first mounting groove, the second mounting groove and the third mounting groove, and the coating layer is respectively adhered and fixed to both sides of the openings of the first mounting groove, the second mounting groove and the third mounting groove, and its bottom is respectively in contact with the sensor unit.
[0011] In general, the above technical solutions conceived by the utility model can achieve the following beneficial effects compared with the prior art:
[0012] (1) The material level height monitoring and vibration system of the utility model can monitor the concrete material level on both sides and the top of the secondary lining layer through the first belt-shaped sensor module arranged in the first installation groove, the second belt-shaped sensor module arranged in the second installation groove, and the third belt-shaped sensor module belonging to the third installation groove, thereby ensuring the accurate detection of the material level height and enabling the vibrator to accurately vibrate the corresponding parts to improve the construction quality.
[0013] (2) The material level height monitoring and vibration system of the utility model is provided with a coating layer at the notch of the first mounting groove, the second mounting groove and the third mounting groove. The coating layer is respectively adhered and fixed to both sides of the notch of the first mounting groove, the second mounting groove and the third mounting groove, and the bottom thereof is respectively in contact with the sensor unit, so that the pressure of the concrete slurry can be transmitted to the sensor unit, and at the same time, the contact between the concrete slurry and the sensor unit is avoided, thereby preventing the sensor unit from being damaged. After the pouring operation is completed, the coating layer is uncovered so that the sensor unit can be reused.
[0014] (3) The material level monitoring and vibration system of the present invention, the third belt-shaped sensor module includes a belt body, and a plurality of pressure sensors fixedly arranged at intervals in the belt body, the plurality of pressure sensors are respectively connected to the control unit for communication, when the concrete material level covers the corresponding pressure sensor, the pressure sensor sends a detection signal to the control unit, which can accurately detect the material level, and can be reused after the pouring operation is completed; compared with the liquid level sensor, due to the viscosity of the concrete slurry, the liquid level sensor is easily enclosed in the concrete slurry, and cannot be accurately detected, and cannot be recovered after the pouring operation; therefore, the present invention adopts the first belt-shaped sensor module, the second belt-shaped sensor module and the third belt-shaped sensor module to detect the material level, which greatly reduces the operating production cost and improves the accuracy of the material level detection. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of a tunnel material level height monitoring and vibration system in an embodiment of the utility model;
[0016] Figure 2 This is a schematic diagram of the layout structure of the sensor unit in the embodiment of the utility model;
[0017] Figure 3 It is a schematic structural diagram of the third strip-shaped sensor module in the embodiment of the utility model.
[0018] In all the accompanying drawings, the same figure marks represent the same technical features, specifically: 1-lining trolley, 2-hydraulic rod, 3-left positioning template, 301-first mounting groove, 4-right positioning template, 401-second mounting groove, 5-top positioning template, 501-third mounting groove, 6-vibrator, 7-initial support, 8-secondary lining layer, 9-first belt sensor module, 10-second belt sensor module, 11-third belt sensor module, 111-belt body, 112-pressure sensor. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the utility model. In addition, the technical features involved in each embodiment of the utility model described below can be combined with each other as long as they do not conflict with each other.
[0020] like Figure 1-3As shown, the utility model provides a tunnel material level height monitoring and vibration system, including a lining trolley 1, a hydraulic rod 2, a template assembly, a vibrator 6, a sensor unit and a control unit. The template assembly supports the pouring of the secondary lining concrete of the tunnel, including a left positioning template 3, a right positioning template 4 and a top positioning template 5. The sensor unit is circumferentially arranged on the outer wall of the template assembly, including a first belt-shaped sensor module 9, a second belt-shaped sensor module 10 and a third belt-shaped sensor module 11. The vibrator 6 array is arranged on the inner wall of the template assembly, vibrating various parts of the template assembly to transmit the vibration force to the poured concrete. When the vibrating system of the utility model is in operation, the lining trolley 1 is transported into the tunnel through the track. After positioning is completed, the hydraulic rod 2, under the control of the control unit, sequentially lifts the left positioning template 3, the right positioning template 4 and the top positioning template 5 to the designated point, so that the three are closed to form an arch structure, and the secondary lining casting section is closed; concrete is poured into the secondary lining layer 8, the material level height is detected by the sensor unit, and the control unit controls the vibrator 6 of the corresponding casting section to vibrate, and the concrete at the corresponding height is vibrated to improve the construction quality.
[0021] like Figure 1 As shown, in the embodiment of the utility model, the lining trolley 1 is arranged in the middle of the bottom of the tunnel, and its bottom is slidably arranged on the track. It is pulled by a winch to move along the track to assist the secondary lining of the tunnel.
[0022] The template assembly is arranged on the outside of the lining trolley 1 and is connected to the lining trolley 1 through a hydraulic rod 2. It is an arch structure, parallel to the inner wall of the tunnel, and supports the pouring of secondary lining concrete of the tunnel, including a left positioning template 3, a right positioning template 4 and a top positioning template 5; the left positioning template 3 and the right positioning template 4 are symmetrically arranged on the left and right sides of the lining trolley 1, and the top positioning template 5 is arranged on the top of the lining trolley 1; when supporting, under the control of the control unit, the hydraulic rod 2 pushes the left positioning template 3, the right positioning template 4 and the top positioning template 5 to the specified position in turn, so that the three are closed to form an arch structure, and the secondary lining pouring section is closed.
[0023] Furthermore, a first mounting groove 301 is opened in the middle of the outer wall surface of the left positioning template 3, and the arc curvature of the first mounting groove 301 is the same as the arc curvature of the left positioning template 3; a second mounting groove 401 is opened in the middle of the outer wall surface of the right positioning template 4, and the arc curvature of the second mounting groove 401 is the same as the arc curvature of the right positioning template 4; a third mounting groove 501 is opened in the middle of the outer wall surface of the top positioning template 5, and the arc curvature of the third mounting groove 501 is the same as the arc curvature of the top positioning template 5; by providing the first mounting groove 301, the second mounting groove 401 and the third mounting groove 501, they can be used to install and fix sensor units respectively to detect the concrete material level height.
[0024] The sensor unit includes a first strip-shaped sensor module 9 disposed in the first installation slot 301, a second strip-shaped sensor module 10 disposed in the second installation slot 401, and a third strip-shaped sensor module 11 disposed in the third installation slot 501. Figure 3 As shown, the first belt-shaped sensor module 9, the second belt-shaped sensor module 10 and the third belt-shaped sensor module 11 have the same structure, wherein the third belt-shaped sensor module 11 includes a belt body 111, and a plurality of pressure sensors 112 fixedly arranged at intervals in the belt body 111, and the plurality of pressure sensors 112 are respectively communicated with the control unit, and when the concrete material level height covers the corresponding pressure sensor 112, the pressure sensor 112 sends a detection signal to the control unit, and the control unit controls the vibrator 6 of the corresponding pouring section to vibrate.
[0025] Furthermore, in order to prevent the sensor unit from being sealed in the slot after the concrete solidifies, a coating layer is provided at the slots of the first installation slot 301, the second installation slot 401 and the third installation slot 501. The coating layer is respectively adhered and fixed to both sides of the slots of the first installation slot 301, the second installation slot 401 and the third installation slot 501, and its bottom is respectively in contact with the sensor unit, so that the pressure of the concrete slurry can be transmitted to the sensor unit, and at the same time, the concrete slurry is prevented from contacting the sensor unit, thereby preventing the sensor unit from being damaged. After the pouring operation is completed, the coating layer is uncovered so that the sensor unit can be reused.
[0026] In the embodiment of the utility model, the vibrator 6 is an attached vibrator, the array of which is arranged on the inner wall surface of the formwork assembly, and is communicated with the control unit to vibrate various parts of the formwork assembly so as to transmit the vibration force to the poured concrete; when vibrating the concrete of the corresponding height, the control unit controls the vibrator 6 to output the corresponding vibration power, and vibrates the concrete of the corresponding height for a set time to improve the construction quality. After completing the vibration operation, the control unit controls the corresponding vibrator 6 to stop the operation to avoid excessive vibration.
[0027] When the material level height monitoring and vibration system of the utility model is in operation, the lining trolley 1 is transported into the tunnel through the track. After positioning is completed, the control unit controls the hydraulic rod 2 to push the left positioning template 3, the right positioning template 4 and the top positioning template 5 to the specified positions in sequence, so that the three are closed to form an arch structure, and the secondary lining casting section is closed; concrete is poured into the secondary lining layer 8, and the concrete slurry exerts pressure on the sensor unit. The sensor unit sends the corresponding material level height detection signal to the control unit, and the control unit controls the vibrator 6 to output the corresponding vibration power, and vibrates the concrete of the corresponding height within the set time to improve the construction quality; through multi-layer casting, the control unit controls the vibrator 6 at the corresponding position to vibrate the concrete until the casting of the tunnel arch is completed.
[0028] The material level height monitoring and vibration system of the utility model can detect the concrete material level on both sides and the top of the secondary lining layer 8 through the first strip sensor module 9 arranged in the first installation groove 301, the second strip sensor module 10 arranged in the second installation groove 401 and the third strip sensor module 11 belonging to the third installation groove 501, thereby ensuring the accurate detection of the material level height, so that the vibrator can accurately vibrate the corresponding part, expel the air in the concrete, and make the concrete layer of the corresponding height densely combined.
[0029] The material level height monitoring and vibration system of the utility model is provided with a coating layer at the slots of the first mounting groove 301, the second mounting groove 401 and the third mounting groove 501. The coating layer is respectively adhered and fixed to both sides of the slots of the first mounting groove 301, the second mounting groove 401 and the third mounting groove 501, and the bottom thereof is respectively in contact with the sensor unit, so that the pressure of the concrete slurry can be transmitted to the sensor unit, and at the same time, the contact between the concrete slurry and the sensor unit is avoided to prevent the sensor unit from being damaged. After the pouring operation is completed, the coating layer is uncovered to make the sensor unit reusable.
[0030] The material level monitoring and vibration system of the present invention, the third strip sensor module 11 includes a strip body 111, and a plurality of pressure sensors 112 fixedly arranged at intervals in the strip body 111, the plurality of pressure sensors 112 are respectively connected to the control unit for communication, when the concrete material level covers the corresponding pressure sensor 112, the pressure sensor 112 sends a detection signal to the control unit, which can accurately detect the material level, and can be reused after the pouring operation is completed; compared with the liquid level sensor, due to the viscosity of the concrete slurry, the liquid level sensor is easily enclosed in the concrete slurry, and cannot be accurately detected, and cannot be recovered after the pouring operation; therefore, the present invention greatly reduces the operating production cost and improves the accuracy of material level detection by adopting the first strip sensor module 9, the second strip sensor module 10 and the third strip sensor module 11.
[0031] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A tunnel material level monitoring and vibration system, characterized in that: include: Lining trolley (1); A template assembly connected to the lining trolley (1) via a hydraulic rod (2), comprising a left positioning template (3), a right positioning template (4) and a top positioning template (5); A sensor unit is circumferentially arranged on the outer wall surface of the template assembly, which detects the concrete slurry pressure at the corresponding material level and transmits the detection signal to the control unit; A vibrator (6) is connected to the control unit for communication and arranged in an array on the inner wall surface of the formwork assembly; the material level height is detected by the sensor unit, and the control unit controls the vibrator (6) of the corresponding pouring section to vibrate, thereby vibrating the concrete at the corresponding height to improve the construction quality.
2. A tunnel material level monitoring and vibration system according to claim 1, characterized in that: A first mounting groove (301) is formed in the middle of the outer wall surface of the left positioning template (3), and the arc curvature of the first mounting groove (301) is the same as that of the left positioning template (3); a second mounting groove (401) is formed in the middle of the outer wall surface of the right positioning template (4), and the arc curvature of the second mounting groove (401) is the same as that of the right positioning template (4); a third mounting groove (501) is formed in the middle of the outer wall surface of the top positioning template (5), and the arc curvature of the third mounting groove (501) is the same as that of the top positioning template (5).
3. A tunnel material level monitoring and vibration system according to claim 2, characterized in that: The sensor unit comprises a first strip-shaped sensor module (9) arranged in a first installation slot (301), a second strip-shaped sensor module (10) arranged in a second installation slot (401), and a third strip-shaped sensor module (11) arranged in a third installation slot (501).
4. A tunnel material level monitoring and vibration system according to claim 3, characterized in that: The first belt-shaped sensor module (9), the second belt-shaped sensor module (10) and the third belt-shaped sensor module (11) have the same structure, wherein the third belt-shaped sensor module (11) comprises a belt body (111) and a plurality of pressure sensors (112) fixedly arranged at intervals in the belt body (111).
5. A tunnel material level monitoring and vibration system according to claim 4, characterized in that: A coating layer is provided at the openings of the first mounting groove (301), the second mounting groove (401) and the third mounting groove (501). The coating layer is respectively adhered and fixed to both sides of the openings of the first mounting groove (301), the second mounting groove (401) and the third mounting groove (501), and the bottoms thereof are respectively in contact with the sensor units.
