Pressurizing equipment for hydraulic bottle pushing hydrogen refueling station

By using the magnetostrictive level gauge and shared plunger pump, the problem of large space occupied by the hydraulic bottle hydrogen refueling station equipment, numerous signal lines and long liquid return time is solved, real-time monitoring of liquid level and gas storage efficiency is achieved Improved, providing higher gas storage and user experience.

CN222011642UActive Publication Date: 2024-11-15BEIJING TUOJIA HYDROGEN ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420594643.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The existing hydraulic bottle hydrogen refueling stations have problems such as large equipment space, numerous signal lines, long liquid return time, waste of gas, inability to display liquid level in real time, cumbersome debugging and insufficient gas storage function in the high-pressure boosting system.

Method used

A magnetostrictive level meter is used to replace two reed level meters and two differential pressure switches to realize real-time monitoring and control of liquid level, and a plunger pump is used to perform liquid injection and return liquid. When the hydrogen storage container returns liquid Replenish gas, reduce the number of equipment and signal lines, and improve the liquid return speed and gas storage efficiency.

Benefits of technology

Simplified the equipment structure, reduced the equipment space and signal lines, improved the efficiency of liquid return and gas replenishment, real-time liquid level monitoring and hydrogen storage statistics, reduced the liquid injection time, and increased the system's gas storage and user experience. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222011642U_ABST
    Figure CN222011642U_ABST
Patent Text Reader

Abstract

The utility model provides hydraulic cylinder pushing hydrogen refueling station supercharging equipment which comprises a liquid phase part and a gas phase part, the liquid phase part and the gas phase part are both connected to hydrogen storage containers, the hydrogen storage containers are a hydrogen storage container A and a hydrogen storage container B, and the liquid phase part comprises a first system and a second system; the first system and the second system share the same plunger pump, and hydrogen storage containers of the first system and the second system are connected with the gas phase part; when the first system carries out the liquid injection process, the second system carries out the liquid return and gas supply process; when the second system carries out a liquid injection process, the first system carries out a liquid return process and an air supply process, the structure is reasonable, one magnetostriction liquid level meter is used for replacing two reed pipe liquid level meters and two differential pressure switches, the occupied space of equipment is reduced, holes in a liquid storage tank are reduced, signal lines are reduced, and an operator can accurately grasp the operation condition of the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of hydraulic bottle pushing hydrogen filling equipment, in particular to a hydraulic bottle pushing hydrogen filling station pressurizing equipment. Background Art

[0002] Hydraulic bottle push hydrogen filling station has been applied in China. During the operation of the high-pressure boosting system of the hydraulic bottle push hydrogen filling station, the hydraulic medium needs to be stored in the liquid storage tank, and the medium in the liquid storage tank is pumped out by a plunger pump, and then enters a hydrogen storage container after pressurization, and the gas in the hydrogen storage container is pressurized and pushed downstream. After the medium fills the hydrogen storage container, it needs to return to the liquid storage tank, and then fill the second hydrogen storage container. After the medium fills the second hydrogen storage container, it returns to the liquid storage tank, and then fills the first hydrogen storage container, and works repeatedly and cyclically. The two hydrogen storage containers are repeatedly injected with hydraulic medium and gas, respectively, and the compressed gas is compressed in a cyclical manner, and the compressed gas is pushed into the buffer tank. The existing hydraulic bottle push hydrogen filling station uses a liquid storage tank, a hydraulic pump, and two hydrogen storage containers. The liquid storage tank uses two reed switch level gauges to determine the high and low liquid levels of the medium. The two hydrogen storage containers are used to compress gas, and the gas storage function is weak. The following defects exist in its use: 1. The lower liquid level of the reed switch level gauge is used as the signal for completion of liquid injection, and the differential pressure switch is used as the signal for completion of liquid return. Two sets of equipment are used to realize the completion signals of liquid supply and liquid return, which requires a lot of equipment investment, occupies a large space, and has many signal lines. In addition, the differential pressure switch can only be triggered to stop the return of liquid when all the hydraulic medium has returned and a small amount of gas has returned to the liquid storage tank. In this way, the pressure cannot be too high at the end of the return of liquid, so the gas cannot be replenished at the same time of the return of liquid, resulting in a long return time, a decrease in the frequency of liquid replacement, and low working efficiency of the booster system; 2. Each time the liquid is returned, a small amount of gas will enter the liquid storage tank and eventually be discharged into the atmosphere, causing waste; 3. The hydraulic medium level cannot be displayed in real time on the control cabinet in the control room, and the hydrogen storage capacity of the hydrogen filling station cannot be counted in real time, and the operator cannot accurately grasp the operation of the equipment; 4. During the equipment debugging process, when adjusting the high and low liquid level positions according to the volume of the hydrogen storage tank, the reed switch level gauge needs to be removed and the length of its wires needs to be adjusted. The operation process is cumbersome, and the reed switch is a fragile glass product, so the operation needs to be more careful. It brings a lot of difficulties to the equipment debugging personnel; 5. The hydrogen storage container as a compression tank has a gas storage function but is not well utilized, making the overall gas storage capacity of the system low; 6. When the injection reaches the set pressure and is about to reach the return liquid level, the liquid will return quickly after startup, and it will take a while to pressurize before hydrogen can be supplied normally, and the user experience is poor. Summary of the invention

[0003] In order to solve the above problems, the utility model provides a hydraulic bottle-pushing hydrogen filling station pressurizing device, which has a reasonable structure and solves the above problems.

[0004] The technical solution of the utility model is to provide a hydraulic bottle push hydrogen filling station boosting device, including a liquid phase part and a gas phase part, the liquid phase part and the gas phase part are both connected to a hydrogen storage container, the hydrogen storage container is a hydrogen storage container A and a hydrogen storage container B, wherein the liquid phase part includes a first system and a second system;

[0005] The first system and the second system share the same plunger pump, and the hydrogen storage containers of the first system and the second system are both connected to the gas phase part;

[0006] When the first system is performing the liquid injection process, the second system is performing the liquid return and gas replenishment process;

[0007] When the second system is performing the liquid injection process, the first system is performing the liquid return and gas replenishment process.

[0008] Optionally, the first system includes a liquid storage tank A, a liquid outlet pneumatic ball valve A, a plunger pump, a liquid inlet pneumatic ball valve A, a hydrogen storage container A, and a liquid return pneumatic ball valve A, the liquid storage tank A is connected to the hydrogen storage container A through a pipeline, and the pipeline is respectively provided with a liquid outlet pneumatic ball valve A, a plunger pump, a liquid inlet pneumatic ball valve A, and a liquid return pneumatic ball valve A;

[0009] Optionally, the second system includes a liquid storage tank B, a liquid outlet pneumatic ball valve B, a plunger pump, a liquid inlet pneumatic ball valve B, a hydrogen storage container B, and a liquid return pneumatic ball valve B, the liquid storage tank B is connected to the hydrogen storage container B through a pipeline, and the pipeline is respectively provided with a liquid outlet pneumatic ball valve B, a plunger pump, a liquid inlet pneumatic ball valve B, and a liquid return pneumatic ball valve B;

[0010] Optionally, the gas phase part is an inlet ball valve A, an inlet ball valve B, and a bypass pneumatic ball valve, and the inlet ball valve A, the inlet ball valve B, and the bypass pneumatic ball valve are connected in series through pipelines;

[0011] Optionally, the hydrogen storage container A and the hydrogen storage container B are connected to the inlet ball valve A, the inlet ball valve B, and the bypass pneumatic ball valve through pipelines respectively;

[0012] Optionally, the liquid storage tank A and the liquid storage tank B are connected to the bypass pipe through two upper and lower pipes, and a manual ball valve is installed on the pipe;

[0013] Optionally, a magnetostrictive liquid level gauge is provided in the bypass pipe;

[0014] Compared with the prior art, the utility model has the following beneficial effects: reasonable structure, using one magnetostrictive level gauge to replace two reed switch level gauges and two differential pressure switches, reducing the space occupied by the equipment, reducing the number of openings in the liquid storage tank, and reducing the number of signal lines; the hydraulic medium level is displayed in real time on the control cabinet, and then the hydrogen storage capacity of the hydrogen filling station can be calculated and displayed in real time through the values ​​of the pressure sensors in various parts, so that the operator can accurately grasp the operation of the equipment; during the debugging process, there is no need to disassemble the magnetostrictive level gauge, and the operation can be completed by setting the high and low liquid levels on the control cabinet, making the debugging process simple and quick; when the hydrogen storage container returns liquid, the back pressure is always maintained at the front gas supply pressure, and the liquid return speed is greatly improved; the hydrogen storage container is replenished with gas at the same time as the liquid returns, which saves time and increases efficiency compared with the process flow of returning liquid first and then replenishing gas in the prior art; since the liquid return and gas replenishment time are greatly shortened, a small-capacity hydrogen storage container can be selected to reduce the liquid injection time, thereby increasing the liquid replacement frequency, improving the compression efficiency, and reducing the compression waiting time; the overall high-pressure gas storage capacity of the system is increased to provide users with a good use experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The utility model is further described below according to the figure:

[0016] Figure 1 It is a structural diagram of the utility model;

[0017] Figure 1 As shown in: including liquid storage tank A1, liquid storage tank B2, plunger pump 3, hydrogen storage container A4, hydrogen storage container B5, liquid outlet pneumatic ball valve A6, liquid outlet pneumatic ball valve B7, liquid inlet pneumatic ball valve A8, air inlet pneumatic ball valve B9, liquid return pneumatic ball valve A10, liquid return pneumatic ball valve B11, inlet ball valve A12, inlet ball valve B13, bypass pneumatic ball valve 14, magnetostrictive liquid level gauge 15, manual ball valve 16, bypass pipe 17. DETAILED DESCRIPTION

[0018] The present invention is further described in detail below in conjunction with the drawings. It should be noted that the drawings are only used to explain the present invention and are schematic illustrations of embodiments of the present invention, and cannot be understood as limiting the present invention.

[0019] In the description of the present invention, it should be noted that the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, or a laser welding connection; it can be directly connected, or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0020] like Figure 1As shown, the hydraulic bottle push hydrogen station booster equipment includes a liquid phase part and a gas phase part, and the liquid phase part and the gas phase part are connected to the hydrogen storage container, the hydrogen storage container is hydrogen storage container A 4 and hydrogen storage container B 5, wherein the liquid phase part includes a first system and a second system;

[0021] The first system and the second system share the same plunger pump 3, and the hydrogen storage containers of the first system and the second system are both connected to the gas phase part;

[0022] When the first system is performing the liquid injection process, the second system is performing the liquid return and gas replenishment process;

[0023] When the second system is performing the liquid injection process, the first system is performing the liquid return and gas replenishment process.

[0024] Optionally, the first system includes a liquid storage tank A1, a liquid outlet pneumatic ball valve A6, a plunger pump 3, a liquid inlet pneumatic ball valve A8, a hydrogen storage container A4, and a liquid return pneumatic ball valve A10, the liquid storage tank A1 is connected to the hydrogen storage container A4 through a pipeline, and the liquid outlet pneumatic ball valve A6, the plunger pump 3, the liquid inlet pneumatic ball valve A8, and the liquid return pneumatic ball valve A10 are respectively provided on the pipeline;

[0025] Optionally, the second system includes a liquid storage tank B2, a liquid outlet pneumatic ball valve B7, a plunger pump 3, a liquid inlet pneumatic ball valve B9, a hydrogen storage container B5, and a liquid return pneumatic ball valve B11, the liquid storage tank B2 is connected to the hydrogen storage container B5 through a pipeline, and the liquid outlet pneumatic ball valve B7, the plunger pump 3, the liquid inlet pneumatic ball valve B9, and the liquid return pneumatic ball valve B11 are respectively provided on the pipeline;

[0026] Optionally, the gas phase part is the inlet ball valve A12, the inlet ball valve B13, and the bypass pneumatic ball valve 14, and the inlet ball valve A12, the inlet ball valve B13, and the bypass pneumatic ball valve 14 are connected in series through pipelines;

[0027] Optionally, the hydrogen storage container A4 and the hydrogen storage container B5 are connected to the inlet ball valve A12, the inlet ball valve B13, and the bypass pneumatic ball valve 14 through pipelines respectively;

[0028] Optionally, the liquid storage tank A1 and the liquid storage tank B2 are connected to the bypass pipe 17 through two upper and lower pipes, and a manual ball valve 16 is installed on the pipe;

[0029] Optionally, a magnetostrictive liquid level gauge 15 is provided in the bypass pipe 17 .

[0030] Example 1

[0031] Working principle of liquid phase:

[0032] During the operation of the equipment, the liquid outlet pneumatic ball valve A6 is opened, the liquid outlet pneumatic ball valve B7 must be closed, and the liquid inlet pneumatic ball valve A8 is opened, and the liquid return pneumatic ball valve A10 is closed. At this time, the hydraulic medium in the liquid storage tank A1 is injected into the hydrogen storage container A4 through the plunger pump 3, and the gas in the hydrogen storage container A4 is compressed and transported to the downstream. When the hydrogen storage container A4 is full, that is, when the magnetostrictive liquid level gauge 15 in the liquid storage tank A1 reaches the lower liquid level, the liquid inlet pneumatic ball valve A8 is closed, the liquid outlet pneumatic ball valve A6 is closed, and the liquid return pneumatic ball valve A10 is opened. At this time, the hydrogen storage container A4 starts to return liquid. At the same time, the liquid outlet pneumatic ball valve B7 is opened, the liquid inlet pneumatic ball valve B9 is opened, and the liquid return pneumatic ball valve B11 is closed. At this time, the hydraulic medium in the liquid storage tank B2 is injected into the hydrogen storage container B5 through the plunger pump 3, and the gas in the hydrogen storage container B5 is compressed and transported to the downstream. When the hydrogen storage container B5 is full, that is, when the magnetostrictive liquid level gauge 15 in the liquid storage tank B2 reaches the lower liquid level, the liquid inlet pneumatic ball valve B9 is closed, the liquid outlet pneumatic ball valve B7 is closed, and the liquid return pneumatic ball valve B11 is opened, and the hydrogen storage container B5 starts to return liquid. The hydrogen storage container A4 and the hydrogen storage container B5 repeatedly inject liquid and return liquid, and work in a cycle.

[0033] During the liquid return process of hydrogen storage container A4 and hydrogen storage container B5, when the pressure in the bottle is lower than the front-end gas supply pressure, gas is replenished to hydrogen storage container A4 and hydrogen storage container B5 to increase and maintain the liquid return speed.

[0034] During the liquid return process of the first system of the equipment, the liquid level of the hydraulic medium in the liquid storage tank A1 gradually rises. When the magnetostrictive liquid level gauge 15 detects that the hydraulic medium has reached the upper liquid level, the liquid return pneumatic ball valve A10 is closed to stop the liquid return. When the hydrogen storage container A4 is filled with gas and the second system is filled with liquid and starts to return liquid, the first system continues the liquid injection process.

[0035] During the liquid return process of the second system of the equipment, the liquid level of the hydraulic medium in the liquid storage tank B2 gradually rises. When the magnetostrictive liquid level gauge 15 detects that the hydraulic medium has reached the upper liquid level, the liquid return pneumatic ball valve B11 is closed to stop the liquid return. When the hydrogen storage container B5 is filled with gas and the first system is filled and starts to return liquid, the second system continues the liquid injection process.

[0036] Working principle of gas phase part:

[0037] The outlets of the two hydrogen storage containers are connected by a pipeline, and a bypass pneumatic ball valve 14 is installed on the pipeline. When there is no gas demand downstream, the hydrogen pressure in the hydrogen storage container A4 and the hydrogen storage container B5, which are mainly used for compressing hydrogen, can be increased to 45MPa, so as to increase the hydrogen storage capacity. The specific operation is as follows: when there is no gas demand downstream, a signal is manually given to the control device. At this time, the operating status of the equipment is detected. When the liquid return pneumatic ball valve A10 and the liquid return pneumatic ball valve B11 are both in the closed state, and the inlet ball valve A12 and the inlet ball valve B13 are both in the closed state (if the above state is not reached, wait until the above state is met), the bypass pneumatic ball valve 14 is automatically opened. The system continues the previous liquid injection process. When any hydrogen storage container returns liquid, the bypass pneumatic ball valve 14 is closed, and the liquid return operation begins. After the operation is completed, the gas replenishment operation is performed. When the above conditions are met, the bypass pneumatic ball valve 14 is opened again until the pressure in the two hydrogen storage containers reaches 45MPa. The bypass pneumatic ball valve 14 is closed and the gas storage is completed.

[0038] The hydrogen storage container A4 has completed liquid return and gas replenishment, the inlet ball valve A12 and the inlet ball valve B13 are in a closed state, the hydrogen storage container A4 is filled with 20MPa gas, and the hydrogen storage container B5 is in a liquid injection compression state, and the internal gas pressure is between 20MPa and 45MPa. The specific steps are as follows:

[0039] 1. Open the bypass pneumatic ball valve 14, and the hydrogen storage container A4 and the hydrogen storage container B5 begin to equalize the pressure. The hydrogen storage container B5 continues to be filled with liquid and compressed until it is full and starts to return liquid.

[0040] 2. When the liquid is returned, the bypass pneumatic ball valve 14 is closed and the hydrogen storage container A4 begins to be filled with liquid and compressed.

[0041] 3. After the hydrogen storage container B5 returns to liquid, open the air inlet ball valve B13 to replenish air. After the air replenishment is completed, the air inlet valve A12 and the air inlet valve B13 are both in the closed state.

[0042] 4. Open the bypass pneumatic ball valve 14, and the hydrogen storage container A 4 and the hydrogen storage container B 5 begin to equalize the pressure. The hydrogen storage container A 4 continues to be filled with liquid and compressed until it is full and starts to return liquid.

[0043] 5. When the liquid is returned, the bypass pneumatic ball valve 14 is closed, and the hydrogen storage container B5 starts to be filled with liquid and compressed to 45MPa, then stops and waits.

[0044] 6. After the hydrogen storage container A4 returns to liquid, open the air inlet ball valve A12 to replenish air. After the air replenishment is completed, the air inlet valve A12 and the air inlet valve B13 are both in the closed state.

[0045] 7. Repeat the first step until the internal pressure of hydrogen storage container A 4 and hydrogen storage container B 5 reaches 45MPa, close the bypass pneumatic ball valve 14, and the gas storage is completed.

[0046] Example 1 is demonstrated by taking an intake pressure of 20 MPa and an exhaust pressure of 45 MPa as an example. On this basis, it is also applicable to other pressures such as an intake pressure of 45 MPa and an exhaust pressure of 90 MPa.

[0047] The utility model has a reasonable structure, and uses a magnetostrictive liquid level gauge to replace two reed switch liquid level gauges and two differential pressure switches, thereby reducing the space occupied by the equipment, reducing the number of openings in the liquid storage tank, and reducing the number of signal lines; the hydraulic medium liquid level is displayed in real time on the control cabinet, and then the hydrogen storage amount of the hydrogen filling station can be displayed in real time through the value of the pressure sensor, so that the operator can accurately grasp the operation of the equipment; during the debugging process, there is no need to disassemble the magnetostrictive liquid level gauge, and the high and low liquid level operations can be set on the control cabinet, so that the debugging process is simple and fast; the back pressure of the hydrogen storage container for liquid return is always maintained at 20MPa or above, and the liquid return speed is greatly improved; the hydrogen storage container is replenished with gas while returning liquid, which saves time and increases efficiency compared with the process flow of returning liquid first and then replenishing gas in the prior art; since the liquid return and gas replenishment time are greatly shortened, a small-capacity hydrogen storage container can be selected to reduce the liquid injection time, thereby increasing the liquid replacement frequency, improving the compression efficiency, and reducing the compression waiting time; the overall high-pressure gas storage capacity of the system is increased to provide users with a good use experience.

[0048] The above is an embodiment of the utility model and is not intended to limit the present invention. For those skilled in the art, the utility model may have various improvements and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the scope of the claims of the utility model.

Claims

1. Hydraulic bottle push hydrogen station booster equipment, characterized by: The method comprises a liquid phase part and a gas phase part, wherein the liquid phase part and the gas phase part are both connected to a hydrogen storage container, the hydrogen storage container is a hydrogen storage container A (4) and a hydrogen storage container B (5), wherein the liquid phase part comprises a first system and a second system; The first system and the second system share a same plunger pump (3), and the hydrogen storage containers of the first system and the second system are both connected to the gas phase part; When the first system is performing the liquid injection process, the second system is performing the liquid return and gas replenishment process; When the second system is performing the liquid injection process, the first system is performing the liquid return and gas replenishment process.

2. According to claim 1, the hydraulic bottle push hydrogen station pressurizing equipment is characterized by: The first system comprises a liquid storage tank A (1), a liquid outlet pneumatic ball valve A (6), a plunger pump (3), a liquid inlet pneumatic ball valve A (8), a hydrogen storage container A (4), and a liquid return pneumatic ball valve A (10). The liquid storage tank A (1) is connected to the hydrogen storage container A (4) via a pipeline, and the liquid outlet pneumatic ball valve A (6), the plunger pump (3), the liquid inlet pneumatic ball valve A (8), and the liquid return pneumatic ball valve A (10) are respectively arranged on the pipeline.

3. According to claim 1, the hydraulic bottle push hydrogen station boosting equipment is characterized by: The second system comprises a liquid storage tank B (2), a liquid outlet pneumatic ball valve B (7), a plunger pump (3), a liquid inlet pneumatic ball valve B (9), a hydrogen storage container B (5), and a liquid return pneumatic ball valve B (11). The liquid storage tank B (2) is connected to the hydrogen storage container B (5) via a pipeline, and the liquid outlet pneumatic ball valve B (7), the plunger pump (3), the liquid inlet pneumatic ball valve B (9), and the liquid return pneumatic ball valve B (11) are respectively arranged on the pipeline.

4. According to claim 1, the hydraulic bottle push hydrogen station boosting equipment is characterized by: The gas phase part comprises an inlet ball valve A (12), an inlet ball valve B (13), and a bypass pneumatic ball valve (14), and the inlet ball valve A (12), the inlet ball valve B (13), and the bypass pneumatic ball valve (14) are connected in series via pipelines.

5. The hydraulic bottle push hydrogen station pressurizing equipment according to any one of claims 2 and 3, characterized in that: The hydrogen storage container A (4) and the hydrogen storage container B (5) are respectively connected to the inlet ball valve A (12), the inlet ball valve B (13) and the bypass pneumatic ball valve (14) through pipelines.

6. The hydraulic bottle push hydrogen station pressurizing equipment according to any one of claims 2 and 3, characterized in that: The liquid storage tank A (1) and the liquid storage tank B (2) are both connected to a bypass pipe (17) through two upper and lower pipes, and a manual ball valve (16) is installed on the pipe.

7. The hydraulic bottle push hydrogen station pressurizing equipment according to claim 6 is characterized by: A magnetostrictive liquid level gauge (15) is arranged in the bypass pipe (17).