Rotating wheel dehumidification system for semiconductor heterojunction production workshop

By setting up multiple dehumidification sections and temperature adjustment sections in the rotor dehumidification system of the semiconductor heterojunction production workshop, the problem of poor dehumidification effect in the prior art is solved, high cleanliness and precise temperature control are achieved, and semiconductors are satisfied Strict requirements of production workshops.

CN222012148UActive Publication Date: 2024-11-15江苏源一工程科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420010367.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-11-15
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

The existing clean workshop dehumidification system has poor dehumidification effect in semiconductor heterojunction production workshops and cannot meet the requirements of high cleanliness.

Method used

A rotor dehumidification system of semiconductor heterojunction production workshop was designed. By setting up a primary filter, heating section, surface cooling section, rotor dehumidification section and frequency converter fan section in the rotor dehumidification unit, two dehumidifications were achieved. The air temperature is adjusted through the fourth surface cooling section and the second heating section to improve the dehumidification effect and temperature control accuracy.

Benefits of technology

It significantly improves the gas dehumidification effect, ensures high cleanliness in the workshop, and improves the temperature control accuracy through temperature adjustment, meeting the strict requirements of the semiconductor production workshop for cleanliness and temperature.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222012148U_ABST
    Figure CN222012148U_ABST
Patent Text Reader

Abstract

The utility model provides a semiconductor heterojunction production workshop rotating wheel dehumidification system which is characterized in that the output end of a rotating wheel dehumidification unit is connected with the fresh air input end of a production workshop through an air supply main pipe, and the air return end of the production workshop is connected with the air return input end of the rotating wheel dehumidification unit through an air return main pipe; a primary efficiency filter section, a first heating section, a first surface cooling section, a second surface cooling section, a first rotating wheel dehumidification section, a first return air mixing section, a medium efficiency filter section, a third surface cooling section, a first frequency conversion fan section, a second rotating wheel dehumidification section and a second frequency conversion fan section are sequentially arranged in the rotating wheel dehumidification unit from left to right. The gas dehumidification effect is greatly improved by arranging the rotary wheel dehumidification sections twice, the fourth surface cooling section is arranged to further cool dry and hot air dehumidified by the second rotary wheel to the set temperature, and meanwhile, the second heating section is arranged to play a role in auxiliary adjustment when the temperature value is lower than the set temperature value due to supercooling of the fourth surface cooling section. And the temperature control precision in the workshop is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dehumidification and cleaning, and more specifically to a rotary dehumidification system for a semiconductor heterojunction production workshop. Background Art

[0002] Thin film / crystalline silicon heterojunction (HJT) belongs to the third generation of high-efficiency solar cell technology. It is a hybrid solar cell made of crystalline silicon substrate and amorphous silicon thin film. A very thin intrinsic amorphous silicon film (called i-type amorphous silicon film) and p-type amorphous silicon film are deposited on one side of the substrate after surface texture, and then a thin i-type amorphous silicon film and n-type amorphous silicon film are deposited on the other side of the substrate; transparent oxide conductive film is deposited on both sides, and Ag electrode is made on the transparent oxide conductive film by screen printing. The semiconductor production workshop has extremely strict requirements on cleanliness during the manufacturing and production process, including air volume, temperature, humidity, and pressure difference.

[0003] The existing clean room dehumidification system adopts (publication number: CN109945329A), which only uses a rotary dehumidifier for dehumidification, and the dehumidification effect is poor and cannot meet a higher cleanliness level.

[0004] Publication number: CN109945329A, a low-temperature isolator air-conditioning system for pharmaceutical companies discloses a low-temperature isolator air-conditioning system for pharmaceutical companies, including an air-conditioning case and a primary fresh air section, a first surface cooling section, a return air mixing section, a medium-efficiency filtration section, a rotary dehumidification section, a low-temperature surface cooling section, a secondary heating section, a humidification section, a fan section, and a medium-efficiency air outlet section arranged therein in sequence. A first air valve is arranged between the medium-efficiency filtration section and the rotary dehumidification section, a second air valve is arranged between the rotary dehumidification section and the low-temperature surface cooling section, a bypass section is arranged in parallel in the rotary dehumidification section, a third air valve is arranged between the bypass section and the medium-efficiency filtration section, and a fourth air valve is arranged between the bypass section and the low-temperature surface cooling section. The first air valve, the second air valve, the third air valve and the fourth air valve are all connected to a controller, and the controller controls the opening and closing of the first air valve, the second air valve, the third air valve and the fourth air valve.

[0005] Therefore, how to meet the high cleanliness required by clean workshops is an urgent problem to be solved by technical personnel in this field. Utility Model Content

[0006] In view of this, in order to solve the problem of poor dehumidification effect and inability to meet a higher cleanliness level, the utility model proposes a rotary dehumidification system for a semiconductor heterojunction production workshop, wherein the outdoor fresh air is connected to the fresh air input end of the rotary dehumidifier unit 1, the output end of the rotary dehumidifier unit 1 is connected to the fresh air input end of the production workshop 3 through the air supply pipe 2, and the return air end of the production workshop 3 is connected to the return air input end of the rotary dehumidifier unit 1 through the return air pipe 4. The rotary dehumidifier unit 1 is provided with a primary filter section 5, a first heating section 6, a first The surface cooling section 7, the second surface cooling section 8, the first rotary dehumidification section 9, the first return air mixing section 12, the medium efficiency filter section 10, the third surface cooling section 11, the first variable frequency fan section 13, the second rotary dehumidification section 14, and the second variable frequency fan section 15 are provided twice to greatly improve the gas dehumidification effect, and the fourth surface cooling section is provided to cool the hot dry air after the second rotary dehumidification to the set temperature, and the second heating section plays a role in regulating the temperature value below the set temperature caused by the overcooling of the fourth surface cooling section, thereby improving the temperature control accuracy in the workshop

[0007] A rotary dehumidification system for a semiconductor heterojunction production workshop, comprising a rotary dehumidification unit 1 and a control cabinet, wherein the rotary dehumidification unit 1 is electrically connected to the control cabinet, and is characterized in that: outdoor fresh air is connected to the fresh air input end of the rotary dehumidification unit 1, the output end of the rotary dehumidification unit 1 is connected to the fresh air input end of the production workshop 3 through an air supply pipe 2, and the return air end of the production workshop 3 is connected to the return air input end of the rotary dehumidification unit 1 through a return air pipe 4. The rotary dehumidification unit 1 is provided with a primary filter section 5, a first heating section 6, a first surface cooling section 7, a second surface cooling section 8, a first rotary dehumidification section 9, a first return air mixing section 12, a medium efficiency filter section 10, a third surface cooling section 11, a first variable frequency fan section 13, a second rotary dehumidification section 14, and a second variable frequency fan section 15 from left to right. The primary filter section 5 It is used for primary filtration of fresh air, the first heating section 6 is used for preheating the fresh air, the first surface cooling section 7 is used for initial cooling and cooling of the fresh air, the second surface cooling section 8 is used for secondary cooling and cooling of the fresh air, the first rotor dehumidification section 9 is used for primary dehumidification of the fresh air after cooling and cooling, the first return air mixing section 12 is used to receive the return air from the production workshop 3 and mix it with the fresh air after primary dehumidification, the medium efficiency filter section 10 is used for medium efficiency filtration of the mixed air, the third surface cooling section 11 is used to cool down and increase the humidity of the air after medium efficiency filtration, the first variable frequency fan section 13 is used to output air to the second rotor dehumidification section 14, the second rotor dehumidification section 14 is used for secondary dehumidification of the air, and the second variable frequency fan section 15 is used to transport the fresh air with humidity adjustment to the fresh air input end of the production workshop 3.

[0008] Furthermore, a fourth surface cooling section 16 is provided between the second rotor dehumidification section 14 and the second variable frequency fan section 15, and the fourth surface cooling section is used to cool down the hot dry air after the second rotor dehumidification to a set temperature.

[0009] Furthermore, a second heating section 17 is provided between the fourth surface cooling section 16 and the second variable frequency fan section 15. The second heating section 17 is used to assist in regulating the temperature when the temperature is lower than the set temperature due to overcooling of the fourth surface cooling section, thereby improving the temperature control accuracy in the workshop.

[0010] Furthermore, a first chamber 18 is provided between the second surface cooling section 8 and the medium efficiency filter section 10, and the first rotary dehumidification section 9 includes a first rotary dehumidifier 91, a first rotary heater 92, and a first rotary fan 93. A first rotary dehumidifier 91 is provided above the first chamber 18 for initially dehumidifying the fresh air after cooling and outputting most of it to the medium efficiency filter section 10. A first rotary heater 92 is provided on the side of the first rotary dehumidifier 91 for drying and heating part of the initially dehumidified air. A first rotary fan 93 is provided on the other side of the first rotary dehumidifier 91 for discharging the dried and heated air to the outside.

[0011] Furthermore, a second chamber 19 is provided between the first variable frequency fan section 13 and the fourth surface cooling section 16, and the second rotary dehumidification section 14 includes a second rotary dehumidifier 141 and a second rotary heater 142. A second rotary dehumidifier 141 is provided above the second chamber 19 for secondary dehumidification of the fresh air after cooling and outputting most of it to the second variable frequency fan section 15. A second rotary heater 142 is provided on the side of the second rotary dehumidifier 141 for drying and heating part of the secondary dehumidified air. The first rotary fan 93 drives the dried and heated air to be discharged to the first rotary dehumidification section 9 and then discharged to the outdoors via the first rotary dehumidification section 9.

[0012] Furthermore, the first heating section 6 includes a first steam supply pipe 61 and a first condensate return pipe 62, and the second heating section 17 includes a second steam supply pipe 171 and a second condensate return pipe 172. The first steam supply pipe 61 and the second steam supply pipe 171 contain 0.2MPa steam, and the first condensate return pipe 62 and the second condensate return pipe 172 are used to discharge condensate to the outside.

[0013] Furthermore, the first surface cooling section 7 includes a first medium-temperature water supply pipe 71 and a first medium-temperature water return pipe 72, the second surface cooling section 8 includes a first chilled water supply pipe 81 and a first chilled water return pipe 82, the third surface cooling section 11 includes a second chilled water supply pipe 111 and a second chilled water return pipe 112, and the fourth surface cooling section 16 includes a second medium-temperature water supply pipe 161 and a second medium-temperature water return pipe 162. The first medium-temperature water supply pipe 71 and the second medium-temperature water supply pipe 161 contain 12°C medium-temperature water, the first medium-temperature water return pipe 72 and the second medium-temperature water return pipe 162 contain 18°C ​​medium-temperature water, the first chilled water supply pipe 81 and the second chilled water supply pipe 111 contain 6°C chilled water, and the first chilled water return pipe 82 and the second chilled water return pipe 112 contain 13°C chilled water.

[0014] Furthermore, a fire damper 20 is provided on the output end of the first rotor fan 93, the air supply pipe 2, and the return air pipe 4. The fire damper 20 is electrically connected to the control cabinet. When the temperature is higher than 70°C, the entire system is shut down.

[0015] Furthermore, differential pressure sensors are provided at the left and right ends of the primary filter section 5, the left and right ends of the medium filter section 10, the fresh air input end of the production workshop 3, and the return air end of the production workshop 3, and the differential pressure sensors are electrically connected to the control cabinet.

[0016] The beneficial effects of the utility model are as follows: the utility model proposes a rotary dehumidification system for a semiconductor heterojunction production workshop, wherein outdoor fresh air is connected to the fresh air input end of a rotary dehumidifier unit 1, the output end of the rotary dehumidifier unit 1 is connected to the fresh air input end of a production workshop 3 through an air supply pipe 2, and the return air end of the production workshop 3 is connected to the return air input end of the rotary dehumidifier unit 1 through a return air pipe 4, and the rotary dehumidifier unit 1 is provided with a primary filter section 5, a first heating section 6, a first surface cooling section 7, a second surface cooling section 8, a first rotary dehumidification section 9, a first return air mixing section 12, a medium efficiency filter section 10, a third surface cooling section 11, a first variable frequency fan section 13, a second rotary dehumidification section 14, and a second variable frequency fan section 15 from left to right, and the gas dehumidification effect is greatly improved by setting the rotary dehumidification section twice, and the fourth surface cooling section is set to further cool the dry hot air after the second rotary dehumidification to a set temperature, and at the same time, the second heating section is set when the fourth surface cooling section is overcooled and the temperature is lower than the set temperature. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the rotary dehumidification system for a semiconductor heterojunction production workshop of the utility model.

[0018] Figure 2 It is a partial structural schematic diagram of the rotary dehumidification system of the semiconductor heterojunction production workshop of the utility model.

[0019] Main component symbols

[0020]

[0021]

[0022] The following specific implementation manner will further illustrate the present utility model in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0023] like Figure 1 As shown, it is a schematic diagram of the structure of the rotary dehumidification system of the semiconductor heterojunction production workshop of the utility model; Figure 2 The figure is a partial structural schematic diagram of the rotary dehumidification system for semiconductor heterojunction production workshop of the utility model.

[0024] A rotary dehumidification system for a semiconductor heterojunction production workshop, comprising a rotary dehumidification unit 1 and a control cabinet, wherein the rotary dehumidification unit 1 is electrically connected to the control cabinet, and is characterized in that: outdoor fresh air is connected to the fresh air input end of the rotary dehumidification unit 1, the output end of the rotary dehumidification unit 1 is connected to the fresh air input end of the production workshop 3 through an air supply pipe 2, and the return air end of the production workshop 3 is connected to the return air input end of the rotary dehumidification unit 1 through a return air pipe 4. The rotary dehumidification unit 1 is provided with a primary filter section 5, a first heating section 6, a first surface cooling section 7, a second surface cooling section 8, a first rotary dehumidification section 9, a first return air mixing section 12, a medium efficiency filter section 10, a third surface cooling section 11, a first variable frequency fan section 13, a second rotary dehumidification section 14, and a second variable frequency fan section 15 from left to right. The primary filter section 5 It is used for primary filtration of fresh air, the first heating section 6 is used for preheating the fresh air, the first surface cooling section 7 is used for initial cooling and cooling of the fresh air, the second surface cooling section 8 is used for secondary cooling and cooling of the fresh air, the first rotor dehumidification section 9 is used for primary dehumidification of the fresh air after cooling and cooling, the first return air mixing section 12 is used to receive the return air from the production workshop 3 and mix it with the fresh air after primary dehumidification, the medium efficiency filter section 10 is used for medium efficiency filtration of the mixed air, the third surface cooling section 11 is used to cool down and increase the humidity of the air after medium efficiency filtration, the first variable frequency fan section 13 is used to output air to the second rotor dehumidification section 14, the second rotor dehumidification section 14 is used for secondary dehumidification of the air, and the second variable frequency fan section 15 is used to transport the fresh air with humidity adjustment to the fresh air input end of the production workshop 3.

[0025] A fourth surface cooling section 16 is further provided between the second rotor dehumidification section 14 and the second variable frequency fan section 15. The fourth surface cooling section is used to cool down the hot dry air after the second rotor dehumidification to a set temperature.

[0026] A second heating section 17 is also provided between the fourth surface cooling section 16 and the second variable frequency fan section 15. The second heating section 17 is used to assist in regulating the temperature when the temperature is lower than the set temperature due to overcooling of the fourth surface cooling section, thereby improving the temperature control accuracy in the workshop.

[0027] A first chamber 18 is provided between the second surface cooling section 8 and the medium efficiency filter section 10. The first rotary dehumidification section 9 includes a first rotary dehumidifier 91, a first rotary heater 92, and a first rotary fan 93. A first rotary dehumidifier 91 is provided above the first chamber 18 for initially dehumidifying the fresh air after cooling and outputting most of it to the medium efficiency filter section 10. A first rotary heater 92 is provided on the side of the first rotary dehumidifier 91 for drying and heating part of the initially dehumidified air. A first rotary fan 93 is provided on the other side of the first rotary dehumidifier 91 for discharging the dried and heated air to the outside.

[0028] A second chamber 19 is provided between the first variable frequency fan section 13 and the fourth surface cooling section 16. The second rotary dehumidification section 14 includes a second rotary dehumidifier 141 and a second rotary heater 142. A second rotary dehumidifier 141 is provided above the second chamber 19 for secondary dehumidification of the fresh air after cooling and outputting most of it to the second variable frequency fan section 15. A second rotary heater 142 is provided on the side of the second rotary dehumidifier 141 for drying and heating part of the secondary dehumidified air. The first rotary fan 93 drives the dried and heated air to be discharged to the first rotary dehumidification section 9 and then discharged to the outdoors via the first rotary dehumidification section 9.

[0029] The first heating section 6 includes a first steam supply pipe 61 and a first condensate return pipe 62, and the second heating section 17 includes a second steam supply pipe 171 and a second condensate return pipe 172. The first steam supply pipe 61 and the second steam supply pipe 171 contain 0.2MPa steam, and the first condensate return pipe 62 and the second condensate return pipe 172 are used to discharge condensate to the outside.

[0030] The first surface cooling section 7 includes a first medium-temperature water supply pipe 71 and a first medium-temperature water return pipe 72, the second surface cooling section 8 includes a first chilled water supply pipe 81 and a first chilled water return pipe 82, the third surface cooling section 11 includes a second chilled water supply pipe 111 and a second chilled water return pipe 112, and the fourth surface cooling section 16 includes a second medium-temperature water supply pipe 161 and a second medium-temperature water return pipe 162. The first medium-temperature water supply pipe 71 and the second medium-temperature water supply pipe 161 contain 12°C medium-temperature water, the first medium-temperature water return pipe 72 and the second medium-temperature water return pipe 162 contain 18°C ​​medium-temperature water, the first chilled water supply pipe 81 and the second chilled water supply pipe 111 contain 6°C chilled water, and the first chilled water return pipe 82 and the second chilled water return pipe 112 contain 13°C chilled water.

[0031] Fire dampers 20 are provided on the output end of the first rotor fan 93, the air supply pipe 2, and the air return pipe 4. The fire dampers 20 are electrically connected to the control cabinet. When the temperature is higher than 70°C, the entire system is shut down.

[0032] Pressure differential sensors are provided at the left and right ends of the primary filter section 5, the left and right ends of the medium filter section 10, the fresh air input end of the production workshop 3, and the return air end of the production workshop 3, and the pressure differential sensors are electrically connected to the control cabinet.

[0033] The beneficial effects of the utility model are as follows: the utility model proposes a rotary dehumidification system for a semiconductor heterojunction production workshop, the outdoor fresh air is connected to the fresh air input end of the rotary dehumidification unit 1, the output end of the rotary dehumidification unit 1 is connected to the fresh air input end of the production workshop 3 through the air supply pipe 2, the return air end of the production workshop 3 is connected to the return air input end of the rotary dehumidification unit 1 through the return air pipe 4, the rotary dehumidification unit 1 is provided with a primary filter section 5, a first heating section 6, a first surface cooling section 7, a second surface cooling section 8, a first rotary The rotor dehumidification section 9, the first return air mixing section 12, the medium efficiency filter section 10, the third surface cooling section 11, the first variable frequency fan section 13, the second rotor dehumidification section 14, and the second variable frequency fan section 15 are provided twice. The gas dehumidification effect is greatly improved by setting the rotor dehumidification section twice. The fourth surface cooling section is provided to further cool the dry hot air after the second rotor dehumidification to the set temperature. At the same time, the second heating section is provided to play an auxiliary adjustment role when the temperature is lower than the set temperature value due to overcooling of the fourth surface cooling section, thereby further improving the temperature control accuracy in the workshop.

[0034] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. A rotary dehumidification system for a semiconductor heterojunction production workshop, comprising a rotary dehumidification unit (1) and a control cabinet, wherein the rotary dehumidification unit (1) is electrically connected to the control cabinet, and is characterized in that: The outdoor fresh air is connected to the fresh air input end of the rotary dehumidifier (1); the output end of the rotary dehumidifier (1) is connected to the fresh air input end of the production workshop (3) through the air supply pipe (2); the return air end of the production workshop (3) is connected to the return air input end of the rotary dehumidifier (1) through the return air pipe (4); the rotary dehumidifier (1) is provided with a primary filter section (5), a first heating section (6), a first surface cooling section (7), a second surface cooling section (8), a first rotary dehumidifier section (9), a first return air mixing section (12), a medium efficiency filter section (10), a third surface cooling section (11), a first variable frequency fan section (13), a second rotary dehumidifier section (14), and a second variable frequency fan section (15) from left to right; the primary filter section (5) is used for primary filtering of the fresh air; the first heating section (6) is used for The first surface cooling section (7) is used for preheating the fresh air, the second surface cooling section (8) is used for performing a secondary cooling and cooling on the fresh air, the first rotary dehumidification section (9) is used for performing a primary dehumidification on the fresh air after cooling and cooling, the first return air mixing section (12) is used for receiving the return air from the production workshop (3) and mixing it with the fresh air after the primary dehumidification, the medium efficiency filter section (10) is used for performing a medium efficiency filtration on the mixed air, the third surface cooling section (11) is used for cooling the air after the medium efficiency filtration and increasing the humidity, the first variable frequency fan section (13) is used for outputting the air to the second rotary dehumidification section (14), the second rotary dehumidification section (14) is used for performing a secondary dehumidification on the air, and the second variable frequency fan section (15) is used for conveying the fresh air after humidity adjustment to the fresh air input end of the production workshop (3).

2. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: A fourth surface cooling section (16) is also provided between the second rotor dehumidification section (14) and the second variable frequency fan section (15), and the fourth surface cooling section is used to cool down the hot dry air after dehumidification by the second rotor to a set temperature.

3. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: A second heating section (17) is also provided between the fourth surface cooling section (16) and the second variable frequency fan section (15). The second heating section (17) is used to play an auxiliary regulating role when the temperature of the fourth surface cooling section is lower than the set temperature value due to overcooling.

4. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: A first chamber (18) is provided between the second surface cooling section (8) and the medium efficiency filter section (10); the first rotary dehumidification section (9) comprises a first rotary dehumidifier (91), a first rotary heater (92), and a first rotary fan (93); a first rotary dehumidifier (91) is provided above the first chamber (18) for initially dehumidifying the fresh air after cooling and outputting most of it to the medium efficiency filter section (10); a first rotary heater (92) is provided on the side of the first rotary dehumidifier (91) for drying and heating part of the initially dehumidified air; and a first rotary fan (93) is provided on the other side of the first rotary dehumidifier (91) for discharging the dried and heated air to the outside.

5. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: A second chamber (19) is provided between the first variable frequency fan section (13) and the fourth surface cooling section (16); the second rotary dehumidification section (14) comprises a second rotary dehumidifier (141) and a second rotary heater (142); a second rotary dehumidifier (141) is provided above the second chamber (19) for performing secondary dehumidification on the fresh air after cooling and outputting most of the fresh air to the second variable frequency fan section (15); a second rotary heater (142) is provided on the side of the second rotary dehumidifier (141) for drying and heating part of the secondary dehumidified air; the first rotary fan (93) drives the dried and heated air to be discharged to the first rotary dehumidification section (9) and then discharged to the outside through the first rotary dehumidification section (9).

6. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: The first heating section (6) includes a first steam supply pipe (61) and a first condensate return pipe (62), and the second heating section (17) includes a second steam supply pipe (171) and a second condensate return pipe (172). The first steam supply pipe (61) and the second steam supply pipe (171) contain 0.2 MPa steam, and the first condensate return pipe (62) and the second condensate return pipe (172) are used to discharge condensate to the outside.

7. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: The first surface cooling section (7) comprises a first medium-temperature water supply pipe (71) and a first medium-temperature water return pipe (72); the second surface cooling section (8) comprises a first chilled water supply pipe (81) and a first chilled water return pipe (82); the third surface cooling section (11) comprises a second chilled water supply pipe (111) and a second chilled water return pipe (112); the fourth surface cooling section (16) comprises a second medium-temperature water supply pipe (161) and a second medium-temperature water return pipe (162), the first medium-temperature water supply pipe (71) and the second medium-temperature water supply pipe (161) contain medium-temperature water of 12°C, the first medium-temperature water return pipe (72) and the second medium-temperature water return pipe (162) contain medium-temperature water of 18°C, the first chilled water supply pipe (81) and the second chilled water supply pipe (111) contain chilled water of 6°C, and the first chilled water return pipe (82) and the second chilled water return pipe (112) contain chilled water of 13°C.

8. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 4, characterized in that: The output end of the first rotor fan (93), the air supply pipe (2) and the return air pipe (4) are all provided with a fire damper (20), which is electrically connected to the control cabinet and shuts down the entire system when the temperature is higher than 70°C.

9. The rotary dehumidification system for semiconductor heterojunction production workshop according to claim 1, characterized in that: Pressure differential sensors are provided at the left and right ends of the primary filter section (5), the left and right ends of the medium filter section (10), the fresh air input end of the production workshop (3), and the return air end of the production workshop (3), and the pressure differential sensors are electrically connected to the control cabinet.