Sludge treatment device for sewage plant
Through the combination of spiral conveying and extrusion mechanism, the problem of difficult separation of moisture in the sludge is solved, and efficient filtration treatment of the sludge is achieved, protecting the environment and saving water resources.
Patent Information
- Application Number
- CN202420309820.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-20
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-20
AI Technical Summary
During the sludge treatment process, the moisture mixed in the sludge is difficult to separate, resulting in environmental pollution and waste of water resources. The existing technology is poor in practicality.
The sludge filtration treatment is carried out by the combination of a screw conveying mechanism and an extrusion mechanism. The sludge is transported through a spiral twisting dragon, and the electric cylinder drives the pressure plate for extrusion, separates the moisture, and discharges the filtered water through the drainage pipe.
Effectively separate the moisture in the sludge, protect the environment, save water resources, and improve the practicality of sludge treatment.
Smart Images

Figure CN222019055U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of sludge treatment, and specifically to a sludge treatment device for a sewage treatment plant. Background Art
[0002] As we all know, sludge is the product of sewage treatment. It is a very complex substance composed of organic debris, bacterial cells, inorganic particles and colloids. The main characteristics of sludge are a water content of up to 99%, a high organic content, easy to rot and stink, and fine particles and a small specific gravity. It is a thick substance between liquid and solid. In order to avoid sludge from polluting the environment, it is generally necessary to treat the sludge after sewage treatment, and dehydrate it during the sludge treatment process.
[0003] In order to facilitate the recycling and reuse of sludge, a sludge treatment device is usually used to treat the sludge before recycling it, or the treated sludge can be directly discharged. However, when the sludge is treated, a certain amount of water is mixed in the sludge, and the water is not easy to separate from the sludge. Direct discharge is not environmentally friendly and wastes water resources, and has poor practicality. Therefore, a sewage plant sludge treatment device is needed to improve the above problems. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In response to the deficiencies in the prior art, the present application provides a sewage treatment plant sludge treatment device that filters sludge through the cooperation of a spiral conveying mechanism and an extrusion mechanism, thereby completing the sludge filtering treatment operation. The filtered water is treated and discharged or reused, which protects the environment, saves water resources, and has high practicality.
[0006] Technical Solution
[0007] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a sludge treatment device for a sewage treatment plant, comprising a mounting plate, a first working box is fixedly mounted on the top of the mounting plate, a feed hopper is arranged on the first working box, a spiral conveying mechanism is arranged in the first working box, the spiral conveying mechanism comprises a spiral auger, a motor is fixedly mounted on the outer wall of the first working box, a conveying box is fixedly mounted in the first working box, a spiral auger is fixedly mounted on the output end of the motor, an end of the spiral auger away from the motor is rotatably connected to the inner wall of the conveying box, two guide plates are fixedly mounted on the conveying box, the top ends of the two guide plates are fixedly connected to the inner wall of the first working box, a first through hole is provided at the top of the conveying box, a first water outlet is provided at the bottom end of the conveying box, a drain pipe is connected and installed at the bottom end of the first working box, and a connecting pipe is connected and installed at the bottom end of the conveying box;
[0008] The mounting plate is provided with an extrusion mechanism, which includes a filter screen plate, and the two ends of the filter screen plate are respectively fixedly connected to the inner walls of the two ends of the second working box. The second working box is fixedly installed on the top of the mounting plate, and a box door is hinged on the second working box. A second through hole is provided on the second working box, and one end of the connecting pipe is connected to the second through hole. An electric cylinder is provided on the top of the second working box, and a pressing plate is provided on the bottom end of the electric cylinder. The two ends of the pressing plate are respectively attached to the inner walls of the two ends of the second working box. A third through hole is provided on the outer wall of the second working box, and a fourth through hole is provided on the outer wall of the first working box, and the third through hole is connected to the fourth through hole;
[0009] A supporting mechanism is provided at the bottom end of the mounting plate for supporting the mounting plate;
[0010] A protection mechanism is arranged on the outer side wall of the first working box for protecting the motor.
[0011] Preferably, the supporting mechanism includes four supporting columns, the top ends of the four supporting columns are fixedly connected to the bottom end of the mounting plate, the bottom ends of the four supporting columns are fixedly installed with stabilizing blocks, the inner end of each supporting column is fixedly installed with a rib plate, the top end of each rib plate is fixedly connected to the bottom end of the mounting plate, the mounting plate is more stable through the installation of four supporting columns and four stabilizing blocks, and the four supporting columns and the mounting plate are more stable through the installation of four rib plates.
[0012] Furthermore, the protection mechanism includes a protective cover, which is fixedly mounted on the outer wall of the first working box. The motor is located inside the protective cover, and a plurality of heat dissipation holes are provided on the outer wall of the protective cover. The installation of the protective cover protects the motor, and the heat generated by the motor when working is discharged through the heat dissipation holes.
[0013] Furthermore, a slope is provided at the inner bottom of the second working box, and the installation of the slope serves to guide the filtered water.
[0014] On the basis of the above-mentioned solution, a support plate is fixedly installed on the bottom end of the mounting plate, and the mounting plate is supported by the installation of the support plate.
[0015] Furthermore, an observation window is provided on the box door, and the installation of the observation window facilitates observation of the internal situation of the second working box.
[0016] Beneficial Effects
[0017] Compared with the prior art, the present application provides a sewage treatment plant sludge treatment device, which has the following beneficial effects:
[0018] The sludge treatment device of the sewage treatment plant puts the sludge into the first working box through the feed hopper, pours the sludge into the conveying box through the first through hole through the cooperation of two guide plates, and the water in the sludge is discharged through the first water outlet hole. By starting the motor, the spiral auger is driven by the motor to rotate, and the sludge in the conveying box is discharged into the second working box through the connecting pipe through the rotation of the spiral auger. When the sludge in the second working box accumulates to a certain capacity, the sludge is stopped from being added, and the electric cylinder is started, and the pressing plate is driven by the electric cylinder to press down, so as to squeeze the sludge. The squeezed water flows into the first working box through the cooperation of the third through hole and the fourth through hole, and is discharged from the drain pipe. The treated sludge is cleaned by opening the box door, thereby completing the filtering treatment of the sludge. The filtered water is discharged or reused after treatment, which protects the environment, saves water resources, and has high practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the cross-sectional structure of the main view of this application;
[0020] Figure 2 This is a structural diagram of the main view of this application;
[0021] Figure 3 It is a schematic diagram of the cross-sectional structure of the side view of part of this application;
[0022] Figure 4 For this application Figure 1 Schematic diagram of the enlarged structure of part A in the middle.
[0023] Markings in the attached figure: 1. Mounting plate; 2. First working box; 3. Feed hopper; 4. Motor; 5. Conveying box; 6. Auger; 7. Connecting pipe; 8. Second working box; 9. Electric cylinder; 10. Pressing plate; 11. Filter screen; 12. Support column; 13. Stabilizing block; 14. Rib; 15. Protective cover; 16. Slope; 17. Guide plate; 18. Support plate; 19. Observation window. DETAILED DESCRIPTION
[0024] Example
[0025] See also Figure 1-4A sludge treatment device for a sewage treatment plant comprises a mounting plate 1, a first working box 2 is fixedly mounted on the top of the mounting plate 1, a feed hopper 3 is arranged on the first working box 2, sludge is put into the first working box 2 through the feed hopper 3, a screw conveying mechanism is arranged in the first working box 2, the screw conveying mechanism comprises a screw auger 6, a motor 4 is fixedly mounted on the outer wall of the first working box 2, a conveying box 5 is fixedly mounted in the first working box 2, a screw auger 6 is fixedly mounted on the output end of the motor 4, and the end of the screw auger 6 away from the motor 4 is rotatably connected to the inner wall of the conveying box 5 Next, by starting the motor 4, the motor 4 provides power to drive the spiral auger 6 to rotate, and two guide plates 17 are fixedly installed on the conveying box 5. The top ends of the two guide plates 17 are fixedly connected to the inner wall of the first working box 2. A first through hole is opened at the top of the conveying box 5, and the sludge is poured into the conveying box 5 through the first through hole through the cooperation of the two guide plates 17. A first water outlet is opened at the bottom end of the conveying box 5, and the water in the sludge is discharged through the first water outlet. The bottom end of the first working box 2 is connected and installed with a drain pipe, and the bottom end of the conveying box 5 is connected and installed with a connecting pipe 7.
[0026] See also Figure 1 The mounting plate 1 is provided with an extrusion mechanism, which includes a filter screen plate 11. The two ends of the filter screen plate 11 are respectively fixedly connected to the inner walls of the two ends of the second working box 8. The second working box 8 is fixedly installed on the top of the mounting plate 1. The second working box 8 is hinged with a box door. The treated sludge is cleaned by opening the box door. The second working box 8 is provided with a second through hole. One end of the connecting pipe 7 is connected to the second through hole. The sludge in the conveying box 5 is discharged into the second working box 8 through the connecting pipe 7 through the rotation of the spiral auger 6. The sludge in the second working box 8 accumulates to a certain capacity. When the sludge is added, an electric cylinder 9 is provided at the top of the second working box 8, and a pressing plate 10 is provided at the bottom of the electric cylinder 9. The two ends of the pressing plate 10 are respectively fitted with the inner walls of the two ends of the second working box 8. The electric cylinder 9 is started, and the pressing plate 10 is driven by the electric cylinder 9 to press down, so as to squeeze the sludge. A third through hole is provided on the outer wall of the second working box 8, and a fourth through hole is provided on the outer wall of the first working box 2. The third through hole and the fourth through hole are connected, and the squeezed water flows into the first working box 2 through the cooperation of the third through hole and the fourth through hole, and is discharged from the drain pipe.
[0027] See also Figure 1 and Figure 2A supporting mechanism is provided at the bottom end of the mounting plate 1 for supporting the mounting plate 1, and the supporting mechanism includes four supporting columns 12, and the top ends of the four supporting columns 12 are fixedly connected to the bottom end of the mounting plate 1, and the bottom ends of the four supporting columns 12 are fixedly installed with stabilizing blocks 13, and the inner end of each supporting column 12 is fixedly installed with a rib plate 14, and the top end of each rib plate 14 is fixedly connected to the bottom end of the mounting plate 1. The installation of the four supporting columns 12 and the four stabilizing blocks 13 makes the mounting plate 1 more stable, and the installation of the four rib plates 14 makes the four supporting columns 12 and the mounting plate 1 more stable.
[0028] See also Figure 1 , Figure 2 and Figure 4 A protective mechanism is provided on the outer wall of the first working box 2 for protecting the motor 4. The protective mechanism includes a protective cover 15. The protective cover 15 is fixedly mounted on the outer wall of the first working box 2. The motor 4 is located inside the protective cover 15. A plurality of heat dissipation holes are provided on the outer wall of the protective cover 15. The installation of the protective cover 15 protects the motor 4. The heat generated by the motor 4 during operation is discharged through the heat dissipation holes.
[0029] See also Figure 1 A slope 16 is provided at the inner bottom of the second working box 8, and the installation of the slope 16 serves to guide the filtered water.
[0030] See also Figure 1 and Figure 2 A support plate 18 is fixedly installed at the bottom end of the mounting plate 1, and the mounting plate 1 is supported by the installation of the support plate 18.
[0031] See also Figure 2 An observation window 19 is provided on the box door, and the installation of the observation window 19 facilitates observation of the situation inside the second working box 8.
[0032] In summary, when the sludge treatment device of the sewage treatment plant is in use, the sludge is placed in the first working box 2 through the feed hopper 3, and the sludge is poured into the conveying box 5 through the first through hole through the cooperation of the two guide plates 17. The water in the sludge is discharged through the first water outlet hole, and the motor 4 is started. This motor is a well-known device purchased directly on the market by technicians in this field. Here we just use it, and have not made any structural and functional improvements to it. We will not go into details here, and the motor is provided with a control switch matched with it. The installation position of the control switch is selected according to the actual use requirements, which is convenient for the operator to operate and control. The machine 4 provides power to drive the spiral auger 6 to rotate. The sludge in the conveying box 5 is discharged into the second working box 8 through the connecting pipe 7 through the rotation of the spiral auger 6. When the sludge in the second working box 8 accumulates to a certain capacity, the sludge is added, and the electric cylinder 9 is started. The electric cylinder 9 drives the pressing plate 10 to press down, thereby squeezing the sludge. The squeezed water is filtered through the filter plate 11, and flows into the first working box 2 through the cooperation of the third through hole and the fourth through hole, and is discharged through the drain pipe. The situation inside the second working box 8 is observed through the observation window 19. After the squeezing is completed, the treated sludge can be cleaned by opening the box door.
Claims
1. A sewage treatment plant sludge treatment device, comprising a mounting plate (1), characterized in that: A first working box (2) is fixedly mounted on the top of the mounting plate (1), a feed hopper (3) is arranged on the first working box (2), a screw conveying mechanism is arranged in the first working box (2), the screw conveying mechanism comprises a screw auger (6), a motor (4) is fixedly mounted on the outer wall of the first working box (2), a conveying box (5) is fixedly mounted in the first working box (2), a screw auger (6) is fixedly mounted on the output end of the motor (4), an end of the screw auger (6) away from the motor (4) is rotatably connected to the inner wall of the conveying box (5), two guide plates (17) are fixedly mounted on the conveying box (5), the top ends of the two guide plates (17) are fixedly connected to the inner wall of the first working box (2), a first through hole is provided at the top end of the conveying box (5), a first water outlet is provided at the bottom end of the conveying box (5), a drainage pipe is connected to the bottom end of the first working box (2), and a connecting pipe (7) is connected to the bottom end of the conveying box (5); The mounting plate (1) is provided with an extrusion mechanism, the extrusion mechanism comprising a filter screen plate (11), the two ends of the filter screen plate (11) are respectively fixedly connected to the inner walls of the two ends of the second working box (8), the second working box (8) is fixedly installed on the top of the mounting plate (1), the second working box (8) is hinged with a box door, the second working box (8) is provided with a second through hole, one end of the connecting pipe (7) is connected to the second through hole, the top of the second working box (8) is provided with an electric cylinder (9), the bottom end of the electric cylinder (9) is provided with a pressing plate (10), the two ends of the pressing plate (10) are respectively in contact with the inner walls of the two ends of the second working box (8), the outer wall of the second working box (8) is provided with a third through hole, the outer wall of the first working box (2) is provided with a fourth through hole, and the third through hole is connected to the fourth through hole; A supporting mechanism is provided at the bottom end of the mounting plate (1) for supporting the mounting plate (1); A protection mechanism is provided on the outer side wall of the first working box (2) for protecting the motor (4).
2. A sewage treatment plant sludge treatment device according to claim 1, characterized in that: The support mechanism comprises four support columns (12), the top ends of the four support columns (12) are fixedly connected to the bottom end of the mounting plate (1), the bottom ends of the four support columns (12) are fixedly mounted with a stabilizing block (13), the inner end of each support column (12) is fixedly mounted with a rib plate (14), and the top end of each rib plate (14) is fixedly connected to the bottom end of the mounting plate (1).
3. A sewage treatment plant sludge treatment device according to claim 2, characterized in that: The protection mechanism comprises a protection cover (15), the protection cover (15) is fixedly mounted on the outer wall of the first working box (2), the motor (4) is located inside the protection cover (15), and a plurality of heat dissipation holes are provided on the outer wall of the protection cover (15).
4. A sewage treatment plant sludge treatment device according to claim 3, characterized in that: A slope (16) is provided at the inner bottom end of the second working box (8).
5. A sewage treatment plant sludge treatment device according to claim 4, characterized in that: A supporting plate (18) is fixedly mounted on the bottom end of the mounting plate (1).
6. A sewage treatment plant sludge treatment device according to claim 5, characterized in that: The box door is connected and provided with an observation window (19).