Reinforcing steel bar correcting device for building construction

By introducing threaded rods and limit rods into the building construction steel bar correction device to adjust the position of the correction wheel, combining the pulley and drive motor, the problem of steel bar correction is solved, and impurities are cleaned through the clamping plate and cleaning brush, which improves the correction Efficiency and applicability.

CN222020574UInactive Publication Date: 2024-11-19申晓东
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420662567.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing building construction steel bar correction device cannot effectively adapt to steel bars of different sizes and specifications, resulting in insufficient applicability.

Method used

A device including a base plate, processing box, positioning frame, correction wheel, drive shaft and drive motor is designed. The position of the correction wheel is adjusted through threaded rods and limit rods, and the correction of steel bars of different sizes is achieved with the pulley and drive motor. And conveniently clean rust or impurities on the surface of the steel bars through the clamping plate and cleaning brush, and use the collection box to collect impurities.

Benefits of technology

It realizes effective correction of steel bars of different sizes and specifications, improves the applicability of the correction device, and conveniently cleans and collects impurities on the surface of the steel bar, improving the correction efficiency and practicality of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222020574U_ABST
    Figure CN222020574U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction steel bar correcting device, which belongs to the technical field of building steel bar processing and comprises a base plate and a processing box. The two material openings are formed in the two sides of the machining box in a penetrating mode respectively, a driving shaft is rotationally connected into the machining box, a positioning frame is arranged on the inner wall, located at the upper end of the driving shaft, of the machining box, and the positioning frame is arranged in a U shape; the positioning shaft is arranged in the positioning frame, correction wheels are arranged on the outer side of the driving shaft and the outer side of the positioning shaft, and one end of the positioning shaft penetrates through the positioning frame and the machining box and extends to the outside; according to the utility model, the threaded rod arranged at the upper end of the positioning frame is matched with the limiting rod and the abutting wheel on one side of the processing box, so that the position of the correcting wheel at the upper end can be conveniently adjusted on the premise of not influencing the rotation of the positioning shaft driven by the driving shaft; and therefore, the building construction reinforcing steel bar correcting device can correct reinforcing steel bars of different sizes and specifications, and the use applicability of the building construction reinforcing steel bar correcting device is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction steel bar processing, and in particular relates to a construction steel bar correction device. Background Art

[0002] The steel bar correction device for construction is a device used to correct the bending, convex and concave deformation of steel bars in construction. The steel bar correction device restores the shape of the steel bar to a predetermined standard state through specific mechanical or physical principles, improves the straightness and precision of the steel bar, and meets the needs of construction. Secondly, by using the steel bar correction device, the construction efficiency can be improved and the time and labor intensity of manual correction can be reduced. As an important structural material, the shape and precision of steel bars directly affect the overall quality and safety of the building. Therefore, the steel bar correction device has important application value in construction.

[0003] Chinese patent announcement number CN209918761U discloses a steel bar correction device for construction, which relates to the technical field of construction machinery, and in particular to a steel bar correction device for construction, which solves the shortcomings of the correction device in the prior art that the correction and straightening effect is poor. The invention comprises a box body, a base and a pre-correction traction device, wherein the base is arranged on one side of the box body, and a plurality of fixed connecting rods are arranged on the base, and the upper ends of the fixed connecting rods are welded to the pre-correction traction device, and the pre-correction traction device comprises a shell, a limit ring, a spring seat, a tension spring, a clamping block, a ball and a clamping groove, a processing inlet is arranged on one side of the box body, and a processing outlet is arranged on the other side, and a pre-correction traction device is arranged in the processing inlet, an upper pressing wheel and a lower pressing wheel are arranged in the box body, and the upper pressing wheel is located directly above the lower pressing wheel, a receiving plate is arranged in the box body, and the receiving plate is located below the processing inlet and the processing outlet, and the utility model can pre-correct the steel bar through the pre-correction traction device, and reduce the wear of the parts in contact with the steel bar.

[0004] In actual use, the utility model usually introduces the steel bars to be corrected into the construction steel bar correction device, and uses the pressure wheel in the device to correct the steel bars. However, the position of the pressure wheel in the utility model is fixed, so that only steel bars of fixed sizes can be corrected. When steel bars of other sizes need to be corrected, the adaptability is insufficient, which makes the applicability of the construction steel bar correction device lacking. Utility Model Content

[0005] The utility model provides a steel bar correction device for construction in order to solve the problem that it is inconvenient to correct steel bars of different sizes in the prior art.

[0006] To achieve the above purpose, the utility model provides the following technical solution: a steel bar correction device for construction, comprising:

[0007] Base plates and processing boxes;

[0008] Two material ports are respectively provided on both sides of the processing box. A driving shaft is rotatably connected in the processing box. A positioning frame is provided on the inner wall of the processing box located at the upper end of the driving shaft. The positioning frame is provided in a "U" shape.

[0009] A positioning shaft is arranged in the positioning frame, and correction wheels are arranged on the outside of the driving shaft and the positioning shaft, and one end of the positioning shaft passes through the positioning frame and the processing box and extends to the outside;

[0010] The transmission shaft is arranged at one side of the processing box. The outer sides of the positioning shaft and the transmission shaft are both provided with pulleys, and the two pulleys are provided with the same transmission belt.

[0011] As a preferred embodiment, a driving motor is provided on one side of the processing box, one end of the driving shaft passes through the processing box and extends to the outside and is arranged on the output end of the driving motor, and driving wheels are provided on the outside of the driving shaft and the transmission shaft, and the two driving wheels are meshed and connected.

[0012] As a preferred embodiment, a fixed block is provided on one side of the processing box, a limiting groove is provided on one side of the fixed block, a matching limiting rod is slidably connected in the limiting groove, one end of the limiting rod extends to the outside and is rotatably connected to a resistance wheel, one side of the resistance wheel is against one side of the transmission belt, a limiting spring is provided at the other end of the limiting rod, and the other end of the limiting spring is arranged on one side of the limiting groove.

[0013] In order to be able to correct steel bars of different sizes, further, a threaded hole is penetrated at the upper end of the processing box, a matching threaded rod is penetrated in the threaded hole, the bottom end of the threaded rod is rotatably connected to the upper end of the positioning frame, and guide rods are provided on both sides of the upper end of the positioning frame, and the two guide rods respectively penetrate the two sides of the processing box and extend to the outside.

[0014] In order to conveniently clean the rust or impurities on the outside of the steel bars, further, two clamping grooves are provided on both sides of the inner wall of the processing box, and two matching clamping plates are provided in the two clamping grooves on the same side, and cleaning brushes are provided on the opposite sides of the two clamping plates on both sides, and compression springs are provided at both ends of the clamping plates, and the other end of the compression spring is arranged on one side of the clamping groove.

[0015] As a preferred embodiment, a mounting groove is provided on one side of the processing box, a matching collection box is provided in the mounting groove, and one end of the collection box passes through the mounting groove and extends to the outside.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] 1. The utility model, through the threaded rod arranged at the upper end of the positioning frame, cooperates with the limit rod and the abutment wheel on one side of the processing box, can conveniently adjust the position of the correction wheel at the upper end without affecting the rotation of the positioning shaft driven by the driving shaft, so that the steel bar correction device for construction can correct steel bars of different sizes and specifications, making the applicability of the steel bar correction device for construction better;

[0018] 2. The utility model, through two clamping plates and two cleaning brushes arranged on both sides of the processing box, can conveniently clean the rust or impurities on the outside of the steel bars when correcting them, and collect them through the collection box, so that the practicality of the steel bar correction device for construction is better. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the front cross-section of the structure of the utility model;

[0020] Figure 2 It is a side cross-sectional schematic diagram of the structure of the utility model;

[0021] Figure 3 It is a side cross-sectional schematic diagram of the clamping groove of the structure of the utility model;

[0022] Figure 4 for Figure 1 A schematic diagram of the enlarged structure at point A in the middle.

[0023] In the figure: 1. base plate; 2. processing box; 3. material opening; 4. driving shaft; 5. positioning frame; 6. positioning shaft; 7. correction wheel; 8. transmission shaft; 9. transmission belt; 10. driving motor; 11. driving wheel; 12. fixing block; 13. limiting rod; 14. resistance wheel; 15. limiting spring; 16. threaded rod; 17. guide rod; 18. clamping plate; 19. cleaning brush; 20. compression spring; 21. collecting box. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0025] Embodiment 1:

[0026] See also Figure 1-4 The utility model provides a steel bar correction device for construction, comprising:

[0027] Base plate 1 and processing box 2;

[0028] Two material ports 3 are respectively provided on both sides of the processing box 2. A driving shaft 4 is rotatably connected in the processing box 2. A positioning frame 5 is provided on the inner wall of the processing box 2 located at the upper end of the driving shaft 4. The positioning frame 5 is provided in a "U" shape.

[0029] The positioning shaft 6 is arranged in the positioning frame 5. The driving shaft 4 and the positioning shaft 6 are both provided with correction wheels 7 on the outside. One end of the positioning shaft 6 passes through the positioning frame 5 and the processing box 2 and extends to the outside.

[0030] The transmission shaft 8 is arranged at one side of the processing box 2. Pulleys are arranged on the outer sides of the positioning shaft 6 and the transmission shaft 8. The two pulleys are provided with the same transmission belt 9.

[0031] Specifically, Figure 1 , Figure 2 and Figure 4 As shown, a driving motor 10 is provided on one side of the processing box 2. The driving motor 10 is a prior art and will not be described in detail here. One end of the driving shaft 4 passes through the processing box 2 and extends to the outside, and is arranged on the output end of the driving motor 10. Driving wheels 11 are provided on the outside of the driving shaft 4 and the transmission shaft 8. The two driving wheels 11 are meshed and connected. The two driving wheels 11 can make the driving shaft 4 and the transmission shaft 8 turn in opposite directions, so that the correction wheel 7 on the outside of the driving shaft 4 and the correction wheel 7 on the outside of the positioning shaft 6 can turn in opposite directions.

[0032] Specifically, Figure 1 and Figure 4 As shown, a fixed block 12 is provided on one side of the processing box 2, and a limiting groove is provided on one side of the fixed block 12. A matching limiting rod 13 is slidably connected in the limiting groove. One end of the limiting rod 13 extends to the outside and is rotatably connected to a contact wheel 14. One side of the contact wheel 14 is against one side of the transmission belt 9. The contact wheel 14 can limit the position of the transmission belt 9 without affecting the movement of the transmission belt 9. A limiting spring 15 is provided on the other end of the limiting rod 13, and the other end of the limiting spring 15 is arranged on one side of the limiting groove. The limiting spring 15 can limit the position of the contact wheel 14 so that it can always be against one side of the transmission belt 9, so that the transmission shaft 8 can drive the positioning shaft 6 to rotate when the positioning shaft 6 is in different positions.

[0033] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, a threaded hole is penetrated at the upper end of the processing box 2, and a matching threaded rod 16 is penetrated in the threaded hole. The bottom end of the threaded rod 16 is rotatably connected to the upper end of the positioning frame 5. Guide rods 17 are provided on both sides of the upper end of the positioning frame 5. The two guide rods 17 respectively penetrate the two sides of the processing box 2 and extend to the outside.

[0034] Through its design, the positioning frame 5 can be driven to move up and down by rotating the threaded rod 16, thereby driving the positioning shaft 6 and the correction wheel 7 at the upper end to move, so that the construction steel bar correction device can correct steel bars of different sizes. The two guide rods 17 can limit the moving position of the positioning frame 5 to prevent it from rotating with the threaded rod 16.

[0035] See also Figure 1-4 When using the construction steel bar correction device to correct the steel bars, it is first necessary to rotate the threaded rod 16 according to the size of the steel bars. The threaded rod 16 will drive the positioning frame 5 to move up and down, and the positioning frame 5 will drive the positioning shaft 6 and the correction wheel 7 at the upper end to move. Then the steel bars are introduced between the two correction wheels 7 in the processing box 2, and then the drive motor 10 is started. The output end of the drive motor 10 will drive the drive shaft 4 to rotate, and the drive shaft 4 will drive the transmission shaft 8 to rotate in the opposite direction through the two drive wheels 11. The transmission shaft 8 will drive the positioning shaft 6 to rotate through the transmission belt 9, thereby driving the two correction wheels 7 to rotate relative to each other, so that the construction steel bar correction device can correct steel bars of different sizes.

[0036] Embodiment 2:

[0037] See also Figure 1-4 The utility model provides a steel bar correction device for construction, comprising:

[0038] Base plate 1 and processing box 2;

[0039] Two material ports 3 are respectively provided on both sides of the processing box 2. A driving shaft 4 is rotatably connected in the processing box 2. A positioning frame 5 is provided on the inner wall of the processing box 2 located at the upper end of the driving shaft 4. The positioning frame 5 is provided in a "U" shape.

[0040] The positioning shaft 6 is arranged in the positioning frame 5. The driving shaft 4 and the positioning shaft 6 are both provided with correction wheels 7 on the outside. One end of the positioning shaft 6 passes through the positioning frame 5 and the processing box 2 and extends to the outside.

[0041] The transmission shaft 8 is arranged at one side of the processing box 2. Pulleys are arranged on the outer sides of the positioning shaft 6 and the transmission shaft 8. The two pulleys are provided with the same transmission belt 9.

[0042] Specifically, Figure 3 As shown, two clamping grooves are provided on both sides of the inner wall of the processing box 2, and two matching clamping plates 18 are provided in the two clamping grooves on the same side. Cleaning brushes 19 are provided on the opposite sides of the two clamping plates 18 on both sides, and compression springs 20 are provided at both ends of the clamping plates 18, and the other end of the compression spring 20 is arranged on one side of the clamping groove.

[0043] Through its design, by setting two clamping plates 18 and two cleaning brushes 19 on both sides of the processing box 2, cooperating with the compression springs 20 on both sides of the clamping plates 18, the construction steel bar correction device can conveniently clean the rust or impurities on the surface of the steel bar when correcting the steel bar.

[0044] Specifically, Figure 2 and Figure 3 As shown, a mounting groove is provided on one side of the processing box 2, and a matching collecting box 21 is provided in the mounting groove. One end of the collecting box 21 passes through the mounting groove and extends to the outside. Through the detachable collecting box 21, the cleaned rust or impurities can be conveniently collected and processed.

[0045] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A steel bar correction device for construction, characterized in that: include: Base plate (1) and processing box (2); Two material ports (3) are respectively provided on both sides of the processing box (2); a driving shaft (4) is rotatably connected inside the processing box (2); a positioning frame (5) is provided on the inner wall of the processing box (2) located at the upper end of the driving shaft (4); and the positioning frame (5) is provided in a "U" shape; A positioning shaft (6) is arranged in the positioning frame (5), and correction wheels (7) are arranged outside the driving shaft (4) and the positioning shaft (6). One end of the positioning shaft (6) passes through the positioning frame (5) and the processing box (2) and extends to the outside; The transmission shaft (8) is arranged on one side of the processing box (2), and belt pulleys are arranged on the outer sides of the positioning shaft (6) and the transmission shaft (8), and the two belt pulleys are provided with the same transmission belt (9).

2. A construction steel bar correction device according to claim 1, characterized in that: A driving motor (10) is provided on one side of the processing box (2); one end of the driving shaft (4) passes through the processing box (2) and extends to the outside and is arranged on the output end of the driving motor (10); driving wheels (11) are provided on the outside of the driving shaft (4) and the transmission shaft (8); and the two driving wheels (11) are meshed and connected.

3. A construction steel bar correction device according to claim 1, characterized in that: A fixing block (12) is provided on one side of the processing box (2), and a limiting groove is provided on one side of the fixing block (12). A matching limiting rod (13) is slidably connected in the limiting groove. One end of the limiting rod (13) extends to the outside and is rotatably connected to a contact wheel (14). One side of the contact wheel (14) contacts one side of the transmission belt (9). A limiting spring (15) is provided on the other end of the limiting rod (13), and the other end of the limiting spring (15) is arranged on one side of the limiting groove.

4. A construction steel bar correction device according to claim 1, characterized in that: A threaded hole is provided at the upper end of the processing box (2), a matching threaded rod (16) is provided in the threaded hole, the bottom end of the threaded rod (16) is rotatably connected to the upper end of the positioning frame (5), guide rods (17) are provided on both sides of the upper end of the positioning frame (5), and the two guide rods (17) respectively pass through both sides of the processing box (2) and extend to the outside.

5. A construction steel bar correction device according to claim 1, characterized in that: Two clamping grooves are provided on both sides of the inner wall of the processing box (2), two matching clamping plates (18) are provided in the two clamping grooves on the same side, cleaning brushes (19) are provided on opposite sides of the two clamping plates (18) on both sides, compression springs (20) are provided at both ends of the clamping plates (18), and the other end of the compression spring (20) is arranged on one side of the clamping groove.

6. A steel bar correction device for construction according to claim 1, characterized in that: A mounting groove is provided on one side of the processing box (2), a matching collection box (21) is provided in the mounting groove, and one end of the collection box (21) passes through the mounting groove and extends to the outside.