Rainwater and sewage pipeline hoisting transportation and butt joint device based on municipal engineering
By designing a device including a U-shaped lifting and mounting positioning structure and a pipe body limiting structure, the problem of cumbersome slipping and binding and dismantling ropes during concrete pipeline lifting is solved, and efficient and stable pipeline installation and joint quality is achieved.
Patent Information
- Application Number
- CN202323574957.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-27
AI Technical Summary
In the prior art, concrete pipes are prone to slip and overturn during lifting, the rope binding process is complicated, the operation efficiency is low, and the position adjustment and docking cannot be assisted with lifting equipment, resulting in difficult installation quality.
A device including a U-shaped lifting and clamping structure, a hanging hole plate seat structure, a pin lock structure, a lifting rope body and a pipe body limit structure is designed. The lifting and clamping structure are hung with a concrete pipe body, and the lifting and clamping are used to hang. The orifice plate seat and pin locks realize lifting assembly, and the pipe body limit structure ensures horizontal installation of the pipeline.
Improves the quality and efficiency of concrete pipeline installation, simplifies operation, is suitable for pipes of all diameters, reduces manual investment, and ensures horizontal installation and joint quality of pipelines.
Smart Images

Figure CN222023896U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of municipal engineering, and in particular to a rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering. Background Art
[0002] At present, concrete pipes are commonly used in underground rainwater and sewage pre-buried pipes for municipal engineering. During the installation and construction of current concrete pipes, rope buckles are usually used to tie and hoist the concrete pipes into the pre-buried trenches, and the pipes are adjusted to a horizontal state with manual assistance, and then spliced and installed in sequence. Although the above construction method can meet the construction requirements to a certain extent, it is easy to slip and overturn during the pipe hoisting process, resulting in damage to the concrete pipe. At the same time, the process of tying and removing the ropes for the pipes is cumbersome and inconvenient, the operation efficiency is too low, and after the ropes are removed, the pipes still need to be manually adjusted and docked, and there is no assistance from the lifting equipment. Ultimately, it is easy to make it difficult for the concrete pipe to maintain a horizontal straightness, and the quality of the socket-type joints is difficult to effectively control. Utility Model Content
[0003] To this end, the utility model provides a rainwater and sewage pipe lifting, transportation and docking device based on municipal engineering to solve the technical problems in the prior art that when lifting concrete pipes by rope buckles, they are prone to slippage, overturning and damage, and the rope tying and untying procedures are cumbersome and inconvenient, the operating efficiency is too low, and the pipes still need to be manually adjusted and docked after the ropes are removed, without the assistance of lifting equipment, and the overall docking quality is difficult to control.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering, comprising:
[0006] The hoisting clamping structure is set as a U-shaped structure frame for hanging the concrete pipe body;
[0007] The hanging hole plate seat structure is fixedly assembled at the top position of the hanging clamping structure, and the hanging hole plate seat structure has a plurality of hanging hole positions arranged at intervals.
[0008] On the basis of the above technical solution, the utility model is further described as follows:
[0009] As a further solution of the utility model, the hoisting clamping structure includes a side arm, an upper arm and a lower arm;
[0010] One end of the upper arm is fixedly connected to one end of the side arm, and the angle between the straight extension direction of the upper arm and the straight extension direction of the side arm is 90°;
[0011] One end of the lower arm is fixedly connected to the other end of the side arm, and the angle between the linear extension direction of the lower arm and the linear extension direction of the side arm is 90°.
[0012] As a further solution of the utility model, the extension length of the lower support arm is greater than the extension length of the upper support arm.
[0013] As a further solution of the utility model, the inner walls of the side support arm, the upper support arm and the lower support arm are fixedly covered with a rubber cushion layer.
[0014] As a further solution of the utility model, the hanging hole plate seat structure includes a plate seat body and a hanging hole position;
[0015] The plate seat body is fixedly mounted on the top of the upper support arm, and a plurality of hoisting holes are arranged on the plate seat body at intervals along the extending direction of the upper support arm.
[0016] As a further solution of the present utility model, the plate seat body is fixedly assembled at a top position on a side of the upper support arm away from the side support arm.
[0017] As a further solution of the utility model, it also includes:
[0018] A pin lock structure, wherein the removable lock is fixedly connected to one of the hoisting holes of the plate base body;
[0019] One end of the hoisting rope is detachably fixedly assembled with the pin lock structure.
[0020] As a further solution of the utility model, it also includes:
[0021] The tube body limiting structure has a pressed end portion;
[0022] The pipe body limiting structure is slidably assembled on the upper support arm, and the pressing end portion is detachably pressed on the concrete pipe body.
[0023] As a further solution of the utility model, the tube body limiting structure includes a sliding guide rail, a limiting slide seat and a positioning screw;
[0024] The sliding guide rails are fixedly mounted on both sides of the upper support arm in a vertical direction;
[0025] The limiting slide is configured as a U-shaped seat body, and the two side portions of the U-shaped limiting slide are respectively and one-to-one correspondingly mounted on the two sets of the sliding guide rails along the vertical sliding direction;
[0026] The adjusting screw rod is screwed and assembled on the upper support arm and the bottom middle part of the U-shaped limiting sliding seat in sequence.
[0027] As a further solution of the utility model, the bottom surface of the position-limiting slide is provided with an adapting arc surface serving as the pressing end.
[0028] The utility model has the following beneficial effects:
[0029] 1. The device has a simple and reliable structure and can improve the quality of concrete pipe docking installation;
[0030] 2. Easy operation, which helps to reduce labor input and improve the installation efficiency of concrete pipes;
[0031] 3. The device is widely used and suitable for concrete pipes of various diameters, which is conducive to reducing investment;
[0032] 4. It is easier to keep the concrete pipe horizontal during the installation of the pipe body, which makes it easier to install and improves the installation quality of the concrete pipe joints;
[0033] 5. The device can also be extended to the installation and construction of other pipe-type prefabricated concrete components. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the implementation methods of the utility model or the technical solutions in the prior art, the drawings required for the implementation methods or the description of the prior art will be briefly introduced below. The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical contents disclosed in the utility model without affecting the effects and purposes that can be achieved by the utility model.
[0035] Figure 1 This is one of the overall side view structural schematic diagrams of the rainwater and sewage pipe lifting, transportation and docking device based on municipal engineering provided in Example 1 of the utility model.
[0036] Figure 2 This is the second overall side view structural schematic diagram of the rainwater and sewage pipe lifting, transportation and docking device based on municipal engineering provided in Example 1 of the utility model.
[0037] Figure 3 This is one of the schematic diagrams of the usage status of the rainwater and sewage pipe lifting, transportation and docking device based on municipal engineering provided in Example 1 of the utility model.
[0038] Figure 4 The second schematic diagram of the structure of the use status of the rainwater and sewage pipe lifting, transportation and docking device based on municipal engineering provided in Example 1 of the utility model.
[0039] Figure 5This is a schematic diagram of the usage status of the rainwater and sewage pipe lifting, transportation and docking device based on municipal engineering provided in Example 2 of the utility model.
[0040] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0041] Lifting clamping structure 1: side arm 11, upper arm 12, lower arm 13;
[0042] Hanging hole plate seat structure 2: plate seat body 21, hanging hole position 22;
[0043] Pin lock structure 3; Hoisting rope body 4;
[0044] The tube body limiting structure 5 includes a sliding guide rail 51 , a limiting slide seat 52 , and a positioning screw 53 .
[0045] Concrete pipe body a. DETAILED DESCRIPTION
[0046] The following is a specific embodiment of the present invention. People familiar with the technology can easily understand the other advantages and functions of the present invention from the contents disclosed in this specification. Obviously, the described embodiment is a part of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] The terms such as "upper", "lower", "left", "right", and "middle" used in this specification are only for the convenience of description and are not intended to limit the scope of the present invention. Changes or adjustments to their relative relationships shall be deemed to be within the scope of the present invention without substantially changing the technical content.
[0048] Example 1
[0049] like Figures 1 to 4As shown, the embodiment of the utility model provides a rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering, including a hoisting clamping structure 1, a hanging hole plate seat structure 2, a pin shaft locking structure 3 and a hoisting rope body 4, which are used to effectively realize the established hanging clamping function through the cooperation between the hoisting clamping structure 1 and the pipe wall of the concrete pipe body a. At the same time, the pin shaft locking structure 3 can be used to cooperate with the hoisting rope body 4 to form a lifting and assembly function, so that the hoisting clamping structure 1 and the concrete pipe body a hung thereon can be effectively lifted based on the hanging hole plate seat structure 2 through the lifting and assembly function. In addition, the lifting and assembly position can be flexibly adjusted according to the outer diameter and weight of the concrete pipe body a to be docked with the help of several hole positions of the hanging hole plate seat structure 2, so that it is easier to ensure its horizontal state when the pipe body is hoisted, thereby facilitating the precise installation of the concrete pipe body a, significantly improving the convenience of operation and construction efficiency, and enhancing the overall functional practicality of the device. The specific settings are as follows:
[0050] Please refer to Figures 1 to 4 The hoisting and clamping structure 1 includes a side support arm 11, an upper support arm 12 and a lower support arm 13; wherein, one end of the upper support arm 12 is fixedly connected to one end of the side support arm 11, and the angle between the straight extension direction of the upper support arm 12 and the straight extension direction of the side support arm 11 is 90°; one end of the lower support arm 13 is fixedly connected to the other end of the side support arm 11, and the angle between the straight extension direction of the lower support arm 13 and the straight extension direction of the side support arm 11 is 90°; this arrangement is used to make the hoisting and clamping structure 1 effectively form a U-shaped structure frame with a hoisting and clamping groove, and then the U-shaped structure frame and its hoisting and clamping groove can be used in conjunction with the pipe wall of the concrete pipe body a to form a predetermined hanging and clamping function, thereby ensuring functional practicality.
[0051] As a preferred solution of this embodiment, the extension length of the lower support arm 13 is greater than the extension length of the upper support arm 12, so as to effectively increase the supporting distance of the lower support arm 13 to the inner wall of the concrete pipe body a, thereby helping to improve the assembly stability when hanging and clamping the concrete pipe body a.
[0052] As another preferred scheme of this embodiment, the inner walls of the side arm 11, the upper arm 12 and the lower arm 13 are fixedly covered with a rubber pad layer with a thickness of 10 mm, so as to utilize the friction properties of the rubber pad layer to further significantly improve the assembly stability when the concrete pipe body a is hung and clamped.
[0053] It should be noted that, as an optional solution of this embodiment, the side support arm 11, the upper support arm 12 and the lower support arm 13 are all 0# I-beams, and the length of the lower support arm 13 is set to 1000 mm, the length of the side support arm 11 is set to 320 mm, and the length of the upper support arm 12 is set to 850 mm.
[0054] Please continue to refer to Figures 1 to 4 The hanging hole plate seat structure 2 includes a plate seat body 21 and hanging holes 22; wherein, the plate seat body 21 is fixedly assembled at the top position of the side of the upper support arm 12 away from the side support arm 11, and the plate seat body 21 is provided with a plurality of hanging holes 22 spaced apart along the extension direction of the upper support arm 12, so that the lifting and assembly position can be flexibly adjusted according to the outer diameter and weight of the concrete pipe body a to be docked and hoisted by utilizing the plurality of hanging holes 22, so that it is easier to adjust the concrete pipe body a to a horizontal state when hoisting it, thereby facilitating the subsequent precise docking and installation of the concrete pipe body a.
[0055] The pin shaft locking structure 3 is detachably locked and fixedly connected to one of the lifting holes 22 of the plate seat body 21, one end of the lifting rope body 4 is detachably fixedly assembled with the pin shaft locking structure 3, and the other end of the lifting rope body 4 is detachably fixedly assembled with an external lifting equipment, so as to complete the lifting and hoisting of the concrete pipe body a.
[0056] Example 2
[0057] In Example 2, the same symbols are given to the same structures as in Example 1, and the same descriptions are omitted. Example 2 is improved on the basis of Example 1, please refer to Figure 5 , also includes a tube body limiting structure 5, the tube body limiting structure 5 includes a sliding guide rail 51, a limiting slide seat 52 and an adjusting screw 53; wherein, the sliding guide rail 51 is vertically fixedly assembled on both side parts of the upper support arm 12; the limiting slide seat 52 is set as a U-shaped seat body, and the two side parts of the U-shaped limiting slide seat 52 are respectively and one by one vertically slidably assembled on two groups of the sliding guide rails 51, and the bottom surface of the limiting slide seat 52 is provided with an adapting camber; the adjusting screw 53 is screwed and assembled on the middle part of the bottom side of the upper support arm 12 and the U-shaped limiting slide seat 52 in sequence; it is used to further press and limit it after being hung on the concrete tube body a through the limiting slide seat 52 and its bottom adapting camber surface, and the sliding position of the limiting slide seat 52 can be adjusted by the rotation control of the adjusting screw 53, which significantly improves the functional practicality.
[0058] Although the utility model has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the utility model. Therefore, these modifications or improvements made without departing from the spirit of the utility model are within the scope of protection claimed by the utility model.
Claims
1. A rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering, characterized in that: include: The hoisting clamping structure is set as a U-shaped structure frame for hanging the concrete pipe body; A hanging hole plate seat structure is fixedly assembled at the top position of the hanging clamping structure, and the hanging hole plate seat structure has a plurality of hanging holes arranged at intervals; The hoisting clamping structure comprises a side arm, an upper arm and a lower arm; One end of the upper arm is fixedly connected to one end of the side arm, and the angle between the straight extension direction of the upper arm and the straight extension direction of the side arm is 90°; One end of the lower arm is fixedly connected to the other end of the side arm, and the angle between the straight extension direction of the lower arm and the straight extension direction of the side arm is 90°; The municipal engineering-based rainwater and sewage pipe hoisting, transportation and docking device further includes: The tube body limiting structure has a pressed end portion; The pipe body limiting structure is slidably assembled on the upper support arm, and the pressing end portion is detachably pressed on the concrete pipe body.
2. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 1 is characterized in that: The extension length of the lower arm is greater than the extension length of the upper arm.
3. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 1 is characterized in that: The inner walls of the side support arm, the upper support arm and the lower support arm are all fixedly covered with a rubber cushion layer.
4. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 1 is characterized in that: The hanging hole plate seat structure includes a plate seat body and hanging holes; The plate seat body is fixedly mounted on the top of the upper support arm, and a plurality of hoisting holes are arranged on the plate seat body at intervals along the extending direction of the upper support arm.
5. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 4 is characterized in that: The plate seat body is fixedly assembled at a top position of a side of the upper support arm away from the side support arm.
6. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 4 is characterized in that: Also includes: A pin lock structure, wherein the removable lock is fixedly connected to one of the hoisting holes of the plate base body; One end of the hoisting rope is detachably fixedly assembled with the pin lock structure.
7. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 1 is characterized in that: The pipe body limiting structure includes a sliding guide rail, a limiting sliding seat and a positioning screw; The sliding guide rails are fixedly mounted on both sides of the upper support arm in a vertical direction; The limiting slide is configured as a U-shaped seat body, and the two side portions of the U-shaped limiting slide are respectively and one-to-one correspondingly mounted on the two sets of the sliding guide rails along the vertical sliding direction; The adjusting screw rod is screwed and assembled on the upper support arm and the bottom middle part of the U-shaped limiting sliding seat in sequence.
8. The rainwater and sewage pipe hoisting, transportation and docking device based on municipal engineering according to claim 7 is characterized in that: The bottom surface of the position-limiting slide is provided with an adapting cambered surface serving as the pressing end.