Fluidized bed device
Through parallel and series operation of the fluidized bed device, the quartz sand crystal-induced crystal carrier and chemical agent are used to solve the problem of high moisture content of suspended bodies in industrial water treatment, and the treatment efficiency and convenience of resource recovery are improved.
Patent Information
- Application Number
- CN202420629450.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-28
AI Technical Summary
In the prior art, when chemical methods are used to treat industrial water, the suspension formed by the elements to be recovered is low in treatment efficiency and high moisture content, resulting in a reduction in industrial water treatment efficiency and difficult to recover resources.
A fluidized bed device is designed, through a fluidized bed system operated in parallel and in series, using quartz sand as a crystal-induced crystal carrier, combined with the addition of a chemical agent, the adhesion of elements to be recovered and the softening of water is reduced, and the moisture content of the suspension is reduced.
It improves the efficiency and effectiveness of industrial water treatment, reduces the moisture content of elements to be recovered, simplifies the resource recycling process, and flexibly responds to changes in water volume and water quality.
Smart Images

Figure CN222024186U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of industrial water treatment, and more specifically relates to a fluidized bed device. Background Art
[0002] Nonferrous metal smelting, power battery production and recycling, coal chemical industry, chemical raw material synthesis, monocrystalline silicon production, display panel production, solar panel production, etc. will produce a large amount of industrial water. On the one hand, these industrial waters need to be softened when they are deeply treated. On the other hand, these industrial waters contain elements with recycling value, such as cobalt, lithium, nickel, and fluorine.
[0003] Currently, only chemical methods are used to treat the above industrial water, and the elements to be recovered form a suspension. Although the clarified water quality can meet the treatment requirements of this stage, the sedimentation time is too long and the water content of the suspension is too high. Therefore, not only the industrial water treatment efficiency is reduced, but the suspension is also difficult to further process and recycle. Utility Model Content
[0004] The utility model aims to provide a fluidized bed device to solve the problem that the method of using chemical method to treat industrial water by clarifying the suspension formed by the elements to be recovered in the prior art has low treatment efficiency and high water content of the suspension.
[0005] In order to achieve the above object, the utility model provides a fluidized bed device, comprising:
[0006] Raw water storage equipment for storing water to be treated;
[0007] At least two fluidized beds, each of which is connected to the raw water storage device via a first conveying unit, and each of which is provided with a crystal-inducing carrier adding port for adding a crystal-inducing carrier into the fluidized bed so that the elements to be recovered adhere to the surface of the crystal-inducing carrier, and the crystal-inducing carrier is quartz sand;
[0008] a second conveying unit, one end of which is connected to the water outlet of one of the fluidized beds, and the other end of which is connected to the water inlet of another of the fluidized beds, so as to connect at least two of the fluidized beds in sequence;
[0009] A dosing unit is used to add reagents into the fluidized bed, the crystal-inducing carrier can allow crystal particles formed by the element to be recovered and the reagent to adhere to the surface of the crystal-inducing carrier, and / or the reagent can adjust the hardness of the water to be treated.
[0010] Optionally, each of the fluidized beds is connected to a produced water storage device, the produced water storage device is provided with a water outlet pipeline, and the water outlet pipeline is provided with a produced water valve.
[0011] Optionally, one end of the second delivery unit is connected to the water outlet pipeline.
[0012] Optionally, the first delivery unit includes a water inlet pipeline, and a water inlet valve and a water inlet pump are provided on the water inlet pipeline.
[0013] Optionally, the second delivery unit includes a connecting pipeline, the connecting pipeline is connected to the water inlet pipeline located downstream of the water inlet valve and upstream of the water inlet pump, and a connecting valve is provided on the connecting pipeline.
[0014] Optionally, each of the fluidized beds is connected to a circulation container via a circulation pipeline, and a circulation pump is provided on the circulation pipeline.
[0015] Optionally, the dosing unit comprises a first drug storage device, the first drug storage device is connected to each of the fluidized beds via a dosing pipeline, and each of the dosing pipelines is provided with a dosing pump.
[0016] The utility model provides a fluidized bed device, which has the beneficial effects of: the fluidized bed device can realize parallel and series operation of at least two fluidized beds through the arrangement of a first conveying unit and a second conveying unit. When the at least two fluidized beds are used in parallel, they can meet the working conditions with lower treatment effect requirements and improve the treatment rate. When the at least two fluidized beds are used in series, they can meet the working conditions with higher treatment effect requirements and improve the treatment effect. A crystal-inducing carrier can be added to the fluidized bed through a crystal-inducing carrier addition port, and medicine can be added to the fluidized bed through a medicine adding unit. After the medicine is added, not only can the crystals formed by the element to be recovered be attached to the surface of the crystal-inducing carrier to achieve the recovery of the element to be recovered, but also the softness of industrial water can be adjusted to achieve the softening of the industrial water. The fluidized bed device can flexibly respond to changes in water volume and water quality through the arrangement of parallel and series operation. At the same time, the fluidized bed device improves the clarification speed of the water to be treated and reduces the water content of the crystal particles of the element to be recovered by adding the crystal-inducing carrier in the fluidized bed, thereby eliminating the dehydration process.
[0017] Other features and advantages of the present invention will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present invention.
[0019] Figure 1 A schematic structural diagram of a fluidized bed device according to an embodiment of the utility model is shown.
[0020] Description of reference numerals:
[0021] 1. The first fluidized bed; 2. The second fluidized bed; 3. The third fluidized bed; 4. The first water storage device; 5. The second water storage device; 6. The third water storage device; 7. The first circulation container; 8. The second circulation container; 9. The third circulation container; 10. The first circulation pump; 11. The second circulation pump; 12. The third circulation pump; 13. The first water inlet pump; 14. The second water inlet pump; 15. The third water inlet pump; 16. The first dosing pump; 17. The second dosing pump; 18. The third dosing pump; 19. The auxiliary dosing pump; 20. The raw water storage tank; 21. The first drug storage tank; 22. The second drug storage tank; 23. The first connecting valve; 24. The second connecting valve; 25. The second water inlet valve; 26. The third water inlet valve; 27. The first water valve; 28. The second water valve; 29. The third water valve; 30. The first water valve. DETAILED DESCRIPTION
[0022] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.
[0023] like Figure 1 As shown, the utility model provides a fluidized bed device, comprising:
[0024] Raw water storage equipment for storing water to be treated;
[0025] At least two fluidized beds, each fluidized bed is connected to the raw water storage device through a first conveying unit, each fluidized bed is provided with a crystal-inducing carrier feeding port, which is used to feed the crystal-inducing carrier into the fluidized bed so that the elements to be recovered adhere to the surface of the crystal-inducing carrier, and the crystal-inducing carrier is quartz sand;
[0026] A second conveying unit, one end of which is connected to the water outlet of one fluidized bed, and the other end of which is connected to the water inlet of another fluidized bed, so as to connect at least two fluidized beds in sequence;
[0027] The dosing unit is used to add reagents into the fluidized bed. The crystal-inducing carrier can allow crystal particles formed by the elements to be recovered and the reagents to adhere to the surface of the crystal-inducing carrier, and / or the reagents can adjust the hardness of the water to be treated.
[0028] Specifically, in order to solve the problem that the suspension formed by clarifying the elements to be recovered when treating industrial water by chemical methods in the prior art is not only low in treatment efficiency but also has a high water content in the suspension, the fluidized bed device provided by the utility model can realize the parallel and series operation of at least two fluidized beds through the arrangement of the first conveying unit and the second conveying unit. When the at least two fluidized beds are used in parallel, the working conditions with lower treatment effect requirements can be met and the treatment rate can be improved. When the at least two fluidized beds are used in series, the working conditions with higher treatment effect requirements can be met and the treatment effect can be improved. The crystal-inducing carrier can be added to the fluidized bed through the body feeding port, and the medicine can be added to the fluidized bed through the dosing unit. After the medicine is added, not only can the crystals formed by the elements to be recovered be attached to the surface of the crystal-inducing carrier to achieve the recovery of the elements to be recovered, but also the softness of industrial water can be adjusted to soften the industrial water; the fluidized bed device can flexibly respond to changes in water volume and water quality through the setting of parallel and series operations. At the same time, the fluidized bed device increases the clarification speed of the water to be treated and reduces the water content of the crystal particles of the elements to be recovered by adding crystal-inducing carriers in the fluidized bed, thereby eliminating the dehydration process.
[0029] Optionally, 2-5 fluidized beds are provided.
[0030] In this embodiment, three fluidized beds are provided, namely a first fluidized bed 1 , a second fluidized bed 2 and a third fluidized bed 3 .
[0031] Optionally, each fluidized bed is connected to a produced water storage device, the produced water storage device is provided with a water outlet pipeline, and the water outlet pipeline is provided with a produced water valve.
[0032] Specifically, the water outlet end of the fluidized bed is connected to the produced water storage device, and the produced water storage device outputs the produced water through the water outlet pipeline.
[0033] In this embodiment, the produced water storage device includes a first produced water storage device 4, a second produced water storage device 5 and a third produced water storage device 6. The first produced water storage device 4, the second produced water storage device 5 and the third produced water storage device 6 are respectively provided with a first water outlet pipeline, a second water outlet pipeline and a third water outlet pipeline. The first water outlet pipeline, the second water outlet pipeline and the third water outlet pipeline are respectively provided with a first water production valve 27, a second water production valve 28 and a third water production valve 29.
[0034] Optionally, one end of the second delivery unit is connected to the water outlet pipeline.
[0035] Specifically, one end of the second conveying unit is connected to the water outlet end of a fluidized bed through a water outlet pipeline on the water production storage device, so that the water produced by one fluidized bed can be conveyed into another fluidized bed to form a series connection of fluidized beds.
[0036] Optionally, the first delivery unit includes a water inlet pipeline, and a water inlet valve and a water inlet pump are arranged on the water inlet pipeline.
[0037] Specifically, the water inlet pipeline connects the raw water storage device and the fluidized bed, the water to be treated is transported by the water inlet pump, and the water inlet pipeline is controlled to be on and off by the water inlet valve.
[0038] In this embodiment, the water inlet pipeline includes a first water inlet pipeline, a second water inlet pipeline and a third water inlet pipeline, and the first water inlet pipeline, the second water inlet pipeline and the third water inlet pipeline are respectively provided with a first water inlet valve 30, a second water inlet valve 25 and a third water inlet valve 26, and the first water inlet pipeline, the second water inlet pipeline and the third water inlet pipeline are respectively provided with a first water inlet pump 13, a second water inlet pump 14 and a third water inlet pump 15.
[0039] Optionally, the second delivery unit includes a connecting pipeline, the connecting pipeline is connected to the water inlet pipeline downstream of the water inlet valve and upstream of the water inlet pump, and a connecting valve is arranged on the connecting pipeline.
[0040] Specifically, one end of the connecting pipeline is connected to the outlet pipeline of one fluidized bed, and the other end of the connecting pipeline is connected to the inlet pipeline of another fluidized bed. The connection and disconnection of the connecting pipeline can be controlled by the connecting valve.
[0041] In this embodiment, the connecting pipeline includes a first connecting pipeline and a second connecting pipeline. The first connecting pipeline is connected to the first water outlet pipeline and the second water inlet pipeline. The second connecting pipeline is connected to the second water outlet pipeline and the third water inlet pipeline. The first connecting pipeline and the second connecting pipeline are respectively provided with a first connecting valve 23 and a second connecting valve 24.
[0042] Optionally, each fluidized bed is connected to a circulation container via a circulation pipeline, and a circulation pump is provided on the circulation pipeline.
[0043] Specifically, the circulation container is used to receive water overflowing from the fluidized bed and supply water to the circulation pump to achieve circulation treatment of the water to be treated in the fluidized bed.
[0044] In this embodiment, the circulation container includes a first circulation container 7, a second circulation container 8 and a third circulation container 9, and the first circulation container 7, the second circulation container 8 and the third circulation container 9 are connected to the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 through the first circulation pipeline, the second circulation pipeline and the third circulation pipeline respectively.
[0045] Optionally, the dosing unit includes a first drug storage device, which is connected to each fluidized bed through a dosing pipeline, and each dosing pipeline is provided with a dosing pump.
[0046] Specifically, the drug storage device is used to store drugs, and the drugs are added into the fluidized bed through the drug adding pipeline and the drug adding pump thereon, so as to adjust the hardness of the water to be treated, that is, the pH value.
[0047] In this embodiment, the first drug storage device is connected to the first dosing pipeline, the second dosing pipeline and the third dosing pipeline, and the first dosing pipeline, the second dosing pipeline and the third dosing pipeline are respectively provided with a first dosing pump 16, a second dosing pump 17 and a third dosing pump 18.
[0048] In this embodiment, the raw water storage device is a raw water storage tank 20 , the produced water storage device is a produced water tank, the circulation container is a circulation tank, and the first medicine storage device is a first medicine storage tank 21 .
[0049] Optionally, a second drug storage device is further included, and the second drug storage device is connected to at least one fluidized bed through an auxiliary drug adding pipeline.
[0050] Specifically, when the reagent in the first reagent storage device cannot meet the treatment demand, the water to be treated can be further treated with another reagent in the second reagent storage device to ensure the treatment effect.
[0051] In this embodiment, the second drug storage device is a second drug storage tank 22, and the second drug storage tank 22 is connected to the second fluidized bed 2 through an auxiliary drug adding pipeline, and an auxiliary drug adding pump 19 is provided on the auxiliary drug adding pipeline.
[0052] The method for using the fluidized bed device provided by the utility model is as follows:
[0053] When at least two fluidized beds are used in parallel:
[0054] Open the first conveying unit and close the second conveying unit to input the water to be treated into the fluidized bed;
[0055] Adding a crystal inducing carrier into the fluidized bed through a crystal inducing adding port and / or opening a dosing unit to add a drug into the fluidized bed;
[0056] When at least two fluidized beds are used in series:
[0057] Opening the second conveying unit and using the second conveying unit to connect at least two fluidized beds in sequence;
[0058] A crystal inducing carrier is added into the fluidized bed through the crystal inducing adding port and / or a dosing unit is opened to add medicine into the fluidized bed.
[0059] Specifically, the fluidized bed can treat the untreated water in parallel. In this embodiment, the first water inlet valve 30, the second water inlet valve 25 and the third water inlet valve 26 are opened, and the first connecting valve 23 and the second connecting valve 24 are closed; the first water inlet pump 13, the second water inlet pump 14 and the third water inlet pump 15 are started, and the untreated water enters the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 through the first water inlet pipeline, the second water inlet pipeline and the third water inlet pipeline respectively; the first circulation pump 10, the second circulation pump 11 and the third circulation pump 12 are started, the first water production valve 27, the second water production valve 28 and the third water production valve 29 are opened, and the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18 are started; the produced water of the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 is output from the first water outlet pipeline, the second water outlet pipeline and the third water outlet pipeline respectively. The fluidized bed can also treat the water to be treated in series. In this embodiment, the first water inlet valve 30 is opened, the second water inlet valve 25 and the third water inlet valve 26 are closed, and the first connecting valve 23 and the second connecting valve 24 are opened; the first water inlet pump 13, the second water inlet pump 14 and the third water inlet pump 15 are started, and the water to be treated enters the first fluidized bed 1 through the first water inlet pipeline, enters the second fluidized bed 2 through the first connecting pipeline, and then enters the third fluidized bed 3 through the second connecting pipeline; the first circulation pump 10, the second circulation pump 11 and the third circulation pump 12 are started, the first water production valve 27 and the second water production valve 28 are closed, and the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18 are started; the produced water treated by the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 in sequence is output from the third water outlet pipeline. In this process, the above-mentioned fluidized bed device is used to soften the water to be treated, and the water to be treated is industrial water. The reagent added to the fluidized bed is 5 (wt)% sodium carbonate solution. When it is necessary to recover the elements to be recovered in the water to be treated, the crystal-inducing carrier is added into the fluidized bed through the crystal-inducing carrier addition port at the upper end of the fluidized bed, so that the elements to be recovered are attached to the surface of the crystal-inducing carrier, thereby realizing the recovery of the elements to be recovered. The crystal-inducing carrier is quartz sand.
[0060] The fluidized bed device provided by the utility model can be applied in industrial water treatment to adjust the hardness of industrial water and to recover the elements to be recovered in industry.
[0061] Specifically, the above-mentioned fluidized bed device is used in industrial water treatment, and the industrial water passes through the fluidized beds working in parallel or in series. In this process, the crystal-inducing carrier is added into the fluidized bed through the crystal-inducing carrier feeding port to realize the attachment and recovery of the elements to be recovered, and the industrial water is softened by adding chemicals into the fluidized bed through the dosing unit, thereby reducing the pH value of the industrial water and realizing the treatment of the industrial water. Compared with the prior art that uses chemical methods to treat industrial water, the elements to be recovered form a suspension, and the recovery of the elements to be treated is realized by clarifying the suspension formed by the elements to be recovered. Using the above-mentioned fluidized bed device for industrial water treatment can not only improve the treatment efficiency, but also the water content of the recovered elements to be recovered is low, which makes it easy to further process the elements to be recovered.
[0062] Optionally, the element to be recovered is at least one of cobalt, lithium, nickel and fluorine.
[0063] In the first implementation, the fluidized bed was used in parallel to soften the industrial water. The operation steps are as follows:
[0064] 1) The pH of the water to be softened is adjusted to between 8.5 and 10.8 in the raw water storage tank 20, and a 5 (wt)% sodium carbonate solution is prepared in the first drug storage tank 21;
[0065] 2) After opening the first water inlet valve 30, the second water inlet valve 25 and the third water inlet valve 26, start the first water inlet pump 13, the second water inlet pump 14 and the third water inlet pump 15 and adjust the pumping volumes of the first water inlet pump 13, the second water inlet pump 14 and the third water inlet pump 15 to the target pumping volumes respectively;
[0066] 3) When the first circulation tank, the second circulation tank and the third circulation tank are filled with the circulation pipelines of the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 respectively, the corresponding first circulation pump 10, the second circulation pump 11 and the third circulation pump 12 are turned on;
[0067] 4) respectively adjusting the pumping volumes of the first circulation pump 10, the second circulation pump 11 and the third circulation pump 12 to the target pumping volumes;
[0068] 5) 2.0 kg of quartz sand of 40-80 mesh is added into the crystal-inducing carrier feeding ports at the upper ends of the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 respectively;
[0069] 6) Turn on the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18, and all of these three dosing pumps extract sodium carbonate solution from the first drug storage tank 21;
[0070] 7) Adjust the pumping volumes of the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18 to be equal;
[0071] 8) Close the first connecting valve 23 and the second connecting valve 24, open the first water production valve 27, the second water production valve 28 and the third water production valve 29, and respectively detect the hardness of the water from the first water production valve 27, the second water production valve 28 and the third water production valve 29, and plot the hardness and the detection time;
[0072] 9) Determine the lowest value of the outlet water hardness at the first water production valve 27, the second water production valve 28 and the third water production valve 29 respectively, and the determination standard is that the outlet water hardness that does not decrease with the extension of time is the lowest hardness under the pumping volume adjustment of the dosing pump;
[0073] 10) If the required hardness of the produced water is higher than the minimum hardness obtained in 9), the pumping volume of the dosing pump is reduced accordingly; otherwise, the pumping volume of the dosing pump is increased. After adjusting the pumping volume of the dosing pump, it is still necessary to determine the minimum value of the outlet water hardness at the first water production valve 27, the second water production valve 28 and the third water production valve 29 until the outlet water hardness meets the required hardness of the produced water.
[0074] In the second implementation, the industrial water was softened by fluidized bed series connection. The operation steps are as follows:
[0075] 1) The pH of the water to be softened is adjusted to between 8.5 and 10.8 in the raw water storage tank 20, and a 5 (wt)% sodium carbonate solution is prepared in the first drug storage tank 21;
[0076] 2) starting the first water inlet pump 13 and adjusting the pumping volume of the first water inlet pump 13 to a target pumping volume;
[0077] 3) When the first circulation tank is filled with the circulation pipeline of the first fluidized bed 1, the first circulation pump 10 is turned on and the pumping amount of the first circulation pump 10 is adjusted to the target pumping amount;
[0078] 4) Close the first water production valve 27, close the second water inlet valve 25, open the first connecting valve 23, start the second water inlet pump 14 and adjust the pumping volume of the second water inlet pump 14 to the target pumping volume;
[0079] 5) When the second circulation tank is filled with the circulation pipeline of the second fluidized bed 2, the second circulation pump 11 is turned on and the pumping volume of the second circulation pump 11 is adjusted to the target pumping volume;
[0080] 6) Close the second water production valve 28, close the third water inlet valve 26, open the second connecting valve 24, start the third water inlet pump 15 and adjust the pumping volume of the third water inlet pump 15 to the target pumping volume;
[0081] 7) When the third circulation tank is filled with the circulation pipeline of the third fluidized bed 3, the third circulation pump 12 is turned on, and the pumping volume of the third circulation pump 12 is adjusted to the target pumping volume;
[0082] 8) Turn on the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18, and all of these three dosing pumps extract sodium carbonate solution from the first drug storage tank 21;
[0083] 9) Open the third water production valve 29, detect the hardness of the water coming out of the third water production valve 29, and draw a graph of the hardness and the detection time;
[0084] 10) Determine the lowest value of the outlet water hardness at the third water production valve 29, and the judgment standard is that the outlet water hardness that does not decrease with the extension of time is the lowest hardness under the pumping volume adjustment of the dosing pump;
[0085] 11) If the hardness required for water production is higher than the minimum hardness obtained in 10), the pumping volume of the dosing pump is reduced accordingly; otherwise, the pumping volume of the dosing pump is increased. After adjusting the pumping volume of the dosing pump, it is still necessary to determine the minimum value of the outlet water hardness at the third water production valve 29 until the outlet water hardness meets the hardness required for water production.
[0086] In the third implementation, the nickel in the battery wastewater was recovered by fluidized bed parallel connection, and the operation steps were as follows:
[0087] 1) The pH of the water to be softened is adjusted to between 8.5 and 10.8 in the raw water storage tank 20, and a 5 (wt)% sodium carbonate solution is prepared in the first drug storage tank 21;
[0088] 2) After opening the first water inlet valve 30, the second water inlet valve 25 and the third water inlet valve 26, start the first water inlet pump 13, the second water inlet pump 14 and the third water inlet pump 15 and adjust the pumping volumes of the first water inlet pump 13, the second water inlet pump 14 and the third water inlet pump 15 to the target pumping volumes respectively;
[0089] 3) When the first circulation tank, the second circulation tank and the third circulation tank are filled with the circulation pipelines of the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 respectively, the corresponding first circulation pump 10, the second circulation pump 11 and the third circulation pump 12 are turned on;
[0090] 4) respectively adjusting the pumping volumes of the first circulation pump 10, the second circulation pump 11 and the third circulation pump 12 to the target pumping volumes;
[0091] 5) 2.0 kg of quartz sand of 40-80 mesh is added into the crystal-inducing carrier feeding ports at the upper ends of the first fluidized bed 1, the second fluidized bed 2 and the third fluidized bed 3 respectively;
[0092] 6) Turn on the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18, and all of these three dosing pumps extract sodium carbonate solution from the first drug storage tank 21;
[0093] 7) Adjust the pumping volumes of the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18 to be equal;
[0094] 8) Close the first connecting valve 23 and the second connecting valve 24, open the first water production valve 27, the second water production valve 28 and the third water production valve 29, and detect the nickel residual concentration of the water outlet at the corresponding valves respectively, and draw a graph of the nickel residual concentration and the detection time;
[0095] 9) Determine the lowest value of the residual nickel concentration in the outlet water at the first water production valve 27, the second water production valve 28 and the third water production valve 29 respectively, and the judgment standard is that the residual nickel concentration in the outlet water that does not decrease with the extension of time is the lowest residual nickel concentration under the pumping volume adjustment of the dosing pump;
[0096] 10) If the nickel residual concentration required for the produced water is higher than the minimum nickel residual concentration obtained in 9), the pumping volume of the dosing pump is reduced accordingly; otherwise, the pumping volume of the dosing pump is increased. After adjusting the pumping volume of the dosing pump, it is still necessary to determine the minimum value of the nickel residual concentration in the outlet water of the first water production valve 27, the second water production valve 28 and the third water production valve 29 until the nickel residual concentration in the outlet water meets the nickel residual concentration required for the produced water.
[0097] In the fourth implementation, the nickel in the battery wastewater was recovered by fluidized bed series connection. The operation steps are as follows:
[0098] 1) The pH of the water to be softened is adjusted to between 8.5 and 10.8 in the raw water storage tank 20, and a 5 (wt)% sodium carbonate solution is prepared in the first drug storage tank 21;
[0099] 2) starting the first water inlet pump 13 and adjusting the pumping volume of the first water inlet pump 13 to a target pumping volume;
[0100] 3) When the first circulation tank is filled with the inner circulation pipe of the first fluidized bed 1, the first circulation pump 10 is turned on and the pumping amount of the first circulation pump 10 is adjusted to the target pumping amount;
[0101] 4) Close the first water production valve 27, close the second water inlet valve 25, open the first connecting valve 23, start the second water inlet pump 14 and adjust the pumping volume of the second water inlet pump 14 to the target pumping volume;
[0102] 5) When the second circulation tank is filled with the circulation pipeline of the second fluidized bed 2, the second circulation pump 11 is turned on and the pumping volume of the second circulation pump 11 is adjusted to the target pumping volume;
[0103] 6) Close the second water production valve 28, close the third water inlet valve 26, open the second connecting valve 24, start the third water inlet pump 15 and adjust the pumping volume of the third water inlet pump 15 to the target pumping volume;
[0104] 7) When the third circulation tank is filled with the inner circulation pipe of the third fluidized bed 3, the third circulation pump 12 is turned on, and the pumping volume of the third circulation pump 12 is adjusted to the target pumping volume;
[0105] 8) Turn on the first dosing pump 16, the second dosing pump 17 and the third dosing pump 18, and all of these three dosing pumps extract sodium carbonate solution from the first drug storage tank 21;
[0106] 9) Open the third water production valve 29, detect the nickel residual concentration of the water outlet from the third water production valve 29, and draw a graph of the nickel residual concentration and the detection time;
[0107] 10) Determine the lowest value of the residual nickel concentration in the outlet water at the third water production valve 29, and the judgment standard is that the residual nickel concentration in the outlet water that does not decrease with the extension of time is the lowest residual nickel concentration under the pumping volume adjustment of the dosing pump;
[0108] 11) If the nickel residual concentration required for water production is higher than the minimum nickel residual concentration obtained in 10), the pumping volume of the dosing pump is reduced accordingly; otherwise, the pumping volume of the dosing pump is increased. After adjusting the pumping volume of the dosing pump, it is still necessary to determine the minimum value of the nickel residual concentration of the effluent water at the third water production valve 29 until the nickel residual concentration of the effluent water meets the nickel residual concentration required for water production.
[0109] The various embodiments of the utility model have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes are obvious to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments.
Claims
1. A fluidized bed device, characterized in that: include: Raw water storage equipment for storing water to be treated; At least two fluidized beds, each of which is connected to the raw water storage device via a first conveying unit, and each of which is provided with a crystal-inducing carrier feeding port for feeding a crystal-inducing carrier into the fluidized bed, wherein the crystal-inducing carrier is quartz sand; a second conveying unit, one end of which is connected to the water outlet of one of the fluidized beds, and the other end of which is connected to the water inlet of another of the fluidized beds, so as to connect at least two of the fluidized beds in sequence; A dosing unit is used to add reagents into the fluidized bed, the crystal-inducing carrier can allow crystal particles formed by the element to be recovered and the reagent to adhere to the surface of the crystal-inducing carrier, and / or the reagent can adjust the hardness of the water to be treated.
2. The fluidized bed device according to claim 1, characterized in that: Each of the fluidized beds is connected to a produced water storage device, the produced water storage device is provided with a water outlet pipeline, and the water outlet pipeline is provided with a produced water valve.
3. The fluidized bed device according to claim 2, characterized in that: One end of the second conveying unit is connected to the water outlet pipeline.
4. The fluidized bed device according to claim 1, characterized in that: The first delivery unit comprises a water inlet pipeline, and a water inlet valve and a water inlet pump are arranged on the water inlet pipeline.
5. The fluidized bed device according to claim 4, characterized in that: The second delivery unit includes a connecting pipeline, the connecting pipeline is connected to the water inlet pipeline located downstream of the water inlet valve and upstream of the water inlet pump, and a connecting valve is arranged on the connecting pipeline.
6. The fluidized bed apparatus according to claim 1, characterized in that: Each of the fluidized beds is connected to a circulation container via a circulation pipeline, and a circulation pump is arranged on the circulation pipeline.
7. The fluidized bed apparatus according to claim 1, characterized in that: The dosing unit comprises a first drug storage device, which is connected to each of the fluidized beds through a dosing pipeline, and each of the dosing pipelines is provided with a dosing pump.
Citation Information
Cited By
Fluidized bed device, use method of fluidized bed device and application of fluidized bed device in industrial water treatment
CN118183963A