Plastic runway anti-shrinkage structure
By using fixed frames, sun visors and drainage systems in plastic runways, combined with waterproofing and sun protection, corner protection and drainage issues are solved, extending the service life of the plastic runway and improving stability and durability.
Patent Information
- Application Number
- CN202420370051.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The existing plastic runway anti-shrink structure fails to effectively protect the edge and corner areas, and the structural drainage problem is not considered, resulting in material shrinkage, aging and corrosion, reducing service life and performance.
Use fixed frames and sun visors to protect the corner areas, combined with waterproof layer, transportation pipe, drainage pipe and drainage tank design, ensure good drainage on the surface and interior of the runway, prevent sunlight and rainwater from damage to the material, and use mixed polyurethane resin as The surface layer is used to improve weather resistance and wear resistance.
Effectively prevent the corners of the plastic runway from hardening and brittle, extend the service life, improve overall stability and durability, ensure dryness on the runway surface, avoid corrosion, and enhance drainage performance.
Smart Images

Figure CN222024824U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of anti-shrinkage structures, in particular to an anti-shrinkage structure for a plastic runway. Background Art
[0002] The plastic track is a ground material widely used in track and field sports venues. Its surface is usually made of a mixture of rubber particles and polyurethane materials, and has good elasticity and wear resistance. However, the plastic track may be affected by factors such as climate change, ultraviolet rays, and temperature during use, resulting in shrinkage and aging of the material, reducing the service life and performance of the track, especially the corners of the plastic track are more prone to shrinkage and flanging, thereby causing the overall damage of the track. A Chinese patent discloses a "plastic track anti-shrinkage structure", which is applied for as "CN201720984536.0". It is provided with a connecting part on both sides of the rubber layer, and the connecting part is fixedly connected to the side of the bottom layer. When the rubber layer shrinks, the connecting part can play a reaction force, and because the upper side of the bottom layer and the back side of the rubber layer are both arranged in a wavy shape, when the rubber layer shrinks, the bottom layer can also play a reaction force on the rubber layer, thereby effectively preventing the rubber layer from shrinking due to cold. In addition, the connecting part and the side of the bottom layer are both provided with a first rivet hole, and a rivet is inserted into the first rivet hole, and the connecting part and the side of the bottom layer are fixedly connected by the rivet. The base layer and the rubber layer are bonded and reliably connected. In addition, the top of the base layer and the back of the rubber layer are both wavy in design, so the bonding area is large and the connection is reliable. However, it does not take into account the protection of the corner areas of the plastic track, nor does it take into account the problem of structural drainage. Utility Model Content
[0003] The purpose of the utility model is to solve at least one of the technical problems existing in the prior art and to provide a plastic runway anti-shrinkage structure. A fixed frame and a sunshade are used to prevent sunlight from shining on the corners of the plastic runway, thereby providing protection for the corners of the plastic runway, preventing it from hardening, brittleness and loss of elasticity, and improving the overall anti-shrinkage property, thereby ensuring the stability and durability of the plastic runway structure. At the same time, the waterproof layer, transport pipe, drain pipe and drainage trough are used in combination to ensure that the plastic runway has good drainage on both the surface and the interior, preventing rainwater from staying and corroding the plastic runway, thereby extending the service life of the runway and improving the overall durability and stability.
[0004] The utility model also provides the above-mentioned anti-shrinkage structure of a plastic runway, comprising: a base layer, a leveling layer is laid on the upper surface of the base layer, a waterproof layer is laid on the upper surface of the leveling layer, a transport pipe is arranged on the upper surface of the waterproof layer, an elastic layer is laid on the upper surface of the waterproof layer, a supporting keel is fixedly connected to the upper surface of the elastic layer, a granular layer is laid on the upper surface of the elastic layer, a surface layer is fixedly connected to the upper surface of the granular layer, a fixed frame is fixedly connected to the side surface of the surface layer, a sun visor is fixedly connected to the upper surface of the fixed frame, a drain pipe is fixedly connected to the side surface of the fixed frame, and a drain groove is arranged on the fixed frame.
[0005] According to the anti-shrinkage structure of a plastic runway described in the utility model, the middle part of the particle layer is higher than the two sides, the lower surface of the particle layer is fixedly connected to the upper surface of the supporting keel, and the material of the particle layer is rubber particles, which can improve the overall drainage performance of the plastic runway, so that rainwater can quickly flow to the drainage grooves and drainage pipes on both sides, effectively preventing water from being retained on the runway surface.
[0006] According to the anti-shrinkage structure of a plastic runway described in the utility model, the upper surface of the surface layer does not contact the lower surface of the sun visor, and the drainage groove is located in the middle. This design can prevent sunlight from directly shining on the edge and corner surface of the runway and reduce the damage of ultraviolet rays to the plastic material.
[0007] According to the anti-shrinkage structure of a plastic runway described in the utility model, the lower surface of the drainage pipe is fixedly connected to the upper surface of the base layer, and the upper surface of the base layer is fixedly connected to the lower surface of the fixed frame, which is conducive to collecting and guiding rainwater, ensuring that the runway surface remains dry, and avoiding erosion and damage to the plastic runway caused by accumulated water.
[0008] According to the anti-shrinkage structure of a plastic runway described in the utility model, the drainage trough is connected with the drainage pipe, the drainage pipe is connected with the transport pipe, and the drainage trough is located above the transport pipe. This connection method can ensure that rainwater is quickly drained away.
[0009] According to the anti-shrinkage structure of a plastic runway described in the utility model, the side surface of the leveling layer is fixedly connected to the side surface of the fixed frame, and the leveling layer material is asphalt concrete. This connection method can ensure the flatness and stability of the edge of the runway and avoid cracks and deformation of the edge of the runway.
[0010] According to the anti-shrinkage structure of a plastic track described in the utility model, a sun protection layer is sprayed on the upper surface of the surface layer. The material of the surface layer is a mixed polyurethane resin, which can effectively block direct sunlight and reduce the damage of ultraviolet rays to the plastic track material. The polyurethane resin has good weather resistance and wear resistance, which improves the durability and stability of the plastic track.
[0011] Beneficial Effects
[0012] 1. Compared with the existing technology, the anti-shrinkage structure of the plastic track prevents sunlight from reaching the corners of the plastic track through the use of fixed frames and sunshades, provides protection for the corners of the plastic track, prevents it from hardening, brittleness and loss of elasticity, improves the overall anti-shrinkage property, and thus ensures the stability and durability of the plastic track structure.
[0013] 2. Compared with the existing technology, the anti-shrinkage structure of the plastic track, the waterproof layer, the transport pipe, the drainage pipe and the drainage trough are used together to make the plastic track have good drainage properties on the surface and inside, avoiding rainwater from staying and corroding the plastic track, thereby extending the service life of the track and improving the overall durability and stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0015] Figure 1 This is the overall structural diagram of the anti-shrinkage structure of the plastic runway of the utility model;
[0016] Figure 2 This is a front view of the anti-shrinkage structure of the plastic runway of the utility model;
[0017] Figure 3 This is a top view of the anti-shrinkage structure of the plastic runway of the utility model;
[0018] Figure 4 It is a cross-sectional view of the anti-shrinkage structure of the plastic runway of the utility model.
[0019] Legend:
[0020] 1. Drain pipe; 2. Surface layer; 3. Granular layer; 4. Support keel; 5. Elastic layer; 6. Waterproof layer; 7. Leveling layer; 8. Base layer; 9. Transport pipe; 10. Fixed frame; 11. Sunshade; 12. Drain trough. DETAILED DESCRIPTION
[0021] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.
[0022] Reference Figure 1-4The utility model embodiment provides a plastic track shrinkage prevention structure, which includes: a base layer 8, which provides overall support and stability, and serves as the foundation of the entire structure. A leveling layer 7 is laid on the upper surface of the base layer 8 to ensure that the surface of the track is flat, which is conducive to the laying and stability of subsequent layers. A waterproof layer 6 is laid on the upper surface of the leveling layer 7 to prevent moisture penetration and protect the track base. A transport pipe 9 is arranged on the upper surface of the waterproof layer 6 for the drainage system to transport the accumulated water to the drainage pipe 1. An elastic layer 5 is laid on the upper surface of the waterproof layer 6 to provide good buffering and elasticity and reduce the influence of force on the track. A supporting keel 4 is fixedly connected to the upper surface of the elastic layer 5 to fix the elastic layer 5 to provide support and stability. The upper surface of layer 5 is paved with a granular layer 3 to provide additional cushioning and elasticity. The material is rubber granules, and the middle part is higher than the two sides to improve the drainage effect. The upper surface of the granular layer 3 is fixedly connected to the surface layer 2 to provide a visible surface of the runway. The material is a mixed polyurethane resin and is sprayed with a sunscreen layer to extend the service life. The side surface of the surface layer 2 is fixedly connected to a fixed frame 10 for fixing the overall structure and maintaining stability. The upper surface of the fixed frame 10 is fixedly connected to a sun visor 11 to avoid direct sunlight, protect the corners of the runway, and extend the service life. The side surface of the fixed frame 10 is fixedly connected to a drain pipe 1 to form a drainage system. A drainage trough 12 is provided on the fixed frame 10 to discharge the accumulated water on the surface layer 2 into the drain pipe 1.
[0023] The middle part of the granular layer 3 is higher than the two sides, the lower surface of the granular layer 3 is fixedly connected to the upper surface of the supporting keel 4, the material of the granular layer 3 is rubber particles, the upper surface of the surface layer 2 is not in contact with the lower surface of the sun visor 11, the drainage groove 12 is located in the middle, the lower surface of the drain pipe 1 is fixedly connected to the upper surface of the base layer 8, the upper surface of the base layer 8 is fixedly connected to the lower surface of the fixed frame 10, the drainage groove 12 is connected to the drainage pipe 1, the drainage pipe 1 is connected to the transport pipe 9, the position of the drainage groove 12 is above the transport pipe 9, the side surface of the leveling layer 7 is fixedly connected to the side surface of the fixed frame 10, the material of the leveling layer 7 is asphalt concrete, the upper surface of the surface layer 2 is sprayed with a sun protection layer, and the material of the surface layer 2 is a mixed polyurethane resin.
[0024] Working principle:
[0025] The base layer provides overall support, the leveling layer ensures the flatness of the track surface, which is conducive to the laying and stability of subsequent layers. The waterproof layer and the setting of drainage pipes and drainage grooves can effectively prevent water penetration and protect the track structure. At the same time, the drainage system can remove the accumulated water in time to prevent the impact of moisture on the track structure. Elastic layer and granular layer: The elastic layer and granular layer provide good cushioning and elasticity, providing athletes with a comfortable sports experience while reducing the impact of force on the track. The setting of fixed frames and sun visors helps to fix the overall structure. At the same time, the sun visors can reduce the sun's exposure to the corners and extend the service life of the track material.
[0026] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A plastic track anti-shrinkage structure, characterized in that: include: A base layer (8), a leveling layer (7) is laid on the upper surface of the base layer (8), a waterproof layer (6) is laid on the upper surface of the leveling layer (7), a transport pipe (9) is arranged on the upper surface of the waterproof layer (6), an elastic layer (5) is laid on the upper surface of the waterproof layer (6), a supporting keel (4) is fixedly connected to the upper surface of the elastic layer (5), a particle layer (3) is laid on the upper surface of the elastic layer (5), a surface layer (2) is fixedly connected to the upper surface of the particle layer (3), a fixed frame (10) is fixedly connected to the side surface of the surface layer (2), a sunshade (11) is fixedly connected to the upper surface of the fixed frame (10), a drainage pipe (1) is fixedly connected to the side surface of the fixed frame (10), and a drainage groove (12) is arranged on the fixed frame (10).
2. The anti-shrinkage structure of a plastic runway according to claim 1, characterized in that: The middle of the particle layer (3) is higher than the two sides, the lower surface of the particle layer (3) is fixedly connected to the upper surface of the supporting keel (4), and the material of the particle layer (3) is rubber particles.
3. The anti-shrinkage structure of a plastic runway according to claim 1, characterized in that: The upper surface of the surface layer (2) does not contact the lower surface of the sunshade (11), and the drainage groove (12) is located in the middle thereof.
4. The anti-shrinkage structure of a plastic runway according to claim 1, characterized in that: The lower surface of the drainage pipe (1) is fixedly connected to the upper surface of the base layer (8), and the upper surface of the base layer (8) is fixedly connected to the lower surface of the fixed frame (10).
5. The anti-shrinkage structure of a plastic runway according to claim 1, characterized in that: The drainage trough (12) is connected to the drainage pipe (1), the drainage pipe (1) is connected to the transport pipe (9), and the drainage trough (12) is located above the transport pipe (9).
6. The anti-shrinkage structure of a plastic runway according to claim 1, characterized in that: The side surface of the leveling layer (7) is fixedly connected to the side surface of the fixed frame (10), and the material of the leveling layer (7) is asphalt concrete.
7. The anti-shrinkage structure of a plastic runway according to claim 1, characterized in that: The upper surface of the surface layer (2) is sprayed with a sunscreen layer, and the material of the surface layer (2) is a mixed polyurethane resin.