Device for preventing displacement of foundation bolt in special-shaped foundation pouring
By installing two layers of longitudinal positioning templates on the special-shaped casting formwork and fixing anchor bolts, the problem of anchor bolt displacement during the casting process is solved, and the installation efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202420660339.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-01
AI Technical Summary
During the pouring process, anchor bolts are easily displaced due to vibration and other factors, which affects the installation efficiency of steel structure columns.
Using a detachable two-layer positioning template, the anchor bolts are fixed through the longitudinal positioning template to ensure that they do not displace during the pouring process.
Effectively prevent the displacement of anchor bolts during the pouring process, and improve the efficiency and accuracy of steel structure column installation.
Smart Images

Figure CN222025089U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pouring construction, in particular to a device for preventing displacement of anchor bolts during pouring of special-shaped foundations. Background Art
[0002] The TBM concrete segment plant is a production line plant specially used for producing lining segments for double shield TBM tunnels. The length of the plant construction period is an important factor affecting the value-added of the project. Since the service life of the segment plant is synchronized with the project construction period, most of these plants are one-time steel structure plants. The steel structure columns are usually installed in the concrete foundation. The concrete foundation and the steel structure are fastened with anchor bolts and poured into a whole through secondary concrete pouring to achieve structural safety.
[0003] At present, the foundation of steel structure columns usually adopts special-shaped foundation piers with larger bottom and smaller top. The conventional casting method is: after the installation of the foundation pier steel bars and anchor bolts, in order to ensure the dense casting, the lower part of the foundation pier is cast first, and then the upper part of the foundation pier is cast. During the casting process, the anchor bolts are displaced due to vibration and other factors, which affects the installation efficiency of the steel structure columns in the later stage. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a device for preventing the displacement of anchor bolts during the casting of special-shaped foundations in view of the deficiencies in the above-mentioned prior art. The device comprises two longitudinal positioning templates which are detachably installed above the special-shaped casting template, and the positioning templates are used to firmly fix the anchor bolts in the longitudinal direction so that no displacement occurs during the casting process.
[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is: a device for preventing the displacement of anchor bolts in special-shaped foundation casting, comprising a special-shaped casting template, a first positioning template is detachably connected to the top of the special-shaped casting template, a second positioning template is arranged directly above the first positioning template, the first positioning template and the second positioning template are exactly the same in shape and size, a limited position support body is arranged between the first positioning template and the second positioning template, the limited position support body is detachably connected to the first positioning template and the second positioning template respectively, a first through opening is opened at the center position of the first positioning template, a second through opening is opened at the center position of the second positioning template, a plurality of first through holes for passing the anchor bolts are uniformly opened on the first positioning template along the circumference of the first through opening, a plurality of second through holes for passing the anchor bolts are uniformly opened on the second positioning template along the circumference of the second through opening, the first through holes and the second through holes are equal in number and opposite in position, and the first through holes and the second through holes are both in contact with the surface of the anchor bolts.
[0006] Furthermore, a circle of limiting blocks is provided along the outer edge of the lower surface of the first positioning template, and the limiting blocks are fitted with the outer surface of the special-shaped casting template.
[0007] Furthermore, the limit block is a magnet limit block, and the special-shaped casting template is a carbon steel special-shaped casting template.
[0008] Furthermore, the first positioning template and the second positioning template are both carbon steel positioning templates.
[0009] Furthermore, the position limiting support body is a magnet position limiting support body.
[0010] Furthermore, the limiting support body includes a longitudinal limiting plate and a transverse supporting block, and the supporting block is fixed at the center position of the limiting plate.
[0011] Furthermore, a support rod seat is fixedly connected to the bottom of the limiting plate, and the bottom of the support rod seat is detachably connected to the bottom of the special-shaped casting template.
[0012] Furthermore, a plurality of exhaust holes are provided on the bottom surface of the special-shaped casting template.
[0013] Furthermore, fixing nuts for fastening the anchor bolts are provided at both upper and lower ends of the first through hole and upper and lower ends of the second through hole.
[0014] Furthermore, the first positioning template and the second positioning template are both square.
[0015] Compared with the prior art, the utility model has the following advantages:
[0016] The utility model provides a device for preventing the displacement of anchor bolts during casting of special-shaped foundations. Two longitudinal positioning templates are detachably installed above the special-shaped casting template. Since the two positioning templates are aligned and fixed in position, the projections of the two positioning templates in the longitudinal direction completely overlap, so that the longitudinal direction of the anchor bolts is fixed by the upper and lower positioning templates, so that the anchor bolts are firmly fixed in the longitudinal direction and will not be displaced during the casting process.
[0017] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 The utility model provides an overall structural diagram of a device for preventing displacement of anchor bolts during pouring of a special-shaped foundation.
[0019] Figure 2 for Figure 1 Enlarged view of point A in the middle.
[0020] Figure 3 It is a structural schematic diagram of the second positioning template in the utility model.
[0021] Description of reference numerals:
[0022] 1. Limit support body; 2. Support rod seat; 3. Exhaust hole; 4. Special-shaped casting template; 5. Anchor bolt; 6. Limit block; 7. First positioning template; 8. Second positioning template; 9. Fixing nut; 10. Second opening; 11. First opening; 12. Second through hole; 13. First through hole. DETAILED DESCRIPTION
[0023] like Figure 1-3 As shown, the utility model provides a device for preventing the displacement of anchor bolts for pouring special-shaped foundations, comprising a special-shaped pouring template 4, a first positioning template 7 is detachably connected to the top of the special-shaped pouring template 4, a second positioning template 8 is arranged directly above the first positioning template 7, the first positioning template 7 and the second positioning template 8 are exactly the same in shape and size, a limited position support body 1 is arranged between the first positioning template 7 and the second positioning template 8, the limited position support body 1 is detachably connected to the first positioning template 7 and the second positioning template 8 respectively, and the first positioning template 7 is provided with a plurality of positioning support bodies 1, wherein the positioning support body 1 ... A first through opening 11 is opened at the center position, a second through opening 10 is opened at the center position of the second positioning template 8, a plurality of first through holes 13 for passing the anchor bolts 5 are evenly opened on the first positioning template 7 along the circumference of the first through opening 11, a plurality of second through holes 12 for passing the anchor bolts 5 are evenly opened on the second positioning template 8 along the circumference of the second through opening 10, the first through holes 13 and the second through holes 12 are equal in number and opposite to each other, and the first through holes 13 and the second through holes 12 are both in contact with the surface of the anchor bolts 5.
[0024] During construction, first, a special-shaped casting template 4 is made according to the special-shaped foundation that needs to be cast, and then a first positioning template 7 and a second positioning template 8 are made according to the special-shaped casting template 4. When making the special-shaped casting template 4, the first positioning template 7 and the second positioning template 8, they are all made according to the dimensions of the design drawings.
[0025] Among them, for the special-shaped casting formwork 4, during construction, according to the design drawings, ordinary low-carbon steel plates with a thickness of more than 12 mm are used for processing, and the processing joints are welded, and the welds are fully welded; the top surface of the bottom expansion part is cut with exhaust holes during casting; the mold is processed with diagonal seams; fastening buckles are arranged at the seam positions, and they are connected by bolts after assembly in place; lifting ears are installed on the top of the special-shaped steel foundation formwork to facilitate installation and disassembly of lifting.
[0026] For the first positioning template 7 and the second positioning template 8, during construction, the first positioning template 7 is made of carbon steel plate, and the second positioning template 8 is made of target. During production, the first positioning template 7 is made of ordinary low-carbon steel plate with a thickness of more than 12 mm. It can be cut and formed as a whole or by welding. After processing, holes are made in the template according to the bolt drawings. After the special-shaped template is installed in place, use a level to adjust the elevation of the anchor bolts to the same horizontal plane, then install a nut and adjust it to the same plane, then install the steel anchor bolt positioning template, and then install a nut to tighten the positioning template; after tightening, the steel positioning template is connected to the special-shaped casting template by welding to form a whole.
[0027] The second positioning template 8 is made by cutting and forming the wooden template on site, and then drilling holes with a hole opener. After the steel anchor bolt positioning template is installed, a nut is installed and adjusted to the same plane, and then the wooden positioning template is installed, and nuts are installed on the upper part to tighten, ensuring the verticality and position accuracy of the bolts.
[0028] In the utility model, the anchor bolt 5 is inserted into the second through hole 12 and the first through hole 13 in sequence, and then the anchor bolt 5 is fixed, and concrete is poured through the first through hole 11 and the second through hole 10, so that the concrete is shaped in the special-shaped casting template 4. Since the positions of the first positioning template 7 and the second positioning template 8 are fixed relative to the special-shaped casting template 4, the anchor bolt 5 will not move at any time during pouring.
[0029] During construction, you can refer to the following steps:
[0030] (1) The processing materials used for the special-shaped casting formwork shall be cut according to the design drawings. The special-shaped formwork shall be processed by welding. The welding shall be carried out symmetrically and the quality of the weld shall meet the technical requirements. The geometric dimensions shall be checked after welding and allowed to be used after confirmation.
[0031] (2) According to the anchor bolt drawing, process a steel and wooden positioning template respectively;
[0032] (3) Lift the installed steel cage and anchor bolts into place, and install a nut in each bolt for standby use;
[0033] (4) The template is divided into blocks and coated with a release agent. After assembly (tightening with bolts) is completed, it is hoisted into place using a truck crane or other lifting equipment. After it is in place, the nut is adjusted to a horizontal plane using a spirit level and the steel anchor bolt positioning template is installed. A nut is installed on the upper part of the template and the upper nut is tightened to tighten the template in place. After tightening, the steel template and the base special-shaped template are connected into a whole by welding.
[0034] (5) After the steel positioning template is installed, install a nut in each anchor bolt, use a level to adjust the nuts to a flat surface, and then install the wooden template. The tightening method is the same as the steel positioning template.
[0035] (6) Carry out quality inspection and pour after confirmation; after pouring, dismantle the wooden positioning formwork, steel positioning formwork, and foundation special-shaped formwork in sequence; clean the formwork and reuse it after it passes the inspection.
[0036] In the present invention, in order to fix the position of the first positioning template 7 and the position of the special-shaped casting template 4, a circle of limit blocks 6 are provided along the outer edge of the lower surface of the first positioning template 7, and the limit blocks 6 fit with the outer surface of the special-shaped casting template 4, like a lid, and completely cover the special-shaped casting template 4. The special-shaped casting template 4 with a square cross-section used in the present invention, so the first positioning template 7 is also square, so as to prevent the first positioning template 7 from being displaced relative to the special-shaped casting template 4 when fitting. The limit blocks 6 are magnet limit blocks, and the special-shaped casting template 4 is a carbon steel special-shaped casting template. The special-shaped casting template 4 and the first positioning template 7 are fixed by the suction force of the magnet.
[0037] In the present invention, in order to stabilize the relative position between the first positioning template 7 and the second positioning template 8, the first positioning template 7 and the second positioning template 8 are designed to be carbon steel positioning templates. The limiting support body 1 is a magnet limiting support body. The limiting support body 1 includes a longitudinal limiting plate and a transverse support block, and the support block is fixed at the center position of the limiting plate.
[0038] At the same time, in order to keep the first positioning template 7 and the second positioning template 8 aligned, the bottom of the limiting plate is fixedly connected to a support rod seat 2, and the bottom of the support rod seat 2 is detachably connected to the bottom of the special-shaped casting template 4.
[0039] In the present invention, a plurality of vent holes 3 are provided on the bottom surface of the special-shaped casting template 4. In order to prevent the anchor bolts 5 from being displaced during the casting process, fixing nuts 9 for fastening the anchor bolts 5 are provided at the upper and lower ends of the first through hole 13 and the upper and lower ends of the second through hole 12. The first positioning template 7 and the second positioning template 8 are both square.
[0040] The utility model provides a device for preventing the displacement of anchor bolts during casting of special-shaped foundations. Two longitudinal positioning templates are detachably installed above the special-shaped casting template. Since the two positioning templates are aligned and fixed in position, the projections of the two positioning templates in the longitudinal direction completely overlap, so that the longitudinal direction of the anchor bolts is fixed by the upper and lower positioning templates, so that the anchor bolts are firmly fixed in the longitudinal direction and will not be displaced during the casting process.
[0041] The above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Any simple modification, change and equivalent structural change made to the above embodiments according to the technical essence of the present invention shall still fall within the protection scope of the technical solution of the present invention.
Claims
1. A device for preventing displacement of anchor bolts during casting of special-shaped foundation, comprising a special-shaped casting template (4), characterized in that: The top of the special-shaped casting template (4) is detachably connected to a first positioning template (7), a second positioning template (8) is arranged directly above the first positioning template (7), the first positioning template (7) and the second positioning template (8) are completely the same in shape and size, a limiting support body (1) is arranged between the first positioning template (7) and the second positioning template (8), the limiting support body (1) is detachably connected to the first positioning template (7) and the second positioning template (8), a first opening (11) is opened at the center of the first positioning template (7), and the second positioning template (8) is provided with a first opening (11) at the center of the first positioning template (7). A second through hole (10) is provided at the center of the plate (8); a plurality of first through holes (13) for passing the anchor bolts (5) are uniformly provided on the first positioning template (7) along the circumference of the first through hole (11); a plurality of second through holes (12) for passing the anchor bolts (5) are uniformly provided on the second positioning template (8) along the circumference of the second through hole (10); the first through holes (13) and the second through holes (12) are equal in number and opposite in position; the first through holes (13) and the second through holes (12) are both in contact with the surface of the anchor bolts (5).
2. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 1, characterized in that: A circle of limiting blocks (6) is provided along the outer edge of the lower surface of the first positioning template (7), and the limiting blocks (6) are fitted with the outer surface of the special-shaped casting template (4).
3. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 2, characterized in that: The limit block (6) is a magnet limit block, and the special-shaped casting template (4) is a carbon steel special-shaped casting template.
4. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 1, characterized in that: The first positioning template (7) and the second positioning template (8) are both carbon steel positioning templates.
5. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 4, characterized in that: The position-limiting support body (1) is a magnetic position-limiting support body.
6. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 5, characterized in that: The position-limiting support body (1) comprises a longitudinal position-limiting plate and a transverse support block, wherein the support block is fixed at the center position of the position-limiting plate.
7. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 6, characterized in that: The bottom of the limiting plate is fixedly connected to a support rod seat (2), and the bottom of the support rod seat (2) is detachably connected to the bottom of the special-shaped casting template (4).
8. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 1, characterized in that: A plurality of exhaust holes (3) are provided on the bottom surface of the special-shaped casting template (4).
9. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 1, characterized in that: The upper and lower ends of the first through hole (13) and the upper and lower ends of the second through hole (12) are both provided with fixing nuts (9) for fastening the anchor bolts (5).
10. A device for preventing displacement of anchor bolts during pouring of special-shaped foundation according to claim 1, characterized in that: The first positioning template (7) and the second positioning template (8) are both square.
