Concrete pouring supporting device for building construction
By designing a concrete pouring support device including clamping components and barbed structures, the problem of construction workers being injured by hand-held concrete pouring pipes is solved, and construction safety and stability of concrete pouring pipes are improved.
Patent Information
- Application Number
- CN202420469619.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-12
AI Technical Summary
During construction, construction workers are easily injured by concrete pressure when holding concrete pouring pipes, which affects construction safety.
A concrete pouring support device for construction is designed, including a mounting frame and a support mechanism, and a concrete pouring pipe is fixed using clamping components and barbed structures to prevent it from being pressured out during the pouring process.
The concrete poured pipe is fixed by clamping components to ensure the safety of construction personnel, and the stability of the pipe is enhanced through the barbed structure to prevent flushing caused by excessive concrete pressure.
Smart Images

Figure CN222025463U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a concrete pouring support device for building construction. Background Art
[0002] Construction is a production activity carried out by people using various building materials, mechanical equipment and equipment according to a specific design blueprint in a certain space and time to build various building products. It includes the entire production process from construction preparation, groundbreaking to project completion acceptance. In this process, construction preparation, construction organization design and management, earthwork engineering, blasting engineering, foundation engineering, steel engineering, formwork engineering, scaffolding engineering, concrete engineering, prestressed concrete engineering, masonry engineering, steel structure engineering, wooden structure engineering, structural installation engineering and other work will be carried out. During construction, it is necessary to wrap the steel bars with wooden boards, and then build concrete in them to make them solidify and support the columns.
[0003] At present, when pouring concrete in construction, workers usually hold a concrete pouring pipe to pour concrete into a wooden mold. The concrete is usually pumped out by a pump body in a concrete truck. In the initial stage when the pump body pumps out concrete from the concrete truck, the concrete pressure in the pouring pipe is relatively large, and the "tube throwing" phenomenon is very likely to occur. Construction workers holding the concrete pouring pipe are easily injured by the concrete pouring pipe, which affects the construction safety of the construction workers. In view of this, we propose a concrete pouring support device for construction. Utility Model Content
[0004] The purpose of the utility model is to overcome the deficiencies of the prior art, meet actual needs, and provide a concrete pouring support device for construction to solve the technical problem that construction workers holding concrete pouring pipes during concrete pouring in current construction are easily injured by the concrete pouring pipes.
[0005] In order to achieve the purpose of the utility model, the technical solution adopted by the utility model is: designing a concrete pouring support device for construction, including a mounting frame and a support mechanism, wherein the support mechanism is arranged in the mounting frame;
[0006] The installation frame is hollow in the middle, and a clamping assembly is provided at the bottom of the installation frame;
[0007] The supporting mechanism comprises an inner tube, an outer tube and a plurality of clamping blocks; a bottom plate with a central opening is fixedly connected to the bottom of the inner tube, a side surface of the bottom plate is fixedly connected to the inner wall of the mounting frame through a supporting rod, the outer tube is sleeved on the bottom end of the inner tube, and the bottom surface of the outer tube is fixedly connected to the top surface of the bottom plate, a plurality of the clamping blocks are annular and rotatably connected to the top end of the outer tube at equal intervals, a clamping cavity is formed by gaps between the clamping blocks and the inner tube, a collar is threadedly connected to the outer wall of the outer tube, and a threaded groove adapted to the collar is provided on the surfaces of the clamping blocks.
[0008] Preferably, an insert block is provided at the bottom end of the clamp block, a through slot is provided at the top end of the outer tube relative to the insert block, the insert block extends into the through slot and is rotatably connected to the inner walls on both sides of the through slot via a rotating shaft.
[0009] Preferably, the inner wall of the clamp block is provided with a plurality of barbs A, and the outer wall of the inner tube is provided with a plurality of barbs B at positions above the barbs A.
[0010] Preferably, the barb A has a diameter that gradually decreases downward, and the barb B has a diameter that gradually increases upward, and the barb A and the barb B are staggered to form a clamping gap.
[0011] Preferably, the clamping assembly includes two symmetrically arranged clamping plates and a bidirectional screw rod, the two ends of the top of the clamping plates are slidably connected to the two side surfaces of the bottom of the mounting frame, and one end of the two clamping plates are respectively threadedly connected to the two ends of the bidirectional screw rod, and one end of the bidirectional screw rod is fixedly connected to a handwheel.
[0012] Preferably, T-shaped sliders are provided at both ends of the top of the clamping plate, and a T-shaped slot is provided at the bottom of the installation frame relative to the T-shaped slider, and the outer wall of the T-shaped slider and the inner wall of the T-shaped slot are limitedly slidable.
[0013] Compared with the prior art, the beneficial effects of the present invention are:
[0014] 1. The utility model fixes the entire device to the wooden board mold through a clamping assembly, inserts one end of the concrete pouring pipe into the gap between a plurality of clamping blocks and the inner pipe to form a clamping cavity, rotates the collar, screws the collar from the outer pipe to the threaded groove of the clamping block, tightens a plurality of clamping blocks, drives the clamping blocks to flip toward the inner pipe with the connection point of the inserting blocks in the through groove as the center, so that the plurality of clamping blocks and the inner pipe clamp and fix one end of the concrete pouring pipe, and construction workers do not need to hold the pouring pipe during construction, thereby ensuring the construction safety of construction workers.
[0015] 2. The diameter of the barb A of the utility model gradually decreases downward, and the diameter of the barb B gradually increases upward. The barbs A and B are staggered to form a clamping gap. The concrete casting pipe is generally a soft material supported by rubber. The barbs A and B are staggered to form a clamping gap to squeeze the concrete casting pipe to cause it to bend, further enhancing the stability of the concrete casting pipe during the casting process, and preventing the concrete casting pipe from rushing out of the clamping cavity formed by the gap between the plurality of clamping blocks and the inner pipe due to excessive concrete pressure. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the split structure of the support mechanism of the utility model;
[0018] Figure 3 It is a schematic diagram of the split cross-sectional structure of the clamping plate and the installation frame of the utility model;
[0019] Figure 4 It is a schematic diagram of the overall operation structure of the utility model;
[0020] Figure 5 It is a schematic diagram of the partially enlarged structure of point A of the present utility model.
[0021] In the figure: 1. mounting frame; 101. clamping assembly; 1011. clamping plate; 1012. bidirectional screw rod; 1013. hand wheel; 1014. T-shaped slider; 102. T-shaped slide groove; 2. supporting mechanism; 201. inner tube; 2011. barb B; 202. outer tube; 2021. through groove; 203. clamping block; 2031. threaded groove; 2032. insert block; 2033. barb A; 204. bottom plate; 205. collar. DETAILED DESCRIPTION
[0022] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0023] Example:
[0024] This embodiment discloses a concrete pouring support device for building construction. Figures 1 to 5 , including a mounting frame 1 and a supporting mechanism 2.
[0025] like Figure 1 , Figure 3 , Figure 4 As shown, the installation frame 1 is hollowed out in the middle, and a clamping assembly 101 is provided at the bottom of the installation frame 1. The clamping assembly 101 is used to fix the entire device to the wood board mold.
[0026] Specifically, Figure 1 , Figure 3 , Figure 4 As shown, the clamping assembly 101 includes two symmetrically arranged clamping plates 1011 and a bidirectional screw rod 1012. The two ends of the top of the clamping plates 1011 are slidably connected to the two side surfaces of the bottom of the installation frame 1, and one end of the two clamping plates 1011 is threadedly connected to the two ends of the bidirectional screw rod 1012 respectively. One end of the bidirectional screw rod 1012 is fixedly connected to a hand wheel 1013. The two clamping plates 1011 are clamped on both sides of the wooden board mold. The bidirectional screw rod 1012 is rotated by the hand wheel 1013, and the bidirectional screw rod 1012 drives the two clamping plates 1011 to move in opposite directions until the two clamping plates 1011 are clamped and fixed to the wooden board mold.
[0027] Further, such as Figure 3 As shown, T-shaped sliders 1014 are provided at both ends of the top of the clamp plate 1011, and a T-shaped slide groove 102 is opened at the bottom of the installation frame 1 relative to the position of the T-shaped slider 1014. The outer wall of the T-shaped slider 1014 and the inner wall of the T-shaped slide groove 102 slide in a limited position, and the clamp plate 1011 drives the T-shaped slider 1014 to slide along the T-shaped slide groove 102.
[0028] like Figure 1 , Figure 2 , Figure 4 , Figure 5 As shown, the supporting mechanism 2 is arranged in the installation frame 1.
[0029] Specifically, Figure 1 , Figure 2 , Figure 4 As shown, the support mechanism 2 includes an inner tube 201, an outer tube 202 and a plurality of clamping blocks 203; a bottom plate 204 with a central opening is fixedly connected to the bottom of the inner tube 201, and the side of the bottom plate 204 is fixedly connected to the inner wall of the mounting frame 1 through a support rod; the outer tube 202 is sleeved on the bottom end of the inner tube 201, and the bottom surface of the outer tube 202 is fixedly connected to the top surface of the bottom plate 204; a plurality of clamping blocks 203 are annular and rotatably connected to the top of the outer tube 202 at equal intervals; the space between the plurality of clamping blocks 203 and the inner tube 201 is The gap forms a clamping cavity, the outer wall of the outer tube 202 is threadedly connected with a collar 205, and the surfaces of the plurality of clamping blocks 203 are provided with thread grooves 2031 adapted to the collar 205. One end of the concrete casting pipe is inserted into the gap between the plurality of clamping blocks 203 and the inner tube 201 to form a clamping cavity, and the collar 205 is rotated to screw the collar 205 from the outer tube 202 to the thread groove 2031 of the clamping block 203, and the plurality of clamping blocks 203 are tightened so that the plurality of clamping blocks 203 and the inner tube 201 clamp and fix one end of the concrete casting pipe.
[0030] Further, such as Figure 2As shown, an insert block 2032 is provided at the bottom end of the clamp block 203, and a through groove 2021 is opened at the top end of the outer tube 202 relative to the position of the insert block 2032. The insert block 2032 extends into the through groove 2021 and is rotatably connected to the inner walls on both sides of the through groove 2021 through a rotating shaft. When the outer tube 202 is screwed to the thread groove 2031 of the clamp block 203, the clamp block 203 is driven to flip toward the inner tube 201 with the connection point of the insert block 2032 in the through groove 2021 as the center.
[0031] Further, if Figure 2 , Figure 5 As shown, the inner wall of the clamp block 203 is provided with a plurality of barbs A2033, and the outer wall of the inner tube 201 is sleeved with a plurality of barbs B2011 relative to the position above the barbs A2033. The diameter of the barbs A2033 gradually decreases downward, and the diameter of the barbs B2011 gradually increases upward. The barbs A2033 and the barbs B2011 are staggered to form a clamping gap. The concrete casting pipe is generally made of a soft material supported by rubber. The barbs A2033 and the barbs B2011 are staggered to form a clamping gap to squeeze the concrete casting pipe and cause it to bend, thereby further enhancing the stability of the concrete casting pipe during the casting process and preventing the concrete casting pipe from rushing out of the clamping cavity formed by the gap between the plurality of clamp blocks 203 and the inner tube 201 due to excessive concrete pressure.
[0032] Working principle: When the utility model is used, two clamping plates 1011 are clamped on both sides of the wooden board mold, and the bidirectional screw rod 1012 is rotated by the hand wheel 1013. The bidirectional screw rod 1012 drives the two clamping plates 1011 to move in opposite directions. The clamping plates 1011 drive the T-shaped slider 1014 to slide along the T-shaped slide groove 102 until the two clamping plates 1011 are clamped and fixed with the wooden board mold. One end of the concrete pouring pipe is inserted into the gap between the plurality of clamping blocks 203 and the inner pipe 201 to form a clamping cavity, and the sleeve ring 205 is rotated to 205 is screwed from the outer tube 202 to the thread groove 2031 of the clamp block 203, driving the clamp block 203 to flip toward the inner tube 201 with the connection point of the insert block 2032 in the through groove 2021 as the center, tightening a plurality of clamp blocks 203 so that a plurality of clamp blocks 203 and the inner tube 201 clamp one end of the concrete casting tube and fix it. At the same time, the barbs A 2033 and the barbs B 2011 are staggered to form a clamping gap, squeezing the concrete casting tube to cause it to bend, thereby further enhancing the stability of the concrete casting tube during the casting process.
[0033] The embodiments of the present invention disclose preferred embodiments, but are not limited thereto. A person skilled in the art can easily understand the spirit of the present invention based on the above embodiments and make different extensions and changes. However, as long as they do not deviate from the spirit of the present invention, they are all within the protection scope of the present invention.
Claims
1. A concrete pouring support device for building construction, characterized in that: It comprises an installation frame (1) and a support mechanism (2), wherein the support mechanism (2) is arranged in the installation frame (1); The installation frame (1) is hollow in the middle, and a clamping assembly (101) is provided at the bottom of the installation frame (1); The support mechanism (2) comprises an inner tube (201), an outer tube (202) and a plurality of clamping blocks (203); a bottom plate (204) in a centrally open shape is fixedly connected to the bottom of the inner tube (201); a side surface of the bottom plate (204) is fixedly connected to the inner wall of the installation frame (1) via a support rod; the outer tube (202) is sleeved on the bottom end of the inner tube (201); the bottom surface of the outer tube (202) is fixedly connected to the top surface of the bottom plate (204); a plurality of clamping blocks (203) are annular and rotatably connected to the top of the outer tube (202) at equal intervals; a clamping cavity is formed by gaps between the plurality of clamping blocks (203) and the inner tube (201); a collar (205) is threadedly connected to the outer wall of the outer tube (202); and a plurality of clamping blocks (203) are provided on the surface with thread grooves (2031) adapted to the collar (205).
2. The concrete pouring support device for building construction as claimed in claim 1, characterized in that: An insert block (2032) is provided at the bottom end of the clamp block (203), a through slot (2021) is provided at the top end of the outer tube (202) at a position relative to the insert block (2032), and the insert block (2032) extends into the through slot (2021) and is rotatably connected to the inner walls on both sides of the through slot (2021) via a rotating shaft.
3. The concrete pouring support device for building construction as claimed in claim 2, characterized in that: The inner wall of the clamping block (203) is provided with a plurality of barbs A (2033), and the outer wall of the inner tube (201) is sleeved with a plurality of barbs B (2011) at positions above the barbs A (2033).
4. The concrete pouring support device for building construction as claimed in claim 3, characterized in that: The barb A (2033) has a diameter that gradually decreases downward, and the barb B (2011) has a diameter that gradually increases upward. The barb A (2033) and the barb B (2011) are staggered to form a clamping gap.
5. The concrete pouring support device for building construction as claimed in claim 1, characterized in that: The clamping assembly (101) comprises two symmetrically arranged clamping plates (1011) and a bidirectional screw rod (1012), the top ends of the clamping plates (1011) are slidably connected to the two side surfaces of the bottom of the installation frame (1), and one end of the two clamping plates (1011) is respectively threadedly connected to the two ends of the bidirectional screw rod (1012), and one end of the bidirectional screw rod (1012) is fixedly connected to a hand wheel (1013).
6. The concrete pouring support device for building construction as claimed in claim 5, characterized in that: Both ends of the top of the clamping plate (1011) are provided with T-shaped sliding blocks (1014), and the bottom of the installation frame (1) is provided with a T-shaped sliding groove (102) at a position relative to the T-shaped sliding block (1014), and the outer wall of the T-shaped sliding block (1014) and the inner wall of the T-shaped sliding groove (102) are limitedly slidable.