Reusable device for spring layer pouring of constructional column concrete

By designing a reusable jump-layer casting structural column concrete device, the fixed connection and quick locking mechanism of the blanking pipe and the elbow pipe are used to solve the problem of high labor intensity and difficult concrete to enrich in traditional construction methods, and efficient Pouring construction and material costs are saved.

CN222025464UActive Publication Date: 2024-11-19GUANGDONG JIANBANG IND GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420119999.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-19
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

The traditional structural column concrete pouring construction method has high labor intensity and low efficiency. Due to the small operating space, it is difficult to enrich the concrete, resulting in a gap between the structural column head and the beam, and the connection is not compact.

Method used

A reusable jump-story casting structural column concrete device is designed, including blanking pipes, straight section pipes and elbow pipes. Through the fixed connection and quick locking mechanism of these pipes, concrete pouring down from the upper floor slab is realized. , reduce the need for artificial transfer of concrete, improve construction efficiency, and facilitate reuse through the detachable pipe sheet design.

Benefits of technology

It reduces labor intensity, improves construction efficiency, ensures that concrete is full and seamless, and the reusable pipe sheets saves material costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025464U_ABST
    Figure CN222025464U_ABST
Patent Text Reader

Abstract

The utility model provides a reusable device for spring layer pouring of constructional column concrete. The reusable device comprises a blanking pipe fixing plate, a blanking pipe, a quick lock, a straight section pipe and an elbow pipe. The blanking pipe fixing plate is fixedly connected with the blanking pipe; the straight section pipe and the blanking pipe as well as the elbow pipe and the straight section pipe are respectively locked by the quick locks; an elbow pipe connecting plate is arranged at the end, away from the straight section pipe, of the elbow pipe, and the elbow pipe is fixed to a constructional column formwork to be poured through the elbow pipe connecting plate. According to the device, the concrete is directly conveyed from the blanking pipe, the concrete does not need to be manually conveyed to the top of the constructional column from the floor of the constructional column, the labor intensity is reduced, and the salary efficiency is improved. The influence of operation space is avoided, and pouring construction is facilitated. And the concrete is poured fully without gaps. The detachable direct pipe, the elbow pipe and the elbow pipe connecting plate are adopted and can be repeatedly used, and cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction devices for pouring structural column concrete, in particular to a reusable device for pouring structural column concrete at a jump layer. Background Art

[0002] In architectural design, structural columns are generally used to resist earthquakes in masonry walls, which can effectively prevent house collapse. The traditional method of pouring concrete for structural columns is generally to transfer concrete upward from the current floor to the top of the column for pouring. This is often done by manually "transferring" concrete from the floor surface of the structural column to the top of the column, resulting in high labor intensity and low efficiency. The pouring is completed on this floor, and the interval between the top opening of the structural column template and the floor slab is only about 30 cm, and the operating space is extremely small, which is not conducive to pouring construction. Due to unreasonable setting of the pouring port or inconvenient pouring, the height of the pouring port is limited, and the concrete in the structural column template is difficult to fill, and the concrete will shrink after solidification, resulting in a loose connection between the structural column head and the beam, a gap between the column and the beam, and the concrete cannot be filled. The technical problems of the structural columns cast by the above existing construction technology have not been well solved. Utility Model Content

[0003] The utility model aims to provide a reusable device for casting concrete of structural columns in leap layers, which can solve the problems in the prior art.

[0004] The purpose of this utility model is achieved through the following technical solutions:

[0005] A reusable device for casting concrete for structural columns in leap layers, comprising a drop pipe fixing plate 4, a drop pipe 5, a quick lock 8, a straight pipe 6 and an elbow pipe 7; the drop pipe fixing plate 4 is fixedly connected to the drop pipe 5; the quick lock 8 locks the straight pipe 6 and the drop pipe 5, and the elbow pipe 7 and the straight pipe 6 respectively; an elbow pipe connecting plate 11 is provided at one end of the elbow pipe 7 away from the straight pipe 6, and the elbow pipe 7 is fixed to the structural column template to be cast through the elbow pipe connecting plate 11.

[0006] Furthermore, the straight-joint tube 6 includes at least two straight-joint tube arc plates 61 that are assembled together, and at least three groups of first protrusions 62 are symmetrically arranged on the edges of the straight-joint tube arc plates 61, and first through holes 63 are arranged on the first protrusions 62; when the two straight-joint tube arc plates 61 are assembled together, two adjacent first protrusions 62 are close to each other, and bolts pass through the two first through holes 63 to install the two straight-joint tube arc plates 61 together.

[0007] Furthermore, the elbow tube 7 includes at least two elbow tube arc plates 71 that are assembled together, and at least three groups of second protrusions 72 are symmetrically arranged on the edge of the elbow tube arc plate 71, and second through holes 73 are arranged on the second protrusions 72; when the two elbow tube arc plates 71 are assembled together, two adjacent second protrusions 72 are close to each other, and bolts pass through the two second through holes 73 to install the two elbow tube arc plates 71 together.

[0008] Furthermore, the elbow pipe connecting plate 11 includes connecting plates that are assembled with each other and have the same number as the elbow pipe arc plates 71 .

[0009] Furthermore, after the straight tube 6 is installed, a gap is left between two adjacent first protrusions 62 .

[0010] Furthermore, after the elbow pipe 7 is installed, a gap is left between two adjacent second protrusions 72 .

[0011] Furthermore, the drop pipe fixing plate 4 is located above the hole reserved in the upper floor slab; the drop pipe 5 extends downward from the hole; the outer dimension of the drop pipe fixing plate 4 is larger than the dimension of the hole, and the outer diameter of the drop pipe 5 is smaller than the dimension of the hole.

[0012] Furthermore, the number of the straight tube arc plates 61 is two, and they are semicircular tubes.

[0013] Furthermore, the number of the elbow pipe arc plates 71 is two, and they are semicircular tubes.

[0014] Compared with the prior art, the beneficial effects of the reusable device for casting concrete of structural columns in the utility model are as follows:

[0015] 1. When installing the device of the present application, the drop pipe fixing plate is supported on the leap-level (upper) floor. The drop pipe fixing plate, drop pipe, direct pipe, and elbow pipe are rigidly connected, and no additional bracket is required to fix the drop device. Concrete is directly transported from the drop pipe, and there is no need to manually "transfer" concrete from the floor of the structural column to the top of the column, which reduces labor intensity and improves labor efficiency. It is not affected by the operating space, which is conducive to pouring construction. The concrete is poured fully without gaps.

[0016] 2. The use of detachable direct pipes, elbow pipes and elbow pipe connecting plates can facilitate the separation of pipe segments, thereby facilitating the separation of pipe segments from the concrete inside them, facilitating the reuse of direct pipes, elbow pipes and elbow pipes, and saving material costs.

[0017] 3. The length of the hole is greater than the outer diameter of the neck of the blanking tube. The hole and the neck of the blanking tube are slidably matched to facilitate the adjustment of errors during installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the structure of a reusable device for pouring concrete for structural columns at leap levels according to the utility model;

[0019] Figure 2 This is a schematic diagram of the elbow pipe structure of the utility model;

[0020] Figure 3 It is a schematic diagram of the straight section pipe structure of the utility model.

[0021] The accompanying drawings are marked as follows: 1. Structural column; 2. Beam; 3. Floor slab; 4. Blanking pipe fixing plate; 5. Blanking pipe; 6. Straight section pipe; 61. Straight section pipe arc plate; 62. First protrusion; 63. First through hole; 7. Elbow pipe; 71. Elbow pipe arc plate; 72. Second protrusion; 73. Second through hole; 8. Quick lock; 9. Opening; 10. Structural column template; 11. Elbow pipe connecting plate. DETAILED DESCRIPTION

[0022] The embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.

[0023] The following describes the embodiments of the present disclosure through specific examples, and those skilled in the art can easily understand other advantages and effects of the present disclosure from the contents disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, rather than all of the embodiments. The present disclosure can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present disclosure. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present disclosure.

[0024] Embodiment 1

[0025] The utility model provides a reusable device for pouring concrete for structural columns at leap layers, such as Figures 1 to 3 As shown, it includes a blanking tube fixing plate 4, a blanking tube 5, a quick lock 8, a straight tube 6, and an elbow tube 7. The blanking tube fixing plate 4 is fixedly connected to the blanking tube 5, and the quick lock 8 quickly locks the straight tube 6 and the blanking tube 5, and the elbow tube 7 and the straight tube 6. An elbow tube connecting plate 11 is provided at one end of the elbow tube 7 away from the straight tube 6, and the elbow tube 7 is fixed to the structural column template 10 through the elbow tube connecting plate 11.

[0026] Holes 9 are reserved at the corresponding positions of the floor slab 3, and the drop pipe 5, straight section pipe 6, and elbow pipe 7 pass through the reserved holes in sequence from bottom to top, and are connected with quick locks 8. The elbow pipe connecting plate 11 is fixed to the structural column template 10 to form a concrete drop device. The drop device is placed and fixed on the floor slab 3 of the leap layer (i.e., the upper layer) by using the drop pipe fixing plate 4, and there is no need to set up additional fixed brackets to fix the drop device. For this reason, workers on the leap layer (upper layer) floor slab 3 "pour from top to bottom" concrete into the structural column template 10 through the drop device, and easily pour concrete. There is no need to manually "transfer" concrete from the floor of the structural column to the top of the column, which reduces labor intensity and improves wage efficiency. It is not affected by the operating space, which is conducive to pouring construction. "Pouring" concrete from top to bottom, using concrete gravity to make the concrete pouring full, without gaps.

[0027] The drop pipe 5 and the straight joint pipe 6, and the straight joint pipe 6 and the elbow pipe 7 are detachably connected through quick locks 8, and the elbow pipe connecting plate 11 is detachably connected to the structural column template 10. The quick lock 8 is the same as the existing concrete delivery pipe connection fittings.

[0028] Further, as an implementation mode of the present application, Figure 3 As shown, the straight tube 6 comprises at least two straight tube arc plates 61 which are assembled with each other, at least three groups of first protrusions 62 are symmetrically arranged on the edge of the straight tube arc plate 61, and first through holes 63 are arranged on the first protrusions 62. When the two straight tube arc plates 61 are assembled together, two adjacent first protrusions 62 are close to each other, and bolts pass through the two first through holes 63 to install the two straight tube arc plates 61 together.

[0029] Further, as an implementation mode of the present application, Figure 2 As shown, the elbow pipe 7 includes at least two elbow pipe curved plates 71 that are assembled together, at least three groups of second protrusions 72 are symmetrically arranged on the edge of the elbow pipe curved plate 71, and second through holes 73 are arranged on the second protrusions 72. When the two elbow pipe curved plates 71 are assembled together, two adjacent second protrusions 72 are close to each other, and bolts pass through the two second through holes 73 to install the two elbow pipe curved plates 71 together. The elbow pipe connecting plate 11 arranged at one end of the elbow pipe curved plate 71 includes the same number of connecting plates assembled together as the elbow pipe curved plates 71.

[0030] During installation, the straight tube arc plate 61 is combined into the straight tube 6, the elbow tube arc plate 71 is combined into the elbow tube 7, and the connecting plate is combined into the elbow tube connecting plate 11. During removal, they are disassembled respectively, and the concrete in the tube is removed, and reused in the next structural column pouring concrete process.

[0031] In this embodiment, the elbow tube 7 includes two elbow arc plates assembled together, and the straight section tube 6 includes two straight section arc plates assembled together, and both the elbow arc plates and the straight section arc plates are semicircular tubes.

[0032] Further, as an embodiment of the present application, after the straight tube 6 and the elbow tube 7 are assembled, a gap is left between two adjacent first protrusions 62 and between two adjacent second protrusions 72, and the optimal gap distance is about 10 mm. After the pouring is completed and the concrete is solidified, tools are inserted between the two first protrusions and the two second protrusions to pry the elbow tube curved plate 71 and the straight tube curved plate 61, so as to facilitate the recycling of the elbow tube curved plate 71 and the straight tube curved plate 61.

[0033] The blanking pipe fixing plate 4 is located above the hole 9 reserved on the floor slab at the top of the beam 2, the outer dimension of the blanking pipe fixing plate 4 is larger than the dimension of the hole 9, and the outer diameter of the blanking pipe 5 is smaller than the width of the hole 9. The length of the hole 9 is larger than the outer diameter of the blanking pipe 5, and the length direction of the hole 9 is perpendicular to the length direction of the masonry wall.

[0034] In the description of the present invention, it should be understood that the terms "middle", "length", "up", "down", "front", "back", "vertical", "horizontal", "inside", "outside", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0035] In the present invention, unless otherwise clearly specified and limited, the first feature "on" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. "Multiple" means at least two, such as two, three, etc., unless otherwise clearly and specifically limited.

[0036] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] The above is only for explaining the implementation mode of the utility model and is not used to limit the utility model. For those skilled in the art, any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the utility model without creative work should be included in the protection scope of the utility model.

Claims

1. A reusable device for casting concrete for structural columns in leap layers, characterized in that: The invention comprises a blanking pipe fixing plate (4), a blanking pipe (5), a quick lock (8), a straight joint pipe (6) and an elbow pipe (7); the blanking pipe fixing plate (4) is fixedly connected to the blanking pipe (5); the quick lock (8) respectively locks the straight joint pipe (6) and the blanking pipe (5), and the elbow pipe (7) and the straight joint pipe (6); an elbow pipe connecting plate (11) is arranged at one end of the elbow pipe (7) away from the straight joint pipe (6), and the elbow pipe (7) is fixed to the structural column template to be cast through the elbow pipe connecting plate (11).

2. The reusable device for casting structural column concrete at leap layers according to claim 1 is characterized in that: The straight tube (6) comprises at least two straight tube arc plates (61) assembled with each other, at least three groups of first protrusions (62) are symmetrically arranged on the edge of the straight tube arc plates (61), and first through holes (63) are arranged on the first protrusions (62); when the two straight tube arc plates (61) are assembled together, two adjacent first protrusions (62) are close to each other, and bolts pass through the two first through holes (63) to install the two straight tube arc plates (61) together.

3. The reusable device for casting structural column concrete at leap layers according to claim 1 is characterized in that: The elbow tube (7) comprises at least two elbow tube arc plates (71) assembled with each other, at least three groups of second protrusions (72) are symmetrically arranged on the edge of the elbow tube arc plate (71), and second through holes (73) are arranged on the second protrusions (72); when the two elbow tube arc plates (71) are assembled together, two adjacent second protrusions (72) are close to each other, and bolts pass through the two second through holes (73) to install the two elbow tube arc plates (71) together.

4. The reusable device for casting concrete for structural columns at leap layers according to claim 3 is characterized in that: The elbow pipe connecting plate (11) comprises the same number of connecting plates as the elbow pipe arc plates (71) which are assembled together.

5. The reusable device for casting concrete for structural columns at leap layers according to claim 2 is characterized in that: After the straight tube (6) is installed, a gap is left between two adjacent first protrusions (62).

6. The reusable device for casting concrete for structural columns at leap layers according to claim 3 is characterized in that: After the elbow pipe (7) is installed, a gap is left between two adjacent second protrusions (72).

7. The reusable device for casting concrete for structural columns at leap layers according to claim 1, characterized in that: The drop pipe fixing plate (4) is located above a hole reserved in the upper floor slab; the drop pipe (5) extends downward from the hole; the outer dimension of the drop pipe fixing plate (4) is larger than the dimension of the hole, and the outer diameter of the drop pipe (5) is smaller than the dimension of the hole.

8. The reusable device for casting concrete for structural columns at leap layers according to claim 2 is characterized in that: The number of the straight tube arc plates (61) is two and they are semicircular tubes.

9. The reusable device for casting concrete for structural columns at leap layers according to claim 3, characterized in that: The number of the elbow pipe arc plates (71) is two and they are semicircular tubes.