Complex terrain fat groove backfill pouring device and construction method

By using a combination device of hopper and feed pipe in the backfill construction of complex terrain fertilizer troughs, the problem of cement bonding to the inner wall of the trough is solved, the construction efficiency and safety are improved, the construction process is simplified, and the cost is reduced.

CN119287903APending Publication Date: 2025-01-10POWER CHINA HENAN ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411763514.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-03
Publication Date
2025-01-10

AI Technical Summary

Technical Problem

In the backfill construction of fertilizer troughs in complex terrain, since the concrete feed truck cannot directly reach, the existing method requires troughs, which leads to the material being exposed in the air, cement is bonded to the inner wall of the trough, making it difficult to clean, reducing material conveying efficiency and extending the construction cycle.

Method used

Using a combination device of hopper and feed pipe, a feed pipe is installed at the bottom of the hopper. The feed pipe runs through the limit plate and the guide barrel, supports the components and rollers to ensure stability, and cast instead of the chute, reduces the contact between concrete and air, and simplifies the construction process. .

Benefits of technology

It improves construction efficiency, reduces construction difficulty and cost, avoids chute cleaning processes, and ensures the stability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119287903A_ABST
    Figure CN119287903A_ABST
Patent Text Reader

Abstract

The invention discloses a complex terrain fertilizer trough backfill pouring device and a construction method.The complex terrain fertilizer trough backfill pouring device comprises a hopper, a material conveying pipe and a limiting plate, first supporting legs are arranged on the periphery of the bottom of the hopper, the material conveying pipe is arranged in the center of the bottom of the hopper, and the right end of the material conveying pipe penetrates through the limiting plate; and two supporting rods are arranged on the two sides of the limiting plate correspondingly, a connecting rod is arranged between the ends of the two supporting rods, rolling wheels are arranged at the ends of the supporting rods, and a supporting assembly is arranged at the bottom of the conveying pipe. The hopper is arranged below the discharge port of the concrete transport vehicle, so that contact between concrete and air is reduced; the conveying pipe is arranged at the bottom of the hopper, so that a worker can conveniently conduct pouring construction on the fertilizer groove, meanwhile, contact between concrete and air is avoided, the procedure of cleaning the chute is omitted, the working efficiency is improved, use is convenient, operation is easy, and popularization is easy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a fertilizer trough backfill auxiliary device, in particular to a fertilizer trough backfill pouring device and a construction method for complex terrain, belonging to the technical field of concrete construction. Background Art

[0002] The use of foundation backfill technology is indispensable in construction projects. There are many aspects of construction technology application involved in the foundation alone. The application of backfill construction technology can ensure the quality of each construction link. The foundation refers to the deformation of the base under the load of the building. The stratum must not be ignored. The foundation refers to the structure that transmits the load of the building to the bottom of the base. As the load supporting the building, the foundation must have the stability and damage prevention strength. The foundation of the construction project is the same as the foundation of the house construction. Both require the use of foundation backfill technology. The soil quality in each region is different, which means that the foundation construction design plan for each construction project is also different. There are many uncontrollable factors in different geology, which requires relevant experts and professional construction personnel to pay more attention to it and not be careless, otherwise it will bury a huge hidden danger for the construction of subsequent projects.

[0003] During the backfill construction of the existing fertilizer trough, due to the complex terrain, the concrete feeder truck cannot directly reach the vicinity of the fertilizer trough. The staff is required to set up a chute near the fertilizer trough and use the chute to cast the fertilizer trough. The existing castables are added with curing agents. During the transportation process, the materials will be exposed to the air for a long time, causing a thick layer of cement to adhere to the inner wall of the chute, which is not only difficult to clean, but also reduces the overall feeding efficiency, thereby extending the construction period. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art, provide a fertilizer trough backfill pouring device and construction method for complex terrain, use a feed pipe instead of a chute to avoid the situation where the inner wall of the chute is adhered to cement and cannot be repaired, thereby improving work efficiency and reducing construction difficulty.

[0005] The technical solution adopted by the present invention to solve the technical problem is: A device for backfilling and pouring fertilizer troughs in complex terrain comprises a hopper, a feed pipe and a limit plate, wherein a first support leg is arranged around the bottom of the hopper, a feed pipe is arranged at the center of the bottom of the hopper, the right end of the feed pipe passes through the limit plate, two support rods are arranged on both sides of the limit plate, a connecting rod is arranged between the ends of the two support rods, rollers are arranged at the ends of the support rods, and a support assembly is arranged at the bottom of the feed pipe.

[0006] There are at least two support assemblies, and each support assembly consists of a lower arc plate, a second leg and an upper arc plate. The second leg is arranged at the bottom of the lower arc plate. The material conveying pipe is located in the lower arc plate, and an upper arc plate is arranged above the material conveying pipe. The upper arc plate and the lower arc plate are fixed together by bolts.

[0007] The upper port of the hopper is provided with a screen.

[0008] A through hole is dug in the middle of the limiting plate, and material guide cylinders are respectively arranged above and below the through hole, and the end of the material conveying pipe passes through the material guide cylinder.

[0009] The connecting rod is provided with a positioning pin to fix the support rod and the bottom surface together.

[0010] The construction method of the complex terrain fertilizer trough backfill pouring device comprises the following steps: S1. Prefabricate the concrete required for construction, add curing agent into the concrete, and mix the concrete evenly with a mixer; S2. Clean the debris at the bottom of the fertilizer tank and waterproof the inner walls on both sides of the fertilizer tank; S3. Use a transport vehicle to transport the mixed concrete to the construction site, place a hopper under the chute of the concrete transport vehicle's discharge port, and weld a fence around the hopper to prevent concrete from splashing out of the hopper during the discharge process; S4. Measure the distance between the hopper and the upper port of the fertilizer tank, install a suitable feed pipe at the bottom of the hopper, and install a support assembly at the bottom of the feed pipe according to the length of the feed pipe so that the feed pipe is supported; S5. Measure the width of the upper port of the fertilizer tank, and weld support rods at both ends of the limit plate so that the ends of the support rods are located on the fertilizer tank; S6. Pass the end of the feed pipe through the feed guide tube, and fix the support rods on the ground on both sides of the fertilizer tank; S7. After installation, use a concrete transport truck to discharge the material into the hopper, and the concrete material enters the fertilizer tank through the feed pipe.

[0011] The positive beneficial effects of the present invention are: 1. The present invention reduces the contact between concrete and air by arranging a hopper below the discharge port of the concrete transport vehicle; and arranges a feeding pipe at the bottom of the hopper, which is convenient for workers to cast the fertilizer trough and avoids the contact between concrete and air, thus eliminating the process of cleaning the chute, improving work efficiency, and being easy to use and simple to operate.

[0012] 2. The present invention uses a material conveying pipe instead of a chute, thereby eliminating the complicated process of setting up a chute base frame, reducing construction costs, and reducing the burden on staff.

[0013] 3. The present invention sets a limit plate at the upper port of the fertilizer tank, and passes the lower end of the feed pipe through the limit plate, so as to fix the feed pipe, avoid the safety hazard of large swing of the feed pipe during the feeding process, and ensure the smooth progress of the construction.

[0014] 4. The present invention sets support rods at both ends of the limit plate and sets rollers at the ends of the support rods. The staff can freely adjust the position of the feed pipe according to the change of the pouring position. By setting a positioning drill on the connecting rod, the support rod can be fixed to ensure the stability of the construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a structural schematic diagram of the support assembly of the present invention; Figure 3 It is a structural schematic diagram of the hopper of the present invention; 1-hopper, 101-screen, 2-enclosing plate, 3-first leg, 4-feeding pipe, 5-limiting plate, 6-material guide cylinder, 7-support rod, 8-connecting rod, 9-roller, 10-positioning drill, 11-lower arc plate, 12-second leg, 13-upper arc plate, A-fertilizer trough. DETAILED DESCRIPTION

[0016] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings: Embodiment 1, a complex terrain fertilizer trough backfill pouring device, comprises a hopper 1, a feed pipe 4 and a limit plate 5, a first support leg 3 is arranged around the bottom of the hopper 1, a feed pipe 4 is arranged in the center of the bottom of the hopper 1, the right end of the feed pipe 4 passes through the limit plate 5, two support rods 7 are respectively arranged on both sides of the limit plate 5, and a connecting rod 8 is arranged between the ends of the two support rods 7, rollers 9 are arranged at the ends of the support rods 7, and a support assembly is arranged at the bottom of the feed pipe 4.

[0017] There are at least two supporting assemblies, and each supporting assembly consists of a lower arc plate 11, a second leg 12 and an upper arc plate 13. The second leg 12 is arranged at the bottom of the lower arc plate 11, the feed pipe 4 is located in the lower arc plate 11, and an upper arc plate 13 is arranged above the feed pipe 4. The upper arc plate 13 is fixedly connected to the lower arc plate 11 by bolts.

[0018] A screen 101 is provided at the upper port of the hopper 1 .

[0019] A through hole is dug in the middle of the limiting plate 5 , and material guide cylinders 6 are respectively arranged above and below the through hole, and the material guide cylinders 6 pass through the end of the material conveying pipe 4 .

[0020] A positioning drill 10 is provided on the connecting rod 8 to fix the support rod 7 and the bottom surface together.

[0021] In the above description, the inner diameter of the material guiding cylinder is larger than the outer diameter of the material conveying pipe.

[0022] In the above description, the material of the feed pipe is a hose.

[0023] In the above description, a screen is arranged at the upper port of the hopper to filter the concrete and prevent larger impurities from flowing into the fertilizer tank.

[0024] Embodiment 2, the construction method of the above-mentioned complex terrain fertilizer trough backfill pouring device comprises the following steps: S1. Prefabricate the concrete required for construction, add curing agent into the concrete, and mix the concrete evenly with a mixer; S2. Clean the debris at the bottom of the fertilizer tank and waterproof the inner walls on both sides of the fertilizer tank A; S3, using a transport vehicle to transport the mixed concrete material to the construction site, and placing a hopper 1 below the chute of the concrete transport vehicle's discharge port, and welding a fence 2 around the hopper 1 to prevent concrete from splashing out of the hopper 1 during the discharge process; S4, measuring the distance between the hopper 1 and the upper port of the fertilizer tank A, installing a suitable feed pipe 4 at the bottom of the hopper 1, and installing a support assembly at the bottom of the feed pipe 4 according to the length of the feed pipe 4, so that the feed pipe 4 is supported; S5, measuring the width of the upper port of the fertilizer tank A, and welding the support rods 7 at both ends of the limit plate 5, so that the ends of the support rods 7 are located on the fertilizer tank A; S6, passing the end of the feed pipe 4 through the feed guide tube 6, and fixing the support rod 7 on the ground on both sides of the fertilizer tank A; S7. After installation is completed, a concrete transport vehicle is used to discharge the concrete into the hopper 1, and the concrete material enters the fertilizer tank A through the conveying pipe 4.

[0025] In the above description, by adding a curing agent to the concrete, the problem of using ordinary lime soil and plain soil to backfill the final tamping density that does not meet the requirements is effectively solved, and the strength after backfilling is enhanced, reducing the risk of collapse and sinking, which can greatly improve the strength and impermeability of the backfill soil and prevent foundation settlement. At the same time, this process saves a lot of sand, gravel, cement and building materials, and has good economic benefits. It can be fully strengthened 10 hours after construction, and no maintenance is required, which can save manpower and effectively resist rain erosion. It is suitable for foundation pit support, foundation cushion, and construction conditions with frequent rainy seasons.

[0026] The present invention reduces the contact between concrete and air by arranging a hopper below the discharge port of the concrete transport vehicle; and arranges a feeding pipe at the bottom of the hopper, which is convenient for workers to cast the fertilizer trough and also avoids the contact between concrete and air, thus eliminating the process of cleaning the chute, improving work efficiency, being easy to use, simple to operate, and easy to promote.

Claims

1. A fertilizer trough backfill pouring device for complex terrain, comprising a hopper (1), a feed pipe (4) and a limit plate (5), characterized in that: The bottom of the hopper (1) is provided with first legs (3) around its periphery, a feed pipe (4) is provided at the center of the bottom of the hopper (1), the right end of the feed pipe (4) passes through a limit plate (5), two support rods (7) are provided on both sides of the limit plate (5), a connecting rod (8) is provided between the ends of the two support rods (7), rollers (9) are provided at the ends of the support rods (7), and a support assembly is provided at the bottom of the feed pipe (4).

2. A complex terrain fertilizer trough backfill pouring device according to claim 1, characterized in that: There are at least two support assemblies, and each support assembly is composed of a lower arc plate (11), a second support leg (12) and an upper arc plate (13). The second support leg (12) is arranged at the bottom of the lower arc plate (11). The material conveying pipe (4) is located in the lower arc plate (11), and an upper arc plate (13) is arranged above the material conveying pipe (4). The upper arc plate (13) and the lower arc plate (11) are fixedly connected together by bolts.

3. The complex terrain fertilizer trough backfill pouring device according to claim 1 is characterized by: The upper port of the hopper (1) is provided with a screen (101).

4. The complex terrain fertilizer trough backfill pouring device according to claim 1 is characterized by: A through hole is dug in the middle of the limiting plate (5), and a material guide cylinder (6) is provided above and below the through hole, respectively, and the end of the material conveying pipe (4) passes through the material guide cylinder (6).

5. The complex terrain fertilizer trough backfill pouring device according to claim 1 is characterized by: The connecting rod (8) is provided with a positioning pin (10) to fix the support rod (7) and the bottom surface together.

6. The construction method of the complex terrain fertilizer trough backfill pouring device according to any one of claims 1 to 5, characterized in that: The steps include: S1. Prefabricate the concrete required for construction, add curing agent into the concrete, and mix the concrete evenly with a mixer; S2. Clean the debris at the bottom of the fertilizer tank and waterproof the inner walls on both sides of the fertilizer tank (A); S3, using a transport vehicle to transport the mixed concrete material to the construction site, and placing a hopper (1) below the chute of the concrete transport vehicle's discharge port, and welding a fence (2) around the hopper (1) to prevent concrete from splashing out of the hopper (1) during the discharge process; S4, measuring the distance between the hopper (1) and the upper end of the fertilizer tank (A), installing a suitable feed pipe (4) at the bottom of the hopper (1), and installing a support assembly at the bottom of the feed pipe (4) according to the length of the feed pipe (4) so ​​that the feed pipe (4) is supported; S5, measuring the width of the upper end of the fertilizer trough (A), and welding the support rods (7) at both ends of the limit plate (5) so that the ends of the support rods (7) are located on the fertilizer trough (A); S6. Pass the end of the feed pipe (4) through the feed guide tube (6), and fix the support rods (7) on the ground on both sides of the fertilizer tank (A); S7. After the installation is completed, the concrete transport vehicle is used to discharge the concrete into the hopper (1), and the concrete material enters the fertilizer tank (A) through the conveying pipe (4).