Non-excavation pipeline inner adjacent drainage middle guide pipe dismounting and mounting equipment
By designing the disassembly and assembly equipment of medium conduits supporting trusses, tracks, walkway plates, rail transport vehicles and lifting frames, difficulties and safety problems in the transportation and installation and removal of medium conduits are solved, and efficient and safe pipeline construction is achieved. in different sizes of medium catheters.
Patent Information
- Application Number
- CN202420043651.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-01-09
AI Technical Summary
In the non-excavation and restoration of pipelines, the transportation, installation and removal process of the medium conduit is difficult, inefficient and poor safety, especially due to its large weight and complex size, it leads to difficulty in pushing and lifting, and often requires water wading operations to increase safety risk.
A temporary intermediate conduit disassembly and assembly equipment in non-excavated pipelines is designed, including supporting trusses, tracks, walkway plates, rail transport vehicles and lifting frames. It is transported through rail transport vehicles to support intermediate conduits and lifted by lifting frames. , the support truss is fixed to the inner wall of the pipeline to avoid offline operation of the water level, reducing construction difficulty and safety risks.
Improve the efficiency of transportation and installation and removal of medium conduits, reduce construction difficulty and safety risks, avoid damage to construction personnel by water flow, and is suitable for medium conduits of different diameters and sizes, simplify the construction process, improve construction safety and efficiency .
Smart Images

Figure CN222026413U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of pipeline trenchless repair construction, in particular to a device for disassembling and assembling a pipe in a temporary drainage pipe in a trenchless pipeline. Background Art
[0002] In the trenchless repair construction of pipelines, the temporary drainage diversion method of the middle conduit is usually adopted. The middle conduit is installed in the original pipeline to divert the water flow in the original pipeline to the middle conduit for temporary drainage to create conditions for pipeline dry warehouse repair. The construction time of the middle conduit is when the original pipeline is at low peak flow. The water flow in the original pipeline is small, but it is still a water-carrying operation. The middle conduit is connected section by section in the original pipeline through flange bolts in the form of pipe sections. The pipe sections of the middle conduit are made of steel. Its common specifications are 3m or 4m. The weight of a single pipe section is about 1.5t to 2t. Therefore, its transportation, installation and removal are extremely difficult. The conventional construction method is to push the pipe section into place with a cart, then lift the pipe section with a jack and set an I-beam support. The installation process not only requires wading operations, but is also extremely laborious and unsafe, and has low disassembly and assembly efficiency. Utility Model Content
[0003] The utility model aims to provide a device for disassembling and assembling a temporary middle pipe in a trenchless pipeline, so as to solve the problems of difficult transportation and disassembly of the middle pipe, low efficiency and poor safety.
[0004] In order to solve the above technical problems, the utility model provides a device for disassembling and assembling a pipe in a trenchless pipeline, comprising:
[0005] There are several supporting trusses, which are arranged in the original pipeline at intervals in the longitudinal direction. Each of the supporting trusses includes a crossbeam, and the two ends of the crossbeam are fixedly arranged on the inner walls of the two sides of the original pipeline;
[0006] Two rails, laid on the beams at longitudinal intervals;
[0007] Walkway plates, located on both sides of the track and laid on the crossbeam in parallel with the track;
[0008] A rail transport vehicle travels on the two rails, and the rail transport vehicle is provided with at least two groups of arc-shaped support plates for supporting the middle conduit to be transported, and each group of arc-shaped support plates is symmetrically arranged with two;
[0009] The lifting frame is supported on the cross beams on the outside of the two tracks. The lifting frame includes a bottom guide beam located on the cross beams on the outside of each track, a support rod arranged on each of the bottom guide beams, and a hanging beam connected between the support rods on both sides. A hoist is arranged on the hanging beam, and the hoist is connected to a sling or a sling on the middle guide tube.
[0010] Furthermore, in the trenchless pipeline inner temporary drainage pipe disassembly and assembly equipment provided by the utility model, each of the support trusses also includes a support leg vertically arranged on the crossbeam, and the support leg is fixedly arranged on the inner wall below the original pipeline.
[0011] Furthermore, the utility model provides a trenchless pipeline inner pipe disassembly and assembly device, wherein both ends of the crossbeam are arc-shaped surfaces matching the inner walls on both sides of the original pipeline, or both ends of the crossbeam are provided with arc-shaped end plates matching the inner walls on both sides of the original pipeline.
[0012] Furthermore, in the equipment for disassembling and assembling the temporary drainage pipe in a trenchless pipeline provided by the utility model, the track is an I-beam.
[0013] Furthermore, the utility model provides a trenchless pipeline in-line temporary drainage mid-pipe disassembly and assembly device, the rail transport vehicle comprises a frame composed of four steel sections and rail wheels arranged on the frame, and the arc-shaped support plate is arranged on the frame.
[0014] Furthermore, in the equipment for disassembling and assembling the intermediate conduit in a trenchless pipeline provided by the utility model, the hanging beam is arched, and the hoist is arranged at the midpoint of the hanging beam and is located below the hanging beam.
[0015] Furthermore, the utility model provides a trenchless pipeline inner middle guide pipe disassembly and assembly equipment, wherein the support rods on each side are two rods obliquely connected to the bottom guide beam with the hanging beam as the center, and the connection nodes of the bottom guide beam, the two support rods and the hanging beam on each side form a triangular structure, and the height of the vertical line from the hanging beam to the bottom guide beam is greater than the total height of the rail transport vehicle and the middle guide pipe thereon and is less than the diameter length of the original pipeline.
[0016] Compared with the prior art, the beneficial effects of the pipe disassembly and assembly device for temporary drainage in trenchless pipelines provided by the utility model are as follows:
[0017] 1. Place the middle conduit on a rail transport vehicle, and use the rail transport vehicle to travel on the track to transport the middle conduit to be installed or removed, which facilitates the transportation of the middle conduit in the original pipeline, thereby reducing the difficulty of transporting the middle conduit in the original pipeline and solving the problem of difficulty in transporting the middle conduit.
[0018] 2. The central conduit is lifted and lowered by connecting the sling or sling through the hoist on the lifting frame, which facilitates the alignment installation of the central conduit to be installed and the installed one on the same axis.
[0019] 3. When the construction is carried out under the low peak flow of the original pipeline, the water level is below the crossbeam of the supporting truss, and the track, track transport vehicle, walkway board, and lifting frame are all above the water level. The construction workers operate the transportation, installation, and removal of the middle conduit on the walkway board without wading in water, which reduces the operational risks of transporting, installing, and removing the middle conduit. Compared with wading in water, it avoids the physical harm of the flowing water in the original pipeline to the construction workers, and avoids the risk of slipping and falling in the water, and avoids the impact of water flow on the construction of the middle conduit, ensuring construction safety.
[0020] 4. After the middle conduit is installed or before it is removed, the middle conduit is supported on the crossbeam of the supporting truss, and the adjacent middle conduits are easily aligned and connected through flange bolts, which improves the stability of the middle conduit during installation, removal and use. Compared with traditional construction, there is no need to set up an independent support for the middle conduit in the original pipeline, which reduces the construction difficulty and the risk of the middle conduit falling off due to the independent support, and avoids the problem of the middle conduit on the independent support causing the adjacent middle conduits to be difficult to align and cause misalignment.
[0021] 5. The installation and removal of the central duct are carried out through the walkway plate, which improves the traffic conditions in the original pipeline and facilitates the installation and removal of the central duct.
[0022] 6. It is suitable for the installation and removal of the middle duct with different diameters and specifications. Compared with the traditional construction, it avoids the problem that the middle duct section becomes larger in specifications and the weight increases greatly, which will make it difficult to push and lift. It has the advantage of a wide range of uses.
[0023] 7. The middle duct is transported by a rail transport vehicle and lifted by a lifting frame, which improves the construction efficiency of the installation and removal of the middle duct.
[0024] 8. The installation and removal of the central duct has become a streamlined and standardized operation. It is not only simple to operate and has a concise process, but also reduces the complexity of the central duct installation and removal process compared to the traditional process that requires the central duct to be transported to its place, lifted, and then processed with the legs to adjust the height of the central duct.
[0025] 9. The medium duct disassembly and assembly equipment consists of a supporting truss, rails, walkway boards, rail transport vehicles and lifting frames. It has the advantages of simple structure, convenient installation and disassembly, and recyclable reuse. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a three-dimensional structural diagram of the supporting truss;
[0027] Figure 2 It is a side view structural diagram of the support truss installed in the original pipeline;
[0028] Figure 3 It is a schematic diagram of the main cross-sectional structure of the support truss and track installation;
[0029] Figure 4 It is a side view of the structure where the track and walkway slabs are laid on the supporting trusses;
[0030] Figure 5 It is a partial cutaway three-dimensional structural diagram of the track and walkway slabs laid on the supporting trusses;
[0031] Figure 6 It is a three-dimensional structural schematic diagram of a rail transport vehicle;
[0032] Figure 7 It is a schematic diagram of the three-dimensional structure of the catheter in a section;
[0033] Figure 8 It is a schematic diagram of the three-dimensional structure of the middle duct placed on the rail transport vehicle;
[0034] Fig. 9 It is a three-dimensional structural schematic diagram of the lifting frame;
[0035] Figures 10 to 13 Schematic diagram of the installation process of the middle duct;
[0036] Fig.14 It is a schematic diagram of the side view structure after the middle duct is installed;
[0037] Fig.15 It is a schematic diagram of the structure in which the middle conduit is lifted by a sling;
[0038] Fig.16 It is a schematic diagram of the structure in which the middle conduit is lifted by a sling;
[0039] As shown in the figure:
[0040] 100. Equipment for disassembling and assembling temporary drainage pipes in trenchless pipelines;
[0041] 110, supporting truss, 111, cross beam, 112, outrigger, 113, curved end plate;
[0042] 120, track;
[0043] 130, walkway board;
[0044] 140. rail transport vehicle, 141. frame, 142. rail wheel, 143. arc-shaped support plate;
[0045] 150, lifting frame, 151, bottom guide beam, 152, support rod, 153, lifting beam, 154, hoist, 155, lifting rope, 156, lifting belt;
[0046] 200, original pipeline;
[0047] 300, middle conduit, 310, flange, 311, bolt hole. DETAILED DESCRIPTION
[0048] The utility model is described in detail below in conjunction with the accompanying drawings: According to the following description, the advantages and features of the utility model will be more clearly understood. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the utility model.
[0049] Please refer to Figures 1 to 16 The embodiment of the utility model provides a trenchless pipeline inner temporary drainage pipe disassembly and assembly device 100, comprising a support truss 110, a track 120, a walkway plate 130, a track transport vehicle 140 and a lifting frame 150, wherein:
[0050] There are several support trusses 110, which are arranged longitudinally and spaced apart in the original pipeline 200. Each of the support trusses 110 includes a crossbeam 111, and the two ends of the length of the crossbeam 111 are fixedly arranged on the inner walls of both sides of the original pipeline 200. The length direction of the original pipeline 200 is the longitudinal direction, and the length direction of the crossbeam 111 is the transverse direction, that is, the radial direction of the original pipeline 200.
[0051] There are two rails 120, which are longitudinally spaced and laid on the crossbeam 111. The rails 120 include but are not limited to I-beams.
[0052] The walkway plate 130 is located on both sides of the track 120 and is laid on the crossbeam 111 parallel to the track 120. The walkway plate is located outside the track 120 and is used for personnel transportation in the pipeline during the construction of the middle pipe 300 and the subsequent pipeline repair construction, while avoiding wading during the transportation of the middle pipe.
[0053] The rail transport vehicle 140 travels on the two rails 120. The rail transport vehicle 140 is provided with at least two groups of arc-shaped support plates 143 for supporting the transported middle conduit 300. Each group of arc-shaped support plates 143 is symmetrically arranged. The arc-shaped support plates 143 can stably place the middle conduit 300 on the rail transport vehicle 140, and maintain the stability of the middle conduit 300 during transportation on the rails 120.
[0054] The lifting frame 150 is supported on the cross beam 111 on the outside of the two rails 120. The lifting frame 150 includes a bottom guide beam 151 located on the cross beam 111 on the outside of each rail 120, a support rod 152 arranged on each of the bottom guide beams 151, and a hanging beam 153 connected between the support rods 152 on both sides. A hoist 154 is arranged on the hanging beam 153, and the hoist 154 is connected to a sling 155 or a sling 156 on the middle guide tube 300.
[0055] Please refer to Figures 1 to 16 The embodiment of the utility model also provides a method for disassembling and assembling the intermediate conduit 300 in a trenchless pipeline, including a method for installing the intermediate conduit 300, specifically comprising:
[0056] Step S1, installing the above-mentioned trenchless pipeline inner temporary drainage pipe disassembly and assembly device 100 in the original pipeline 200 of the trenchless pipeline repair construction, such as Figures 1 to 10 shown.
[0057] Step S2, move the lifting frame 150 to the position where the middle conduit 300 is to be installed, such as Figure 10 to Figure 11 shown.
[0058] Step S3, the middle conduit 300 to be installed is hoisted on the rail transport vehicle 140 by a hoisting device and limited by two sets of arc-shaped support plates 143, and the rail transport vehicle 140 travels on the track 120 to transport the middle conduit 300 thereon to the location to be installed, such as Figure 8 , Figure 10 to Figure 11 shown.
[0059] Step S4, the flanges 310 at both ends of the middle conduit 300 on the rail transport vehicle 140 are connected through the bolt holes 311 thereon by the sling 155, as shown in FIG. Fig.15 or by the sling 156 on the rail transport vehicle 140 of the conduit 300 connected around its circumferential direction, such as Fig.16 shown.
[0060] Step S5, connect the sling 155 or the sling 156 to the hoist 154 of the lifting frame 150, lift the middle conduit 300 by the hoist 154, and move the rail transport vehicle 140 out from under the lifted middle conduit 300, as shown in FIG. Figures 10 to 13 shown.
[0061] Step S6, lower the lifted middle conduit 300 to the crossbeam 111 of the support frame at the corresponding position by means of the hoist 154 and align it with the flange 310 of the installed middle conduit 300, and connect the two sections of the middle conduit 300 by means of flange bolts (not shown) penetrating the flange 310, as shown in FIG. Figure 12 to Figure 13 shown.
[0062] Step S7, repeating steps S1 to S6 until all the middle conduits 300 are installed.
[0063] The embodiment of the utility model provides a method for disassembling and assembling a middle conduit 300 for temporary drainage in a trenchless pipeline. After the middle conduit 300 is installed, the end of the middle conduit 300 is blocked and diverted to achieve temporary drainage of the middle conduit 300 and create conditions for repairing the pipeline dry warehouse. This is the stage where the temporary drainage of the middle conduit is put into use. At this stage, the support truss 110 and the walkway plate 130 constitute a traffic road in the original pipeline 200, which is convenient for the movement of personnel and the entry of materials, and also serves as a safe evacuation channel.
[0064] Please refer to Figures 1 to 16 The embodiment of the utility model also provides a method for disassembling and assembling the intermediate conduit in a trenchless pipeline, and also includes a method for removing the intermediate conduit 300, which is the reverse process of the installation method, specifically including:
[0065] Step S11, removing the flange bolts connected to the middle conduit 300.
[0066] Step S12, move the lifting frame 150 to the location of the middle conduit 300 to be removed, such as Figure 12 to Figure 13 described.
[0067] Step S13, the flanges 310 at both ends of the middle conduit 300 with the flange bolts removed are connected through the bolt holes 311 thereon by means of the sling 155; or the middle conduit 300 with the flange bolts removed is connected around its circumference by means of the sling 156, such as Figure 15 to Figure 16 shown.
[0068] Step S14, connect the sling 155 or the sling 156 to the hoist 154 of the lifting frame 150, lift the middle conduit 300 by the hoist 154, and move the rail transport vehicle 140 to the bottom of the lifted middle conduit 300, as shown in FIG. Figure 10 to Figure 11 shown.
[0069] Step S15, lower the lifted middle conduit 300 to the rail transport vehicle 140 through the hoist 154 and limit it through the two sets of arc-shaped support plates 143, release the connection between the hoist 154 and the sling 155 or the sling 156, and transport the middle conduit 300 on it away by the rail transport vehicle 140 running on the track 120, as shown in FIG. Figure 8 , Fig.10 shown.
[0070] Step S16, the middle conduit 300 on the rail transport vehicle 140 is hoisted out by connecting the hoisting equipment to the sling 155 or the sling 156. Specifically, the middle conduit 300 can be hoisted out of the well for reuse.
[0071] Step S17, repeating steps S11 to S16 until all the middle conduits 300 are removed.
[0072] In order not to affect the peak flow rate after the trenchless repair of the pipeline, the method for removing the middle conduit 300 may further include:
[0073] Step S18, after all the intermediate pipes 300 are removed, the intermediate pipe disassembly and assembly device 100 for temporary drainage in the trenchless pipeline is removed from the original pipeline 200. The removal step can be performed as follows: Figure 5 to Figure 1 The order is the reverse process of installation.
[0074] The above-mentioned embodiment of the utility model provides a trenchless pipeline intermediate conduit disassembly and assembly device 100 and a method, which places the intermediate conduit 300 on a rail transport vehicle 140, and the rail transport vehicle 140 travels on the track 120 to transport the intermediate conduit 300 to be installed and removed, thereby facilitating the transportation of the intermediate conduit 300 in the original pipeline 200, thereby reducing the difficulty of transporting the intermediate conduit 300 in the original pipeline 200 and solving the problem of the difficulty in transporting the intermediate conduit 300.
[0075] The above-mentioned embodiment of the utility model provides a non-excavation pipeline intermediate conduit disassembly and assembly device 100 and method, which lifts and lowers the intermediate conduit 300 by connecting the hoist 154 on the lifting frame 150 with the sling 155 or the sling 156, so as to facilitate the alignment installation of the intermediate conduit 300 to be installed and the installed one on the same axis.
[0076] The above embodiment of the utility model provides a trenchless pipeline temporary drainage middle conduit disassembly and assembly device 100 and method. When the original pipeline 200 is constructed at a low peak flow rate, the water level is below the crossbeam 111 of the support truss 110, and the track 120, the track transport vehicle 140, the walkway 130, and the lifting frame 150 are all above the water level. The construction workers operate the transportation, installation, and removal of the middle conduit 300 on the walkway 130 without wading in water, thereby reducing the operation risks of transporting, installing, and removing the middle conduit 300. Compared with wading in water, it avoids the physical harm of the flowing water in the original pipeline 200 to the construction workers, and avoids the risk of the construction workers slipping and falling in the water, and avoids the influence of the water flow on the construction of the middle conduit 300, thereby improving the construction safety.
[0077] In the above embodiment of the utility model, the intermediate conduit disassembly and assembly device 100 and method for temporary drainage in trenchless pipelines are provided. After the intermediate conduit 300 is installed in place or before the intermediate conduit 300 is removed, the intermediate conduit 300 is supported on the crossbeam 111 of the support truss 110, and the adjacent intermediate conduits 300 are conveniently aligned and connected by flange bolts, thereby improving the stability of the intermediate conduit 300 during installation, removal and use. Compared with traditional construction, there is no need to set an independent support for the intermediate conduit 300 in the original pipeline 200, which reduces the construction difficulty, reduces the risk of the intermediate conduit 300 being easily detached due to the independent support, and avoids the problem of the intermediate conduit 300 being difficult to align and misalign adjacent intermediate conduits 300 on the independent support.
[0078] The above-mentioned embodiment of the utility model provides a trenchless pipeline temporary drainage middle conduit disassembly and assembly device 100 and method, which operates the installation and removal of the middle conduit 300 through the walkway plate 130, improves the traffic conditions in the original pipeline 200, and facilitates the construction of the installation and removal of the middle conduit 300.
[0079] The above-mentioned embodiment of the utility model provides a trenchless pipeline temporary drainage intermediate conduit disassembly and assembly device 100 and method, which is suitable for the installation and removal of intermediate conduits 300 of different diameters and specifications. Compared with the traditional construction, it avoids the problem that the intermediate conduit 300 pipe sections become larger in specifications and the weight increases greatly, which will make it difficult to push and lift, and has the advantage of a wide range of uses.
[0080] The above-mentioned embodiment of the utility model provides a trenchless pipeline intermediate conduit disassembly and assembly device 100 and method, which transports the intermediate conduit 300 by a rail transport vehicle 140 and lifts the intermediate conduit 300 by a lifting frame 150, thereby improving the construction efficiency of the installation and removal of the intermediate conduit 300.
[0081] The above-mentioned embodiment of the utility model provides a trenchless pipeline intermediate conductor disassembly and assembly device 100 and a method, and the installation and removal construction of the intermediate conductor 300 becomes a streamlined and standardized operation, which is not only simple to operate but also concise in process. Compared with the traditional process that requires the intermediate conductor 300 to be transported to the right place, lifted, and then the legs are processed to adjust the height alignment of the intermediate conductor 300, the complexity of the installation and removal process of the intermediate conductor 300 is reduced.
[0082] The above-mentioned embodiment of the utility model provides a non-excavation pipeline intermediate pipe disassembly and assembly device 100 and method. The intermediate pipe 300 disassembly and assembly device 100 is composed of a supporting truss 110, a track 120, a walkway plate 130, a track transport vehicle 140 and a lifting frame 150, and has the advantages of simple structure, convenient installation and disassembly, and recyclable reuse.
[0083] Please refer to Figures 1 to 5In order to improve the reliability of the support truss 110 installed on the original pipeline 200, the embodiment of the utility model provides a trenchless pipeline in-line temporary drainage pipe disassembly and assembly device 100 and method, each of the support trusses 110 also includes a support leg 112 vertically arranged on the crossbeam 111, and the support leg 112 is fixedly arranged on the inner wall below the original pipeline 200. Each support truss 100 is provided with at least one support leg 112. At this time, the support truss 110 is supported on the original pipeline 200 at least three points, which improves the reliability of the support truss 110 being arranged on the inner wall of the original pipeline 200, and can also unify the installation elevation of the crossbeam 111, ensure the reliability of the installation of the rail 120 on the crossbeam 111 and the stability of the rail transport vehicle 140 running on it, and avoid the rollover problem caused by the different heights of the rails.
[0084] Please refer to Figure 1 , Figure 2 , Figure 4 , Figure 5 In order to improve the reliability of the crossbeam 111 being arranged on the original pipeline 200, the embodiment of the utility model provides a trenchless pipeline in-line temporary drainage pipe disassembly and assembly device 100 and method, the two ends of the crossbeam 111 are arc-shaped surfaces matching the inner walls of the two sides of the original pipeline 200, or the two ends of the crossbeam 111 are provided with arc-shaped end plates 113 matching the inner walls of the two sides of the original pipeline 200. In order to improve the stability and support effect of the support truss 110, the support truss 110 can be a steel structure.
[0085] Please refer to Figure 6 In order to reduce the cost, the embodiment of the utility model provides a trenchless pipeline in-line pipe disassembly and assembly device 100 and method, wherein the rail transport vehicle 140 comprises a frame 141 composed of four steel sections, and a rail wheel 142 disposed on the frame 141, and the arc-shaped support plate 143 is disposed on the frame 141. At this time, the frame 141 has the advantages of simple structure and low cost. In order to improve the support strength, the frame 141 can be composed of steel sections such as I-beams.
[0086] Please refer to Fig. 9 In order to improve the hoisting rigidity of the hoist 154 at the hoisting point to the central conduit 300, the embodiment of the utility model provides a trenchless pipeline temporary central conduit disassembly and assembly device 100 and method, in the hoisting frame 150, the suspension beam 153 is arched, and the hoist 154 is arranged at the midpoint of the suspension beam 153 and below the suspension beam 153. The arched suspension beam 153 has the advantages of strong rigidity and is not easy to bend downward.
[0087] Please refer to Fig. 9In order to improve the structural stability of the lifting frame 150, the embodiment of the utility model provides a trenchless pipeline intermediate pipe disassembly and assembly device 100 and method. In the lifting frame 150, the support rods 152 on each side are two rods obliquely connected to the bottom guide beam 151 with the suspension beam 153 as the center. The connection nodes of the bottom guide beam 151, the two support rods 152 and the suspension beam 153 on each side form a triangular structure. The height of the vertical line from the suspension beam 153 to the bottom guide beam 151 is greater than the total height of the rail transport vehicle 140 and the intermediate pipe 300 thereon and is less than the diameter length of the original pipe 200. The stability of the triangular structure improves the stability of the lifting frame 150 supported on the crossbeam 111.
[0088] The present invention provides a trenchless pipeline internal temporary drainage pipe disassembly and assembly device 100 and method, and the process of trenchless pipeline repair construction is as follows:
[0089] Installation of equipment for disassembling and assembling middle duct for temporary drainage in trenchless pipeline → Transportation of middle duct → Installation of middle duct → Use of middle duct for temporary drainage → Disassembly of middle duct → Transportation of middle duct → Disassembly of equipment for disassembling and assembling middle duct for temporary drainage in trenchless pipeline.
[0090] The installation of the intermediate conduit 300 starts from the downstream end of the original pipeline 200, and the intermediate conduit 300 is continuously transported upstream to the installation position. The intermediate conduit 300 is transported by the rail transport vehicle 140. First, the intermediate conduit 300 is hoisted onto the rail transport vehicle 140 at the upstream well position, and then the construction workers push the rail transport vehicle 140 on the walkway 130 or push the rail transport vehicle 140 forward on the track 120 through a push-pull device until it is transported to the intermediate conduit installation position. It has the advantages of labor saving and convenience, and the transportation of the intermediate conduit can be completed by only 1-2 people.
[0091] The present utility model is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments obtained by ordinary technicians in this field based on the described embodiments of the present utility model belong to the scope of protection of the present utility model. Those skilled in the art can make other levels of modifications and changes to the present utility model. In this way, if these modifications and changes of the present utility model fall within the scope of the claims of the present utility model, the present utility model is also intended to include these changes and changes.
Claims
1. A device for disassembling and assembling a pipe in a trenchless pipeline, characterized in that: include: There are several supporting trusses, which are arranged in the original pipeline at intervals in the longitudinal direction. Each of the supporting trusses includes a crossbeam, and the two ends of the crossbeam are fixedly arranged on the inner walls of the two sides of the original pipeline; Two rails, laid on the beams at longitudinal intervals; Walkway plates, located on both sides of the track and laid on the crossbeam in parallel with the track; A rail transport vehicle travels on the two rails, and the rail transport vehicle is provided with at least two groups of arc-shaped support plates for supporting the middle conduit to be transported, and each group of arc-shaped support plates is symmetrically arranged with two; The lifting frame is supported on the cross beams on the outside of the two tracks. The lifting frame includes a bottom guide beam located on the cross beams on the outside of each track, a support rod arranged on each of the bottom guide beams, and a hanging beam connected between the support rods on both sides. A hoist is arranged on the hanging beam, and the hoist is connected to a sling or a sling on the middle guide tube.
2. The device for disassembling and assembling the pipe in the temporary drainage of the trenchless pipeline according to claim 1 is characterized in that: Each of the supporting trusses also includes a support leg vertically arranged on the crossbeam, and the support leg is fixedly arranged on the inner wall below the original pipeline.
3. The device for disassembling and assembling a pipe in a trenchless pipeline according to claim 1, characterized in that: The two ends of the cross beam are arc-shaped surfaces matching the inner walls of the two sides of the original pipeline, or the two ends of the cross beam are provided with arc-shaped end plates matching the inner walls of the two sides of the original pipeline.
4. The device for disassembling and assembling a pipe in a trenchless pipeline according to claim 1, characterized in that: The track is an I-beam.
5. The device for disassembling and assembling a pipe in a trenchless pipeline according to claim 1, characterized in that: The rail transport vehicle comprises a frame composed of four steel sections and rail wheels arranged on the frame, and the arc-shaped supporting plate is arranged on the frame.
6. The device for disassembling and assembling a pipe in a trenchless pipeline according to claim 1, characterized in that: The hanging beam is arched, and the hoist is arranged at the midpoint of the hanging beam and is located below the hanging beam.
7. The device for disassembling and assembling a pipe in a trenchless pipeline according to claim 1, characterized in that: The support rods on each side are two rods obliquely connected to the bottom guide beam with the suspension beam as the center. The bottom guide beam on each side, the two support rods and the connecting node of the suspension beam form a triangular structure. The height of the vertical line from the suspension beam to the bottom guide beam is greater than the total height of the rail transport vehicle and the middle duct thereon and is less than the diameter length of the original pipeline.
Citation Information
Cited By
Equipment and method for disassembling and assembling adjacent drainage middle guide pipe in trenchless pipeline
CN117605880A