Liquefied natural gas (LNG) unloading hose fixing frame

By designing the LNG unloading hose fixing frame, the hose is classified and placed and positioned using the slip ring and positioning frame, the problems of installation errors and residual liquid splashing during the unloading process are solved, and safety and on-site cleanliness are improved.

CN222026424UActive Publication Date: 2024-11-19ZHAOQING XINAO GAS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420231650.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-11-19
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

The LNG unloading hose lacks a fixed position during installation and disassembly, resulting in messy on the site, with installation errors and safety hazards of residual liquid backflow and splashing.

Method used

A LNG unloading hose fixing frame including anti-collision rail body, sliding chute, sliding ring, warning light, placement frame and positioning ring is designed. It is installed in the slide groove by sliding the sliding ring, and the positioning frame fixes the anti-collision rail and place it. The inside signs indicate the type of pipe and light the warning light when in use to avoid collisions.

Benefits of technology

The hose is classified and positioned, preventing damage from being rolled back and damaged, and preventing residual liquid from being reflowed and splashing out after disassembly, improving operational safety and on-site cleanliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026424U_ABST
    Figure CN222026424U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of LNG unloading hose placement, in particular to an LNG unloading hose fixing frame which comprises an anti-collision fence body, sliding grooves are formed in the anti-collision fence body at equal intervals, warning lamp bodies are movably inserted into the two ends of the anti-collision fence body respectively, and the LNG unloading hose fixing frame further comprises sliding rings. The sliding ring is slidably installed in the sliding groove. The upper end and the lower end of the sliding ring are fixedly provided with a containing frame and a positioning ring respectively. The problems that at the present stage, due to the fact that the unloading hoses are not fixedly placed, the site is disordered, the unloading ports of all tank cars are different in sequence, and the hoses are not installed at the corresponding unloading ports are solved; and after the unloading operation is completed, residual liquid occasionally exists in the hose in the link of disassembling the hose, and the residual liquid can flow back and splash out when the blind plate is installed, so that potential safety hazards exist.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of LNG unloading hose placement, in particular to an LNG unloading hose fixing rack. Background Art

[0002] Liquefied natural gas, referred to as LNG, is mainly composed of methane and is recognized as the cleanest fossil energy on earth. It is colorless, odorless, non-toxic and non-corrosive. Its volume is about 1 / 625 of the volume of the same amount of gaseous natural gas, and the mass of liquefied natural gas is only about 45% of the same volume of water. Its manufacturing process is to purify the natural gas produced by the gas field first, and then transport it by liquefied natural gas ship after a series of ultra-low temperature liquefaction. After burning, liquefied natural gas causes very little air pollution and releases a lot of heat, so liquefied natural gas is a relatively advanced energy source. Liquefied natural gas is natural gas that has been compressed and cooled to its freezing point (-161.5℃) and becomes liquid. Usually, liquefied natural gas is stored in low-temperature storage tanks at -161.5 degrees Celsius and about 0.1MPa. Its main component is methane, which is transported by special ships or tank trucks and re-gasified when used.

[0003] During the installation of the unloading hose before the unloading operation, the site is rather messy because the unloading hose has no fixed position, and the order of the unloading ports of each tank truck is different, so there is a hidden danger that the hose is not installed at the corresponding unloading port; after the unloading operation is completed, when the hose is dismantled, there is occasionally residual liquid in the hose, and when the blind plate is installed, the residual liquid will flow back and splash out, posing a safety hazard. Therefore, an LNG unloading hose fixing rack is needed to solve the above problems. Utility Model Content

[0004] The utility model aims to provide an LNG unloading hose fixing rack, which has the advantages of preventing the tank truck from over-crushing the pipeline when reversing and causing damage to the pipeline, facilitating the classified placement of the unloading hoses and preventing the residual liquid from flowing back and splashing after the hoses are disassembled after unloading. It solves the problem that the unloading hoses have no fixed placement positions at the current stage, resulting in a messy site, and the order of the unloading ports of each tank truck is different, resulting in the hidden danger of the hoses not being installed at the corresponding unloading ports; after the unloading operation is completed, there is occasionally residual liquid in the hoses during the process of disassembling the hoses, and the residual liquid will flow back and splash when the blind plate is installed, posing a safety hazard.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an LNG unloading hose fixing frame, comprising a crash barrier body, on which slide grooves are evenly spaced, and warning light bodies are movably inserted at both ends of the crash barrier body, and also comprising a slip ring;

[0006] The slip ring is slidably installed in the slide groove;

[0007] Among them, a placement frame and a positioning ring are fixedly installed at the upper and lower ends of the slip ring respectively.

[0008] When using an LNG unloading hose fixing rack in the technical solution, the slip ring is slidably installed in the slide groove on the crash barrier body, and the crash barrier body is fixedly installed at the loading point through the positioning frame. At the same time, a signboard is inserted in the placement frame. At the same time, the names of the gas phase pipe, liquid phase pipe and boost pipe are written on the three signboards respectively, so that when in specific use, the gas phase pipe, liquid phase pipe and boost pipe can be passed through the corresponding positioning rings respectively. When not in use, the signboard can remain vertical and located on the top of the crash barrier body under the action of gravity, so as to facilitate observation by the operator and avoid making mistakes in taking the pipeline. At the same time, when in use, the lit warning light body can be directly inserted into the reserved hole, so as to facilitate vehicle observation and reduce the possibility of collision.

[0009] Preferably, reserved holes are respectively provided at both ends of the crash barrier body, and a positioning frame is fixedly installed at the bottom of the crash barrier body.

[0010] By fixing the positioning frame at the bottom of the crash barrier body, when the crash barrier body is fixedly installed, the positioning frame can be fixedly installed on the ground by positioning bolts, thereby achieving fixed installation of the crash barrier body.

[0011] Preferably, the warning light body is internally installed with a rechargeable lithium battery, and the warning light body is movably inserted into the reserved hole.

[0012] By installing a rechargeable lithium battery in the warning light body and movably inserting the warning light body into the reserved hole, the driver can be warned through the warning light body, thereby avoiding collision during parking operations.

[0013] Preferably, a first connecting rod is fixedly installed on the top of the slip ring, a second connecting rod is fixedly installed on the bottom of the slip ring, and the number of slip rings is three.

[0014] By fixing a first connecting rod on the top of the slip ring and a second connecting rod on the bottom of the slip ring, the placement frame and the positioning ring can be fixedly installed through the first connecting rod and the second connecting rod. At the same time, there are three slip rings, so the gas phase pipe, liquid phase pipe and boost pipe can be positioned to a certain extent through the corresponding three positioning rings.

[0015] Preferably, a signboard is movably inserted in the placement rack, the placement rack is designed with a transparent acrylic material, and the bottom of the placement rack is fixedly connected to the top of the first connecting rod.

[0016] By movably inserting a signboard in the placement rack and designing the placement rack with a transparent acrylic material, it is convenient for operators to understand the type of pipe inserted in the corresponding positioning ring through the signboard arranged in the placement rack.

[0017] Preferably, the positioning ring is designed with stainless steel material, the inner side of the positioning ring is provided with anti-slip grooves, and the top of the positioning ring is fixedly connected to the bottom of the second connecting rod.

[0018] By designing the positioning ring with stainless steel material and providing anti-skid grooves on the inner side of the positioning ring, the gas phase pipe, liquid phase pipe or booster pipe can be positioned and clamped to a certain extent through the anti-skid grooves.

[0019] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0020] The utility model provides a slip ring, and slides the slip ring in the slide groove. At the same time, the upper and lower ends of the slip ring are respectively fixedly installed with a placement frame and a positioning ring, so that the pipe passing through the corresponding positioning ring can be marked by the placement frame. Then, in actual use, the slip ring is slidably installed in the slide groove on the anti-collision barrier body, and the anti-collision barrier body is fixedly installed at the loading point by the positioning frame. At the same time, a signboard is inserted in the placement frame, and the names of the gas phase pipe, the liquid phase pipe and the booster pipe are written on the three signboards respectively, so that in specific use, Pass the gas phase pipe, liquid phase pipe and boost pipe through the corresponding positioning rings respectively. When not in use, the signboard can remain vertical and located on the top of the guardrail body under the action of gravity, so as to facilitate observation by operators and avoid mistakes in taking the pipes. At the same time, when in use, the lit warning light body can be directly inserted into the reserved hole, so as to facilitate observation by the vehicle, prevent the tank truck from over-crushing the pipe when reversing and causing damage to the pipe, facilitate the classification and placement of unloading hoses, and prevent the residual liquid from flowing back and splashing after the hoses are disassembled after unloading. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the main structure of the utility model;

[0022] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;

[0023] Figure 3 For the utility model Figure 2 The structural diagram of the enlarged part in the middle;

[0024] Figure 4 The utility model is a schematic diagram of the anti-collision barrier body structure.

[0025] In the figure: 1. anti-collision barrier body; 2. warning light body; 3. placement rack; 4. slip ring; 5. positioning ring; 6. positioning rack; 7. first connecting rod; 8. second connecting rod; 9. reserved hole; 10. slide groove. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] Example

[0028] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the utility model provides an embodiment: an LNG unloading hose fixing frame, comprising a crash barrier body 1, on which slide grooves 10 are evenly spaced, and warning light bodies 2 are movably inserted at both ends of the crash barrier body 1, and also comprising a slip ring 4;

[0029] Specifically, the slip ring 4 is slidably installed in the slide groove 10;

[0030] The upper and lower ends of the slip ring 4 are respectively fixedly mounted with a placement frame 3 and a positioning ring 5 .

[0031] By setting the slip ring 4, and slidingly installing the slip ring 4 in the slide groove 10, at the same time, the upper and lower ends of the slip ring 4 are respectively fixedly installed with a placement frame 3 and a positioning ring 5, so that the pipeline passing through the corresponding positioning ring 5 can be marked by the placement frame 3, and then in actual use, the slip ring 4 is slidably installed in the slide groove 10 on the crash barrier body 1, and the crash barrier body 1 is fixedly installed at the loading point through the positioning frame 6. At the same time, a signboard is inserted in the placement frame 3, and the names of the gas phase pipe, the liquid phase pipe and the boost pipe are written on the three signboards respectively, so that in specific use, When in use, the gas phase pipe, liquid phase pipe and boost pipe can be passed through the corresponding positioning ring 5 respectively. When not in use, the signboard can remain vertical and located on the top of the guardrail body 1 under the action of gravity, so as to facilitate observation by the operator and avoid making mistakes in taking the pipe. At the same time, when in use, the lit warning light body 2 can be directly inserted into the reserved hole 9, so as to facilitate observation by the vehicle, prevent the tank truck from over-crushing the pipe when reversing and causing damage to the pipe, facilitate the classification and placement of unloading hoses, and prevent the residual liquid from flowing back and splashing after the unloading hoses are disassembled.

[0032] Furthermore, reserved holes 9 are respectively provided at both ends of the crash barrier body 1 , and a positioning frame 6 is fixedly installed at the bottom of the crash barrier body 1 .

[0033] By fixing the positioning frame 6 on the bottom of the crash barrier body 1 , when the crash barrier body 1 is fixedly installed, the positioning frame 6 can be fixedly installed on the ground by positioning bolts, thereby achieving fixed installation of the crash barrier body 1 .

[0034] Furthermore, the warning light body 2 is internally installed with a rechargeable lithium battery, and the warning light body 2 is movably inserted into the reserved hole 9 .

[0035] By installing a rechargeable lithium battery in the warning light body 2 and movably inserting the warning light body 2 into the reserved hole 9, the driver can be warned by the warning light body 2, thereby avoiding collision during parking operations.

[0036] Furthermore, a first connecting rod 7 is fixedly installed on the top of the slip ring 4, and a second connecting rod 8 is fixedly installed on the bottom of the slip ring 4. The number of slip rings 4 is three.

[0037] By fixing the first connecting rod 7 on the top of the slip ring 4 and fixing the second connecting rod 8 on the bottom of the slip ring 4, the placement frame 3 and the positioning ring 5 can be fixedly installed through the first connecting rod 7 and the second connecting rod 8. At the same time, there are three slip rings 4, so that the gas phase pipe, liquid phase pipe and boost pipe can be positioned to a certain extent through the corresponding three positioning rings 5.

[0038] Furthermore, a signboard is movably inserted in the placement rack 3 , the placement rack 3 is designed with a transparent acrylic material, and the bottom of the placement rack 3 is fixedly connected to the top of the first connecting rod 7 .

[0039] By movably inserting a signboard in the placement rack 3 and designing the placement rack 3 with a transparent acrylic material, it is convenient for operators to understand the type of pipe inserted in the corresponding positioning ring 5 through the signboard set in the placement rack 3.

[0040] Furthermore, the positioning ring 5 is designed with stainless steel material, and the inner side of the positioning ring 5 is provided with anti-slip grooves, and the top of the positioning ring 5 is fixedly connected to the bottom of the second connecting rod 8.

[0041] By designing the positioning ring 5 with stainless steel and providing anti-skid grooves on the inner side of the positioning ring 5 , the gas phase pipe, liquid phase pipe or boost pipe can be positioned and clamped to a certain extent by the anti-skid grooves.

[0042] When the utility model is used, the slip ring 4 is slidably installed in the slide groove 10 on the crash barrier body 1, and the crash barrier body 1 is fixedly installed at the loading point through the positioning frame 6. At the same time, a signboard is inserted in the placement frame 3. At the same time, the names of the gas phase pipe, the liquid phase pipe and the boost pipe are written on the three signboards respectively, so that when they are used specifically, the gas phase pipe, the liquid phase pipe and the boost pipe can be passed through the corresponding positioning rings 5 ​​respectively. When not in use, the signboard can be kept vertical and located at the top of the crash barrier body 1 under the action of gravity, so as to facilitate the operator to observe and avoid making mistakes in taking the pipeline. At the same time, when in use, the lit warning light body 2 can be directly inserted into the reserved hole 9, so as to facilitate the vehicle to observe and reduce the possibility of collision.

[0043] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. An LNG unloading hose fixing frame, comprising a crash barrier body (1), wherein the crash barrier body (1) is provided with slide grooves (10) at equal intervals, and warning light bodies (2) are movably inserted at both ends of the crash barrier body (1), characterized in that: Also includes: A slip ring (4) is slidably mounted in the slide groove (10); Wherein, a placement frame (3) and a positioning ring (5) are respectively fixedly installed at the upper and lower ends of the slip ring (4).

2. The LNG unloading hose fixing bracket according to claim 1 is characterized in that: Reserved holes (9) are respectively provided at both ends of the crash barrier body (1), and a positioning frame (6) is fixedly installed at the bottom of the crash barrier body (1).

3. The LNG unloading hose fixing bracket according to claim 1 is characterized in that: The warning light body (2) is internally installed with a rechargeable lithium battery, and the warning light body (2) is movably inserted into the reserved hole (9).

4. The LNG unloading hose fixing bracket according to claim 1 is characterized in that: A first connecting rod (7) is fixedly mounted on the top of the slip ring (4), and a second connecting rod (8) is fixedly mounted on the bottom of the slip ring (4). The number of the slip rings (4) is three.

5. The LNG unloading hose fixing bracket according to claim 1 is characterized in that: A signboard is movably inserted in the placement rack (3); the placement rack (3) is made of a transparent acrylic material; and the bottom of the placement rack (3) is fixedly connected to the top of the first connecting rod (7).

6. The LNG unloading hose fixing bracket according to claim 1 is characterized in that: The positioning ring (5) is made of stainless steel, and the inner side of the positioning ring (5) is provided with anti-slip grooves. The top of the positioning ring (5) is fixedly connected to the bottom of the second connecting rod (8).