Temporary widening structure for paver
By integrating identification components and widening components on the paver, using TOF identification camera and drive motor to adjust the baffle length, the problem that fixed-width paver cannot adapt to changes in pavement width is solved, the construction efficiency and quality are improved, and the cost is reduced .
Patent Information
- Application Number
- CN202420656556.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-01
AI Technical Summary
During high-speed road construction, frequent disassembly and assembly of screeds by fixed-width pavers lead to an impact on construction time and quality, and it is impossible to effectively adapt to changes in pavement width.
Design a temporary widening structure for pavers, including identification components and widening components, use TOF identification camera to identify road surface width, adjust the baffle and slide length by driving motor and electronically controlled telescopic rod to achieve paver width Flexible adjustments to simplify the installation process.
It reduces the waste of construction time caused by disassembly and assembly of screeds, improves the flatness and uniformity of asphalt paving, reduces construction costs and leasing costs, and improves construction efficiency and quality.
Smart Images

Figure CN222043779U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of widening structures, in particular to a temporary widening structure for a paver. Background Art
[0002] Generally speaking, in the design of conventional highway pavement width, the top surface width of the asphalt upper layer is usually 11.5 meters, the top surface width of the asphalt upper layer in the bridge deck with drainage ditch is 11.3 meters, and the top surface width of the asphalt upper layer in the super-elevated section with a sump is 11.1 meters. Considering the construction quality, fixed-width asphalt pavers are generally selected for assembly. The assembly width is generally 11 meters for the main board, and the screed of the paver is a large accessory. The installation of the screed of the paver requires stopping construction and using lifting equipment. If the paver is frequently disassembled and assembled to fill the paving width, it will delay the on-site construction time and construction quality. In order to solve the progress and construction quality of the construction site, it is necessary to develop a device: it can be fixed on the screed side plates on both sides of the paver, which can increase the effective paving width to adapt to changes in the width of the highway pavement. To address this problem, we have designed a mechanical structure that can adjust the width of the paver to ensure that it can adapt to changes in the width of the highway pavement and reduce the construction time and construction quality delayed by the disassembly and assembly of the screed of the paver. Utility Model Content
[0003] In order to solve the problem that when a paver is paving asphalt, the paver needs to be frequently disassembled and assembled in order to fill the paving width, which will delay the on-site construction time and construction quality, the utility model provides a temporary widening structure for the paver to solve the above problem.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A temporary widening structure for a paving machine, comprising a paving machine body, an identification component is installed on the outer wall of the paving machine body, and a widening component is installed on the outer wall of the paving machine body;
[0006] The identification component includes a mounting block, which is mounted on the outer wall of the paving machine body by bolts, a fixing bracket is mounted on the outer wall of the mounting block, a mounting plate is mounted on the outer wall of the fixing bracket, a controller is mounted on the outer wall of the mounting plate, and a TOF identification camera is mounted on the outer wall of the controller;
[0007] The widening assembly includes a driving motor, which is mounted on the outer wall of the paving machine body, a mounting base is mounted on the outer wall of the driving motor, a fixing block is rotatably connected to the outer wall of the mounting base, a mounting rod is mounted on the inner wall of the fixing block, an adjusting buckle is mounted on the outer wall of the mounting rod, a guide rod is mounted on the outer wall of the adjusting buckle, a mounting bracket is rotatably connected to the outer wall of the guide rod, a baffle is mounted on the outer wall of the mounting bracket, a slide is slidably connected to the inner wall of the baffle, an electrically-controlled telescopic rod is mounted on the outer wall of the baffle, and one end of the electrically-controlled telescopic rod is connected to the outer wall of the slide.
[0008] As a preferred solution of the utility model, the controller is respectively connected to the driving motor, the electric-controlled telescopic rod and the TOF recognition camera through wires, and the connection method is electrical connection.
[0009] As a preferred solution of the utility model, the identification component is located on the upper side of the widening component, and the TOF identification camera is located on one side of the baffle.
[0010] As a preferred solution of the utility model, the widening components are provided in two groups and are respectively located on opposite outer walls of the paving machine body, and the identification components are provided in two groups and are respectively located on opposite outer walls of the paving machine body.
[0011] As a preferred solution of the utility model, the fixed bracket is a frame structure, the mounting plate is located on the side wall of the fixed bracket, and two groups of TOF recognition cameras are provided and are respectively located on the outer wall of the controller.
[0012] As a preferred solution of the utility model, the driving motors are provided in two groups and are respectively located on the outer wall of the paving machine body, and the angle between the baffle plate and the side plate of the paving machine body is greater than 90 degrees.
[0013] As a preferred solution of the utility model, the electric-controlled telescopic rods are provided in two groups and are respectively located on the outer wall of the baffle, and the bottom end of the baffle is flush with the bottom end of the side plate of the paving machine body.
[0014] Compared with the prior art, the utility model sets a switch for opening the controller in the temporary widening structure of the paver, so that the controller controls the drive motor to rotate, so that the drive shaft of the drive motor drives the fixed block to rotate through the mounting base, so that the fixed block drives the mounting rod to rotate to a suitable position, so that the device is unfolded, and then the adjustment buckle is used to fix this structure with another Φ48.3×3.6 30cm long guide rod, and the formed widening component is installed at the reserved external hole on the side plate of the paver ironing plate. After installation, the adjustment buckle is adjusted to make the angle between the baffle and the side plate of the paver greater than 90°, which is beneficial to the layout of the asphalt mixture and the installation is simpler and more convenient, thereby solving the problem of different road widths. When installing the paver ironing plate, it is necessary to stop construction and use lifting equipment. If the paver is frequently disassembled and assembled to fill the paving width, it will delay the on-site construction time and construction quality.
[0015] By using the TOF recognition camera to identify the width of the asphalt mixture on the road surface, the TOF recognition camera generates an electrical signal which is transmitted to the controller through a wire, so that the controller compares the width data of the road surface. When the width of the road surface is different, the controller controls the electric telescopic rod to operate, so that one end of the electric telescopic rod drives the skateboard to move, so that the skateboard moves on the inner wall of the baffle, so that the length of the baffle and the skateboard can be flexibly adjusted according to the width of the road surface, thereby solving the problem that in the conventional highway road surface width design, the top surface width of the asphalt upper layer is usually 11.5 meters, the top surface width of the asphalt upper layer in the bridge deck with drainage ditch is 11.3 meters, and the top surface width of the asphalt upper layer in the super-elevated section with a sump is 11.1 meters. The road surface width is different, the asphalt paving area of the paver is fixed, and the paving effect is not good. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the widening component structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the identification component structure of the utility model;
[0019] Figure 4 This is a schematic diagram of the baffle structure of the utility model.
[0020] In the figure: 1. paving machine body; 2. identification component; 201. mounting block; 202. fixing bracket; 203. mounting plate; 204. controller; 205. TOF recognition camera; 3. widening component; 301. driving motor; 302. mounting base; 303. fixing block; 304. mounting rod; 305. adjusting buckle; 306. guide rod; 307. mounting bracket; 308. baffle; 309. slide plate; 310. electric telescopic rod. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0022] Example: See Figure 1-4 The temporary widening structure for a paving machine shown in the figure comprises a paving machine body 1, characterized in that: an identification component 2 is installed on the outer wall of the paving machine body 1, and a widening component 3 is installed on the outer wall of the paving machine body 1;
[0023] Among them, the controller 204 is connected to the driving motor 301, the electric-controlled telescopic rod 310 and the TOF recognition camera 205 through wires and the connection method is electrical connection, so that the device is powered on, and the recognition component 2 is located on the upper side of the widening component 3. The widening component 3 is provided with two groups and is respectively located on the opposite outer walls of the paving body 1. The recognition component 2 is provided with two groups and is respectively located on the opposite outer walls of the paving body 1, which is convenient for identifying the road surface width on both sides of the device.
[0024] In this embodiment, specific reference Figure 1 and Figure 3 The identification component 2 includes a mounting block 201, which is mounted on the outer wall of the paving machine body 1 by bolts, a fixing bracket 202 is mounted on the outer wall of the mounting block 201, the fixing bracket 202 is a frame structure, a mounting plate 203 is mounted on the outer wall of the fixing bracket 202, the mounting plate 203 is located on the side wall of the fixing bracket 202, a controller 204 is mounted on the outer wall of the mounting plate 203, a TOF identification camera 205 is mounted on the outer wall of the controller 204, and two groups of TOF identification cameras 205 are provided and are respectively located on the outer wall of the controller 204;
[0025] In this embodiment, specific reference Figure 1 , Figure 2 and Figure 4The widening component 3 includes a driving motor 301, which is mounted on the outer wall of the paving machine body 1. The driving motor 301 is provided with two groups and is respectively located on the outer wall of the paving machine body 1. A mounting base 302 is mounted on the outer wall of the driving motor 301. A fixing block 303 is rotatably connected to the outer wall of the mounting base 302. A mounting rod 304 is mounted on the inner wall of the fixing block 303. An adjusting buckle 305 is mounted on the outer wall of the mounting rod 304. A guide rod 306 is mounted on the outer wall of the adjusting buckle 305. A mounting rod 306 is rotatably connected to the outer wall of the guide rod 306. Bracket 307, a baffle 308 is installed on the outer wall of the mounting bracket 307, the TOF recognition camera 205 is located on one side of the baffle 308, the angle between the baffle 308 and the side plate of the paving machine body 1 is greater than 90 degrees, the bottom end of the baffle 308 is flush with the bottom end of the side plate of the paving machine body 1, a slide plate 309 is slidably connected to the inner wall of the baffle 308, an electric-controlled telescopic rod 310 is installed on the outer wall of the baffle 308, two groups of the electric-controlled telescopic rod 310 are provided and are respectively located on the outer walls of the baffle 308, and one end of the electric-controlled telescopic rod 310 is connected to the outer wall of the slide plate 309.
[0026] Among them, taking general expressways as an example, in terms of design, about 25% of the sections usually involve widening construction. If all of them are constructed with telescopic paver, the overall quality control effect is not as stable as that of fixed plate paver. Therefore, it is still recommended to use fixed plate paver to ensure quality for conventional non-widening sections. At the same time, in order to meet the widening construction, it is generally necessary to rent another telescopic paver to cooperate with manual construction. Under the conventional one-year construction period, the time required to rent a telescopic paver is about 3 months. The temporary rental fee of the telescopic paver in the market is 5,000 / day. The resulting rent, transportation fee, and labor auxiliary fees total about 500,000 yuan. The pavement rental company improved the width of the paver and made a temporary widening setting for the paver, which not only saved construction costs and liberated labor, but also improved the flatness of asphalt paving and the uniformity of the paving surface. The economic benefits and time cost benefits brought about by this are still significant. The promotion and application of this rationalization suggestion will contribute to the high-quality development of professional pavement construction.
[0027] This solution is used for the temporary widening structure of the paving machine. When the paving machine is working, a mounting base 302 is installed on the outer wall of the driving motor 301, and a fixing block 303 is rotatably connected to the outer wall of the mounting base 302. Under the action of a mounting rod 304 installed on the inner wall of the fixing block 303, the device is set on the outer wall of the paving machine body 1. It is only necessary to turn on the switch of the controller 204 so that the controller 204 controls the driving motor 301 to rotate, so that the driving shaft of the driving motor 301 drives the fixing block 303 to rotate through the mounting base 302, so that the fixing block 303 drives the mounting rod 304 to rotate to a suitable position, so that the device is unfolded, and an adjusting buckle 305 is installed on the outer wall of the mounting rod 304, and a guide rod 306 is installed on the outer wall of the adjusting buckle 305. , a mounting bracket 307 is rotatably connected to the outer wall of the guide rod 306, and a baffle 308 is installed on the outer wall of the mounting bracket 307. Then, the adjusting buckle 305 is used to fix this structure to another Φ48.3×3.6 30cm long guide rod 306. The formed widening component 3 is installed at the reserved external hole on the side plate of the paver screed. After installation, the adjusting buckle 305 is adjusted to make the angle between the baffle 308 and the side plate of the paver greater than 90°, which is beneficial to the layout of the asphalt mixture and the installation is simpler and more convenient, thereby solving the problem of different road widths. When installing the paver screed, it is necessary to stop construction and use lifting equipment. If the paver is frequently disassembled and assembled to fill the paving width, it will delay the on-site construction time and construction quality.
[0028] A controller 204 is installed on the outer wall of the mounting plate 203, and a TOF recognition camera 205 is installed on the outer wall of the controller 204. Two groups of TOF recognition cameras 205 are provided and are respectively located on the outer wall of the controller 204. The TOF recognition camera 205 is located on one side of the baffle 308, so that the TOF recognition camera 205 can recognize the width of the asphalt mixture on the road surface. The TOF recognition camera 205 generates an electrical signal which is transmitted to the controller 204 through a wire, so that the controller 204 compares the width data of the road surface. When the width of the road surface is different, the controller 204 controls the electrical signal. The telescopic rod 310 is controlled to operate, so that one end of the electric telescopic rod 310 drives the slide plate 309 to move, so that the slide plate 309 moves on the inner wall of the baffle 308, so that the length of the baffle 308 and the slide plate 309 can be flexibly adjusted according to the road width, thereby solving the problem that in the conventional highway road width design, the top surface width of the asphalt upper layer is usually 11.5 meters, the top surface width of the asphalt upper layer of the bridge deck with drainage ditch is 11.3 meters, and the top surface width of the asphalt upper layer at the super-high section with a sump is 11.1 meters. The road width is different, the asphalt paving area of the paver is fixed, and the paving effect is not good.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A temporary widening structure for a paving machine, comprising a paving machine body (1), characterized in that: An identification component (2) is installed on the outer wall of the paving machine body (1), and a widening component (3) is installed on the outer wall of the paving machine body (1); The identification component (2) comprises a mounting block (201), the mounting block (201) being mounted on the outer wall of the paving machine body (1) by means of bolts, a fixing bracket (202) being mounted on the outer wall of the mounting block (201), a mounting plate (203) being mounted on the outer wall of the fixing bracket (202), a controller (204) being mounted on the outer wall of the mounting plate (203), and a TOF identification camera (205) being mounted on the outer wall of the controller (204); The widening component (3) comprises a driving motor (301), the driving motor (301) being mounted on the outer wall of the paving machine body (1), a mounting base (302) being mounted on the outer wall of the driving motor (301), a fixing block (303) being rotatably connected to the outer wall of the fixing base (302), a mounting rod (304) being mounted on the inner wall of the fixing block (303), an adjusting buckle (305) being mounted on the outer wall of the mounting rod (304), and the adjusting buckle (305) being mounted on the outer wall of the fixing rod (304). A guide rod (306) is mounted on the outer wall of the joint buckle (305); a mounting bracket (307) is rotatably connected to the outer wall of the guide rod (306); a baffle (308) is mounted on the outer wall of the mounting bracket (307); a slide plate (309) is slidably connected to the inner wall of the baffle (308); an electric-controlled telescopic rod (310) is mounted on the outer wall of the baffle (308); and one end of the electric-controlled telescopic rod (310) is connected to the outer wall of the slide plate (309).
2. The temporary widening structure for a paver according to claim 1, characterized in that: The controller (204) is respectively connected to the driving motor (301), the electric control telescopic rod (310) and the TOF recognition camera (205) via wires, and the connection method is electrical connection.
3. The temporary widening structure for a paver according to claim 1, characterized in that: The identification component (2) is located above and to the side of the widening component (3), and the TOF identification camera (205) is located on one side of the baffle (308).
4. The temporary widening structure for a paver according to claim 1, characterized in that: The widening components (3) are provided in two groups and are respectively located on opposite outer walls of the paving machine body (1); the identification components (2) are provided in two groups and are respectively located on opposite outer walls of the paving machine body (1).
5. The temporary widening structure for a paver according to claim 1, characterized in that: The fixed bracket (202) is a frame structure, the mounting plate (203) is located on a side wall of the fixed bracket (202), and two groups of TOF recognition cameras (205) are provided and are respectively located on the outer wall of the controller (204).
6. The temporary widening structure for a paver according to claim 1, characterized in that: The driving motors (301) are provided in two groups and are respectively located on the outer wall of the paving machine body (1); the included angle between the baffle plate (308) and the side plate of the paving machine body (1) is greater than 90 degrees.
7. The temporary widening structure for a paver according to claim 1, characterized in that: The electrically controlled telescopic rods (310) are provided in two groups and are respectively located on the outer wall of the baffle plate (308); the bottom end of the baffle plate (308) is flush with the bottom end of the side plate of the paving machine body (1).