Pier column construction operation frame capable of being rapidly installed

By adopting a three-point positioning design of arc notch and limit threaded rod in the pier column construction operation frame, combined with the handwheel and the transmission shaft to drive the pulley, the problem of low installation efficiency in the existing technology is solved, and pier column construction is realized Quick installation and efficient assembly of the operating rack.

CN222043913UActive Publication Date: 2024-11-22NIUCO STRONTIUM (ZHEJIANG) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420317234.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-11-22
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The existing pier column construction operating frame is less efficient when installed, and it is necessary to adjust the positions of four locking fixing plates separately, resulting in too slow installation efficiency.

Method used

A pier column construction operation frame including support plate, reinforced base plate and support column is designed. Three-point positioning is formed through arc-shaped notch and limit thread rod, and the pulley and limit thread rod are driven to quickly adjust the pulley and limit thread rod using handwheel and transmission shaft. location to improve assembly efficiency.

Benefits of technology

The rapid installation of the pier column construction operation frame is realized, the construction efficiency is improved, and the positioning and assembly process of the device is simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043913U_ABST
    Figure CN222043913U_ABST
Patent Text Reader

Abstract

The utility model discloses a pier column construction operation frame capable of being rapidly installed, and relates to the technical field of pier column construction operation frames. The device comprises a supporting plate, a reinforcing bottom plate and four supporting columns, the supporting plate and the reinforcing bottom plate are arranged on the four supporting columns in a sleeving mode, arc-shaped notches are formed in one side of the supporting plate and one side of the reinforcing bottom plate, and first belt wheels are arranged on the two opposite sides of the reinforcing bottom plate in a running fit mode. The reinforcing bottom plate and the supporting plate are arranged on the supporting column in a sleeving mode, the device can be conveniently and rapidly assembled, the assembling efficiency of the device can be conveniently improved, the hand wheel rotates the transmission shaft to drive the two second belt wheels to synchronously rotate, the second belt wheels drive the first belt wheel to rotate through the transmission belt, and the first belt wheel drives the limiting threaded rod to be in threaded fit with the reinforcing bottom plate; and the length of the limiting threaded rods extending into the arc-shaped notches is adjusted, three-point positioning is conveniently formed through the arc-shaped notches and the two limiting threaded rods, and then the device is conveniently and rapidly positioned on one side of the pier column.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of pier column construction operation frames, in particular to a pier column construction operation frame which can be quickly installed. Background Art

[0002] The pier is a bridge pier used to support the bridge. Generally, the pier is large in size and very troublesome to construct. An operating frame is needed to help the construction workers, making it easier and more convenient for them to carry out the construction.

[0003] A Chinese patent with publication number CN218291624U discloses a pier construction operation frame, including a support leg, a mounting platform and a disassembly plate, a threaded connection tube is installed through the outer side of the support leg, a threaded rod is installed through the inner side of the threaded connection tube, a positioning fixing plate is installed at one end of the threaded rod, a connecting sleeve is provided on the outer side of the support leg through a bolt sleeve, a mounting platform is installed on the inner side of the support leg through the connecting sleeve, a pier slot is provided on the top of the mounting platform, a disassembly plate is installed on the inner side of the pier slot, and a movable support plate is installed on the bottom of the disassembly plate through a movable rod. In the utility model, when it is necessary to construct the annular column, the disassembly plate is disassembled, and the pier column slot is clamped on the outside of the pier column, so that the construction area of ​​the pier column can be maximized when the construction personnel construct the pier column on the installation platform, making the construction of the pier column more convenient and faster for the construction personnel. The pier column construction operation frame in the application adjusts the position of the clamping fixing plate by a threaded rod to further locate the position of the pier column construction operation frame, and it is necessary to adjust the positions of the four clamping fixing plates separately, resulting in too slow installation efficiency.

[0004] In view of this, the present utility model is proposed. Utility Model Content

[0005] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a pier column construction operation frame which can be quickly installed.

[0006] In order to solve the above technical problems, the basic concept of the technical solution adopted by the utility model is:

[0007] A pier column construction operation frame that can be quickly installed comprises a support plate, a reinforced base plate, and four support columns. The support plate and the reinforced base plate are both sleeved on the four support columns. An arc-shaped notch is provided on one side of the support plate and the reinforced base plate. First pulleys are rotatably matched with the opposite sides of the reinforced base plate. Limiting threaded rods are threadedly matched with the opposite sides of the reinforced base plate. The thread directions of the two limiting threaded rods are opposite. The limiting threaded rods are slidably matched in the first pulley. Second pulleys are rotatably matched with the opposite sides of the reinforced base plate. A transmission belt is used for transmission between the first pulley and the second pulley. A transmission shaft is rotatably matched with the reinforced base plate. The two second pulleys are fixedly sleeved on the transmission shaft, and a hand wheel is provided at one end of the transmission shaft.

[0008] By reinforcing the bottom plate and the support plate on the support column, it is convenient to assemble the device quickly and improve the assembly efficiency of the device. The transmission shaft is rotated by the hand wheel to drive the two second pulleys to rotate synchronously. The second pulley drives the first pulley to rotate through the transmission belt. The first pulley drives the limiting threaded rod to cooperate with the reinforcing bottom plate thread. The length of the limiting threaded rod extending into the arc-shaped notch is adjusted, so that three-point positioning is formed through the arc-shaped notch and the two limiting threaded rods, thereby facilitating the rapid positioning of the device on one side of the pier column.

[0009] Optionally, a guide slide is provided on the side of the limiting threaded rod along the length direction, a guide hole is provided on the first pulley, a guide protrusion is provided on the inner wall of the guide hole, and the guide protrusion is located in the guide slide, so that the first pulley drives the limiting threaded rod to rotate while driving the limiting threaded rod to slide in the guide hole.

[0010] Optionally, a first bearing corresponding to the first pulley is embedded in the side of the reinforced base plate, and a protrusion is provided at one end of the first pulley. The protrusion is located in the first bearing, so as to improve the rotation stability of the first pulley through the first bearing.

[0011] Optionally, a smooth curved surface is provided on the outer side of one end of the limiting threaded rod extending into the arc-shaped notch, a second bearing is sleeved on the arc-shaped notch, and a sphere is sleeved on the second bearing to facilitate contact with the pier column through the sphere, so that the limiting threaded rod can rotate in the sphere through the second bearing after the sphere contacts the pier column.

[0012] Optionally, a supporting outer flange is provided at the bottom end of the support column, a limiting portion is provided at the upper end of the support column, the support plate is sleeved on the limiting portion, the reinforcing base plate is located above the supporting outer flange, four first through holes are provided above the support plate, the support plate is sleeved on the limiting portion through the first through holes, a U-shaped protective frame is provided on the support plate, four second through holes are provided above the reinforcing base plate, the reinforcing base plate is sleeved on the support column through the second through holes, so as to facilitate erecting the support column through the supporting outer flange, the reinforcing base plate is sleeved on the support column through the second through holes, and the support plate is sleeved on the limiting portion through the first through holes.

[0013] After adopting the above technical solution, the utility model has the following beneficial effects compared with the prior art. Of course, any product implementing the utility model does not necessarily need to achieve all the advantages described below at the same time:

[0014] By reinforcing the bottom plate and the support plate on the support column, it is convenient to assemble the device quickly and improve the assembly efficiency of the device. The transmission shaft is rotated by the hand wheel to drive the two second pulleys to rotate synchronously. The second pulley drives the first pulley to rotate through the transmission belt. The first pulley drives the limiting threaded rod to cooperate with the reinforcing bottom plate thread. The length of the limiting threaded rod extending into the arc-shaped notch is adjusted, so that three-point positioning is formed through the arc-shaped notch and the two limiting threaded rods, thereby facilitating the rapid positioning of the device on one side of the pier column.

[0015] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings described below are only some embodiments. For those skilled in the art, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of an embodiment of the utility model;

[0018] Figure 2 This is a schematic cross-sectional view of an embodiment of the utility model;

[0019] Figure 3 This is a schematic cross-sectional view of the reinforced bottom plate of an embodiment of the utility model;

[0020] Figure 4 This is a schematic diagram of the support plate structure of an embodiment of the utility model;

[0021] Figure 5 for Figure 1 Schematic diagram of the structure at A in the middle;

[0022] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0023] Support plate 1, first through hole 101, U-shaped protective frame 102, reinforced bottom plate 2, support column 3, supporting outer flange 301, limiting portion 302, first pulley 4, guide hole 401, guide protrusion 402, protrusion 403, limiting threaded rod 5, second bearing 501, sphere 502, guide slide 503, second pulley 6, transmission belt 7, transmission shaft 8, arc-shaped notch 9.

[0024] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but rather to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0025] The utility model will now be further described in detail with reference to the accompanying drawings.

[0026] See also Figure 1-5 As shown, in the present embodiment, a pier column construction operation frame that can be quickly installed is provided, including a support plate 1, a reinforced base plate 2, and four support columns 3. The support plate 1 and the reinforced base plate 2 are both sleeved on the four support columns 3. An arc-shaped notch 9 is provided on one side of the support plate 1 and the reinforced base plate 2. The opposite sides of the reinforced base plate 2 are rotatably matched with a first pulley 4. The opposite sides of the reinforced base plate 2 are threadedly matched with a limiting threaded rod 5. The thread directions of the two limiting threaded rods 5 are opposite. The limiting threaded rod 5 is slidably matched in the first pulley 4. The opposite sides of the reinforced base plate 2 are rotatably matched with a second pulley 6. A transmission belt 7 is provided for transmission between the first pulley 4 and the second pulley 6. A transmission shaft 8 is rotatably matched on the reinforced base plate 2. The two second pulleys 6 are fixedly sleeved on the transmission shaft 8, and a handwheel is provided at one end of the transmission shaft 8.

[0027] By sleeved the reinforcing base plate 2 and the supporting plate 1 on the supporting column 3, the device can be assembled quickly and the assembly efficiency of the device can be improved. The transmission shaft 8 is rotated by the hand wheel to drive the two second pulleys 6 to rotate synchronously. The second pulley 6 drives the first pulley 4 to rotate through the transmission belt 7. The first pulley 4 drives the limiting threaded rod 5 to cooperate with the thread of the reinforcing base plate 2. The length of the limiting threaded rod 5 extending into the arc-shaped notch 9 is adjusted, so that three-point positioning is formed through the arc-shaped notch 9 and the two limiting threaded rods 5, thereby facilitating the rapid positioning of the device on one side of the pier column.

[0028] In this embodiment, a guide slide 503 is provided on the side of the limiting threaded rod 5 along the length direction, and a guide hole 401 is provided on the first pulley 4. A guide protrusion 402 is provided on the inner wall of the guide hole 401. The guide protrusion 402 is located in the guide slide 503, so that the first pulley 4 can drive the limiting threaded rod 5 to rotate while driving the limiting threaded rod 5 to slide in the guide hole 401, so that the screwing depth of the limiting threaded rod 5 can be adjusted by the first pulley 4.

[0029] A first bearing corresponding to the first pulley 4 is embedded in the side of the reinforced base plate 2 of this embodiment. A protrusion 403 is provided at one end of the first pulley 4. The protrusion 403 is located in the first bearing to facilitate improving the rotation stability of the first pulley 4 through the first bearing.

[0030] In this embodiment, a smooth curved surface is provided on the outer side of one end of the limiting threaded rod 5 extending into the arc-shaped notch 9, and a second bearing 501 is sleeved on the arc-shaped notch 9, and a sphere 502 is sleeved on the second bearing 501, so that it is convenient to contact the pier column through the sphere 502. After the sphere 502 contacts the pier column, the limiting threaded rod 5 can rotate in the sphere 502 through the second bearing 501, so as to reduce the tightening rotation resistance of the limiting threaded rod 5.

[0031] The support column 3 of this embodiment is provided with a supporting outer flange 301 at the bottom end, and a limiting portion 302 is provided at the upper end of the support column 3. The support plate 1 is sleeved on the limiting portion 302, and the reinforcing bottom plate 2 is located above the supporting outer flange 301. Four first through holes 101 are provided above the support plate 1, and the support plate 1 is sleeved on the limiting portion 302 through the first through holes 101. A U-shaped protective frame 102 is provided on the support plate 1, and four second through holes are provided above the reinforcing bottom plate 2. The reinforcing bottom plate 2 is sleeved on the support column 3 through the second through holes, which is convenient for erecting the support column 3 through the supporting outer flange 301, and the reinforcing bottom plate 2 is sleeved on the support column 3 through the second through holes, and the support plate 1 is sleeved on the limiting portion 302 through the first through holes 101, which is convenient for improving the assembly efficiency of the device.

[0032] Working principle: erect the support column 3 through the supporting outer flange 301, and the reinforcing base plate 2 is sleeved on the support column 3 through the second through hole. The support plate 1 is sleeved on the limiting portion 302 through the first through hole 101, so as to improve the assembly efficiency of the device. The side of the pier column is located in the arc-shaped notch 9, and then the transmission shaft 8 is rotated by the hand wheel to drive the two second pulleys 6 to rotate synchronously. The second pulley 6 drives the first pulley 4 to rotate through the transmission belt 7. The first pulley 4 drives the limiting threaded rod 5 to cooperate with the thread of the reinforcing base plate 2. The length of the limiting threaded rod 5 extending into the arc-shaped notch 9 is adjusted to form a three-point positioning through the arc-shaped notch 9 and the two limiting threaded rods 5, so as to facilitate the rapid positioning of the device on one side of the pier column.

[0033] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0034] The present invention is not limited to the above-mentioned implementation modes. Anyone should be aware of the structural changes made under the inspiration of the present invention. Any technical solution that is the same or similar to the present invention falls within the protection scope of the present invention. The technology, shape, and structure that are not described in detail in the present invention are all known technologies.

Claims

1. A pier construction operation frame that can be quickly installed. It is characterized in that include: A support plate (1), a reinforcement base plate (2), and four support columns (3). The support plate (1) and the reinforcement base plate (2) are sleeved on the four support columns (3). An arc-shaped notch (9) is provided on one side of the support plate (1) and the reinforcement base plate (2). The two opposite sides of the reinforcement base plate (2) are rotatably matched with first pulleys (4). The two opposite sides of the reinforcement base plate (2) are threadedly matched with limiting threaded rods (5). The thread directions of the two limiting threaded rods (5) are opposite. The limiting threaded rods (5) are slidably matched in the first pulley (4). The two opposite sides of the reinforcement base plate (2) are rotatably matched with second pulleys (6). A transmission belt (7) is transmitted between the first pulley (4) and the second pulley (6). A transmission shaft (8) is rotatably matched on the reinforcement base plate (2). The two second pulleys (6) are fixedly sleeved on the transmission shaft (8).

2. A pier column construction operation frame that can be quickly installed according to claim 1, It is characterized in that A guide slideway (503) is provided on the side of the limiting threaded rod (5) along the length direction, a guide hole (401) is provided on the first pulley (4), a guide protrusion (402) is provided on the inner wall of the guide hole (401), and the guide protrusion (402) is located in the guide slideway (503).

3. A pier column construction operation frame that can be quickly installed according to claim 1, It is characterized in that A first bearing corresponding to the first pulley (4) is embedded in the side surface of the reinforcing bottom plate (2); a protrusion (403) is provided at one end of the first pulley (4); and the protrusion (403) is located in the first bearing.

4. A pier column construction operation frame that can be quickly installed according to claim 1, It is characterized in that A smooth curved surface is provided on the outer side of one end of the limiting threaded rod (5) extending into the arc-shaped notch (9); a second bearing (501) is sleeved on the arc-shaped notch (9); and a sphere (502) is sleeved on the second bearing (501).

5. A pier column construction operation frame that can be quickly installed according to claim 1, It is characterized in that The bottom end of the support column (3) is provided with a support outer flange (301), the upper end of the support column (3) is provided with a limit portion (302), the support plate (1) is sleeved on the limit portion (302), and the reinforcing bottom plate (2) is located above the support outer flange (301).

6. A pier column construction operation frame that can be quickly installed according to claim 5, It is characterized in that Four first through holes (101) are provided above the support plate (1), and the support plate (1) is sleeved on the limiting portion (302) through the first through holes (101). A U-shaped protective frame (102) is provided on the support plate (1), and four second through holes are provided above the reinforcing bottom plate (2), and the reinforcing bottom plate (2) is sleeved on the support column (3) through the second through holes.