Low pier concrete pouring construction platform

By designing a detachable rectangular construction platform and ladder, the problems of insufficient economy, adaptability and turnover in the construction of low-short bridge pier columns are solved, and good economicality and adaptability are provided. The concrete pouring construction platform for low-piers with strong and good turnover has achieved efficient, safe and convenient construction results.

CN222043922UActive Publication Date: 2024-11-22SCEGC MECHANIZED CONSTR GRP COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420603986.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-22
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

Traditional finished ladder cages and operating platforms have poor economics, poor adaptability and poor turnover in the construction of low-short bridge pier columns, resulting in high construction costs and waste of resources.

Method used

A low-pier concrete pouring construction platform was designed, including the rectangular construction platform body and a detachable ladder. It is connected to the low-pier concrete formwork through a rectangular opening to provide a convenient construction platform, which has good economicality, strong adaptability and turnover. Good advantages.

Benefits of technology

The platform provides convenient conditions for low-pier column construction, saves funds for purchasing finished equipment, and realizes efficient, safe and convenient construction. It is suitable for low-pier concrete pouring operations at heights of 1.8m to 2.2m, reducing construction costs. And improves the turnaroundness of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043922U_ABST
    Figure CN222043922U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of bridge pier construction, and discloses a low bridge pier concrete pouring construction platform which comprises a rectangular construction platform body, and an opening used for being arranged on a low bridge pier concrete formwork in a sleeved mode is formed in the center of the rectangular construction platform body. The rectangular construction platform body is arranged on the low pier concrete formwork in a sleeving mode through the opening, and the rectangular construction platform body is detachably connected with the low pier concrete formwork. A rectangular opening is formed in the position, close to the first side edge, of the rectangular construction platform body, and the rectangular opening is formed in the extending direction of the first side edge. A ladder stand is arranged in the rectangular opening in a matched mode, one end of the ladder stand is hinged to one end of the rectangular opening, and the other end of the ladder stand is detachably connected with the other end of the rectangular opening. The device has the advantages of being good in economical efficiency, high in adaptability and good in turnover performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge pier construction, and in particular relates to a low bridge pier concrete pouring construction platform. Background Art

[0002] In the construction of municipal engineering, the construction of urban bridges across small rivers accounts for a considerable proportion. In these bridge projects, bridge structures with low pier heights are often encountered. For such bridges with low piers, the traditional construction method mainly relies on purchasing ready-made ladder cages and operating platforms. These ready-made ladder cages and operating platforms provide convenience for construction workers during the construction of bridge piers, allowing them to perform concrete vibrating operations on bridge piers.

[0003] However, for the situation where the height of bridge piers is only between 1.8m and 2.2m and the bridge is small in scale, the traditional finished ladder cage and operating platform are not completely applicable. Although these finished equipment have the advantages of high standardization and good sensory neatness, and perform well in high pier operations, they also have some obvious defects and deficiencies: First, poor economy is a major disadvantage of finished ladder cages and operating platforms. Since these equipment are finished products, their prices are relatively high; for small-scale bridge projects, purchasing these equipment will increase construction costs, which is not conducive to the economy of the project. Secondly, the adaptability of finished ladder cages and operating platforms is poor. Since they are standardized products, it is often difficult to fully adapt to bridge piers of different sizes and heights. Especially for low piers, the use of finished ladder cages and operating platforms will waste space and inconvenience in operation. In addition, the turnover of finished ladder cages and operating platforms is also poor. Since these equipment are purchased specifically for specific projects, once the project is completed, these equipment are difficult to use again in other projects, resulting in a waste of resources. Summary of the invention

[0004] In view of the problems existing in the prior art, the utility model provides a low pier concrete pouring construction platform, which has the advantages of good economy, strong adaptability and good turnover.

[0005] In order to solve the above technical problems, the utility model is implemented through the following technical solutions:

[0006] A low pier concrete pouring construction platform comprises a rectangular construction platform body, wherein an opening for inserting into a low pier concrete formwork is provided at the center of the rectangular construction platform body, the rectangular construction platform body is sleeved on the low pier concrete formwork through the opening, and the rectangular construction platform body is detachably connected to the low pier concrete formwork; a rectangular opening is provided on the rectangular construction platform body at a position close to a first side edge, and the rectangular opening is provided along a direction in which the first side edge extends; a ladder is matched in the rectangular opening, one end of the ladder is hinged to one end of the rectangular opening, and the other end of the ladder is detachably connected to the other end of the rectangular opening.

[0007] Furthermore, an n-shaped connector with its opening facing downward is fixed to the other end of the rectangular opening, and movable pins are inserted into the n-shaped connector at positions close to the bottom on both sides; the other end of the ladder can enter the n-shaped connector, and the ladder is limited and fixed by the movable pins.

[0008] Furthermore, a safety fence is arranged around the upper end surface of the rectangular construction platform body.

[0009] Furthermore, when the other end of the ladder is separated from the other end of the rectangular opening, the other end of the ladder can contact the ground.

[0010] Furthermore, one end of the ladder is hinged to one end of the rectangular opening through a hinge.

[0011] Furthermore, the rectangular construction platform body is connected to the low pier concrete formwork via a bolt and nut assembly.

[0012] Furthermore, the length of the ladder is 1800 mm to 2200 mm.

[0013] Furthermore, the width of the ladder is 600 mm to 800 mm.

[0014] Compared with the prior art, the utility model has at least the following beneficial effects:

[0015] The utility model provides a low bridge pier concrete pouring construction platform. For the low bridge pier concrete pouring operation, an opening is opened at the center position of a rectangular construction platform body, and the rectangular construction platform body is sleeved on the low bridge pier concrete template through the opening, so that the rectangular construction platform body and the low bridge pier concrete template are detachably connected. A rectangular opening is opened at a position close to the first side edge on the rectangular construction platform body, and a ladder is matched in the rectangular opening, one end of the ladder is hinged with one end of the rectangular opening, and the other end of the ladder is detachably connected with the other end of the rectangular opening. When it is necessary to perform pouring operation, the worker enters the rectangular construction platform body from the ladder, the worker enters the rectangular construction platform body and detours to the other end of the rectangular opening, lifts the ladder, and connects the other end of the ladder with the other end of the rectangular opening to form the entire concrete pouring construction platform, and vibration operation can be performed at this time. When the pouring operation is completed, the other end of the ladder is separated from the other end of the rectangular opening, and the worker can quickly leave the rectangular construction platform body with the help of the ladder. When the operation is completed, the rectangular construction platform body is disassembled, lifted off the platform, and turned to the next bridge pier column construction surface. Compared with traditional finished ladder cages and operating platforms, the construction platform of the utility model provides extremely convenient construction conditions for the construction of low piers, saves funds for purchasing finished ladder cages and operating platforms, and has the advantages of good economy, strong adaptability and good turnover.

[0016] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the specific implementation modes of the present invention, the drawings required for use in the description of the specific implementation modes will be briefly introduced below. Obviously, the drawings described below are some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 This is a schematic diagram of the overall structure of a low pier concrete pouring construction platform according to an embodiment of the utility model;

[0019] Figure 2 It is a partial enlarged view of the cooperation between the N-shaped connector and the ladder in a low pier concrete pouring construction platform according to an embodiment of the utility model.

[0020] In the figure: 1-rectangular construction platform body; 2-low pier concrete formwork; 3-ladder; 4-N-shaped connector; 5-movable latch; 6-hinge; 7-bolt and nut assembly; 8-safety fence. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] like Figure 1 As shown, a low pier concrete pouring construction platform provided by an embodiment of the utility model is intended to provide an economical, practical and highly adaptable solution for low pier concrete pouring operations with a height between 1.8m and 2.2m. The construction platform mainly includes a rectangular construction platform body 1, a central position of which is designed with an opening for inserting a low pier concrete formwork 2. The rectangular construction platform body 1 is sleeved on the low pier concrete formwork 2 through the opening, and the rectangular construction platform body 1 is detachably connected to the low pier concrete formwork 2. This design enables the rectangular construction platform body 1 to be stably connected to the low pier concrete formwork 2, making it convenient for construction personnel to perform vibration operations around the low pier concrete formwork. At the same time, the design of the detachable connection between the rectangular construction platform body 1 and the low pier concrete formwork 2 facilitates the circulation and turnover of the construction platform.

[0023] A rectangular opening is specially provided at a position near the first side on the rectangular construction platform body 1, and the rectangular opening is provided along the direction in which the first side extends. A rectangular opening is provided at a position near the first side on the rectangular construction platform body 1, and a ladder 3 is matched in the rectangular opening, one end of the ladder 3 is hinged to one end of the rectangular opening, and the other end of the ladder 3 is detachably connected to the other end of the rectangular opening. This rectangular opening is not only convenient for construction workers to enter and exit the construction platform, but more importantly, it can also be perfectly combined with the ladder 3. When pouring operations are required, workers enter the rectangular construction platform body 1 from the ladder 3. After entering, the workers lift the ladder 3 and connect the other end of the ladder 3 to the other end of the rectangular opening to form the entire concrete pouring construction platform. When the pouring operations are completed, the other end of the ladder 3 is separated from the other end of the rectangular opening, and the workers can leave the construction operation surface from the rectangular construction platform body 1, and finally lift off the device and turn around to the next bridge pier construction surface. It provides extremely convenient construction conditions for the construction of the low piers of this project, saving funds for purchasing finished ladder cages and operating platforms. The ladder can be easily unfolded to provide construction workers with a convenient up and down passage; when not needed, the ladder can be folded and stored without affecting the normal use of the construction platform.

[0024] For example, the entire construction platform is made of angle steel welded together, and the construction platform can be disassembled into the original angle steel material after it is used, so as to facilitate the construction and use of other parts of the project.

[0025] In one embodiment, in combination Figure 1 and Figure 2 As shown, an n-shaped connector 4 with its opening facing downward is fixed at the other end of the rectangular opening, and movable latches 5 are inserted at positions near the bottom on both sides of the n-shaped connector 4. The other end of the ladder 3 can enter the n-shaped connector 4, and the ladder 3 is limited and fixed by the movable latch 5. Exemplarily, the n-shaped connector 4 is fixed to the other end of the rectangular opening by welding, and the n-shaped connector 4 is a cut channel steel.

[0026] Specifically, the ladder 3 is fixed in a limited position by using the cooperation of the N-shaped connector 4 and the movable latch 5, so that the ladder 3 can be fixed and opened conveniently and quickly.

[0027] In one embodiment, if Figure 1 As shown, one end of the ladder 3 is hinged to one end of the rectangular opening by a hinge 6. Exemplarily, the two are hinged by multiple hinges 6, one side of the hinge 6 is fixed to one end of the ladder 3, and one side of the hinge 6 is fixed to one end of the rectangular opening, which is convenient to manufacture and has a low design cost.

[0028] As a more preferred embodiment, Figure 1 As shown, in order to ensure the safety of workers when working on the rectangular construction platform body 1, a safety fence 8 is arranged around the upper end surface of the rectangular construction platform body 1, and the risk of workers falling is effectively avoided by the safety fence 8. Exemplarily, the safety fence 8 is fixed to the upper end surface of the rectangular construction platform body 1 by welding, and the height of the safety fence 8 is 800mm to 1000mm.

[0029] On the basis of the above embodiment, more preferably, when the other end of the ladder 3 is separated from the other end of the rectangular opening, the other end of the ladder 3 can contact the ground. When the worker climbs up and down the ladder 3, the ladder 3 will not shake because it is supported on the ground, thus ensuring the stability of the ladder 3.

[0030] Preferably, practicality and convenience are fully considered, and the length of the ladder is controlled between 1800mm and 2200mm, and the width is between 600mm and 800mm. This ensures that construction workers can go up and down comfortably and avoids the inconvenience caused by excessive size.

[0031] In one embodiment, the rectangular construction platform body 1 is connected to the low pier concrete formwork 2 via a bolt and nut assembly 7. This connection method is simple and reliable, which not only ensures the stability of the construction platform but also facilitates disassembly and transportation.

[0032] It should be noted that after the worker enters the rectangular construction platform body 1, he / she goes around the rectangular construction platform body 1 to the other end of the rectangular opening, and with the assistance of the ground staff, he / she pushes the ladder 3 to the worker on the rectangular construction platform body 1, and the worker on the rectangular construction platform body 1 connects the other end of the ladder 3 to the other end of the rectangular opening. Of course, a lifting rope can also be tied to the ladder 3, and the worker on the rectangular construction platform body 1 can directly lift the ladder 3 through the lifting rope without the assistance of the ground staff.

[0033] It should also be noted that for this type of low pier concrete pouring construction work, workers can walk at the other three positions on the rectangular construction platform body 1 without having to stand on the stowed ladder 3. Of course, they can also stand on the ladder 3, but in this case, a flat plate needs to be laid on the ladder 3 to prevent stepping on empty space. It should be understood that if workers need to stand on the stowed ladder, the connection between the ladder and the rectangular opening needs to be reinforced, such as adding an n-shaped connector 4 and a hinge 6.

[0034] The low pier concrete pouring construction platform provided in this embodiment not only solves the deficiencies of traditional finished ladder cages and operating platforms in terms of economy, adaptability and turnover, but also realizes high efficiency, safety and convenience of low pier concrete pouring operations through clever design and reasonable size control, bringing great convenience and benefits to bridge construction in municipal engineering construction.

[0035] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0036] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0037] In the present invention, unless otherwise clearly defined and limited, the terms "connected", "connection" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0039] In the present utility model, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0040] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the utility model, which are used to illustrate the technical solution of the utility model, rather than to limit it. The protection scope of the utility model is not limited thereto. Although the utility model is described in detail with reference to the above-mentioned embodiments, ordinary technicians in this field should understand that any technician familiar with the technical field can still modify the technical solution recorded in the above-mentioned embodiments within the technical scope disclosed by the utility model, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solution deviate from the spirit and scope of the technical solution of the embodiment of the utility model, and should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model shall be based on the protection scope of the claims.

Claims

1. A low pier concrete pouring construction platform, characterized in that: The invention comprises a rectangular construction platform body (1), wherein an opening for inserting a low pier concrete formwork (2) is provided at the center of the rectangular construction platform body (1), the rectangular construction platform body (1) is inserted into the low pier concrete formwork (2) through the opening, and the rectangular construction platform body (1) and the low pier concrete formwork (2) are detachably connected; a rectangular opening is provided at a position close to a first side edge of the rectangular construction platform body (1), and the rectangular opening is provided along the direction in which the first side edge extends; a ladder (3) is matched in the rectangular opening, one end of the ladder (3) is hinged to one end of the rectangular opening, and the other end of the ladder (3) is detachably connected to the other end of the rectangular opening.

2. A low pier concrete pouring construction platform according to claim 1, characterized in that: An n-shaped connecting piece (4) with its opening facing downward is fixed to the other end of the rectangular opening, and movable latches (5) are inserted into the positions of the two sides of the n-shaped connecting piece (4) close to the bottom; the other end of the ladder (3) can enter the n-shaped connecting piece (4), and the ladder (3) is limited and fixed by using the movable latches (5).

3. A low bridge pier concrete pouring construction platform according to claim 1, characterized in that: Safety fences (8) are arranged around the upper end surface of the rectangular construction platform body (1).

4. A low pier concrete pouring construction platform according to claim 1, characterized in that: When the other end of the ladder (3) is separated from the other end of the rectangular opening, the other end of the ladder (3) can contact the ground.

5. The low pier concrete pouring construction platform according to claim 1 is characterized in that: One end of the ladder (3) is hinged to one end of the rectangular opening via a hinge (6).

6. A low pier concrete pouring construction platform according to claim 1, characterized in that: The rectangular construction platform body (1) is connected to the low pier concrete formwork (2) via a bolt and nut assembly (7).

7. The low bridge pier concrete pouring construction platform according to claim 1, characterized in that: The length of the ladder (3) is 1800 mm to 2200 mm.

8. The low pier concrete pouring construction platform according to claim 1, characterized in that: The width of the ladder (3) is 600 mm to 800 mm.