Flow guide structure suitable for inverted siphon construction
By setting up a drainage structure with rotating flange connection in the construction area of the inverted siphon section, the problem of low construction efficiency when the river flow is small was solved, and the construction space can be flexibly divided and the construction progress can be guaranteed.
Patent Information
- Application Number
- CN202420561749.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-21
AI Technical Summary
When the river flow is low, existing technology cannot guarantee the construction efficiency and quality of inverted siphons, especially the limitations of diversion pipe laying, which makes it difficult to control the construction progress and quality.
Upstream and downstream cofferdams are set up in the construction area of the inverted siphon pipe section, and the upstream and downstream straight pipe sections are connected to the middle bend pipe section through a drainage structure. The middle bend pipe section is rotated by a rotating flange to divide the construction area and provide sufficient construction space.
The rotation of the middle bend section is achieved by using a rotating flange connection, ensuring sufficient construction space for the inverted siphon pipe section on each side, guaranteeing construction progress and quality. The structure is simple and easy to operate.
Smart Images

Figure CN222044072U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a diversion structure suitable for inverted siphon construction. Background Art
[0002] An inverted siphon is a type of hydraulic structure that uses water level difference and potential energy difference to achieve the function of water passing through the road surface or under the ditch. During the construction process, it is often encountered that the water diversion pipeline crosses the river. Generally, phased diversion is adopted, and cofferdams are used on the left and right banks in turn for construction; the cofferdam blocks the riverbed once, and an open channel is excavated on the side for diversion; when the flow rate in the river is small and the conditions for phased diversion and open channel excavation are not met, the cofferdam can also be used to block the riverbed once, and a pipeline can be buried at the bottom for diversion. In this case, due to the restrictions on the laying of the diversion pipeline, the progress and quality control of the lifting of the water diversion pipeline section will be affected. In serious cases, it is necessary to stop the work and move the diversion pipe, so the construction efficiency of the inverted siphon cannot be guaranteed. Utility Model Content
[0003] The purpose of the utility model is to provide a diversion structure that can ensure the continuous construction of an inverted siphon. To this end, the utility model adopts the following technical solutions:
[0004] A diversion structure suitable for inverted siphon construction, wherein an upstream cofferdam and a downstream cofferdam are respectively intercepted and arranged on the upstream and downstream sides of a river channel where a construction work surface of an inverted siphon section is located, a water discharge structure is arranged in the same direction as the flow direction of the river channel, and an upstream straight pipe section and a downstream straight pipe section are respectively arranged at both ends of the water discharge structure for passing through the upstream cofferdam and the downstream cofferdam to conduct the water flow, the axes of the upstream straight pipe section and the downstream straight pipe section are in the same straight line, and a middle curved pipe section is connected between the two by a rotating flange, the middle curved pipe section is used to divide the construction work surface as a whole, and a rotating construction area switching state is formed; a fixed part connected to the straight pipe section and a rotating part connected to the middle curved pipe section are respectively arranged at both ends of the rotating flange, and the rotating part is sleeved on the fixed part.
[0005] Furthermore: the end sections of the two side areas of the middle curved pipe section are connected to the rotating part in a straight tube shape, and bending sections are arranged at both ends of the middle section of the middle area of the middle curved pipe section so that there is a turning distance between the axis of the middle section of the middle curved pipe section and the axis of the upstream straight pipe section and the downstream straight pipe section.
[0006] Furthermore: the length of the middle section of the middle curved pipe section is greater than the spacing of the construction working surface in the river channel along the direction of water flow.
[0007] Furthermore: a flared groove is provided in the end face of the fixed part, and a connecting part is provided at the end of the rotating part, which extends into the flared groove and is connected and cooperated with the flared groove. There is a gap between the end face of the fixed part and the rotating part, and an annular groove is formed on the connecting part. A limit block is provided in the annular groove, and the limit block is clamped and connected with the fixed part and the rotating part in the circumferential direction at the same time.
[0008] Furthermore: a retaining ring is embedded and installed in the annular groove, the retaining ring is connected to the fixing part, and covers the periphery of the limiting block.
[0009] Furthermore, a hole is provided in the end of the fixing portion along its axial direction, and a bolt hole matching the hole is provided on the side of the retaining ring, so that the fixing portion and the retaining ring are connected and locked by bolts.
[0010] Furthermore: the drainage structure is laid on the bottom of the river channel.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] The utility model uses the drain structure to connect the straight pipe sections with the middle curved pipe section under the action of the rotating flange connection, so that the middle curved pipe section can rotate around the axis of the upstream straight pipe section and the downstream straight pipe section, and thereby the middle curved pipe section can be transferred to the left and right side areas of the construction work surface, so as to ensure that there is sufficient construction space when constructing the inverted siphon pipe section in each side area, and to ensure the construction progress and quality. At the same time, the utility model has a simple structure and is easy to operate, easy to assemble and disassemble, and is conducive to actual engineering use. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a plan layout diagram of the construction and diversion of the inverted siphon of the utility model;
[0014] Figure 2 It is a plan layout diagram of the drainage structure of the inverted siphon construction of the utility model;
[0015] Figure 3 It is the AA section view of the inverted siphon construction diversion of the utility model;
[0016] Figure 4 It is a cross-sectional view of the diversion rotating flange for constructing the inverted siphon pipe of the utility model;
[0017] Figure 5 This is a layout diagram of the connection holes of the diversion rotating flange for the construction of the inverted siphon pipe of the utility model.
[0018] The marks in the accompanying drawings are: 1-upstream cofferdam, 2-downstream cofferdam, 3-drainage structure, 301-upstream straight pipe section, 302-middle curved pipe section, 303-downstream straight pipe section, 304-rotating flange, 3041-fixing part, 3042-rotating part, 3043-limiting block, 3044-retaining ring, 3045-hole, 3046-straight section connecting hole, 3047-curved section connecting hole, 3048-annular groove, 4-inverted siphon pipe section, 41-outer pipe. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0020] like Figure 1-5 As shown, a diversion structure suitable for inverted siphon construction is provided. An upstream cofferdam 1 and a downstream cofferdam 2 are respectively intercepted and arranged on the upstream and downstream sides of the river channel where the construction operation surface of the inverted siphon section 4 is located. A discharge structure 3 is arranged in the same direction of the flow direction of the river channel. The upstream cofferdam 1 and the downstream cofferdam 2 respectively block the upstream incoming water and the downstream backwater. The discharge structure 3 is laid along the river bottom, passes through the upstream cofferdam 1, the construction operation surface and the downstream cofferdam 2 in sequence, and discharges the upstream incoming water to the downstream. The downstream backwater is blocked by the downstream cofferdam 2, so that the construction operation surface has dry land construction conditions. The two ends of the discharge structure 3 are respectively provided with water diversion devices passing through the upstream cofferdam 1 and the downstream cofferdam 2. The upstream straight pipe section 301 and the downstream straight pipe section 303 are connected, the axes of the upstream straight pipe section 301 and the downstream straight pipe section 303 are on the same straight line, and the middle curved pipe section 302 is connected between the two through a rotating flange 304, the axis of the middle curved pipe section 302 deviates from the axes of the upstream straight pipe section 301 and the downstream straight pipe section 303, the middle curved pipe section 302 is used to divide the construction working surface as a whole, and a rotating construction area switching state is formed; the two ends of the rotating flange 304 are respectively provided with a fixed part 3041 connected to the straight pipe section and a rotating part 3042 connected to the middle curved pipe section 302, and the rotating part 3042 is sleeved on the fixed part 3041.
[0021] In this embodiment, the middle curved pipe section 302 is in an arch shape, and the shape is described as follows: the middle curved pipe section 302 is divided into three areas as a whole, including end sections of the two side areas and the middle section of the middle area, the end sections of the middle curved pipe section 302 are in a straight tube shape and connected to the rotating part 3042, both ends of the middle section of the middle curved pipe section 302 are provided with bending sections, the middle section is in a straight tube shape and connected to the end sections through the bending sections, and there is a turning distance between the axis of the middle section of the middle curved pipe section 302 and the axis of the upstream straight pipe section 301 and the downstream straight pipe section 303. Therefore, the middle curved pipe section 302 can rotate along the central axis of the upstream straight pipe section 301 and the downstream straight pipe section 303 through the rotating flanges 304 connected on both sides.
[0022] The length of the middle section of the middle curved pipe section 302 is greater than the spacing of the construction working surface in the river channel along the water flow direction, so as to ensure that there is enough construction space during the construction of the inverted siphon pipe section 4.
[0023] In this embodiment, the rotating flange 304 is generally tower-shaped, and the outer side of the end of the fixed part 3041 relative to the straight pipe section side is evenly arranged with straight section connecting holes 3046 in a circumferential direction, which can be connected to the upstream straight pipe section 301 and the downstream straight pipe section 303 through flange bolts; the rotating part 3042 is short and thick tower-shaped, and the outer side of the end of the rotating part 3042 relative to the middle curved pipe section 302 side is evenly arranged with curved section connecting holes 3047 in a circumferential direction, which can be connected to the middle curved pipe section 302 through flange bolts.
[0024] Specifically, the fixed portion 3041 expands the inner wall of its end portion on the side opposite to the rotating portion 3042 to form a flared groove; the end of the rotating portion 3042 is provided with a connecting portion that is embedded in the flared groove and connected to it, there is a gap between the end face of the fixed portion 3041 and the rotating portion 3042, and an annular groove 3048 is formed on the connecting portion, and a clamping groove is provided in the annular groove 3048, which is divided into a first clamping portion provided on the end face of the fixed portion 3041 and a second clamping portion provided on the circumferential surface of the connecting portion of the rotating portion 3042, and a limiting block 3043 is installed in the clamping groove, after the rotating portion 3042 is fit and embedded in the fixed portion 3041, the first clamping portion and the second clamping portion are assembled into a whole, and by embedding the limiting block 3043, the limiting block 3043 is clamped and connected to the fixed portion 3041 and the rotating portion 3042 at the same time in the circumferential direction of the rotating flange 304.
[0025] The retaining ring 3044 is tightly embedded in the annular groove 3048, and a groove matching the groove limit block 3043 is provided on the inner wall of the retaining ring 3044, and the retaining ring 3044 covers the periphery of the limit block 3043. In this embodiment, the overall retaining ring 3044 is divided into a plurality of arc segments, so that the retaining ring 3044 can be assembled in petals.
[0026] A hole 3045 is provided in the end of the fixing portion 3041 along its axial direction, and a bolt hole matching the hole 3045 is provided on the side of the retaining ring 3044, so that the fixing portion 3041 and the retaining ring 3044 are connected and locked by bolts.
[0027] In this embodiment, the inverted siphon pipe section 4 is arranged at the bottom of the river channel and crosses the river channel; an outer sheath pipe 41 is provided on the outside of the inverted siphon pipe section 4, and the outer sheath pipe 41 is sheathed with C25 reinforced concrete.
[0028] See also Figure 1-5 When constructing the inverted siphon section through the diversion structure, the specific steps are as follows:
[0029] S1: pre-assemble the rotating flange 304, after the fixing part 3041, the rotating part 3042 and the limit block 3043 are fitted and fixed, install the retaining ring 3044, the retaining ring 3044 can be assembled in petals, after the bolt hole of the retaining ring 3044 is aligned with the hole 3045, install the long bolt to connect and lock;
[0030] S2: Assemble the drainage structure 3, connect the upstream straight pipe section 301 and the downstream straight pipe section 303 to the middle curved pipe section 302 through the rotating flange 304 respectively. During the assembly process, ensure that the axes of the upstream straight pipe section 301 and the downstream straight pipe section 303 are on the same straight line;
[0031] S3: Measure and lay out the positions of the upstream cofferdam 1, the downstream cofferdam 2 and the water discharge structure 3, hoist the water discharge structure 3 to the designated position, and then fill the upstream cofferdam 1 and the downstream cofferdam 2;
[0032] S4: Pump the water stored in the foundation pit between the upstream cofferdam 1 and the downstream cofferdam 2 to the downstream, adjust and fix the position of the middle curved pipe section 302, and place it on the left side of the construction work surface to ensure that there is enough space for hoisting and concrete pouring of the right inverted siphon pipe section 4. After the construction of the right area of the construction work surface is completed, rotate the middle curved pipe section 302 to the right area and fix it, and construct the inverted siphon pipe section 4 in the left area. Therefore, the construction of the inverted siphon pipe 4 in the left area will not be affected by the drainage structure 3, and its smooth construction can be ensured;
[0033] S5: After the construction of the inverted siphon section 4 across the river is completed, the upstream cofferdam 1 and the downstream cofferdam 2 are dismantled in turn, and the discharge structure 3 is disassembled and hoisted out.
[0034] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.
Claims
1. A diversion structure suitable for inverted siphon construction, Features: An upstream cofferdam (1) and a downstream cofferdam (2) are respectively arranged to intercept and set at the upstream and downstream sides of the river channel where the construction operation surface of the inverted siphon pipe section (4) is located, and a water discharge structure (3) is arranged in the same direction as the flow direction of the river channel. An upstream straight pipe section (301) and a downstream straight pipe section (303) are respectively arranged at both ends of the water discharge structure (3) to pass through the upstream cofferdam (1) and the downstream cofferdam (2) to conduct the water flow. The axes of the upstream straight pipe section (301) and the downstream straight pipe section (303) are on the same straight line, and the middle curved pipe section (302) is connected between the two via a rotating flange (304); The two ends of the rotating flange (304) are respectively provided with a fixing part (3041) connected to the straight pipe section and a rotating part (3042) connected to the middle curved pipe section (302), and the rotating part (3042) is sleeved on the fixing part (3041).
2. A diversion structure suitable for inverted siphon construction according to claim 1, Features: The end sections of the two side regions of the middle curved pipe section (302) are connected to the rotating section (3042) in a straight tube shape, and bending sections are provided at both ends of the middle section of the middle region of the middle curved pipe section (302) so that there is a turning distance between the axis of the middle section of the middle curved pipe section (302) and the axes of the upstream straight pipe section (301) and the downstream straight pipe section (303).
3. A diversion structure suitable for inverted siphon construction according to claim 2, Features: The length of the middle section of the middle curved pipe section (302) is greater than the spacing of the construction working surface in the river channel along the direction of water flow.
4. A diversion structure suitable for inverted siphon construction according to claim 1, Features: A flared groove is provided in the end face of the fixed part (3041), and a connecting part is provided at the end of the rotating part (3042) to extend into the flared groove and to be connected and matched therewith. There is a gap between the end face of the fixed part (3041) and the rotating part (3042), and an annular groove (3048) is formed on the connecting part. A limit block (3043) is provided in the annular groove (3048), and the limit block (3043) is connected to the fixed part (3041) and the rotating part (3042) in the circumferential direction.
5. A diversion structure suitable for inverted siphon construction according to claim 4, Features: A retaining ring (3044) is embedded and installed in the annular groove (3048); the retaining ring (3044) is connected to the fixing portion (3041) and covers the periphery of the limiting block (3043).
6. A diversion structure suitable for inverted siphon construction according to claim 5, Features: A hole (3045) is provided in the end of the fixing portion (3041) along its axial direction, and a bolt hole matching the hole (3045) is provided on the side of the retaining ring (3044), so that the fixing portion (3041) and the retaining ring (3044) are locked by bolt connection.
7. A diversion structure suitable for inverted siphon construction according to claim 1, Features: The drainage structure (3) is laid on the bottom of the river channel.
Citation Information