Control brake

By setting up a corridor connecting the two gates at the T-shaped diversion port of the river, the problems of complex management and high maintenance costs are solved, the effect of rapid management and cost reduction is achieved, and the water flow management is optimized through additional structures to improve the Work efficiency and river safety.

CN222044107UActive Publication Date: 2024-11-22SHANDONG SURVEY & DESIGN INST OF WATER CONSERVANCY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420738680.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-11-22
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

At the T-shaped diversion port of the river channel, there is no connection channel between the two gates, which leads to complex management and high maintenance costs.

Method used

A control gate was designed, by setting up a corridor between the two gates to connect the opening and closing machine room, allowing staff to quickly shuttle and control the opening or closing of the two gates. At the same time, a management room is set up in the middle of the corridor, which is convenient for office work and Implement controls to reduce equipment quantity and maintenance costs.

Benefits of technology

The staff quickly manages the round trip between the two gates, simplifies the management process, reduces maintenance costs, and optimizes the water flow management through structures such as U-shaped grooves, drainage pools, sea mans and gabion gabions, improving work Efficiency and safety of the river.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044107U_ABST
    Figure CN222044107U_ABST
Patent Text Reader

Abstract

The utility model discloses a control gate, and relates to the technical field of gate control. According to the technical scheme, the control gate comprises a first gate body, a second gate body is arranged on the opposite side of the first gate body, a first hoist room is arranged above the first gate body, a second hoist room is arranged above the second gate body, and the first hoist room and the second hoist room are communicated through a corridor. According to the device, the working efficiency is remarkably improved, management is simpler, workers can rapidly go back and forth between the first gate and the second gate, meanwhile, some devices can be shared, and the maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of gate control, in particular to a control gate. Background Art

[0002] At the T-shaped diversion of the river, the importance of the gate is self-evident. As a key component of the water conservancy project, it undertakes multiple tasks such as regulating water flow and controlling water level. When a flood hits, the gate can be closed in time to effectively prevent flooding and protect the lives and property of residents along the coast. In the dry season, the gate can be opened in time to regulate the water flow and ensure that the irrigation needs of downstream farmland are met. In addition, the gate can filter impurities in the river, protect water quality, and maintain ecological balance. It can be said that without the protection of the gate, the safety and stability of the river intersection will be out of the question. Therefore, at the intersection of the river, the construction and maintenance of the gate is particularly important. It is directly related to the smooth flow and safety of the river and is an indispensable part of the construction of water conservancy projects.

[0003] At the T-shaped diversion of the river, in order to control the flow of the two tributaries, gates are built on the two tributaries. The two gates work independently to regulate the flow of the tributaries they control, thereby ensuring the reasonable distribution of water flow and the safe operation of the river.

[0004] However, since the two gates are located in different tributaries and there is no direct channel connecting them, it is difficult for staff to quickly shuttle between the two gates, which makes the management work quite complicated and cumbersome, and also increases the cost and difficulty of maintenance. Summary of the invention

[0005] The utility model aims to solve the problem that there is no connecting passage between two gates, which leads to complicated management and high maintenance cost, and provides a control gate with a connecting passage between the two gates, which is simple to manage and has low maintenance cost.

[0006] In order to solve the above problems, the technical solution adopted by the utility model is a control gate, including a first gate, a second gate is arranged on the opposite side of the first gate, a first opening and closing machine room is arranged above the first gate, and a second opening and closing machine room is arranged above the second gate, and the first opening and closing machine room and the second opening and closing machine room are connected by a corridor. The first gate is located above the first tributary, and the second gate is located above the second tributary. The staff can quickly travel back and forth between the first opening and closing machine room and the second opening and closing machine room through the corridor, and the first gate and the second gate can be opened or closed by controlling the first opening and closing machine room and the second opening and closing machine room. Therefore, the device enables the staff to quickly travel back and forth between the first gate and the second gate, is simple to manage, and can reduce the number of equipment and maintenance costs.

[0007] Preferably, a management room is provided in the middle of the corridor. The staff works in the management room on a daily basis, and once receiving relevant commands, they can quickly go to the first opening and closing machine room and the second opening and closing machine room to control the first gate and the second gate.

[0008] Preferably, a U-shaped groove is provided between the first gate and the second gate. The U-shaped groove can effectively collect the river water of the main stream of the river.

[0009] Preferably, a bridge board is arranged above the U-shaped groove, the bridge board enables the staff to enter the corridor, a rack is fixed at the bottom of the bridge board, and a fence is installed on the bridge board. The bridge board enables pedestrians to cross the river conveniently and enables the staff to enter the corridor, the rack can support and fix the bridge board, and the fence ensures the safety of pedestrians during walking.

[0010] Preferably, the outlets of the first gate and the second gate are both provided with energy dissipation pools, which slow down the high-speed flowing water when passing through, and are used to eliminate the excess energy in the water flow.

[0011] Preferably, a floodplain is provided behind the energy dissipation pool, which can continue to dissipate the residual energy of the water flow, allowing the water flow to spread smoothly into the natural river channel, thereby avoiding scouring the downstream river bank.

[0012] Preferably, gabion stone cages are arranged behind the sea. Gabion stone cages can not only resist the scouring of water flow, but also allow the natural infiltration of water flow, which helps to maintain the ecological balance of the river bank.

[0013] It can be seen from the above technical solutions that the advantages of the utility model are: the first gate and the second gate are respectively located above the first tributary and the second tributary, and the staff can quickly shuttle between the first opening and closing machine room and the second opening and closing machine room by means of the corridor. By controlling the first opening and closing machine room and the second opening and closing machine room, the first gate and the second gate can be quickly opened or closed. In summary, the device significantly improves work efficiency, makes management simpler, enables staff to quickly travel between the first gate and the second gate, and some equipment can be shared, thereby reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solution of the utility model, the drawings required for use in the description will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a structural schematic diagram of a specific implementation method of the utility model.

[0016] Description of main reference numerals

[0017] In the figure: 1. Main stream, 2. First tributary, 3. Second tributary, 4. U-shaped trough, 5. Bridge deck, 6. Corridor, 61. Management room, 62. First hoisting and shutting machine room, 63. Second hoisting and shutting machine room, 64. First gate, 65. Second gate, 7. Energy dissipation pool, 8. Sea cover, 9. Gabion stone cage. DETAILED DESCRIPTION

[0018] In order to make the purpose, features and advantages of the utility model more obvious and easy to understand, the technical scheme of the utility model will be clearly and completely described below in combination with the drawings in the specific embodiment. Obviously, the embodiments described below are only part of the embodiments of the utility model, not all of them. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.

[0019] A control gate includes a first gate 64, which is located above a first tributary 2 and can control the flow of the first tributary 2. A second gate 65 is provided on the opposite side of the first gate 64, which is located above a second tributary 3 and can control the flow of the second tributary 3. The water inlet main stream 1 of the river channel is located between the first gate 64 and the second gate 65, and the water entering from the main stream 1 flows out from the first tributary 2 and the second tributary 3 respectively.

[0020] like Figure 1 As shown, in this specific embodiment, a U-shaped groove 4 is provided at the water inlet main stream 1 of the river channel, and the U-shaped groove 4 can effectively collect the river water flowing in from the main stream 1 of the river channel. In this embodiment, the U-shaped groove 4 is set to a cylindrical shape. In other embodiments, the U-shaped groove 4 can be designed to be a truncated cone, in which the end with a narrower cross-section is adjacent to the first gate 64 and the second gate 65 to optimize the water flow concentration effect. A bridge deck 5 is provided above the U-shaped groove 4, and the bridge deck 5 is convenient for pedestrians to cross the river channel, and at the same time, it is convenient for staff to go to the first gate 64 and the second gate 65. A rack is welded at the bottom of the bridge deck 5, and the rack can support and fix the bridge deck 5. A fence is installed on the bridge deck 5, and the fence ensures the safety of pedestrians during walking.

[0021] In this specific embodiment, a corridor 6 is provided above the first gate 64 and the second gate 65, and the corridor 6 is arranged in a "concave" shape. The top of the "concave" shape faces the water inlet main stream 1 of the river. The first gate 64 is located below the left side of the corridor 6, that is, the first gate 64 is located below the left side of the "concave" shape. The second gate 65 is located below the right side of the corridor 6, that is, the second gate 65 is located below the right side of the "concave" shape. A first opening and closing machine room 62 is installed on the left side of the corridor 6, and the first opening and closing machine room 62 is located above the first gate 64. The first opening and closing machine room 62 can control the opening or closing of the first gate 64, and the first opening and closing machine room 62 and the method for controlling the opening or closing of the first gate 64, as well as the specific structure of the first gate 64, are all prior art and need not be elaborated. A second hoisting and closing machine room 63 is installed on the right side of the corridor 6. The second hoisting and closing machine room 63 is located above the second gate 65, and the second hoisting and closing machine room 63 can control the opening or closing of the second gate 65. The second hoisting and closing machine room 63 and the method for controlling the opening or closing of the second gate 65, as well as the specific structure of the second gate 65, are all prior arts and need not be described in detail. At the same time, the corridor 6 connects the first hoisting and closing machine room 62 and the second hoisting and closing machine room 63 together, so that the staff can quickly travel back and forth between the first hoisting and closing machine room 62 and the second hoisting and closing machine room 63.

[0022] In this specific embodiment, the outlets of the first gate 64 and the second gate 65 are both provided with an energy dissipation pool 7. The energy dissipation pool 7 can decelerate the water flow out of the first gate 64 or the second gate 65 and eliminate the excess energy in the water flow. The specific structure of the energy dissipation pool 7 is a prior art and need not be elaborated. A seawall 8 is provided behind the energy dissipation pool 7. The seawall 8 can continue to dissipate the residual energy of the water flow out of the energy dissipation pool 7, so that the water flow can be smoothly diffused into the natural river channel to avoid scouring the downstream river bank. The specific structure of the seawall 8 is a prior art and need not be elaborated. A gabion gabion 9 is provided behind the seawall 8. The gabion gabion 9 is a three-dimensional structure woven from a metal mesh, and the interior of the gabion gabion 9 is filled with stones or other suitable hard materials to form a solid and permeable structure. The gabion gabion 9 can not only resist the scouring of the water flow, but also allow the natural infiltration of the water flow. The specific structure of the gabion gabion 9 and its installation method are both prior art and need not be elaborated.

[0023] A management room 61 is arranged in the middle of the corridor 6, that is, the management room 61 is arranged in the middle of the bottom of the "concave" shape. The management room 61 is the daily office of the staff. When receiving a command to open or close the gate, the staff can quickly go to the first opening and closing machine room 62 and the second opening and closing machine room 63 to control the first gate 64 and the second gate 65.

[0024] The specific use process of the utility model is as follows: the main stream 1 of the river inflow is effectively collected through the U-shaped groove 4, and then the water flow is temporarily stored by the structure formed by the first gate 64, the second gate 65 and the corridor 6. Once it is necessary to open the gate to release water, the staff will quickly set out from the management room 61, quickly reach the first opening and closing machine room 62 and the second opening and closing machine room 63 through the corridor 6, and control the opening of the first gate 64 and the second gate 65. With the opening of the first gate 64 and the second gate 65, the water flows into the first tributary 2 and the second tributary 3 respectively, and passes through the energy dissipation pool 7, the sea flood 8 and the gabion stone cage 9 in turn. These structures effectively eliminate the energy of the water flow, thereby avoiding the scouring of the downstream river bank.

[0025] It can be seen from the above embodiments that the beneficial effect of the utility model is that the first gate and the second gate are respectively located above the first tributary and the second tributary, and the staff can quickly shuttle between the first opening and closing machine room and the second opening and closing machine room by means of the corridor. By controlling the first opening and closing machine room and the second opening and closing machine room, the first gate and the second gate can be quickly opened or closed. In summary, the device significantly improves work efficiency, makes management simpler, enables staff to quickly travel between the first gate and the second gate, and some equipment can be shared, thereby reducing maintenance costs.

[0026] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A control gate, characterized in that: The invention comprises a first gate (64), a second gate (65) is arranged on the opposite side of the first gate (64), a first opening and closing machine room (62) is arranged above the first gate (64), a second opening and closing machine room (63) is arranged above the second gate (65), and the first opening and closing machine room (62) and the second opening and closing machine room (63) are connected through a corridor (6).

2. The control gate according to claim 1, characterized in that: A management room (61) is arranged in the middle of the corridor (6).

3. The control gate according to claim 1, characterized in that: A U-shaped groove (4) is provided between the first gate (64) and the second gate (65).

4. The control gate according to claim 3, characterized in that: A bridge board (5) is arranged above the U-shaped groove (4), and the bridge board (5) enables workers to enter the corridor (6). A rack is fixed at the bottom of the bridge board (5), and a fence is installed on the bridge board (5).

5. The control gate according to claim 1, characterized in that: The outlets of the first gate (64) and the second gate (65) are both provided with energy dissipation pools (7).

6. The control gate according to claim 5, characterized in that: A sea bank (8) is arranged at the rear of the energy dissipation pool (7).

7. The control gate according to claim 6, characterized in that: A gabion stone cage (9) is arranged behind the seawall (8).