Underground water diversion system for slope building
By using a layered groundwater diversion system, blind drains and sump wells are used to effectively drain groundwater, solving the problem of building uplift caused by groundwater seepage and achieving the dual functions of economical and efficient groundwater management and fire-fighting water supply.
Patent Information
- Application Number
- CN202420653891.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-01
AI Technical Summary
In underground engineering, the "basin effect" caused by groundwater seepage causes buildings to float. Traditional dewatering measures are costly and not very applicable, and are difficult to effectively drain groundwater.
The groundwater diversion system, which adopts a layered structure, includes a structural base slab, a sump, blind drains, and transparent water pipes. Groundwater is diverted to the sump through the blind drains and protected by polyester geotextile and polyethylene materials, thereby achieving effective drainage and monitoring of groundwater.
It effectively reduces the buoyancy of groundwater on the foundation slab, avoids floating accidents, saves construction costs, and also has fire-fighting water supply functions, which is in line with the green and sustainable development design concept.
Smart Images

Figure CN222044245U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of groundwater diversion of buildings, in particular to a groundwater diversion system for slope buildings. Background Art
[0002] In underground projects, after the excavation of the foundation pit, a water head difference is formed inside and outside the foundation pit. The groundwater bypasses the bottom of the water-stop curtain through seepage in the soil and replenishes into the foundation pit. If reasonable measures are not taken in time to deal with this part of the groundwater, a "basin effect" may occur, causing the underground building to float as a whole or partially, resulting in adverse consequences such as cracking of the bottom plate and structural damage, which is extremely harmful. Therefore, precipitation measures are generally required to maintain a dry construction environment in the pit. When the soil near the bottom of the foundation pit and the periphery has a small permeability coefficient and the water-stop curtain can effectively isolate the medium-strong permeable layer, the seepage of groundwater will be very slow, and the daily water replenishment will be small. The precipitation load on the construction site is very low, and short-term pumping can keep the groundwater from overflowing the bottom of the foundation pit for a long time.
[0003] Conventional basement floors and anti-floating piles or anti-floating anchors are generally used in traditional construction. This technology requires a thicker basement floor, is more expensive and less applicable, and groundwater is not easy to discharge, with a certain chance of floating accidents. Utility Model Content
[0004] The utility model aims to provide a groundwater diversion system for slope buildings, which aims to solve the technical problems that groundwater accumulated in the basement is difficult to discharge, the basement floor is thick, and the applicability and economy are low.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The utility model provides a groundwater diversion system for slope buildings, comprising a structural bottom plate and a water collection well. A concrete cushion layer is arranged on the lower end surface of the structural bottom plate, a crushed stone layer is arranged on the lower end surface of the concrete cushion layer, a stone chip layer is arranged on the lower end surface of the crushed stone layer, a blind ditch for drainage is arranged between the crushed stone layer and the stone chip layer, and an original soil layer is arranged on the lower end surface of the stone chip layer. The blind ditch is a tubular structure, a plurality of holes for water permeability are arranged on the wall of the tube, and a polyester geotextile is covered on the outer side of the tube wall for protecting the blind ditch and filtering groundwater. The blind ditch is arranged to be tilted downward as a whole, and the end of the blind ditch is connected with the water collection well through a connecting sleeve.
[0007] Preferably, it also includes a vertically arranged transparent water pipe, the bottom end of which is arranged in a blind ditch, the top end of which extends upward out of the structural bottom plate and is provided with a faucet, and the faucet is kept in a normally open state.
[0008] Preferably, a scale is provided on the outer side of the transparent water pipe for measuring the groundwater level in the blind ditch.
[0009] Preferably, a polyethylene protective film is continuously provided at the interface junction between the lower end surface of the concrete cushion layer and the upper end surface of the crushed stone layer to prevent the cement slurry from seeping into the crushed stone layer to reduce the water permeable cross section.
[0010] Preferably, the particle sizes of the crushed stones in the crushed stone layer are relatively concentrated, so that there are relatively large gaps between the crushed stones.
[0011] Preferably, the water collection well is a concrete structure, and a plurality of reserved holes for connecting to the blind ditch are vertically arranged on the side wall of the water collection well.
[0012] Preferably, one end of the connecting sleeve extends into the blind ditch or the gravel layer and is fixedly connected to the blind ditch, and the other end of the connecting sleeve passes through the reserved hole and extends into the water collection well.
[0013] Preferably, the connecting sleeve is made of PVC material, and the blind ditch is made of a hollow porous polyethylene tube.
[0014] The beneficial effects of the utility model are embodied in:
[0015] 1) The utility model provides a groundwater diversion system for slope buildings. By scientifically setting a layered structure under the structural bottom plate and setting a blind ditch according to the hydraulic gradient, the system can effectively discharge the groundwater accumulated under the basement bottom plate, reduce the buoyancy of the groundwater on the bottom plate, avoid floating accidents, and can replace traditional anti-floating piles or anti-floating anchors, reduce the thickness of the bottom plate, have strong applicability, and save costs.
[0016] 2) The utility model provides a groundwater diversion system for slope buildings, which is provided with a transparent water pipe equipped with a faucet. The transparent water pipe is connected to the blind ditch. The water level below the bottom plate of the structure can be monitored in real time through the scale on the transparent water pipe, and measures can be taken in advance according to the water level to give early warning or make emergency treatment.
[0017] 3) The utility model provides a groundwater diversion system for slope buildings. The collected groundwater can be directly pumped out from the water collection well when needed. If used for emergency, the water collection well can also serve as a fire well to provide a large amount of fire water when needed. The daily full use of the seepage water from the water collection well can effectively solve the problem of domestic water consumption, which is in line with the design concept of green and sustainable development.
[0018] Other features and advantages of the utility model will be described in the following description, and partly become apparent from the description, or understood by implementing the utility model. The main purpose and other advantages of the utility model can be realized and obtained by the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0020] Figure 1 It is a side sectional view of the utility model.
[0021] Figure 2 It is a top view of the utility model.
[0022] Figure 3 It is a connection schematic diagram of the blind ditch and the connecting sleeve of the utility model.
[0023] Figure numerals: 1-structural base plate, 2-water collection well, 3-concrete cushion, 4-gravel layer, 5-stone chip layer, 6-blind ditch, 7-original soil layer, 8-polyester geotextile, 9-connecting sleeve, 10-transparent water pipe, 11-faucet, 12-polyethylene protective film, 13-reserved hole. DETAILED DESCRIPTION
[0024] The technical solution of the present invention is described in detail below through embodiments. The following embodiments are merely exemplary and can only be used to explain and illustrate the technical solution of the present invention, but cannot be interpreted as limiting the technical solution of the present invention.
[0025] Reference Figures 1 to 3In this embodiment, the utility model provides a groundwater diversion system for slope buildings, including a structural bottom plate 1 and a water collection well 2. The water collection well 2 is a concrete structure. Before pouring, a plurality of reserved holes 13 for connecting the blind ditch 6 are arranged vertically on the side wall; a concrete cushion layer 3 is arranged on the lower end surface of the structural bottom plate 1, and a crushed stone layer 4 is arranged on the lower end surface of the concrete cushion layer 3. A polyethylene protective film 12 is continuously arranged at the interface junction of the lower end surface of the concrete cushion layer 3 and the upper end surface of the crushed stone layer 4 to prevent the concrete cushion from leaking. During the construction of layer 3, cement slurry enters into the gravel layer 4, thereby greatly reducing the permeable cross section; the gravel particle size in the gravel layer 4 is relatively concentrated, so that there are larger gaps between the gravel, preventing fine particles carried by groundwater from clogging the gaps, making it easier for groundwater to enter the water collection well 2; a stone chip layer 5 is arranged at the lower end surface of the gravel layer 4, a blind ditch 6 for drainage is arranged between the gravel layer 4 and the stone chip layer 5, an original soil layer 7 is arranged at the lower end surface of the stone chip layer 5, and the original soil layer 7 needs to be excavated before the stone chip layer 5 is laid on the upper part of the original soil layer 7 To the designed elevation, and leveling; the blind ditch 6 is a tubular structure, and a hollow porous polyethylene pipe can be used. The blind ditch 6 is distributed in a network shape in the horizontal direction. Its pipe wall has multiple holes for water permeability. The outer side of the pipe wall is covered with a polyester geotextile 8 for protecting the blind ditch 6 and filtering groundwater. The blind ditch 6 should be protected during the segmented installation and compaction of the gravel layer 4, and the connection should be firm; the blind ditch 6 is set downwardly as a whole, and is set along the hydraulic gradient. The end of the blind ditch 6 is connected to the water collection well through a connecting sleeve 9. 2 is connected, the connecting sleeve 9 can be made of PVC material, one end of which extends into the blind ditch 6 or the gravel layer 4 and is fixedly connected to the blind ditch 6, and the other end of the connecting sleeve 9 passes through the reserved hole 13 and extends into the water collection well 2; it also includes a vertically arranged transparent water pipe 10, the bottom end of the transparent water pipe 10 is arranged in the blind ditch 6, the top end extends upwardly from the structural bottom plate 1 and is provided with a faucet 11, and the faucet 11 is kept in a normally open state, and the outer side of the transparent water pipe 10 is provided with a scale for measuring the groundwater level in the blind ditch 6.
[0026] Furthermore, the working principle of the utility model is as follows: when the groundwater of the slope building flows toward the structural bottom plate 1, the groundwater is filtered by the polyester geotextile 8 and enters the blind ditch 6 set along the hydraulic gradient. After the diversion effect of the blind ditch 6, the groundwater finally flows into the collection well 2 through the connecting sleeve 9; when the groundwater level is high, the groundwater flows into the collection well 2 along the gap in the gravel layer 4 due to gravity; a transparent water pipe 10 with a scale is installed on the ground, and the faucet 11 is always open to monitor the groundwater level in the blind ditch 6 in real time. The utility model can effectively discharge groundwater accumulated under the structural bottom plate 1, reduce the buoyancy of groundwater on the structural bottom plate 1, avoid floating accidents, and can replace traditional anti-floating piles or anti-floating anchors, reduce the thickness of the bottom plate, have strong applicability, and save construction costs; at the same time, the groundwater collected in the water collection well 2 can be directly pumped out from the water collection well 2 when necessary. If it is used for emergency, the water collection well 2 can also serve as a fire-fighting well to provide a large amount of fire-fighting water when needed; making full use of the seepage water from the water collection well 2 on a daily basis can effectively solve the problem of domestic water consumption, which is in line with the design concept of green and sustainable development.
[0027] The above description is only a preferred specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field thinks of within the technical scope disclosed in the present invention should be included in the protection scope of the present invention.
Claims
1. A groundwater diversion system for sloped buildings, characterized by: The invention comprises a structural base plate (1) and a water collection well (2); a concrete cushion layer (3) is provided on the lower end surface of the structural base plate (1); a crushed stone layer (4) is provided on the lower end surface of the concrete cushion layer (3); a stone chip layer (5) is provided on the lower end surface of the crushed stone layer (4); a blind ditch (6) for drainage is provided between the crushed stone layer (4) and the stone chip layer (5); and an original soil layer (7) is provided on the lower end surface of the stone chip layer (5); the blind ditch (6) is a tubular structure, a plurality of water-permeable holes are provided on the wall of the tube, and a polyester geotextile (8) is provided on the outer surface of the tube wall for protecting the blind ditch (6) and filtering groundwater; the blind ditch (6) is arranged to be tilted downward as a whole, and the end of the blind ditch (6) is connected to the water collection well (2) through a connecting sleeve (9).
2. The groundwater diversion system for sloped buildings according to claim 1, characterized in that: It also includes a vertically arranged transparent water pipe (10), the bottom end of the transparent water pipe (10) is arranged in the blind ditch (6), the top end extends upward from the structural bottom plate (1) and is provided with a faucet (11), and the faucet (11) is kept in a normally open state.
3. The groundwater diversion system for sloped buildings according to claim 2, characterized in that: The outer side of the transparent water pipe (10) is provided with a scale for measuring the groundwater level in the blind ditch (6).
4. The groundwater diversion system for sloped buildings according to claim 2, characterized in that: A polyethylene protective film (12) is continuously provided at the interface between the lower end surface of the concrete cushion layer (3) and the upper end surface of the crushed stone layer (4) to prevent cement slurry from seeping into the crushed stone layer (4) and reducing the permeable cross section.
5. The groundwater diversion system for sloped buildings according to claim 2, characterized in that: The crushed stones in the crushed stone layer (4) have relatively concentrated particle sizes, so that there are relatively large gaps between the crushed stones.
6. The groundwater diversion system for sloped buildings according to claim 2, characterized in that: The water collection well (2) is a concrete structure, and a plurality of reserved holes (13) for connecting to the blind ditch (6) are vertically arranged on the side wall of the water collection well (2).
7. The groundwater diversion system for sloped buildings according to claim 6, characterized in that: One end of the connecting sleeve (9) extends into the blind ditch (6) or the gravel layer (4) and is sleeved and fixed with the blind ditch (6), and the other end of the connecting sleeve (9) passes through the reserved hole (13) and extends into the water collection well (2).
8. The groundwater diversion system for sloped buildings according to claim 1, characterized in that: The connecting sleeve (9) is made of PVC, and the blind ditch (6) is made of a hollow porous polyethylene tube.