Prefabricated tire membrane for building foundation construction
By pre-embedding of extruded plates and setting up hooks and steel mesh in the membrane for construction foundations, the problem of large weight of the membrane is solved, the effect of facilitating lifting and improving stiffness is achieved, and the construction process is simplified.
Patent Information
- Application Number
- CN202420191830.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-25
AI Technical Summary
The membranes in existing building foundations are heavy due to solid pouring, making them difficult to lift.
The extruded plate is embedded in the membrane body, and hooks and reinforced mesh are installed on the concrete wall, and arc-shaped structures and reinforced holes are adopted to reduce weight and improve stiffness.
By reducing the weight of the membrane and improving stiffness, it is achieved to facilitate lifting and use, while avoiding the application of plastering and waterproof coatings.
Smart Images

Figure CN222044253U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a prefabricated fetal membrane used for building foundation construction. Background Art
[0002] Brick membrane refers to brick masonry replacing formwork and is widely used in underground structures. Brick membrane can serve as outer formwork, such as underground continuous walls and cast-in-place wall foundations.
[0003] Currently, most of the fetal membranes used are prefabricated in factories. The prefabricated fetal membranes are made of cast concrete. When used, they are hoisted to the designated location and then proceed to the next process.
[0004] In order to ensure the lateral rigidity of the fetal membrane, the fetal membrane is cast solidly, which results in a heavy weight of the fetal membrane and is not conducive to lifting. Utility Model Content
[0005] Therefore, the technical problem to be solved by the utility model is to overcome the defect in the prior art that the fetal membrane is solidly cast, resulting in a large weight of the fetal membrane and being unfavorable for lifting, thereby providing a prefabricated fetal membrane for building foundation construction.
[0006] In order to solve the above technical problems, the utility model provides a prefabricated fetal membrane for building foundation construction, comprising: a fetal membrane body;
[0007] An extruded plate, pre-buried in the fetal membrane body;
[0008] The fetal membrane body is provided with hooks for lifting, and the hooks have at least two symmetrically arranged hooks.
[0009] Optionally, the extruded boards are respectively embedded in four concrete walls of the fetal membrane body.
[0010] Optionally, the shape of the extruded board is the same as that of the concrete wall.
[0011] Optionally, the extruded board is vertically arranged in the concrete wall.
[0012] Optionally, the hooks are respectively provided on the tops of the four concrete walls of the fetal membrane body.
[0013] Optionally, it also includes: steel mesh sheets, which are respectively pre-embedded in the four concrete walls.
[0014] Optionally, each steel mesh in the concrete wall is fixedly connected to a hook.
[0015] Optionally, the connection between the inner side surface and the top surface of the four concrete walls of the fetal membrane body is an arc-shaped structure.
[0016] Optionally, a steel bar hole for positioning is provided at the bottom of the fetal membrane body.
[0017] Optionally, the bottoms of the four concrete walls of the fetal membrane body are respectively provided with the steel bar holes, and each of the concrete walls has at least four steel bar holes.
[0018] The technical solution of the utility model has the following advantages:
[0019] 1. The prefabricated fetal membrane provided by the utility model for building foundation construction has an extruded board embedded in the fetal membrane body. The extruded board is lighter than concrete at the same volume, which can reduce the weight of the fetal membrane body and facilitate lifting. The extruded board can also ensure the lateral stiffness of the fetal membrane body and ensure the use effect.
[0020] 2. The prefabricated fetal membrane used for building foundation construction provided by the utility model and the steel mesh can further strengthen the rigidity of the fetal membrane body, have a greater bearing capacity and a better use effect.
[0021] 3. The prefabricated fetal membrane for building foundation construction provided by the utility model can avoid plastering of the arc structure on the concrete wall, and is convenient for applying the waterproof coating evenly and continuously. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 This is a front view of a prefabricated fetal membrane for building foundation construction provided in the first embodiment of the utility model;
[0024] Figure 2 for Figure 1 A top view of
[0025] Figure 3 for Figure 1 Bottom view of
[0026] Figure 4 for Figure 1 Schematic diagram of the AA position in the middle;
[0027] Figure 5 for Figure 4 Schematic diagram of the middle BB;
[0028] Figure 6 for Figure 4 Schematic diagram of CC in the middle.
[0029] Description of reference numerals:
[0030] 1. Fetal membrane body; 2. Extruded board; 3. Hook; 4. Steel mesh; 5. Steel bar holes; 6. Concrete wall. DETAILED DESCRIPTION
[0031] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0035] like Figure 1 , Figure 4 As shown, a specific implementation of the prefabricated fetal membrane provided in this embodiment for building foundation construction includes: a fetal membrane body 1, an extruded board 2 and a hook 3. The fetal membrane body 1 is formed by four concrete walls 6, the extruded board 2 is pre-buried in the fetal membrane body 1, and the hook 3 is arranged on the fetal membrane body 1. The hook 3 has two symmetrically arranged hooks, and the fetal membrane body 1 is then hoisted by the hook 3.
[0036] The prefabricated fetal membrane provided in this embodiment for building foundation construction has an extruded board 2 embedded in the fetal membrane body 1. The extruded board 2 is lighter than concrete at the same volume, which can reduce the weight of the fetal membrane body 1 and facilitate lifting. The extruded board 2 can also ensure the lateral stiffness of the fetal membrane body 1 to ensure the use effect.
[0037] like Figure 1 , Figure 4 As shown, in the prefabricated membrane for building foundation construction provided by this embodiment, the extruded boards 2 are respectively embedded in the four concrete walls 6 of the membrane body 1, which can reduce the weight of the membrane body 1 to the greatest extent and ensure the lateral rigidity of the concrete wall 6. In addition, as an alternative embodiment, the extruded boards 2 can also be embedded in two of the concrete walls 6.
[0038] like Figure 1 , Figure 4 As shown, in the prefabricated membrane for building foundation construction provided by this embodiment, the shape of the extruded board 2 is the same as the shape of the concrete wall 6. The extruded board 2 is a rectangular board, and the area of the extruded board 2 can be maximized, making the membrane body 1 more lightweight. In addition, as an alternative embodiment, the extruded board 2 can also be other shapes such as round, triangular, etc.
[0039] like Figure 1 , Figure 4 As shown, in the prefabricated membrane for building foundation construction provided by this embodiment, the extruded board 2 is vertically arranged in the concrete wall 6, and only one extruded board 2 with a larger area is embedded in each concrete wall 6, which is convenient for construction. In addition, as an alternative embodiment, the extruded board 2 can also be arranged into small pieces, and multiple extruded boards 2 are embedded in each concrete wall 6, and the extruded boards 2 are arranged horizontally.
[0040] like Figure 1 , Figure 2 As shown, in the prefabricated fetal membrane for building foundation construction provided by this embodiment, hooks 3 are respectively arranged on the tops of the four concretes of the fetal membrane body 1. The fetal membrane body 1 is hoisted by the four hooks 3, and each concrete wall 6 can be stressed, and the hoisting is more stable. In addition, as an alternative embodiment, there can also be only two hooks 3, which are respectively arranged on two parallel concrete walls 6.
[0041] like Figure 1 , Figure 4 , Figure 5 As shown, the prefabricated membrane for building foundation construction provided by this embodiment also includes: steel mesh 4, which is respectively embedded in four concrete walls 6. The steel mesh 4 can further strengthen the rigidity of the membrane body 1, with greater bearing capacity and better use effect. In addition, as an alternative implementation, the steel mesh 4 can also be replaced by a steel cage.
[0042] like Figure 1 , Figure 4 , Figure 5 As shown, in the prefabricated membrane for building foundation construction provided by this embodiment, the steel mesh 4 in each concrete wall 6 is fixedly connected to the hook 3. In this embodiment, the hook 3 is welded to the steel mesh 4, and the contact area between the steel mesh 4 and the concrete wall 6 is larger. During hoisting, the reaction force can be transmitted through the steel mesh 4, and the force-bearing area is larger, which can prevent the hook 3 from falling off from the concrete wall 6. In addition, as an alternative embodiment, the length of the hook 3 extending into the concrete wall 6 can also be extended to increase the contact area.
[0043] like Figure 4 , Figure 6 As shown, in the prefabricated fetal membrane provided in this embodiment for building foundation construction, the connection between the inner side surfaces and the top surface of the four concrete of the fetal membrane body 1 is an arc structure, and the inner side surface is the supporting side. The arc structure can avoid plastering and facilitates uniform and continuous application of the waterproof coating.
[0044] like Figures 1 to 3 As shown, in the prefabricated fetal membrane for building foundation construction provided by this embodiment, a steel bar hole 5 for positioning is provided at the bottom of the fetal membrane body 1. During installation, the steel bars at the construction site can be inserted into the steel bar hole 5, thereby positioning the position of the fetal membrane body 1 to avoid installation errors. In addition, as an alternative implementation, the steel bar hole 5 can also be omitted, a template is set at the construction site, and the fetal membrane body 1 is installed in the template.
[0045] like Figures 1 to 3 As shown, in the prefabricated fetal membrane for building foundation construction provided by this embodiment, the bottoms of the four concrete walls 6 of the fetal membrane body 1 are respectively provided with steel bar holes 5, and each concrete wall 6 has at least four steel bar holes 5. In this embodiment, the steel bar holes 5 of the four concrete walls 6 are sixteen in total, and the positioning of multiple steel bar holes 5 is more accurate and not easy to move. In addition, as an alternative embodiment, only two steel bar holes 5 can be provided at the corners of the fetal membrane body 1.
[0046] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the scope of protection of the present utility model.
Claims
1. A prefabricated fetal membrane for building foundation construction, It is characterized in that include: Fetal membrane proper (1); An extruded plate (2) is pre-buried in the fetal membrane body (1); The fetal membrane body (1) is provided with a hook (3) for lifting, and the hook (3) has at least two symmetrically arranged hooks.
2. The prefabricated fetal membrane for building foundation construction according to claim 1, It is characterized in that The extruded plates (2) are respectively pre-buried in the four concrete walls (6) of the fetal membrane body (1).
3. The prefabricated fetal membrane for building foundation construction according to claim 2, It is characterized in that The shape of the extruded board (2) is the same as that of the concrete wall (6).
4. The prefabricated fetal membrane for building foundation construction according to claim 2, It is characterized in that The extruded board (2) is vertically arranged in the concrete wall (6).
5. The prefabricated fetal membrane for building foundation construction according to claim 1, It is characterized in that The hooks (3) are respectively arranged on the tops of the four concrete walls (6) of the fetal membrane body (1).
6. The prefabricated fetal membrane for building foundation construction according to claim 5, It is characterized in that Also includes: The steel mesh sheets (4) are respectively pre-buried in the four concrete walls (6).
7. The prefabricated fetal membrane for building foundation construction according to claim 6, It is characterized in that The steel mesh (4) in each concrete wall (6) is fixedly connected to the hook (3).
8. The prefabricated fetal membrane for building foundation construction according to any one of claims 1 to 7, It is characterized in that The connection between the inner side surface and the top surface of the four concrete walls (6) of the fetal membrane body (1) is an arc-shaped structure.
9. The prefabricated fetal membrane for building foundation construction according to any one of claims 1 to 7, It is characterized in that The bottom of the fetal membrane body (1) is provided with a steel bar hole (5) for positioning.
10. The prefabricated fetal membrane for building foundation construction according to claim 9, It is characterized in that The bottoms of the four concrete walls (6) of the fetal membrane body (1) are respectively provided with the steel bar holes (5), and each of the concrete walls (6) has at least four steel bar holes (5).