River-entering runoff pollution ecological intercepting device

By using the upper filter and lower filter structures in the ecological interception device, the problem of biological filler and river silt surge is solved, the stability of the biological filler layer and the purification effect of water-relief plants is ensured, and the sewage purification effect is improved.

CN222044423UActive Publication Date: 2024-11-22HANGZHOU YINGLV MUNICIPAL GARDEN ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420184290.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-11-22
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

During the actual use of the existing ecological interceptor island, since biological fillers are directly placed above the river silt, when the discharge into the river is large, it is easy to cause biological fillers and river silt to surge, resulting in the loss of nutritional supply of biological fillers. Withering, losing its purifying effect on sewage.

Method used

An ecological interception device for runoff pollution in rivers was designed, using an upper filter and a lower filter were located above the box of the island and on the top of the silt layer, respectively. The outlet of the sewage pipe was located between the two, and the lower filter blocked the silt layer. Reduce the surge of biological fillers, ensure their stable position, and improve installation stability and sealing through structures such as the number of holes and rubber pads, and reduce the probability of sewage being directly discharged without purification.

Benefits of technology

It effectively reduces the probability of biological filler and sludge surge, ensures the stability of the biological filler layer and the growth of water-relief plants, improves the purification effect of sewage, and ensures the purified water quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044423U_ABST
    Figure CN222044423U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of ecological intercepting devices, and discloses an in-river runoff pollution ecological intercepting device which comprises a river bank retaining wall, a roundabout box arranged on the side wall of the river bank retaining wall, a blow-off pipe penetrating through the river bank retaining wall and communicating with the interior of the roundabout box, and fixing piles arranged on the periphery of the roundabout box. An upper filter screen and a lower filter screen are arranged on the roundabout box body, the lower filter screen is located at the top of a sludge layer of a riverbed, a biological filler layer is arranged at the top of the upper filter screen, and emergent aquatic plants are planted on the biological filler layer. When the blow-off pipe performs blow-off operation, sewage enters the space between the upper filter screen and the lower filter screen, and the sludge layer at the bottom of the roundabout box body is blocked by the lower filter screen, so that the impact of sludge surging on the biological filler layer is reduced, and the probability that biological filler and river sludge surging is easily caused when the discharge amount of the blow-off pipe is large is reduced; the biological filler layer is stably positioned at the top of the upper filter screen so as to meet the growth requirement of the emergent aquatic plants, and the sewage purification effect of the emergent aquatic plants is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ecological interception devices, in particular to an ecological interception device for river runoff pollution. Background Art

[0002] Interception, also known as plugging, refers to the work of plugging the gap (dragon mouth) left when the river channel is narrowed to a certain extent during the construction of the cofferdam. There are three ways of interception: horizontal plugging, vertical plugging and mixed plugging. In the construction of diversion, the original riverbed water flow is cut off, and the river water is finally diverted to the diversion and discharge structure to discharge, and the construction of the main building is carried out in the riverbed. Interception is part of the work of building a horizontal cofferdam in the riverbed. Ecological interception refers to the purification and interception of discharged sewage through vegetation. Purification is achieved through vegetation, the concentration of pollutants in the sewage is reduced, and the purified water is discharged into the river.

[0003] An ecological interception island is disclosed in a Chinese utility model patent with publication number CN213475530U, which has the following structure: an ecological shallow water area and a local deep water area are arranged in a ring-shaped island box, and a number of fixed piles are arranged around the ring-shaped island box for fixing the ecological interception island to the riverbed; the ecological shallow water area is filled with river sludge and biological fillers in sequence, and emergent plants are planted on the biological filler layer; the bottom of the local deep water area is filled with river sludge and then covered with biological fillers, and submerged plants, floating plants or floating leaf plants are planted; an inlet for pollutants entering the river is arranged in the local deep water area, which is connected to the river outlet.

[0004] With respect to the above-mentioned related technologies, the inventors believe that the following defects exist: during the actual use of the above-mentioned ecological interception island, since the biological filler is directly arranged above the river silt, when the discharge volume into the river outlet is large, it is easy to cause the biological filler and the river silt to surge, resulting in the probability of the biological filler surging out of the island box or fixed piles, causing the emergent plants to lose the nutrient supply of the biological filler and eventually wither, losing the sewage purification effect. Utility Model Content

[0005] In order to solve the above problems, the utility model provides an ecological interception device for river runoff pollution.

[0006] The above-mentioned technical purpose of the utility model is achieved through the following technical scheme: an ecological interception device for river runoff pollution, including a river bank retaining wall, an island box body arranged on the side wall of the river bank retaining wall, a sewage pipe penetrating the river bank retaining wall and connected with the interior of the island box body, and fixed piles arranged on the periphery of the island box body and inserted into the riverbed, the island box body is provided with an upper filter screen and a lower filter screen, the water outlet of the sewage pipe is located between the upper filter screen and the lower filter screen, the lower filter screen is located on the top of the silt layer of the riverbed, the top of the upper filter screen is provided with a biological filler layer, and emergent plants are planted on the biological filler layer.

[0007] By adopting the above technical scheme, when the sewage pipe is discharging sewage, the sewage enters between the upper filter screen and the lower filter screen, and the silt layer at the bottom of the roundabout box is blocked by the lower filter screen, thereby reducing the impact of the silt surge on the biological filler layer, and reducing the probability of causing the biological filler and river channel silt surge when the discharge volume of the sewage pipe is large, so that the biological filler layer is stably located on the top of the upper filter screen to provide for the growth of emergent plants, thereby ensuring the emergent plants' purification effect on sewage.

[0008] Furthermore, the number of holes in the upper filter screen and the lower filter screen per square centimeter is 4-6.

[0009] By adopting the above technical scheme, while ensuring that the upper filter supports the biological filler layer, it is beneficial for the purified water to be discharged from the ring island box through the mesh holes on the upper filter. The limitation on the number of mesh holes of the lower filter reduces the probability of the mesh holes on the lower filter being blocked and has a good interception effect on the silt layer. In addition, the debris entrained in the sewage falls under the action of gravity, which is beneficial for small stones and other particles to fall into the silt layer from the mesh holes on the lower filter.

[0010] Furthermore, an upper mounting opening for installing an upper filter is provided at a position corresponding to the upper filter on the side wall of the roundabout box, a lower mounting opening for installing the lower filter is provided at a position corresponding to the lower filter on the side wall of the roundabout box, and an insertion rod that cooperates with the gap on the top of the roundabout box is provided on the top of the roundabout box, the insertion rod passes through the upper filter and the lower filter and cooperates with the mesh holes at the corresponding positions, and four insertion rods are provided and distributed in a rectangular shape at the four corners of the top of the roundabout box.

[0011] By adopting the above technical solution, the cooperation between the upper mounting opening, the lower mounting opening and the insertion rod enhances the stability of the upper filter screen and the lower filter screen when installed on the roundabout box body.

[0012] Furthermore, an upper rubber pad is provided on a fixed sleeve at one end of the upper filter screen near the upper mounting port opening, and an edge of the upper rubber pad is tightly pressed against the position of the upper mounting port opening; a lower rubber pad is provided on a fixed sleeve at one end of the lower filter screen near the lower mounting port opening, and an edge of the lower rubber pad is tightly pressed against the position of the lower mounting port opening.

[0013] By adopting the above technical solution, the upper rubber pad and the lower rubber pad are arranged, thereby improving the sealing performance at the openings of the upper installation port and the lower installation port, and reducing the probability of sewage being directly discharged into the water without being purified by emergent plants.

[0014] Furthermore, a cleaning window is provided on the side wall of the roundabout box body, which is located between the bottom of the lower filter screen and the inner bottom wall of the roundabout box body. A closing plate is hinged on the side wall of the roundabout box body near the bottom of the cleaning window. A sealing strip is fixed on the closing plate, and the side of the sealing strip away from the closing plate is pressed against the inner wall of the cleaning window.

[0015] By adopting the above technical solution, the setting of the cleaning window is conducive to the staff to clean the sludge between the upper filter and the lower filter. The setting of the sealing strip reduces the probability of unpurified sewage in the roundabout box seeping out from the gap between the closing plate and the cleaning window, which is conducive to improving the sewage purification effect.

[0016] Furthermore, a planting grid is provided on the top of the roundabout box, and the emergent plants are arranged in the planting grid.

[0017] By adopting the above technical solution and setting up the planting grid, the probability of the biological filler layer being washed into the river channel due to the surge of water flow is reduced, which is beneficial to ensuring the integrity of the biological filler layer and facilitating the growth of emergent plants.

[0018] Furthermore, a counterweight plate is hinged on the top of the roundabout box, and the bottom surface of the counterweight plate abuts against the top surface of the planting grid.

[0019] By adopting the above technical solution and setting the counterweight plate, the probability of the planting grid being flipped over or even overturned due to the influence of silt surge and lifting can be reduced to a certain extent.

[0020] In summary, the utility model has the following beneficial effects:

[0021] 1. In this application, when the sewage pipe is discharging sewage, the sewage enters between the upper filter and the lower filter, and the silt layer at the bottom of the roundabout box is blocked by the lower filter, which reduces the impact of the silt surge on the biological filler layer, and reduces the probability of biological fillers and river channel silt surge when the sewage pipe discharges a large amount, so that the biological filler layer is stably located on the top of the upper filter to provide for the growth of emergent plants, ensuring the purification of sewage by emergent plants;

[0022] 2. In the present application, while ensuring that the upper filter supports the biological filler layer, it is beneficial for the purified water to be discharged from the mesh holes on the upper filter out of the island box. The limitation on the number of mesh holes of the lower filter reduces the probability of the mesh holes on the lower filter being blocked and plays a good intercepting role on the silt layer. In addition, the debris entrained in the sewage falls under the action of gravity, which is beneficial for small stones and other particles to fall into the silt layer from the mesh holes on the lower filter. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model;

[0024] Figure 2 It is a schematic diagram of the planar structure of an embodiment of the utility model;

[0025] Figure 3 It is a structural schematic diagram of an embodiment of the utility model for highlighting the positional relationship between the upper filter screen, the lower filter screen and the insertion rod;

[0026] Figure 4 It is a structural schematic diagram of an embodiment of the utility model for highlighting the position between the upper filter screen and the upper rubber pad.

[0027] In the figure: 1. river bank retaining wall; 2. roundabout box; 21. upper filter screen; 211. upper rubber pad; 22. lower filter screen; 221. lower rubber pad; 23. upper mounting port; 24. lower mounting port; 25. plug-in rod; 27. cleaning window; 271. closing plate; 272. sealing strip; 28. planting grid; 29. ​​counterweight plate; 3. sewage pipe; 4. fixed piles; 5. silt layer; 6. biological filler layer; 7. emergent plants; 8. normal water level; 9. riverbed. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.

[0029] like Figure 1-4 As shown, the embodiment of the present application discloses an ecological interception device for river runoff pollution, including a river bank retaining wall 1. A roundabout box 2 is arranged on the side wall of the river bank retaining wall 1, and the roundabout box 2 is made of a transparent material. The outer periphery of the roundabout box 2 is provided with fixed piles 4 inserted into the riverbed 9, so as to fix the roundabout box 2 to the edge of the river channel.

[0030] An upper filter 21 and a lower filter 22 are provided on the roundabout box body 2. Specifically: an upper mounting opening 23 for installing the upper filter 21 is provided at a position corresponding to the upper filter 21 on the side wall of the roundabout box body 2, and a lower mounting opening 24 for installing the lower filter 22 is provided at a position corresponding to the lower filter 22 on the side wall of the roundabout box body 2. A plug rod 25 that matches the gap with the top of the roundabout box body 2 is provided on the top of the roundabout box body 2. The plug rod 25 passes through the upper filter 21 and the lower filter 22 and matches with the mesh holes at the corresponding positions. Four plug rods 25 are provided and are distributed in a rectangular shape at the four corners of the top of the roundabout box body 2. The cooperation between the upper mounting opening 23, the lower mounting opening 24 and the plug rod 25 enhances the stability of the upper filter 21 and the lower filter 22 installed on the roundabout box body 2.

[0031] When the sewage pipe 3 is discharging sewage, the sewage enters between the upper filter screen 21 and the lower filter screen 22, and the silt layer 5 at the bottom of the roundabout box 2 is blocked by the lower filter screen 22, thereby reducing the impact of the silt surge on the biological filler layer 6, and reducing the probability of causing the biological filler and river channel silt surge when the sewage pipe 3 discharges a large amount, so that the biological filler layer 6 is stably located on the top of the upper filter screen 21 to provide for the growth of the emergent plants 7, thereby ensuring the purifying effect of the emergent plants 7 on the sewage.

[0032] The lower filter screen 22 is located at the top of the silt layer 5 of the riverbed 9, and a biological filler layer 6 is arranged on the top of the upper filter screen 21. A planting grid 28 is arranged on the top of the biological filler layer 6 (the planting grid 28 is located near the top of the roundabout box 2), and the mesh of the planting grid 28 is planted with emergent plants 7 growing on the biological filler layer 6 (the emergent plants 7 can be aquatic plants with short rhizomes, such as lotus, reed seedlings, etc., which have good purification effects). The setting of the planting grid 28 reduces the probability of the biological filler layer 6 being washed into the river channel due to the surge of water flow, which is conducive to ensuring the integrity of the biological filler layer 6 and facilitating the growth of the emergent plants 7. In this embodiment, a sewage pipe 3 connected to the inside of the roundabout box 2 is provided through the side wall of the river bank retaining wall 1, and the outlet of the sewage pipe 3 is located between the upper filter screen 21 and the lower filter screen 22.

[0033] In order to facilitate pebbles and other particulates to fall into the silt layer 5 through the mesh holes on the lower filter 22, the number of holes per square centimeter of the upper filter 21 and the lower filter 22 is 4-6. While ensuring that the upper filter 21 supports the biological filler layer 6, it is beneficial for the purified water to be discharged from the roundabout box 2 through the mesh holes on the upper filter 21. The limitation on the number of holes in the lower filter 22 reduces the probability of the mesh holes on the lower filter 22 being blocked, and has a good interception effect on the silt layer 5. In addition, the debris entrained in the sewage falls under the action of gravity.

[0034] In order to reduce the probability of sewage being directly discharged into the water without being purified by the emergent plants 7, an upper rubber pad 211 is fixedly sleeved on one end of the upper filter screen 21 near the opening of the upper mounting port 23, and the edge of the upper rubber pad 211 is tightly pressed against the opening of the upper mounting port 23. A lower rubber pad 221 is fixedly sleeved on one end of the lower filter screen 22 near the opening of the lower mounting port 24, and the edge of the lower rubber pad 221 is tightly pressed against the opening of the lower mounting port 24. The provision of the upper rubber pad 211 and the lower rubber pad 221 improves the sealing performance at the openings of the upper mounting port 23 and the lower mounting port 24.

[0035] A cleaning window 27 located between the bottom of the lower filter 22 and the inner bottom wall of the roundabout box 2 is provided on the side wall of the roundabout box 2, and a closing plate 271 is hinged on the side wall of the roundabout box 2 near the bottom of the cleaning window 27, and a sealing strip 272 is fixed on the closing plate 271, and the side of the sealing strip 272 away from the closing plate 271 is tightly pressed against the inner wall of the cleaning window 27, and a limiting block is rotatably installed on the side wall of the roundabout box 2, and the side wall of the limit block close to the side of the roundabout box 2 is tightly pressed against the side wall of the closing plate 271. The setting of the cleaning window 27 is conducive to the staff to clean the sludge between the upper filter 21 and the lower filter 22, and the setting of the sealing strip 272 reduces the probability of unpurified sewage in the roundabout box 2 seeping out from the gap between the closing plate 271 and the cleaning window 27, which is conducive to improving the sewage purification effect.

[0036] A counterweight plate 29 is hinged on the top of the roundabout box 2, and the bottom surface of the counterweight plate 29 abuts against the top surface of the planting grid 28. The setting of the counterweight plate 29 reduces the probability of the planting grid 28 being flipped over or even overturned due to the influence of silt surge and lifting to a certain extent.

[0037] The use principle of an ecological interception device for river runoff pollution in the present embodiment is as follows: when the sewage pipe 3 is discharging sewage, the sewage enters between the upper filter screen 21 and the lower filter screen 22, and the silt layer 5 at the bottom of the roundabout box 2 is blocked by the lower filter screen 22, thereby reducing the impact of the silt surge on the biological filler layer 6, and reducing the probability of causing biological fillers and river channel silt surge when the discharge volume of the sewage pipe 3 is large, so that the biological filler layer 6 is stably located on the top of the upper filter screen 21 to provide for the growth of emergent plants 7, thereby ensuring the purifying effect of emergent plants 7 on sewage.

[0038] The above is only a preferred embodiment of the present invention. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. An ecological interception device for river runoff pollution, comprising a river bank retaining wall (1), an island box (2) arranged on the side wall of the river bank retaining wall (1), a sewage pipe (3) penetrating the river bank retaining wall (1) and communicating with the inside of the island box (2), and a fixed pile (4) arranged on the periphery of the island box (2) and inserted into the riverbed (9), wherein: An upper filter screen (21) and a lower filter screen (22) are provided on the roundabout box (2); a water outlet of the sewage pipe (3) is located between the upper filter screen (21) and the lower filter screen (22); the lower filter screen (22) is located on the top of the silt layer (5) of the riverbed (9); a biological filler layer (6) is provided on the top of the upper filter screen (21); and emergent plants (7) are planted on the biological filler layer (6).

2. The ecological interception device for river runoff pollution according to claim 1 is characterized by: The number of holes in the upper filter screen (21) and the lower filter screen (22) is 4-6 per square centimeter.

3. The ecological interception device for river runoff pollution according to claim 1 is characterized by: An upper mounting opening (23) for mounting the upper filter (21) is provided through the side wall of the roundabout box (2) at a position corresponding to the upper filter (21), and a lower mounting opening (24) for mounting the lower filter (22) is provided through the side wall of the roundabout box (2) at a position corresponding to the lower filter (22). A plug rod (25) is provided through the top of the roundabout box (2) and is in clearance with the top of the roundabout box (2). The plug rod (25) penetrates the upper filter (21) and the lower filter (22) and is in conjunction with mesh holes at corresponding positions. Four plug rods (25) are provided and are distributed in a rectangular shape at the four corners of the top of the roundabout box (2).

4. The ecological interception device for river runoff pollution according to claim 1 is characterized by: An upper rubber pad (211) is fixedly sleeved on one end of the upper filter screen (21) close to the opening of the upper mounting opening (23), and the edge of the upper rubber pad (211) is tightly pressed against the opening of the upper mounting opening (23); and a lower rubber pad (221) is fixedly sleeved on one end of the lower filter screen (22) close to the opening of the lower mounting opening (24), and the edge of the lower rubber pad (221) is tightly pressed against the opening of the lower mounting opening (24).

5. The ecological interception device for river runoff pollution according to claim 1 is characterized by: A cleaning window (27) is provided on the side wall of the roundabout box (2) and is located between the bottom of the lower filter screen (22) and the inner bottom wall of the roundabout box (2); a closing plate (271) is hingedly connected to the side wall of the roundabout box (2) near the bottom of the cleaning window (27); a sealing strip (272) is fixed to the closing plate (271); and the side of the sealing strip (272) away from the closing plate (271) is pressed against the inner wall of the cleaning window (27).

6. The ecological interception device for river runoff pollution according to claim 1 is characterized by: A planting grid (28) is arranged on the top of the island box (2), and the emergent plants (7) are arranged in the planting grid (28).

7. The ecological interception device for river runoff pollution according to claim 1 is characterized by: A counterweight plate (29) is hingedly connected to the top of the roundabout box body (2), and the bottom surface of the counterweight plate (29) abuts against the top surface of the planting grid (28).