Drainage pipe network cleaning and dredging equipment
By designing the combination technology of pipe sealing, conveying source, clearing and traction components, the problem of low clearing efficiency of urban drainage pipeline networks is solved, and efficient and low-cost clearing effect is achieved. It is suitable for large pipe diameters and long-distance pipes. net.
Patent Information
- Application Number
- CN202420671393.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-02
AI Technical Summary
In the prior art, the clearing efficiency of urban drainage pipeline network is low, especially for large pipe diameters and long-distance pipeline networks. The existing hydraulic clearing and mechanical clearing methods have poor coordination, high costs, and it is difficult to effectively clean up silt, which affects urban life. and production.
A drainage pipe network cleaning equipment was designed, including pipe sealing components, conveying source components, cleaning components, traction components and sewage extraction components. By blocking sewage flow, dual fluid transport, two-stage sludge and traction sliding, etc. , improves the cleaning efficiency and is suitable for large pipe diameters and long-distance pipe networks.
Improve sludge cleaning efficiency and reduce cleaning costs. It is suitable for cleaning of large pipe diameters and long-distance pipelines, and realizes efficient pipeline cleaning. The modular design of cleaning components and traction components can be applied to different Drainage network with pipe diameter.
Smart Images

Figure CN222044438U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage treatment, in particular to a drainage pipe network clearing device and a clearing method. Background Art
[0002] With the development of urbanization, urban drainage pipe networks have become one of the important infrastructures in urban construction; with the increasing attention paid by the country to sewage treatment, the scale of urban drainage construction has achieved unprecedented development. However, with the increase in drainage volume, the drainage pipe network cannot be cleaned and maintained in time, resulting in pipe blockage, reduced drainage capacity, and even the loss of function of some pipe systems and paralysis of local pipe networks, which seriously affects the normal operation of urban life and production. Therefore, doing a good job in the cleaning, maintenance and management of urban drainage pipes and ensuring the normal operation of the drainage pipe network is of great significance to maintaining the normal order of the city and optimizing the living environment.
[0003] In the prior art, hydraulic or mechanical clearing methods are generally used to clear pipelines. However, the existing hydraulic and mechanical clearing operations have poor coordination and high clearing costs. In addition, they have certain limitations in cleaning large-diameter pipes (pipe diameters exceeding 500mm), deep manholes (greater than 5m), and long-distance pipe networks (pipe sections exceeding 50m). Therefore, how to improve the clearing efficiency of large-diameter and long-distance pipe networks is a technical problem that needs to be solved urgently. Utility Model Content
[0004] In view of this, the utility model provides a drainage pipe network clearing device and a clearing method to solve the technical problem of low pipe network clearing efficiency existing in the prior art.
[0005] According to one aspect of the utility model, the utility model provides a drainage network clearing device, which may include:
[0006] A pipe sealing component for blocking the flow of sewage through the pipe section to be cleared, wherein the pipe sealing component is arranged at both ends of the pipe section to be cleared;
[0007] A conveying source component, the conveying source component includes a conveying pipeline, and the conveying pipeline is used to be connected to the pipe section to be cleared;
[0008] A clearing component, which is used to be arranged in the pipe section to be cleared and can move in the pipe section to be cleared, and the clearing component is provided with a nozzle, and the nozzle is connected to the conveying pipeline;
[0009] A traction component, including a traction rope, wherein the traction rope is fixedly connected to the clearing component;
[0010] The sewage pumping component comprises a sewage pump and a sewage pumping pipe, and the sewage pumping pipe is connected with the pipe section to be cleared.
[0011] In some embodiments of the utility model, the clearing device also includes a detection component, which includes a PC controller, a telescopic coil and a camera. The PC controller is used to be arranged outside the pipe section to be cleared, and the camera is connected to the PC controller through the telescopic coil, and the camera is fixed on the clearing component.
[0012] In some embodiments of the utility model, the delivery source component includes a liquid delivery branch, a gas delivery branch and a water ejector;
[0013] The liquid delivery branch includes a water storage tank and a flushing water pump, the water inlet end of the flushing water pump is connected to the water storage tank, and the water outlet end of the flushing water pump is connected to the liquid input end of the water ejector;
[0014] The gas delivery branch comprises a first gas compressor, and a gas output end of the first gas compressor is connected to a gas input end of the water ejector;
[0015] The output end of the water ejector is communicated with the delivery pipeline.
[0016] In some embodiments of the present utility model, the tube sealing component includes an upstream tube sealing airbag and a downstream tube sealing airbag;
[0017] The upstream tube-sealing airbag is connected in parallel with the gas delivery branch through the trachea, and the gas delivery branch and the trachea are both provided with diverter valves.
[0018] In some embodiments of the present invention, the clearing device further comprises a second gas compressor, which is arranged outside the pipe section to be cleared, and the downstream tube sealing airbag is connected to the second gas compressor via an air pipe.
[0019] In some embodiments of the utility model, the clearing component includes a silt flushing component and a sliding auxiliary frame;
[0020] The silt flushing component comprises a cross-tube parallel to the laying direction of the pipe section to be cleared, and both ends of the cross-tube are respectively connected to a spray component to achieve two-stage silt flushing, and the nozzle is located on the spray component.
[0021] The sliding auxiliary frame comprises a cross frame parallel to the cross tube, two ends of the cross frame are respectively connected to a vertical frame component, a roller is arranged at the bottom of the vertical frame component, and the vertical frame component is fixedly connected to the adjacent injection component.
[0022] In some embodiments of the utility model, the injection component is semicircular or fan-shaped, which is formed by bending a pipe, and the injection component is coaxially arranged with the cross-tube, and the nozzle is arranged on one side of the arc tube of the injection component.
[0023] In some embodiments of the utility model, connecting rings are provided at both ends of the cross frame, and hooks are provided at the ends of the traction ropes, and the hooks are fixed on the connecting rings.
[0024] In some embodiments of the present invention, the traction component includes an upstream winch and a downstream winch, the traction rope of the upstream winch is connected to the connecting ring of the cross frame close to the upstream of the pipe section to be cleared, and the traction rope of the downstream winch is connected to the connecting ring of the cross frame close to the downstream of the pipe section to be cleared.
[0025] In some embodiments of the present invention, the transport source component and the upstream winch are assembled on the first vehicle body, and the sewage extraction component, the second gas compressor, and the downstream winch are assembled on the second vehicle body.
[0026] The drainage pipe network clearing equipment in the embodiment of the utility model adopts a traction component to control the sliding of the clearing component in the pipe section to be cleared while flushing silt, thereby improving the silt cleaning efficiency and reducing the clearing cost, and can be suitable for clearing large-diameter and long-distance pipe networks; in addition, the delivery source component adopts a dual-fluid delivery source, and the clearing component adopts a two-stage clearing, which further improves the clearing efficiency of the pipe network; the modular design of the clearing component and the traction component can be applied to drainage pipe networks with different pipe diameters.
[0027] Additional advantages, purposes, and features of the present invention will be partially described in the following description, and will become partially apparent to those skilled in the art after studying the following, or may be learned from the practice of the present invention. The purposes and other advantages of the present invention can be achieved and obtained by the structures specifically pointed out in the written description and its claims and the drawings.
[0028] Those skilled in the art will understand that the purposes and advantages that can be achieved by the present invention are not limited to the above specific description, and the above and other purposes that can be achieved by the present invention will be more clearly understood based on the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of the present application, and do not constitute a limitation of the present invention. The components in the drawings are not drawn to scale, but are only for the purpose of illustrating the principles of the present invention. In order to facilitate the illustration and description of some parts of the present invention, the corresponding parts in the drawings may be enlarged, that is, they may become larger relative to other components in the exemplary device actually manufactured according to the present invention. In the drawings:
[0030] Figure 1 This is a schematic diagram of the structure of the pipe section to be cleared.
[0031] Figure 2 It is a structural schematic diagram of the drainage pipe network clearing device in the embodiment of the utility model located at the head end of the pipe section to be cleared.
[0032] Figure 3 for Figure 2 The structure diagram shown is that the drainage network clearing equipment slides to the end position of the pipe section to be cleared.
[0033] Figure 4 The figure is a schematic structural diagram of a silt flushing component according to an embodiment of the utility model.
[0034] Figure 5 It is a structural schematic diagram of a sliding auxiliary frame according to an embodiment of the utility model.
[0035] Figure 6 This is a schematic structural diagram of an embodiment of the utility model in which a silt flushing component and a sliding auxiliary frame are integrated into one body.
[0036] Figure 7 for Figure 6 The schematic diagram of the connection between the injection component and the stand component is shown.
[0037] Figure 8 This is a schematic diagram of the connection between the injection component and the stand component of another embodiment of the utility model;
[0038] Fig. 9 for Figure 2 The structural schematic diagram of the conveying source component of the drainage network clearing equipment shown;
[0039] Fig.10 for Figure 2 The schematic diagram of the structure of the sewage extraction component of the drainage network clearing equipment is shown. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the embodiment of the utility model more clear, the embodiment of the utility model is further described in detail below in conjunction with the accompanying drawings. Here, the illustrative embodiment of the utility model and its description are used to explain the utility model, but are not used as a limitation of the utility model.
[0041] It should be noted here that in order to avoid obscuring the present invention due to unnecessary details, only the structures and / or processing steps closely related to the scheme according to the present invention are shown in the accompanying drawings, while other details that are not closely related to the present invention are omitted.
[0042] It should be emphasized that the terms “include / comprises / has” when used herein refer to the presence of features, elements, steps or components, but do not exclude the presence or addition of one or more other features, elements, steps or components.
[0043] It should also be noted that the directional terms such as "left end" and "right end" in this specification are relative to the position directions shown in the drawings; if there is no special explanation, the term "connection" in this article can refer to not only direct connection, but also indirect connection with an intermediate. Direct connection means that two parts are connected without the help of an intermediate part, and indirect connection means that two parts are connected with the help of other parts.
[0044] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the accompanying drawings, the same reference numerals represent the same or similar components.
[0045] In one embodiment of the present utility model, the present utility model discloses a drainage network clearing device, such as Figure 2 and Figure 3 As shown in FIG. 1 , the drainage pipe network clearing device includes a pipe sealing component, a conveying source component, a clearing component, a traction component and a sewage extraction component. The pipe sealing component is used to block the sewage flow through the pipe section to be cleared 21 and is arranged at both ends of the pipe section to be cleared 21. Figure 1 As shown. Specifically, the pipe sealing component can be placed into the upstream pipe section 22 and the downstream pipe section 23 from the upstream inspection well 11 and the downstream inspection well 12 located at both ends of the pipe section 21 to be cleared; when the pipeline is cleared, the pipe sealing component temporarily blocks the upstream and downstream pipe sections of the pipe section 21 to be cleared to block the sewage flowing through the pipe section 21 to be cleared. The delivery source component is used to deliver flushing fluid to the pipe section 21 to be cleared, and it is located outside the pipe section 21 to be cleared; the delivery source component has a delivery pipeline 441, and the delivery pipeline 441 is connected to the pipe section 21 to be cleared. Specifically, the delivery source component can be located on the ground above the upstream inspection well 11 at one end of the pipe section 21 to be cleared, and further, the delivery pipeline 441 extends from the upstream inspection well 11 to the pipe section 21 to be cleared.
[0046] The clearing component is provided with a nozzle f, which is connected to the delivery pipeline 441 of the delivery source component; the fluid delivered by the delivery source component is delivered to the clearing component through the delivery pipeline 441, and is ejected through the nozzle f located on the clearing component; when clearing, the clearing component is located in the pipe section to be cleared 21, and can slide in the pipe section to be cleared 21. The traction component is arranged outside the pipe section to be cleared 21, for example, on the ground above the inspection well, and is used to pull the clearing component to slide in the pipe section to be cleared 21; the traction component may include a traction rope, which is fixedly connected to the clearing component through the traction rope, and the clearing component can be moved in the pipe section to be cleared 21 under the traction of the traction rope. The sewage extraction component is used to extract the sludge in the pipe to be cleared, and may include a sewage pump 74 and a sewage pipe 741. The sewage pipe 741 is connected to the pipe section 21 to be cleared, and the sludge in the pipe section 21 to be cleared is then extracted from the pipe section 21 to be cleared by the sewage pump 74. In order to facilitate the collection of sewage and sludge extracted from the pipe section 21 to be cleared, the sewage extraction component may also be provided with a sewage storage tank 72. The sewage storage tank 72 may be set on the ground above the downstream inspection well 12. The water inlet end of the sewage pump 74 is connected to the sewage pipe 741, and the water outlet end of the sewage pump 74 is connected to the sewage storage tank 72, so as to extract the sewage and sludge in the pipe section 21 to be cleared into the sewage storage tank 72.
[0047] Furthermore, the drainage pipe network clearing equipment may also include a detection component. The detection component is used to monitor the siltation in the pipe section 21 to be cleared; during the clearing process, the detection component can slide in the pipe section 21 to be cleared. The detection component may include a PC controller 81, a telescopic cable 82 and a camera. The camera is used to realize environmental monitoring in the pipe to be cleared, the telescopic cable 82 is used to pull the camera to slide in the pipe section 21 to be cleared, and the PC controller 81 can be used to display the environmental information monitored by the camera; among them, a camera with built-in infrared color night vision function is preferred to facilitate night operation. Furthermore, the PC controller 81 can be located on the ground above the inspection well, or it can be located at other locations that are convenient for staff to observe; during the clearing process, the camera can be fixed on the clearing component, and when the clearing component moves in the pipe section 21 to be cleared, the camera moves synchronously with the clearing component. The camera is fixedly connected to the detection component to achieve the coordinated work of detection and clearing. It can not only effectively detect the environment inside the pipe during the clearing process, but also clear it in time when silt is detected to restore the flow rate of the pipe section and ensure the safe operation of the drainage network facilities.
[0048] Furthermore, the detection of the internal environment of the pipe section 21 to be cleared can be achieved by an intelligent endoscope 83, which is fixed to the end of the telescopic cable 82, and the end of the telescopic cable 82 or the intelligent endoscope 83 is further fixed to the clearing component, so that the intelligent endoscope 83 and the clearing component move synchronously. Specifically, the intelligent endoscope 83 can be a dustproof and waterproof endoscope wide-angle camera.
[0049] In order to further improve the efficiency of clearing the pipe section, the delivery source component can be set to dual fluid delivery, for example: liquid + gas. The dual fluid delivery source component may include a liquid delivery branch, a gas delivery branch and a water ejector b. The liquid delivery branch includes a water storage tank 42 and a flushing water pump 44, the water inlet end of the flushing water pump 44 is connected to the water storage tank 42, and the water outlet end of the flushing water pump 44 is connected to the liquid input end of the water ejector b. The gas delivery branch includes a first gas compressor 45, and the first gas compressor 45 is connected to the gas input end of the water ejector b. The output end of the water ejector b is connected to the delivery pipeline 441 connected to the pipe section 21 to be cleared. Both the liquid delivery branch and the gas delivery branch are connected to the water ejector b. During the clearing process, the enhanced flushing function of the dual fluids of gas and water can be realized; therefore, the flushing efficiency (gas and water dual fluid flushing) is improved.
[0050] The delivery source component and the first gas compressor 45 can be arranged outside the pipe section 21 to be cleared, for example, on the ground above the upstream inspection well 11. The water tank 42 stores liquid for flushing the pipe section 21 to be cleared. The volume of the water tank 42 can be 5 to 20 cubic meters, and the liquid stored therein can be a fluid medium such as clean water or cleaning liquid. The water tank 42 can be connected to the water inlet end of the flushing water pump 44 through a water pipe, and the water outlet end of the flushing water pump 44 can also be connected to the liquid input end of the water ejector b through a water pipe. The first gas compressor 45 is used to generate gas, and it is connected to the gas input end of the water ejector b through an air pipe. The output end of the water ejector b is connected to the delivery pipeline 441, and a pressure gauge C can also be provided on the delivery pipeline 441; further, the delivery pipeline 441 can be a hose with a length of 80 to 200 meters and a diameter of 4 minutes to 1 inch.
[0051] The clearing device may also include a second gas compressor 75, which is also arranged at an external position of the pipe section 21 to be cleared, for example, on the ground above the downstream inspection well 12; the pipe sealing component used to block the sewage flow through the pipe section 21 to be cleared can be a pipe sealing airbag, preferably, there are two pipe sealing airbags. The two pipe sealing airbags are respectively arranged at the two ends of the pipe section 21 to be cleared, and can be placed at the upstream and downstream pipe sections at both ends of the pipe section 21 to be cleared through the upstream and downstream inspection wells. The upstream pipe sealing airbag 31 located at the upstream inspection well 11 can be connected to the first gas compressor 45 through the air pipe 451, and the upstream pipe section 22 of the pipe section 21 to be cleared can be blocked and connected by inflating and deflating the pipe sealing airbag. Since the upstream pipe sealing airbag 31 connected through the air pipe 451 shares the first gas compressor 45 with the gas delivery branch, the upstream pipe sealing airbag 31 forms a parallel gas branch with the gas delivery branch through the air pipe 451. Furthermore, a diverter valve d1 may be provided on the gas delivery branch, and a diverter valve d2 may be provided on the gas pipe 451 .
[0052] The downstream pipe-sealing airbag 32 located at the downstream inspection well 12 is connected to the second gas compressor 75 through the air pipe 751. The second gas compressor 75 fills and releases gas into the downstream pipe-sealing airbag 32 to achieve the blocking and connection of the downstream pipe section 23. The two pipe-sealing airbags are controlled by two gas compressors respectively, so that the upstream pipe-sealing airbag 31 and the downstream pipe-sealing airbag 32 can be charged and discharged separately; for example, the upstream pipe section 22 is generally blocked by the upstream pipe-sealing airbag 31 first, and after a specific time, the downstream pipe section 23 is blocked by the downstream pipe-sealing airbag 32.
[0053] In one embodiment of the present invention, the clearing component may include a silt flushing component 5 and a sliding auxiliary frame 6; the silt flushing component 5 is connected to the sliding auxiliary frame 6 so that the silt flushing component 5 and the sliding component move synchronously in the pipe section 21 to be cleared. In order to further improve the flushing efficiency of the pipe section 21 to be cleared, the silt flushing component 5 is a two-stage silt flushing component. Figure 4 As shown, the silt flushing component 5 includes a cross-tube 52 and injection components 53 located at both ends of the cross-tube 52. The cross-tube 52 is arranged parallel to the laying direction of the pipe section 21 to be cleared, and its length can be 30 to 60 cm. The middle part of the cross-tube 52 has a joint pipe 51 for connecting with the conveying pipeline 441. The joint pipe 51 is perpendicular to the cross-tube 52 and communicates with the cross-tube 52, so that the gas or liquid generated by the conveying source component can be conveyed into the cross-tube 52; the length of the joint pipe 51 can be 20 to 40 mm. Two sets of injection components 53 are symmetrically arranged at both ends of the cross-tube 52; when the silt flushing component 5 moves in the pipe section 21 to be cleared, the injection components 53 located at both ends of the cross-tube 52 form a two-stage silt flushing, one in front and one behind.
[0054] Preferably, Figure 7 and 8As shown, the spray component 53 may be semicircular or fan-shaped, and may be formed by bending a plastic pipe with an inner diameter of 15 to 25 mm. Specifically, it may include a wing symmetrical portion e2 and an arc-bend portion e3; a certain number of fire nozzles f are installed at regular intervals on the side of the arc-bend portion e3; the nozzles f allow the liquid flowing through the spray component 53 to be sprayed in a specific direction, for example, the liquid spraying direction of the nozzles f may be parallel to the water flow direction in the pipe section. In this embodiment, the wing symmetrical portion e2 and the arc-bend portion e3 are connected end to end in sequence.
[0055] Furthermore, the fan-shaped or semicircular spray component 53 is connected to the cross-tube 52 through the vertical connection part e1; the vertical connection part e1 can be a plastic pipe with an inner diameter of 20 to 40 mm, one end of which is connected to the intersection of the two side wing symmetrical parts e2 of the spray component 53, and the other end is connected to the end of the cross-tube 52, so that the liquid flowing through the cross-tube 52 is further transported to the spray component 53, and then sprayed out through the nozzle f of the spray component 53. The included angle between the vertical connection part e1 and the two side wing symmetrical parts e2 is equal, and can be specifically set to 90° to 135°.
[0056] The sliding auxiliary frame 6 includes a cross frame 61 and a vertical frame component 62, and the vertical frame component 62 is respectively arranged at both ends of the cross frame 61. The cross frame 61 is arranged in parallel with the cross tube 52, and the length of the cross frame 61 and the cross tube 52 is approximately the same. The vertical frame component 62 includes two horizontal frames 622 and two vertical frames 623. The two vertical frames 623 and the two horizontal frames 622 are connected end to end to form a rectangular frame. The two horizontal frames 622 serve as the two horizontal sides of the rectangular frame, and the two vertical frames 623 serve as the two vertical sides of the rectangular frame; the rectangular frame is further connected to the end of the cross frame 61 through the vertical short frame 621. The length of the vertical short frame 621 can be 20 to 40 mm, the length of the horizontal frame 622 is 50 to 200 mm, and the length of the vertical frame 623 can be approximately or greater than twice the length of the symmetrical parts e2 of the two side wings of the injection component 53, generally 100 to 200 mm. In order to enable the sliding auxiliary frame 6 to slide in the pipe section to be cleared 21, two rollers 624 are provided at the bottom of the two vertical frames 623. Specifically, the rollers 624 can be sliding universal wheels. In order to ensure that the sliding auxiliary frame 6 can freely pass through the pipe section to be cleared 21, when the vertical frame component 62 is located in the pipe section to be cleared 21, it should be ensured that the distance between the highest point of the vertical frame component 62 and the inner wall of the pipe section to be cleared 21 is greater than 50mm, and the height of the component 5 and the horizontal span of the component 6 are in the range of 1 / 3 to 4 / 5 of the inner diameter of the pipe section to be cleared 21.
[0057] Furthermore, the sliding auxiliary frame 6 can be made of galvanized or carbon steel pipes, and the diameter of the pipes can be 15 to 40 mm. The various pipe sections can be connected by threaded pipe fittings. Figure 5As shown, when used, each stand component 62 of the sliding auxiliary frame 6 can be anchored or bolted to the injection component 53 of the silt flushing component 5, thereby realizing the synchronous movement of the silt flushing component 5 and the sliding auxiliary frame 6. The specific connection between the stand component 62 and the injection component 53 can be a clamp structure that is easy to disassemble, or other connection methods. The silt flushing component 5 and the sliding auxiliary frame 6 in the above embodiment can be designed and used as a set. For example, in two sections of pipes 21 to be cleared with different diameters, the silt flushing work of the pipe sections with different inner diameters can be completed by replacing the silt flushing component 5 and the sliding auxiliary frame 6 as a set.
[0058] Furthermore, two connecting rings are provided on the vertical short frame 621 of the sliding auxiliary frame 6, and the connecting rings can be used to fix the traction rope of the traction component. Specifically, a hook can be provided at the end of the traction rope, and the hook is further hung on the connecting ring to achieve the connection between the traction rope and the clearing component. The clearing component can move in the pipe section 21 to be cleared under the traction of the traction rope. In addition to fixing the hook of the traction rope, the connecting ring can also fix the camera of the detection component, so that the camera can move synchronously with the clearing component, thereby realizing real-time monitoring of the environment in the pipe to be cleared.
[0059] In one embodiment of the utility model, the traction of the traction rope is realized by a winch. The winch may include an upstream winch 43 and a downstream winch 73; the upstream winch 43 is connected to a connecting ring on the cross-tube 52 close to the upstream pipe section 22 through a traction rope 431, and the downstream winch 73 is connected to a connecting ring on the cross-tube 52 close to the downstream pipe section 23 through a traction rope 731. When the clearing component moves from the upstream to the downstream of the pipe section 21 to be cleared, the downstream winch 73 tightens the traction rope 731, and the upstream winch 43 relaxes the traction rope 431; when the clearing component moves from the downstream to the upstream of the pipe section 21 to be cleared, the upstream winch 43 tightens the traction rope 431, and the downstream winch 73 relaxes the traction rope 731. Further, the upstream winch 43 or the downstream winch 73 can realize the traction function of the traction rope by being equipped with a wire drum, and the traction rope in the wire drum can be a spring steel wire of 80-200 meters. It should be understood that the traction work of the clearing component can also be achieved by other traction methods besides the winch.
[0060] Furthermore, in order to facilitate the movement of the clearing equipment, the transport source component and the upstream winch 43 can be assembled on the first vehicle body 41 to form a vehicle-mounted transport source assembly 4 (such as Fig. 9 The sewage pumping components, the downstream winch 73 and the second gas compressor are assembled on the second vehicle body 71 to form a vehicle-mounted sewage pumping assembly 7 (as shown); Fig.10 When the pipeline network is being cleared, the vehicle-mounted transport source assembly 4 is located on the ground near the upstream inspection well 11, and the vehicle-mounted sewage extraction assembly 7 is located on the ground near the downstream inspection well. The various components of the clearing equipment are assembled on the vehicle body to facilitate the movement of the clearing equipment.
[0061] When the drainage pipe network clearing device is used for clearing, the pipe sealing components can be first set at both ends of the pipe to be cleared to block the flow of sewage flowing through the pipe section to be cleared 21. Specifically, the clearing component can be a blocking airbag, which is respectively placed at both ends of the pipe section to be cleared 21, and then the first gas compressor 45 and the second gas compressor 75 are respectively started to inflate the upstream pipe sealing airbag 31 and the downstream pipe sealing airbag 32 until the pipe sealing airbag expands to fill the upstream pipe section 22 and the downstream pipe section 23, and blocks the flow of sewage flowing through the pipe section to be cleared 21, that is, the inflation is completed.
[0062] After the upstream pipe section 22 and the downstream pipe section 23 of the pipe section 21 to be cleared are blocked respectively, a suitable clearing component is further selected according to the inner diameter size of the pipe section 21 to be cleared. Further, the traction rope 731 of the downstream winch 73 passes through the downstream inspection well 12, the pipe section 21 to be cleared, and the upstream inspection well 11 in sequence, and the end of the traction rope 731 extends to the wellhead of the upstream inspection well 11; the end of the traction rope 731 of the downstream winch 73 is fixed to the fixing ring at one end of the clearing component, the end of the traction rope 431 of the upstream winch 43 is fixed to the fixing ring at the other end of the clearing component, and the camera of the detection component is also fixed to the fixing ring at the end of the clearing component; further, the downstream winch 73 retracts the traction rope 731, thereby collecting the clearing component into the pipe section 21 to be cleared.
[0063] The camera located on the clearing component detects the environment inside the pipe section 21 to be cleared in real time, and adjusts the flushing water or gas volume accordingly according to the siltation situation. For example, when the pipe is in a light to moderate siltation situation, only the sewage pump 44 can be turned on to flush the inner wall of the pipe section only with liquid; when the pipe is in a serious siltation situation, the gas volume generated by the first gas compressor 45 can be appropriately distributed by adjusting the diverter valve d1 and the diverter valve d2 to achieve dual-fluid mixed flushing of gas and liquid. While flushing the pipe, the traction rope 731 of the downstream winch 73 can be tightened, and the traction rope 431 of the upstream winch 43 and the telescopic coil line 82 of the camera can be loosened to move the clearing component in the pipe section 21 to be cleared. The synergy of traction, flushing, and detection of the clearing component is achieved, and a good detection and clearing effect is achieved.
[0064] Furthermore, during the process of flushing the inner wall of the pipe section 21 to be cleared by the clearing component, the sewage pump 74 is started to pump out the sludge in the pipe section 21 to be cleared. Specifically, the sewage pumping pipe 741 of the sewage pumping component can be extended into the pipe section 21 to be cleared through the downstream inspection well 12, the water inlet end of the sewage pump 74 is connected to the sewage pumping pipe 741, and the water outlet end of the sewage pump 74 is connected to the sewage storage tank 72, so that the sewage pump 74 can pump the sewage in the pipe section 21 to be cleared into the sewage storage tank 72.
[0065] Through the above embodiments, it can be found that the drainage pipe network clearing equipment in the embodiments of the utility model adopts a traction component to control the sliding of the clearing component in the pipe to be cleared while flushing silt, thereby improving the silt cleaning efficiency and reducing the clearing cost, and can be suitable for clearing large-diameter and long-distance pipe networks; in addition, the delivery source component adopts a dual-fluid delivery source, and the clearing component adopts a two-stage clearing, which further improves the clearing efficiency of the pipe network; the modular design of the clearing component and the traction component can be applied to drainage pipe networks with different pipe diameters.
[0066] In the present invention, features described and / or illustrated for one embodiment may be used in the same manner or in a similar manner in one or more other embodiments, and / or combined with features of other embodiments or replace features of other embodiments.
[0067] The above-listed embodiments show and describe the basic principles and main features of the utility model, but the utility model is not limited to the above-mentioned embodiments. Any modifications, equivalent changes and modifications made to the utility model by those skilled in the art without making any creative work should fall within the scope of protection of the technical solution of the utility model.
Claims
1. A drainage network clearing device, characterized in that: The clearing equipment includes: A pipe sealing component for blocking the flow of sewage through the pipe section to be cleared, wherein the pipe sealing component is arranged at both ends of the pipe section to be cleared; A conveying source component, the conveying source component includes a conveying pipeline, and the conveying pipeline is used to be connected to the pipe section to be cleared; A clearing component, which is used to be arranged in the pipe section to be cleared and can move in the pipe section to be cleared, and the clearing component is provided with a nozzle, and the nozzle is connected to the conveying pipeline; A traction component, including a traction rope, wherein the traction rope is fixedly connected to the clearing component; The sewage pumping component comprises a sewage pump and a sewage pumping pipe, and the sewage pumping pipe is connected with the pipe section to be cleared.
2. The drainage network clearing equipment according to claim 1, characterized in that: The clearing device also includes a detection component, which includes a PC controller, a telescopic coil and a camera. The PC controller is used to be arranged outside the pipe section to be cleared, and the camera is connected to the PC controller through the telescopic coil, and the camera is fixed on the clearing component.
3. The drainage network clearing equipment according to claim 1, characterized in that: The delivery source component includes a liquid delivery branch, a gas delivery branch and a water ejector; The liquid delivery branch includes a water storage tank and a flushing water pump, the water inlet end of the flushing water pump is connected to the water storage tank, and the water outlet end of the flushing water pump is connected to the liquid input end of the water ejector; The gas delivery branch comprises a first gas compressor, and a gas output end of the first gas compressor is connected to a gas input end of the water ejector; The output end of the water ejector is communicated with the delivery pipeline.
4. The drainage network clearing equipment according to claim 3, characterized in that: The tube sealing component comprises an upstream tube sealing airbag and a downstream tube sealing airbag; The upstream tube-sealing airbag is connected in parallel with the gas delivery branch through the trachea, and the gas delivery branch and the trachea are both provided with diverter valves.
5. The drainage network clearing device according to claim 4, characterized in that: The clearing device further comprises a second gas compressor, which is arranged outside the pipe section to be cleared, and the downstream pipe sealing airbag is connected to the second gas compressor via an air pipe.
6. The drainage network clearing device according to claim 5, characterized in that: The clearing component includes a silt flushing component and a sliding auxiliary frame; The silt flushing component includes a cross-tube parallel to the laying direction of the pipe section to be cleared, and both ends of the cross-tube are respectively connected to a spray component to achieve two-stage silt flushing, and the nozzle is located on the spray component. The sliding auxiliary frame comprises a cross frame parallel to the cross tube, two ends of the cross frame are respectively connected to a vertical frame component, a roller is arranged at the bottom of the vertical frame component, and the vertical frame component is fixedly connected to the adjacent injection component.
7. The drainage network clearing device according to claim 6, characterized in that: The injection component is semicircular or fan-shaped, and is formed by bending a pipe. The injection component is coaxially arranged with the cross-tube, and the nozzle is arranged on one side of the arc tube of the injection component.
8. The drainage network clearing device according to claim 7, characterized in that: Both ends of the cross frame are provided with connecting rings, and the end of the traction rope is provided with a hook, and the hook is fixed on the connecting ring.
9. The drainage network clearing device according to claim 8, characterized in that: The traction component includes an upstream winch and a downstream winch, the traction rope of the upstream winch is connected to the connecting ring of the cross frame close to the upstream of the pipe section to be cleared, and the traction rope of the downstream winch is connected to the connecting ring of the cross frame close to the downstream of the pipe section to be cleared.
10. The drainage network clearing device according to claim 9, characterized in that: The conveying source component and the upstream winch are assembled on the first vehicle body, and the sewage extraction component, the second gas compressor, and the downstream winch are assembled on the second vehicle body.
