Siphon drainage device based on BIM

By using the suspension boom of BIM model and scale marks in the siphon rainwater system, the problems of inaccurate installation location of the siphon rainwater system components and uneven support brackets are solved, achieving higher installation accuracy and suitable for complex buildings. The layout design ensures the stability of the pipe and the correctness of the connection.

CN222044742UActive Publication Date: 2024-11-22POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420011539.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-11-22
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

During the construction of the siphon rainwater system, errors caused by inaccurate installation location of components and uneven support hangers, the pipeline deforms or breaks during thermal expansion and contraction, and the difficulty of connection design and installation in complex construction situations increases. The existing BIM Technology has failed to effectively solve these problems.

Method used

Using BIM-based siphon drainage device, the BIM model of the siphon rainwater hanger is established, combined with the suspension boom of the scale line, ensures the installation accuracy and straightness. The design includes suspension boom, mounting piece, support pole, support pole reinforcement, rainwater The bucket, inspection port and drain pipes use the precise positioning and connection structure of these components to ensure proper suspension and fixation of the pipes.

Benefits of technology

It improves the installation accuracy of the siphon rainwater hanger, reduces errors, is suitable for layout design and pipeline connections for complex working conditions, ensures the stability of the pipeline during thermal expansion and contraction, and avoids fracture.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044742U_ABST
    Figure CN222044742U_ABST
Patent Text Reader

Abstract

The utility model provides a siphon drainage device based on BIM, which comprises a suspension rod, a mounting piece, a supporting rod connecting piece, a supporting rod, a supporting rod reinforcing piece, a rainwater hopper, an inspection opening and a drainage pipe, and further comprises a BIM model of a siphon rainwater suspension bracket, the BIM model is used for modeling design of each arrangement area, the arrangement area comprises a drainage structure arrangement area and a connecting structure arrangement area, and the drainage structure arrangement area is connected with the connecting structure arrangement area. A drainage pipe is arranged in the drainage structure arrangement area, a plurality of rainwater hoppers are connected to the upper portion of the drainage pipe and communicated with the drainage pipe, a plurality of suspension rods are arranged in the connection structure arrangement area, scale marks used for assisting positioning are arranged on the suspension rods, and one end of each suspension rod is fixedly connected with an upper wall. The BIM model of the siphon rainwater hanging bracket is established before formal construction, and is matched with the hanging rod with the scale marks, so that the installation precision is higher, the error is smaller, and the installation straightness of the siphon rainwater hanging bracket can be ensured; the device is suitable for arrangement design and pipeline connection under complex working conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building water supply and drainage installation, in particular to a siphon drainage device based on BIM. Background Art

[0002] BIM generally refers to Building Information Modeling. The core of BIM is to establish a virtual three-dimensional model of the construction project and use digital technology to provide this model with a complete construction project information database that is consistent with the actual situation.

[0003] For example, the authorization announcement number CN217519672U is a system for renovating the water supply and drainage pipes of existing buildings using BIM technology. Applying BIM to the renovation of the water supply and drainage pipes of buildings can intuitively and accurately display the data information of the location of the renovation point.

[0004] The siphon rainwater system is an important part of the building's water supply and drainage system. Its task is to promptly remove rainwater and snow water that fall on the roof of the building, avoid the formation of roof water accumulation that threatens the roof, or cause rainwater overflow, roof leakage and other water disasters, so as to ensure people's normal life and production activities. The characteristic of the siphon drainage system is that when the horizontal pipe is not set with a slope, a full pipe flow is formed, and the accumulated water on the roof is drained at a very fast speed. Due to the excellent drainage performance of the siphon drainage system, it has been widely used in various engineering construction projects in recent years. However, there are various problems in the actual construction of the siphon rainwater system, such as collisions caused by the intersection of various parts or insufficient space, a large amount of rework and demolition and modification due to spatial conflicts, and inaccurate installation positions of the components of the siphon drainage system, uneven support and hanger brackets, etc., which will cause the secondary suspension system to deform or even break during the process of thermal expansion and contraction of the pipe. In addition, the complexity of different building conditions is different. The more complex the building conditions, the more difficult it is to arrange and install the pipe connections of the siphon drainage system. At present, BIM technology has not been applied in the arrangement design and precise positioning of the siphon rainwater system. Utility Model Content

[0005] The purpose of the utility model is to overcome the deficiencies of the above-mentioned prior art and provide a siphon drainage device based on BIM, which can solve the problems of inaccurate installation positions of components of the siphon drainage system and uneven supports and hangers.

[0006] To this end, the utility model adopts the following technical solutions:

[0007] A siphon drainage device based on BIM, comprising a suspension rod, a mounting plate, a support rod connector, a support rod, a support rod reinforcement, a rain gutter, an inspection port, and a drain pipe, and also comprising various arrangement areas designed based on the BIM model of the siphon rain water hanger, wherein the arrangement area comprises a drainage structure arrangement area and a connection structure arrangement area, wherein the drain pipe is arranged in the drainage structure arrangement area, a plurality of rain gutter are connected above the drain pipe, the rain gutter is communicated with the drain pipe, a plurality of suspension rods are arranged in the connection structure arrangement area, the suspension rods are provided with scale lines for auxiliary positioning, one end of the suspension rod is fixedly connected to the upper wall, the other end of the suspension rod is fixedly connected to the support rod below, the drain pipe is suspended below the support rod and the two are fixedly connected.

[0008] On the basis of adopting the above technical solutions, the present invention can also adopt the following further technical solutions, or use these further technical solutions in combination:

[0009] The drain pipe includes a first drain pipe, a second drain pipe and a third drain pipe which are interconnected. The first drain pipe is arranged parallel to the wall above it, the second drain pipe is arranged below the first drain pipe, a plurality of third drain pipes are arranged above the first drain pipe, and the rain gutter is arranged above each of the third drain pipes.

[0010] The first drain pipe includes a middle drain pipe and several side drain pipes, and the side drain pipes include a first side drain pipe, one end of the first side drain pipe is connected to the middle drain pipe, and the other end is connected to the second drain pipe. Except for the first side drain pipe, the other side drain pipes are connected to the middle drain pipe at one end, and the other end is connected to the third drain pipe.

[0011] The support rod includes a first support rod and a second support rod, the first support rod is arranged above the middle drain pipe, and the second support rod is arranged above the first side drain pipe. The middle drain pipe and the outside of the first support rod are sleeved with a plurality of sliding pipe clamps and anchoring pipe clamps, and the first side drain pipe and the outside of the second support rod are sleeved with a plurality of anchoring pipe clamps.

[0012] The outside of the second drain pipe is sleeved with a plurality of riser sliding pipe clamps and riser anchoring pipe clamps, the riser sliding pipe clamps and the riser anchoring pipe clamps are respectively fixedly connected to wall connectors, and the second drain pipe is fixedly connected to one side wall through the wall connectors.

[0013] A sealing pipe clamp is fixedly connected at the connection between the drainage pipe and the rain gutter.

[0014] When the diameter of the intermediate drainage pipe is greater than 275 mm, at least two anchoring pipe clamps are sleeved between the intermediate drainage pipe and the outer side of the first support rod.

[0015] The maximum distance between the riser anchoring pipe clamps is 5m, and the maximum distance between the riser sliding pipe clamps is 15 times the pipe diameter.

[0016] The mounting plate is fixedly connected to the top of the suspension rod, and the mounting plate is fixedly connected to the upper wall. The support rod connecting piece is fixedly connected to the bottom of the suspension rod, and the support rod connecting piece is sleeved and fixed to the support rod. The surface of the support rod is fixedly connected to a support rod reinforcement piece.

[0017] An inspection port is provided at the lower portion of the second drain pipe, and the center of the inspection port is one meter away from the ground.

[0018] Compared with the prior art, the utility model has the following advantages and beneficial effects: by establishing a BIM model of the siphon rainwater hanger before formal construction, combined with a suspension rod with scale lines, the installation accuracy is higher and the error is smaller, which can ensure the straight installation of the siphon rainwater hanger; it is suitable for layout design and pipeline connection in complex working conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the utility model.

[0020] Figure 2 It is a schematic diagram of some scale lines of the suspension rod of the utility model.

[0021] Figure 3 and Figure 4 It is a partial structural schematic diagram of the utility model after installation. DETAILED DESCRIPTION

[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the preferred implementation scheme of the present invention is described below in conjunction with specific embodiments. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent elements with the same or similar functions. However, it should be understood that the accompanying drawings are only used for illustrative purposes and cannot be understood as limitations on the present invention. In order to better illustrate the present embodiment, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the accompanying drawings may be omitted, and the positional relationship described in the accompanying drawings is only used for illustrative purposes and cannot be understood as limitations on the present invention.

[0023] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0024] The utility model provides a BIM-based siphon drainage device, including a suspension rod 1, a mounting plate 2, a support rod connector 3, a support rod 4, a support rod reinforcement 5, a rain gutter 9, an inspection port 21, and a drainage pipe 13, and also includes various arrangement areas designed based on the BIM model of the siphon rainwater hanger, the arrangement area including a drainage structure arrangement area 10 and a connection structure arrangement area 20, wherein the drainage pipe 13 is arranged in the drainage structure arrangement area 10, a plurality of rain gutter 9 is connected above the drainage pipe 13, the rain gutter 9 is communicated with the drainage pipe 13, a plurality of suspension rods 1 are arranged in the connection structure arrangement area 20, the suspension rod 1 is provided with a scale line for auxiliary positioning, one end of the suspension rod 1 is fixedly connected to the upper wall, the other end of the suspension rod 1 is fixedly connected to the support rod 4 below, the drainage pipe 13 is suspended below the support rod 4 and the two are fixedly connected.

[0025] Create a BIM model of the siphon rainwater hanger according to the drawings, and reserve holes at the drainage pipe 13 passing through the floor and shear wall according to the BIM model. During the roof structure construction, cooperate with the civil engineering to reserve holes that meet the installation requirements of the rainwater bucket 9, or directly embed the rainwater bucket 9 and the installation piece 2 in the roof concrete. When embedding, the thickness of the roof leveling layer should be reserved (the reserved position should refer to the civil engineering construction drawing and the water application drawing). At the same time, consider the position of the lamps and ceilings to prevent the suspension rod 1 from conflicting with the lamps.

[0026] The above-mentioned support rod 4 is a steel square support rod, the support rod connector 3 is a steel clip for sleeve-connecting the support rod 4, and the support rod reinforcement 5 is a channel steel covering and fixed on the outside of the support rod 4. All of them are parts that can be purchased on the market and will not be described in detail.

[0027] The rainwater gutter 9 should be set at the lowest point of the roof or gutter, and the number of rainwater gullies 9 in each catchment area should be no less than 2.

[0028] The distance between two rainwater buckets 9 shall not exceed 20m. The distance between the rainwater bucket 9 and the edge of the roof shall not be less than 1m and not more than 10m. The siphon rainwater bucket 9 shall be reliably connected to the roof or gutter and pipeline system.

[0029] The drain pipe 13 includes a first drain pipe 14, a second drain pipe 15 and a third drain pipe 16 which are interconnected. The first drain pipe 14 is arranged parallel to the wall above it, the second drain pipe 15 is arranged below the first drain pipe 14, and a plurality of third drain pipes 16 are arranged above the first drain pipe 14. A rain gutter 9 is arranged above each third drain pipe 16.

[0030] like Figure 2As shown, the scale lines set on the surface of the suspension rod 1 increase from top to bottom, which facilitates the data of the BIM model of the siphon rainwater hanger to accurately control the distance between the first drainage pipe 14 and the upper wall. For example: According to the BIM model of the siphon rainwater hanger, after the suspension rod 1 and the first drainage pipe 14 are installed, the length of the suspension rod is 0.8m. During actual construction, the support rod connector 3 can be fixed at the 800mm scale of the suspension rod 1, and then the support rod 4 is fixed under the support rod connector 3 to ensure that the support rod 4 is installed horizontally, thereby ensuring that the first drainage pipe 14 is installed horizontally, and the installation error can be controlled to the millimeter level.

[0031] The first drain pipe 14 includes a middle drain pipe 17 and several side drain pipes 18. The side drain pipes 18 include a first side drain pipe 181. One end of the first side drain pipe 181 is connected to the middle drain pipe 17, and the other end is connected to the second drain pipe 15. Except for the first side drain pipe 181, the other side drain pipes 18 are connected to the middle drain pipe 17 at one end, and the other end is connected to the third drain pipe 16.

[0032] The bends between the middle drain pipe 17 and the side drain pipe 18, the side drain pipe 18 and the third drain pipe 16, and the first side drain pipe 181 and the second drain pipe 15 are connected by two 45° elbows or 90° elbows with R≥4D. During the installation process, the open openings of the drain pipe 13 and the rain gutter 9 should be blocked. The suspension system should avoid crossing the building settlement joints and expansion joints. When it is unavoidable due to on-site conditions, corresponding measures should be taken according to the characteristics of the system pipes and the deflection of different pipes.

[0033] The support rod 4 includes a first support rod 41 and a second support rod 42. The first support rod 41 is arranged above the middle drain pipe 17, and the second support rod 42 is arranged above the first side drain pipe 181. The middle drain pipe 17 and the outside of the first support rod 41 are sleeved with a plurality of sliding pipe clamps 6 and anchoring pipe clamps 7, and the first side drain pipe 181 and the outside of the second support rod 42 are sleeved with a plurality of anchoring pipe clamps 7.

[0034] A plurality of riser sliding pipe clamps 11 and riser anchoring pipe clamps 12 are sleeved on the outside of the second drain pipe 15 . The riser sliding pipe clamps 11 and the riser anchoring pipe clamps 12 are respectively fixedly connected to wall connectors 19 . The second drain pipe 15 is fixedly connected to one side wall via the wall connectors 19 .

[0035] A sealing pipe clamp 8 is fixedly connected to the connection between the drain pipe 16 and the rain gutter 9 .

[0036] The sealing pipe clamp 8 is connected to the drain pipe 16 and the rainwater bucket 9 by welding.

[0037] When the diameter of the middle drainage pipe 17 is greater than 275 mm, at least two anchoring pipe clamps 7 are sleeved between the middle drainage pipe 17 and the outer side of the first support rod 41 .

[0038] The maximum distance between the riser anchoring pipe clamps 12 is 5 m, and the maximum distance between the riser sliding pipe clamps 11 is 15 times the pipe diameter.

[0039] A mounting plate 2 is fixedly connected to the top of the suspension rod 1, and the mounting plate 2 is fixedly connected to the upper wall. A support rod connector 3 is fixedly connected to the bottom of the suspension rod 1, and the support rod connector 3 is sleeved and fixed to the support rod 4, and a support rod reinforcement 5 is fixedly connected to the surface of the support rod 4.

[0040] An inspection port 21 is provided at the lower portion of the second drain pipe 15 , and the center of the inspection port 21 is one meter away from the ground.

[0041] The above-mentioned support rod connector 3, support rod reinforcement 5, sliding pipe clamp 6, anchor pipe clamp 7, and sealing pipe clamp 8 are used as fixing parts, which can be purchased directly and will not be elaborated. The above-mentioned fixing parts must be able to withstand the weight of the full flow pipeline and the impact force generated by the high-speed water flow, and should also absorb the axial stress generated by the thermal expansion and contraction of the pipeline. The fixing parts should be set according to the requirements of various pipes, with accurate positioning, flat burial, and close contact with the pipeline, but shall not damage the surface of the pipeline. At the same time, the spacing and setting requirements of the pipeline supports and hangers must meet the requirements of the specifications.

[0042] After installation, a water filling test should be conducted, and the water filling height must reach the rain gutter 9 on the top of each system. Fill with water for 15 minutes, and after the water level drops, fill it up again and observe for 5 minutes. If the liquid level does not drop and there is no leakage at the interface, it is qualified. The drainage pipes 13 should all be tested for water flow. The drainage should be unobstructed and unblocked, and the pipes and interfaces should be free of leakage.

[0043] According to the description and drawings of the utility model, a person skilled in the art can easily manufacture or use a BIM-based siphon drainage device of the utility model, and can produce the positive effects recorded in the utility model.

[0044] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present utility model and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be an internal connection between two mechanisms, elements or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.

[0045] In the description of the present invention, it should be understood that the terms "one end", "the other end", "outside", "inside", "horizontal", "end", "length", "outer end", "left", "right" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the mechanism or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present invention. The terms "first" and "second" are also used only for the sake of brevity in the description, and do not indicate or imply relative importance.

[0046] Furthermore, in practicing the claims of the present invention, those skilled in the art may understand and affect variations to the disclosed embodiments by studying the drawings, disclosure, and appended claims. In addition, in the claims and the specification, words such as "comprises", "comprising", etc. do not exclude other elements or steps, and non-plural nouns do not exclude their plural forms.

[0047] The above is only a preferred embodiment of the present invention and is not intended to limit the scope of implementation of the present invention. That is, all equivalent changes and modifications made according to the present invention are covered by the scope of the claims of the present invention and will not be listed one by one here.

Claims

1. A siphon drainage device based on BIM, comprising a suspension rod (1), a mounting plate (2), a support rod connector (3), a support rod (4), a support rod reinforcement (5), a rainwater bucket (9), an inspection port (21), and a drainage pipe (13), characterized in that: It also includes various arrangement areas designed based on the BIM model modeling of the siphon rainwater hanger, wherein the arrangement areas include a drainage structure arrangement area (10) and a connection structure arrangement area (20), wherein the drainage pipe (13) is provided in the drainage structure arrangement area (10), and a plurality of rainwater gutters (9) are connected above the drainage pipe (13), and the rainwater gutters (9) are in communication with the drainage pipe (13); a plurality of suspension rods (1) are provided in the connection structure arrangement area (20), and scale lines for auxiliary positioning are provided on the suspension rods (1); one end of the suspension rod (1) is fixedly connected to the upper wall, and the other end of the suspension rod (1) is fixedly connected to the lower support rod (4); the drainage pipe (13) is suspended below the support rod (4) and the two are fixedly connected.

2. A BIM-based siphon drainage device as claimed in claim 1, characterized in that: The drainage pipe (13) comprises a first drainage pipe (14), a second drainage pipe (15) and a third drainage pipe (16) which are interconnected. The first drainage pipe (14) is arranged parallel to the wall above it, the second drainage pipe (15) is arranged below the first drainage pipe (14), a plurality of the third drainage pipes (16) are arranged above the first drainage pipe (14), and the rain gutter (9) is arranged above each of the third drainage pipes (16).

3. A BIM-based siphon drainage device as claimed in claim 2, characterized in that: The first drain pipe (14) comprises a middle drain pipe (17) and a plurality of side drain pipes (18); the side drain pipes (18) comprise a first side drain pipe (181); one end of the first side drain pipe (181) is connected to the middle drain pipe (17), and the other end is connected to the second drain pipe (15); except for the first side drain pipe (181), the other side drain pipes (18) are all connected to the middle drain pipe (17) at one end, and connected to the third drain pipe (16) at the other end.

4. The BIM-based siphon drainage device according to claim 3, characterized in that: The support rod (4) comprises a first support rod (41) and a second support rod (42); the first support rod (41) is arranged above the middle drainage pipe (17); the second support rod (42) is arranged above the first side drainage pipe (181); a plurality of sliding pipe clamps (6) and anchoring pipe clamps (7) are sleeved on the outside of the middle drainage pipe (17) and the first support rod (41); a plurality of anchoring pipe clamps (7) are sleeved on the outside of the first side drainage pipe (181) and the second support rod (42).

5. The BIM-based siphon drainage device according to claim 2, characterized in that: A plurality of riser sliding pipe clamps (11) and riser anchoring pipe clamps (12) are sleeved on the outside of the second drainage pipe (15); the riser sliding pipe clamps (11) and the riser anchoring pipe clamps (12) are respectively fixedly connected to wall connection pieces (19); and the second drainage pipe (15) is fixedly connected to a wall on one side via the wall connection pieces (19).

6. The BIM-based siphon drainage device according to claim 2, characterized in that: A sealing pipe clamp (8) is fixedly connected to the connection point between the third drainage pipe (16) and the rain gutter (9).

7. The BIM-based siphon drainage device according to claim 4, characterized in that: When the diameter of the intermediate drainage pipe (17) is greater than 275 mm, at least two anchoring pipe clamps (7) are sleeved on the outside of the intermediate drainage pipe (17) and the first support rod (41).

8. The BIM-based siphon drainage device according to claim 5, characterized in that: The maximum distance between the riser anchoring pipe clamps (12) is 5 m, and the maximum distance between the riser sliding pipe clamps (11) is 15 times the pipe diameter.

9. The BIM-based siphon drainage device according to claim 1, characterized in that: The upper side of the suspension rod (1) is fixedly connected to the mounting plate (2), the mounting plate (2) is fixedly connected to the upper wall surface, the lower side of the suspension rod (1) is fixedly connected to a support rod connecting piece (3), the support rod connecting piece (3) is sleeved and fixed to the support rod (4), and the surface of the support rod (4) is fixedly connected to a support rod reinforcement piece (5).

10. The BIM-based siphon drainage device according to claim 2, characterized in that: An inspection port (21) is provided at the lower portion of the second drainage pipe (15), and the center of the inspection port (21) is one meter away from the ground.