Recyclable assembly type prefabricated stair
By designing recyclable prefabricated stairs, using steel pipe beams, prefabricated concrete steps and connectors, the problems of traditional stairs in transportation and decoration are solved, and rapid installation, convenient disassembly and material coordination are achieved, and costs and resource waste are reduced.
Patent Information
- Application Number
- CN202420609502.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-27
AI Technical Summary
Traditional steel structure stairs take up a lot of space during transportation and installation, and the exposed fasteners on concrete steps during decoration are not conducive to matching with other decoration materials.
Adoptable prefabricated staircase design, including rectangular steel pipe beams, precast concrete steps and connectors. The concrete steps are equipped with a foam layer, the bottom surface is fitted with the metal base plate, and the top surface is equipped with a support surface layer, which can achieve rapid connection by fixing bolts and magnets. Install and disassemble to ensure easy installation and matching materials.
It realizes rapid installation and disassembly of stairs, reduces transportation and installation costs, retains the concrete surface intact and facilitates subsequent decoration, and components can be transported and recycled in batches as needed, saving resources.
Smart Images

Figure CN222044768U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated stairs, in particular to a recyclable assembled prefabricated staircase. Background Art
[0002] Traditional steel structure stairs are welded in the factory and installed on site. They take up a lot of space during transportation and require large lifting equipment, which results in high transportation and installation costs. With the development of prefabricated concrete stairs, more and more buildings are using prefabricated concrete stairs. Prefabricated concrete stairs mainly include support beams and concrete steps. The existing technology uses the method of placing the concrete steps on the support beams and then fixing them with fixing bolts from above. This results in exposed fasteners above the concrete steps, which is not conducive to the coordination of the stairs with other decoration materials on the market in the subsequent decoration work. Utility Model Content
[0003] In view of the above-mentioned prior art, the utility model provides a recyclable assembled prefabricated staircase to solve the above-mentioned technical problems.
[0004] To achieve the above purpose, the technical solution of the embodiment of the utility model is implemented as follows:
[0005] A recyclable assembled prefabricated staircase comprises a steel tube beam, a concrete tread and a connector, wherein the concrete tread comprises a metal base plate and a concrete layer, wherein the concrete layer is cast on the metal base plate, two steel tube beams are arranged along the direction of the staircase, and both ends of a plurality of concrete treads are mounted on the two steel tube beams, wherein the steel tube beam is provided with the connector, and the connector is provided with fixing bolts, and the fixing bolts fix the concrete tread from the bottom.
[0006] Furthermore, a foam layer is provided inside the concrete layer.
[0007] Furthermore, the bottom surface of the concrete layer is bonded to the metal bottom plate, the metal bottom plate is bonded to the steel pipe beam, the top surface of the concrete layer is provided with a step surface layer, and upper supporting surfaces and lower supporting surfaces are vertically provided at both ends of the bottom surface of the step surface layer, the upper supporting surface extends to the step surface layer, the lower supporting surface is connected to the vertical surface, and the vertical surface extends to the step surface layer.
[0008] Furthermore, the cross-section of the metal bottom plate is U-shaped, and the metal bottom plate covers the bottom surface, the upper supporting surface and the lower supporting surface.
[0009] Furthermore, the connecting member is a connecting angle steel, the connecting angle steel is fixedly connected to the steel tube beam, the connecting angle steel is provided with a first through hole, the concrete step is provided with a fixing hole, and the fixing bolt passes through the first through hole and is connected to the fixing hole.
[0010] Furthermore, the two steel tube beams are connected by fixed angle steels, and the fixed angle steels are arranged at the upper end and the lower end of the steel tube beam.
[0011] Furthermore, the steel tube beam is a rectangular steel tube beam, and the concrete step is a prefabricated single-step step.
[0012] Furthermore, a first nut is provided on one side of the upper supporting surface of the concrete step, and the first nut is provided with a connecting bolt. A second nut is provided on one side of the downward supporting surface of the concrete step, and the connecting bolt is provided with a magnet. Under the action of an external rotating magnetic field, the magnet drives the connecting bolt to be screwed into the second nut on another level of the concrete step.
[0013] The beneficial effect of the utility model is that during installation, the steel tube beam is first installed, and then the concrete steps are installed on the steel tube beam in sequence. The concrete steps can be directly placed on the steel tube beam from above, and then the workers use fixing bolts from the bottom to fix them, which makes the installation more convenient and quick. The upper surface of the installed concrete steps is concrete material, which is convenient for subsequent decoration work to be matched with other decoration materials on the market. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic structural diagram of a recyclable assembled prefabricated staircase in Example 1 of the present application;
[0015] Figure 2 This is a schematic diagram of the structure of the steel tube beam in Example 1 of the present application;
[0016] Figure 3 This is a schematic diagram of a partial cross-sectional structure of a recyclable assembled prefabricated staircase in Example 1 of the present application;
[0017] Figure 4 This is a schematic cross-sectional structure diagram of a recyclable assembled prefabricated staircase in Example 1 of the present application;
[0018] Figure 5 This is a schematic diagram of a partial cross-sectional structure of a recyclable assembled prefabricated staircase in Example 2 of the present application;
[0019] Description of Figure Numbers:
[0020] 1 steel tube beam, 2 concrete step, 3 connecting piece, 4 metal base plate, 5 concrete layer, 6 fixing bolts, 7 foam layer, 8 step surface layer, 9 upper supporting surface, 10 lower supporting surface, 11 vertical surface, 12 first through hole, 13 fixing hole, 14 fixing angle steel, 15 first nut, 16 connecting bolts, 17 second nut, 18 magnet. DETAILED DESCRIPTION
[0021] The technical solution of the utility model is further elaborated in detail below in conjunction with the drawings and specific embodiments of the specification. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by technicians in the technical field of the utility model. The terms used herein in the specification of the utility model are only for the purpose of describing specific embodiments and are not intended to limit the utility model. In the following description, the expression "some embodiments" is involved, which describes a subset of all possible embodiments, but it should be understood that "some embodiments" can be the same subset or different subsets of all possible embodiments, and can be combined with each other without conflict.
[0022] It should also be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "inside", "outside", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0023] Example 1
[0024] Please refer to the attached Figures 1 to 4 The present application provides a recyclable assembled prefabricated staircase, comprising a steel tube beam 1, a concrete step 2 and a connector 3. The steel tube beam 1 plays a supporting role. The concrete step comprises a metal base plate 4 and a concrete layer 5. The concrete layer 5 is cast on the metal base plate 4. The connection is more secure when cast directly on the metal base plate 4. The concrete steps cast on the metal base plate 4 of the same specification have uniform sizes and are easy to install. The metal base plate 4 also improves the strength of the concrete step 2. Two steel tube beams 1 are arranged along the direction of the staircase. Both ends of a plurality of concrete steps are mounted on the two steel tube beams 1. Concrete of each level is arranged along the direction of the steel tube beam 1. The steel tube beam 1 supports the bottom sides of the concrete step 2. The connector 3 is provided on the steel tube beam 1. The connector 3 is provided with a fixing bolt 6. The fixing bolt 6 fixes the concrete step from the bottom. When installing, the fixing bolt 6 is passed through the connector 3 and fixed to the concrete step 2. During installation, the utility model first installs the steel tube beam 1, and then sequentially installs the concrete step 2 on the steel tube beam 1. The concrete step 2 can be directly placed on the steel tube beam 1 from above, and then the worker fixes it from the bottom with the fixing bolt 6, which makes the installation more convenient and quick. The upper surface of the installed concrete step 2 is concrete material, which is convenient for matching with other decoration materials on the market in subsequent decoration work.
[0025] The ladder beams, steps, connectors 3, etc. of the prefabricated staircase of the utility model can be made separately in the factory and packaged independently. The volume is smaller than that of the integral prefabricated staircase or the traditional steel ladder, and can be transported in batches. It can be transported to the site for assembly and splicing in batches according to the construction progress of one building or one project. The prefabricated staircase of the utility model is connected by bolts 16, and all components can be recycled when dismantled, and can be installed in the next project after maintenance, saving resources.
[0026] Specifically, a foam layer 7 is provided inside the concrete layer 5, which can effectively reduce the weight of the concrete step 2, making it easier to transport and install. Compared with traditional prefabricated stairs, the weight is light.
[0027] Specifically, the bottom surface of the concrete layer 5 is in contact with the metal bottom plate 4, the metal bottom plate 4 is in contact with the steel tube beam 1, the top surface of the concrete layer 5 is provided with a step surface layer 8, and the two ends of the bottom surface of the step surface layer 8 are vertically provided with an upper support surface 9 and a lower support surface 10, the upper support surface 9 extends to the step surface layer 8, the lower support surface 10 is connected to a vertical surface 11, and the vertical surface 11 extends to the step surface layer 8. After installation, the upper support surface 9 and the lower support surface 10 of adjacent concrete steps 2 abut against each other, and when the concrete step 2 of the upper level presses the concrete step 2 of the lower level downward, the direction of the extrusion force is parallel to the direction of the steel tube beam 1, so as to avoid the adjacent concrete steps 2 from sliding upward when the extrusion force is large, thereby improving the stability of the prefabricated stairs.
[0028] Specifically, the cross section of the metal bottom plate 4 is U-shaped, and the metal bottom plate 4 covers the bottom surface, the upper support surface 9 and the lower support surface 10. After the metal bottom plates 4 of the same specifications are processed and the concrete steps 2 are cast on the metal bottom plates 4, the specifications of the concrete steps 2 are unified, which is convenient for installation.
[0029] Specifically, the connecting member 3 is a connecting angle steel, which has high strength. The connecting angle steel is fixedly connected to the steel tube beam 1, and the connecting angle steel is welded to the inner side of the steel tube beam 1, flush with the top of the steel tube beam 1. The connecting angle steel is provided with a first through hole 12, and the concrete step 2 is provided with a fixing hole 13. The fixing bolt 6 passes through the first through hole 12 and is screwed into the fixing hole 13, so that the concrete step 2 is firmly connected to the connecting angle steel.
[0030] Specifically, the two steel tube beams 1 are connected by a fixed angle steel 14 , and the fixed angle steel 14 is arranged at the upper end and the lower end of the steel tube beam 1 to improve the connection strength of the steel tube beam 1 .
[0031] Specifically, the steel tube beam 1 is a rectangular steel tube beam 1, which is light and strong, and the concrete step 2 is a prefabricated single-stage step, which reduces the weight of the concrete step 2 and is easy to install and carry.
[0032] Example 2
[0033] Please refer to the attached Figure 5 The difference between this embodiment and the first embodiment is that a first nut 15 is provided on one side of the upper support surface 9 of the concrete step, and a connecting bolt 16 is provided on the first nut 15, and a second nut 17 is provided on one side of the lower support surface 10 of the concrete step, and a magnet 18 is provided on the connecting bolt 16. The magnet 18 drives the connecting bolt 16 to be screwed into the second nut 17 on the other level of the concrete step under the action of the external rotating magnetic field. Another magnet is arranged outside the concrete step 2, and the magnet is connected to the motor. When the motor rotates, a rotating magnetic field is generated, and the magnet and the magnet 18 attract each other, thereby driving the magnet 18 to rotate. Since the bolt 16 is fixedly connected to the magnet 18, it can drive the screw to rotate and screw into the second nut 17, thereby connecting two adjacent concrete steps 2, preventing the concrete steps 2 from being dislocated and offset under the action of external forces, and improving the strength of the prefabricated stairs.
[0034] The above are only specific implementations of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. The protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A recyclable prefabricated staircase, characterized in that: It includes a steel tube beam, a concrete step and a connecting piece. The concrete step includes a metal base plate and a concrete layer. The concrete layer is cast on the metal base plate. Two steel tube beams are arranged along the direction of the stairs. Both ends of a number of concrete steps are erected on the two steel tube beams. The steel tube beam is provided with the connecting piece. The connecting piece is provided with fixing bolts. The fixing bolts fix the concrete step from the bottom.
2. The recyclable prefabricated staircase according to claim 1, characterized in that: A foam layer is arranged inside the concrete layer.
3. The recyclable prefabricated staircase according to claim 1, characterized in that: The bottom surface of the concrete layer is in contact with the metal bottom plate, the metal bottom plate is in contact with the steel pipe beam, the top surface of the concrete layer is provided with a step surface layer, and upper supporting surfaces and lower supporting surfaces are vertically provided at both ends of the bottom surface of the step surface layer, the upper supporting surface extends to the step surface layer, the lower supporting surface is connected to the vertical surface, and the vertical surface extends to the step surface layer.
4. The recyclable prefabricated staircase according to claim 3, characterized in that: The cross section of the metal bottom plate is U-shaped, and the metal bottom plate covers the bottom surface, the upper supporting surface and the lower supporting surface.
5. The recyclable prefabricated staircase according to claim 1, characterized in that: The connecting piece is a connecting angle steel, the connecting angle steel is fixedly connected to the steel tube beam, the connecting angle steel is provided with a first through hole, the concrete step is provided with a fixing hole, and the fixing bolt passes through the first through hole and is connected to the fixing hole.
6. The recyclable prefabricated staircase according to claim 1, characterized in that: The two steel tube beams are connected by fixed angle steels, and the fixed angle steels are arranged at the upper end and the lower end of the steel tube beam.
7. The recyclable prefabricated staircase according to claim 1, characterized in that: The steel tube beam is a rectangular steel tube beam, and the concrete step is a prefabricated single-stage step.
8. The recyclable prefabricated staircase according to claim 3, characterized in that: A first nut is provided on one side of the upper supporting surface of the concrete step, and the first nut is provided with a connecting bolt. A second nut is provided on one side of the lower supporting surface of the concrete step, and the connecting bolt is provided with a magnet. Under the action of an external rotating magnetic field, the magnet drives the connecting bolt to be screwed into the second nut on another level of the concrete step.