External wall thermal insulation construction rack

By adding suction cup components and anti-fall metal mesh to the exterior wall insulation construction bench, the problems of swaying the bench and inclination of the paint barrel are solved, the safety and stability of the construction are improved, and the smooth progress of the construction is ensured.

CN222044975UActive Publication Date: 2024-11-22LIAOCHENG MENGDA CONSTR & INSTALLATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420606538.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-22
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

The existing exterior wall insulation construction bench is prone to swing when working at high altitudes, which poses safety hazards and affects construction efficiency.

Method used

An external wall insulation construction tray including construction bench plates, side plate frames, anti-fall front blocking plates, bench pillars, rear blocking plates, suction wall sliding holes and suction cup components are designed, and the suction cup components are adsorbed on the wall through the suction cup components. , combined with anti-fall metal mesh and paint bucket limit slot, prevent the bench from shaking and the paint bucket tilting, and improve construction stability and safety.

Benefits of technology

Effectively prevent the construction bench from swaying due to wind and personnel activities, improve construction safety and efficiency, prevent the paint barrel from tilting and slipping, and significantly improve the stability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044975U_ABST
    Figure CN222044975U_ABST
Patent Text Reader

Abstract

The utility model discloses an external wall thermal insulation construction rack which comprises a construction platen and side plate frames fixedly arranged on the construction platen, an anti-falling front blocking plate is fixedly arranged between the two side plate frames, rack supporting columns are fixedly arranged on the back faces of the two side plate frames, and a rear blocking plate is fixedly installed between the two rack supporting columns. The outer wall heat preservation construction rack comprises a construction bedplate, two rack supporting columns are arranged on the construction bedplate, wall suction sliding holes are formed in the two rack supporting columns, suction cup assemblies used for improving the construction stability of an outer wall are installed on the wall suction sliding holes, and L-shaped bottom brackets are fixedly arranged on the two sides of the bottom end of the construction bedplate. When the construction rack descends to the construction height, the construction rack can be adsorbed to a nearby wall body through the suction cup assemblies on the two sides, so that the phenomenon that the construction rack swings due to factors such as wind power and walking of constructors is prevented, the safety of outer wall construction can be improved, and it can be guaranteed that the constructors conduct outer wall coating smoothly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of exterior wall construction, in particular to an exterior wall thermal insulation construction stand. Background Art

[0002] Due to the long-term influence of rain and wind erosion, the wall skin of the exterior wall will fall off. In order to improve the insulation effect of the building, the construction workers will first apply a layer of insulation paint on the exterior wall, and then apply a layer of protective decorative paint. Since there is no fulcrum on the exterior wall of a high-rise building, in order to improve construction safety, a construction platform will be used to facilitate the construction workers to carry out exterior wall insulation construction. The currently common exterior wall insulation construction platform is mainly composed of two parts: a platform and a side guard plate. A protective door is installed on the side guard plate. It is lifted by a crane on the roof, and the platform is lowered by a cable. The construction workers can stand on the platform to carry out coating construction on the exterior wall of the building. For example, an exterior wall insulation construction platform with application number CN202321396699.9 includes an assembly platform, a connecting plate, an access fence and a fixed fence. The access fence and the fixed fence are connected with a sling device to adjust the height of the construction platform; the above common types of exterior wall insulation construction platforms have the following shortcomings in actual applications:

[0003] The construction platform is lowered by a crane and cables. When working at high altitude, the construction platform will sway due to the influence of wind and other factors. The insulation paint buckets placed on the construction platform will tilt and overturn, and falling objects will occur, which not only poses a safety hazard, but also affects the normal exterior wall coating construction of the construction workers. Utility Model Content

[0004] The utility model aims to provide an exterior wall insulation construction platform to solve the problem that the existing exterior wall insulation construction platform proposed in the above background technology has the phenomenon of swaying during high-altitude operation, which poses a safety hazard and affects the normal construction.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an exterior wall insulation construction platform, comprising a construction platform and a side panel frame fixedly arranged on the construction platform, a front anti-falling baffle is fixedly arranged between the two side panel frames, platform pillars are fixedly arranged on the backs of the two side panel frames, a rear baffle is fixedly installed between the two platform pillars, wall suction sliding holes are opened on the two platform pillars, and suction cup assemblies for improving the stability of exterior wall construction are installed on the wall suction sliding holes, L-shaped bottom brackets are fixedly arranged on both sides of the bottom end of the construction platform, and an anti-falling metal mesh is fixedly arranged on the surface of the L-shaped bottom bracket, and a plurality of paint bucket limit grooves are opened on both sides of the top of the construction platform.

[0006] Preferably, a reserved door is hinged on one side of the rear baffle, and a door latch is fixedly installed on the reserved door, so as to facilitate construction workers to enter and exit the construction platform.

[0007] Preferably, the suction cup assembly includes a cross-like suction cup frame and four wall-suction vacuum cups fixedly installed on the outside of the cross-like suction cup frame, a sliding rod is fixedly arranged on the inner side of the cross-like suction cup frame, the sliding rod is slidably arranged on the wall-suction sliding hole, a plurality of limit pin holes are opened on the surface of the sliding rod, and two push handles are fixedly arranged on one end of the sliding rod; it is adsorbed on the wall of the construction area to prevent the construction platform from shaking.

[0008] Preferably, a lifting ring is fixedly installed on the top of each of the two side panel frames, and a lifting lock control box is fixedly installed on the inner side of one of the side panel frames.

[0009] Preferably, a reinforcing cross arm is fixedly provided at the top of the anti-falling front baffle, and an anti-falling cross bar is fixedly provided at the top of the reinforcing cross arm; this can play an auxiliary anti-falling role and improve construction safety.

[0010] Preferably, the paint bucket limiting groove is arranged opposite to the L-shaped bottom bracket, and the height of the L-shaped bottom bracket is set to 30 cm; this can prevent the thermal insulation paint bucket from tilting and slipping when the construction platform is raised or lowered.

[0011] Preferably, the surface of the construction platform is fixedly provided with evenly distributed anti-skid protrusions; the anti-skid ability of the construction platform can be improved, and construction workers are not likely to slip during construction.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The external wall insulation construction platform is equipped with a suction cup assembly on the platform. When the construction platform is lowered to the construction height, the suction cup assemblies on both sides can be used to adsorb the construction platform on the nearby wall, thereby preventing the construction platform from swaying due to wind force and the movement of construction workers. This can not only improve the safety of external wall construction, but also ensure that construction workers can smoothly carry out external wall coating construction.

[0014] A bottom support is added to the bottom of the construction platform, and a paint bucket limit groove is set facing the bottom support. The construction worker's insulation paint bucket can be limited in the paint bucket limit groove, thereby preventing the paint bucket from tilting and slipping when the construction platform is raised or lowered, and effectively preventing the generation of falling objects without affecting the construction workers' walking and construction.

[0015] The overall structure has high strength and is equipped with an anti-fall cross bar that can be used to hang the safety buckle of construction workers. It has a significant anti-fall effect and further improves the safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a structural schematic diagram of the construction platform of the utility model;

[0017] Figure 2This is a schematic diagram of the structure of the suction cup assembly of the utility model;

[0018] Figure 3 This is a structural schematic diagram of the construction platform of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the anti-fall front baffle of the utility model.

[0020] In the figure: 1. Construction table; 2. Side panel frame; 3. Suction cup assembly; 31. Slide rod; 32. Cross suction cup frame; 33. Wall suction vacuum plate; 34. Push handle; 35. Limit pin hole; 4. Anti-fall front baffle; 5. Anti-fall cross bar; 6. Lifting ring; 7. Table support; 8. Lifting lock control box; 9. Rear baffle; 10. Reserved door; 11. Door latch; 12. L-shaped bottom bracket; 13. Anti-fall metal mesh; 14. Wall suction sliding hole; 15. Paint bucket limit slot; 16. Anti-slip protrusion; 17. Strengthening cross arm. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0022] See also Figure 1-4 The utility model provides an external wall insulation construction platform, including a construction platform 1 and a side panel frame 2 fixedly arranged on the construction platform 1, an anti-falling front baffle 4 is fixedly arranged between the two side panel frames 2, platform pillars 7 are fixedly arranged on the backs of the two side panel frames 2, a rear baffle 9 is fixedly installed between the two platform pillars 7, and the two platform pillars 7 are provided with wall suction sliding holes 14, and the wall suction sliding holes 14 are installed with suction cup assemblies 3 for improving the stability of external wall construction, L-shaped bottom brackets 12 are fixedly arranged on both sides of the bottom end of the construction platform 1, and an anti-falling metal mesh 13 is fixedly arranged on the surface of the L-shaped bottom bracket 12, and a plurality of paint bucket limiting grooves 15 are opened on both sides of the top of the construction platform 1, a reserved door 10 is hinged on one side of the rear baffle 9, and a door latch 11 is fixedly installed on the reserved door 10, and a lifting ring 6 is fixedly installed on the top of the two side panel frames 2, and a lifting lock control box 8 is fixedly installed on the inner side of one of the side panel frames 2.

[0023] See also Figure 1 and Figure 2 Further, the suction cup assembly 3 includes a cross suction cup frame 32 and four wall suction vacuum cups 33 fixedly installed on the outside of the cross suction cup frame 32, a slide bar 31 is fixedly arranged on the inner side of the cross suction cup frame 32, the slide bar 31 is slidably arranged on the wall suction slide hole 14, a plurality of limit pin holes 35 are opened on the surface of the slide bar 31, and two push handles 34 are fixedly arranged at one end of the slide bar 31;

[0024] When in use, the construction platform 1 is moved to a suitable construction position, and the staff first holds the push handle 34 to make the wall vacuum plate 33 stick tightly to the wall, and then takes out the pin and inserts it into the two limit pin holes 35 close to the platform support 7. The pins are stuck on both sides of the platform support 7 one after the other, thereby limiting the sliding of the platform support 7. At this time, the construction platform will not shake left and right, which can improve the safety and stability of construction.

[0025] See also Figure 1 and Figure 4 Further, a reinforcing cross arm 17 is fixedly provided at the top of the anti-falling front baffle 4, and an anti-falling cross bar 5 is fixedly provided at the top of the reinforcing cross arm 17;

[0026] When in use, after the construction workers step onto the construction platform 1, they can clip the safety rope buckle on the anti-falling cross bar 5, and the safety rope buckle can slide left and right on the anti-falling cross bar 5, which will not affect the normal construction of the construction workers and can improve the safety of the construction.

[0027] See also Figure 1 and Figure 3 Further, the paint bucket limit groove 15 is arranged opposite to the L-shaped bottom bracket 12, the height of the L-shaped bottom bracket 12 is set to 30 cm, and the surface of the construction platform 1 is fixedly provided with uniformly distributed anti-slip protrusions 16;

[0028] When in use, the insulated paint bucket for construction is inserted into the paint bucket limiting groove 15 in sequence. After insertion, the bottom of the paint bucket contacts the L-shaped bottom bracket 12, the middle is restricted by the paint bucket limiting groove 15, and the top is higher than the construction platform 1. The size of the paint bucket limiting groove 15 matches the size of the insulated paint bucket. During the lifting and lowering of the construction platform, the paint bucket will not tilt and slip, and is more stable.

[0029] When the embodiment of the present application is in use: when the insulation material is coated on the exterior wall, the crane is installed on the roof of the building, the bottom end of the lifting cable is fixed on the lifting ring 6, and the door latch 11 is pulled open. At this time, the reserved door 10 can be opened, and the construction personnel walk onto the construction platform 1, and insert the insulation paint bucket used for construction into the paint bucket limiting groove 15 in sequence. After insertion, the bottom of the paint bucket contacts the L-shaped bottom bracket 12, the middle is restricted by the paint bucket limiting groove 15, and the top is higher than the construction platform 1. When preparing for work, close the reserved door 10, insert the door latch 11, and then control the crane to slowly move down through the lifting lock control box 8 until the construction platform 1 is at a suitable construction position. The staff first holds the push handle 34 to make the wall vacuum plate 33 closely adsorbed on the wall, and then takes out the pin and inserts it into the two limiting pin holes 35 near the platform support 7. Under the fixation of the pin, the construction platform 1 will not swing left and right with the wind, and the construction is stable and safe.

[0030] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. An exterior wall insulation construction platform, comprising a construction platform (1) and a side panel frame (2) fixedly arranged on the construction platform (1), characterized in that: An anti-falling front baffle (4) is fixedly provided between the two side panel frames (2), a platform support (7) is fixedly provided on the back of the two side panel frames (2), a rear baffle (9) is fixedly installed between the two platform supports (7), a wall suction sliding hole (14) is provided on the two platform supports (7), a suction cup assembly (3) for improving the stability of the exterior wall construction is installed on the wall suction sliding hole (14), an L-shaped bottom bracket (12) is fixedly provided on both sides of the bottom end of the construction platform (1), an anti-falling metal mesh (13) is fixedly provided on the surface of the L-shaped bottom bracket (12), and a plurality of paint bucket limit grooves (15) are provided on both sides of the top end of the construction platform (1).

2. The exterior wall insulation construction stand according to claim 1, characterized in that: A reserved door (10) is hinged on one side of the rear baffle (9), and a door latch (11) is fixedly installed on the reserved door (10).

3. The exterior wall insulation construction stand according to claim 1, characterized in that: The suction cup assembly (3) includes a cross-like suction cup frame (32) and four wall-suction vacuum cups (33) fixedly mounted on the outside of the cross-like suction cup frame (32); a slide rod (31) is fixedly arranged on the inner side of the cross-like suction cup frame (32); the slide rod (31) is slidably arranged on the wall-suction sliding hole (14); a plurality of limit pin holes (35) are opened on the surface of the slide rod (31); and two push handles (34) are fixedly arranged on one end of the slide rod (31).

4. The exterior wall insulation construction stand according to claim 1, characterized in that: A lifting ring (6) is fixedly installed on the top ends of the two side plate frames (2), and a lifting lock control box (8) is fixedly installed on the inner side of one of the side plate frames (2).

5. The exterior wall insulation construction stand according to claim 1, characterized in that: A reinforcing cross arm (17) is fixedly provided on the top end of the anti-falling front baffle (4), and an anti-falling cross bar (5) is fixedly provided on the top end of the reinforcing cross arm (17).

6. The exterior wall insulation construction stand according to claim 1, characterized in that: The paint bucket limiting groove (15) is arranged opposite to the L-shaped bottom bracket (12), and the height of the L-shaped bottom bracket (12) is set to 30 cm.

7. The exterior wall insulation construction stand according to claim 1, characterized in that: The surface of the construction platform (1) is fixedly provided with evenly distributed anti-slip protrusions (16).