Unloading platform for building construction
By designing the bearing plate and fixing device on the unloading platform for construction construction, and using the support rod and the top support rod to form a stable triangular structure, the problem of cumbersome adjustment of the installation position of the unloading platform in the prior art is solved, and the installation efficiency and Security.
Patent Information
- Application Number
- CN202420592337.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-25
AI Technical Summary
The existing unloading platform for construction needs to be embedded in the round steel during the installation process, which makes the position adjustment cumbersome and time-consuming. Each adjustment requires the round steel to be embedded in advance, affecting the installation efficiency.
A discharge platform including a load-bearing plate, a fence plate, a load-bearing rod, a limit block and a fixing device is designed. A stable triangular structure is formed through the support rod and the top support rod, and the drive assembly and bevel gear transmission system are used to realize the load-bearing rod. Quick fixing and position adjustment simplifies the installation process.
It realizes rapid replacement and fixation of the unloading platform position, reduces installation time, improves the installation efficiency of workers, and improves the safety and stability of the fixation of the load bearing rod.
Smart Images

Figure CN222045101U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a material unloading platform for building construction. Background Art
[0002] The unloading platform is a temporary operating table or operating frame often set up at construction sites. It is generally used for material turnover. It is mainly divided into mobile unloading platforms, floor-standing unloading platforms and cantilevered unloading platforms.
[0003] A Chinese patent with announcement number CN214195603U discloses an unloading platform for construction, including a frame, a limiting support rod welded to the bottom of the frame, round steel arranged on the outside of the frame, and wooden wedges installed inside the round steel, the frame and the round steel form a clamping structure through the wooden wedges, and the round steel is symmetrical about the central axis of the frame, so that the frame is firmly fixed to the ground.
[0004] During the use of the above technology, since the unloading platform is a random and temporary device, round steel needs to be embedded in the location where the unloading platform is installed. The embedded round steel requires a certain amount of curing time, resulting in the need to plan the embedded position of the round steel in advance before installing the unloading platform. Each time the position of the unloading platform is adjusted, the round steel needs to be embedded again in advance. This process is cumbersome and time-consuming, and there are shortcomings. Utility Model Content
[0005] In order to improve the convenience of installation of the unloading platform, the present application provides an unloading platform for construction.
[0006] The present application provides a construction unloading platform that adopts the following technical solution:
[0007] A material unloading platform for construction comprises a load-bearing plate, wherein a plurality of enclosures are arranged on the load-bearing plate, and the plurality of enclosures enclose a material discharge area for placing materials, wherein a plurality of load-bearing rods are arranged on the load-bearing plate, and the load-bearing rods are used to be placed on the floor of a house, and a limit block is arranged on the load-bearing rod, and the limit block is used to abut against the edge of a floor slab, and a fixing device for fixing the load-bearing rod is arranged on the load-bearing rod, and the fixing device comprises a support rod rotatably arranged on the load-bearing rod, and a receiving groove for accommodating the support rod is provided on the load-bearing rod, and the support rod is located on the side of the limit block facing away from the enclosure, and a top support groove is provided on the support rod, and a top support rod for abutting against the top of the house is slidably provided on the top support groove, and when the top support rod abuts against the top of the house, the support rod abuts against the inner side wall of the receiving groove, and a driving component for driving the top support rod to move is provided on the support rod.
[0008] By adopting the above technical solution, the worker places the load-bearing rod on the floor of the house, and makes the limit block abut against the edge of the floor, then rotates the support rod and makes it abut against the inner wall of the accommodating groove, and then drives the top support rod to slide and gradually abut against the top of the house through the driving assembly, and presses the load-bearing rod to the floor of the house through the top support rod and the support rod to form a stable triangular structure. This technology can change the installation position of the unloading platform at any time, is simple to operate, is conducive to reducing the time required for installing the unloading platform, and improves the installation efficiency of workers.
[0009] Optionally, the top support rod is in close contact with the top support groove, and the driving assembly includes a screw rod rotatably set on the support rod, and two fixing ears with a certain distance between them are set on the support rod relative to the top support groove, and the screw rod is rotatably passed through the two fixing ears, and a top support block is set on the top support rod and located between the two fixing ears, and the top support block is threadedly connected to the screw rod, and a rotating part for driving the screw rod to rotate is set on the support rod.
[0010] By adopting the above technical solution, the rotating member drives the screw rod to rotate forward, the screw rod moves with the top support block, and the top support block drives the top support rod to approach and gradually abut against the top of the house, thereby realizing the lifting and lowering of the top support rod.
[0011] Optionally, the rotating member includes a transmission rod rotatably set on the support rod, the transmission rod and the screw rod are transmitted through mutually meshing bevel gears, a handle is set on the transmission rod, a ratchet is set on the transmission rod, and a thorn meshing with the ratchet is rotatably set on the support rod.
[0012] By adopting the above technical solution, the worker turns the handle forward, the handle drives the transmission rod to rotate, and the transmission rod drives the screw to rotate through the mutually meshing bevel gears. The worker controls the rotation direction of the screw by turning the handle forward and reverse. At the same time, the ratchet thorns reduce the possibility of accidental rotation of the screw, which is beneficial to improving the safety of fixing the load-bearing rod.
[0013] Optionally, when the support rod is received in the receiving groove, the top support rod is located between the support rod and the load-bearing rod, and a pull rope is provided on the support rod.
[0014] By adopting the above technical solution, workers pull the support rod to rotate by pulling the rope, which is helpful to reduce the possibility of accidental damage to the top support rod and the bevel gear.
[0015] Optionally, an abutment block is provided on the top support rod, and the abutment block is used to abut against the top of the house. A plurality of friction cones are provided on one side of the abutment block used to abut against the top of the house.
[0016] By adopting the above technical solution, as the top support rod gradually approaches the top of the house, the friction cone on the abutment block gradually inserts into the top of the house, thereby increasing the contact area and friction with the top of the house and reducing the possibility of accidental sliding of the top support rod under force.
[0017] Optionally, a reinforcement rod is rotatably arranged on the support rod, a reinforcement groove for accommodating the reinforcement rod is provided on the support rod, a fixing plate is hinged at one end of the reinforcement rod away from its rotation center, a fixing bolt is threadedly connected on the fixing plate, and a fixing groove for bolting the fixing bolt is provided on the accommodating groove.
[0018] By adopting the above technical solution, when the support rod abuts against the inner wall of the accommodating groove, the worker rotates the reinforcing rod and simultaneously rotates the fixing plate so that the fixing bolts on the fixing plate are bolted to the fixing groove, thereby improving the stability of the support rod during support and reducing the possibility of the support rod rotating back to the accommodating groove, which is beneficial to improving the stability of the support rod support.
[0019] Optionally, a slide bar is provided on the top support rod along its sliding direction, and a slide groove for the slide bar to slide is provided on the inner side wall of the top support groove.
[0020] The adoption of the technical solution is helpful to reduce the possibility of the top support rod rotating when supporting the top of the house.
[0021] Optionally, a plurality of anti-slip conical teeth are provided on the side of the bearing bar facing the floor of the house.
[0022] By adopting the above technical solution, in the process of the friction cone piercing the top wall of the house, the anti-slip cone teeth are gradually embedded in the floor of the house, thereby reducing the possibility of the bearing rod sliding and helping to improve the safety of the unloading platform.
[0023] In summary, the present application includes at least one of the following beneficial technical effects:
[0024] 1. The worker places the load-bearing rod on the floor of the house, and makes the limit block abut against the edge of the floor slab, then rotates the support rod and makes it abut against the inner wall of the receiving groove, and then drives the top support rod to slide and gradually abut against the top of the house through the driving assembly, and presses the load-bearing rod on the floor of the house through the top support rod and the support rod to form a stable triangular structure. This technology can change the installation position of the unloading platform at any time, is simple to operate, is conducive to reducing the time required for installing the unloading platform, and improves the installation efficiency of workers;
[0025] 2. The worker turns the handle forward, and the handle drives the transmission rod to rotate. The transmission rod drives the screw to rotate through the meshing bevel gears. The worker controls the rotation direction of the screw by turning the handle forward and reverse. At the same time, the ratchet thorns reduce the possibility of accidental rotation of the screw, which is conducive to improving the safety of fixing the load-bearing rod;
[0026] 3. When the support rod abuts against the inner wall of the receiving groove, the worker rotates the reinforcing rod and at the same time rotates the fixing plate so that the fixing bolts on the fixing plate are bolted to the fixing groove, thereby improving the stability of the support rod during support and reducing the possibility of the support rod turning back to the receiving groove, which is beneficial to improving the stability of the support rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application.
[0028] Figure 2 It is a structural schematic diagram of the positional relationship among the support rods, top support rods and bearing rods in the embodiment of the present application.
[0029] Figure 3 It is a cross-sectional view showing the positional relationship among the screw rod, the top support rod and the handle in the embodiment of the present application.
[0030] Figure 4 It is a cross-sectional view showing the positional relationship among the bearing rod, the fixing bolt and the fixing groove in the embodiment of the present application.
[0031] Explanation of the accompanying drawings: 1. Load-bearing plate; 2. Enclosure; 3. Discharge area; 4. Load-bearing rod; 5. Limit block; 6. Fixing device; 61. Support rod; 62. Accommodating groove; 63. Top support groove; 64. Top support rod; 65. Drive assembly; 651. Screw; 652. Fixing ear; 653. Top support block; 654. Rotating member; 6541. Transmission rod; 6542. Bevel gear; 6543. Handle; 6544. Ratchet; 6545. Thorn; 7. Pull rope; 8. Abutment block; 9. Friction cone; 10. Reinforcement rod; 11. Reinforcement groove; 12. Fixing plate; 13. Fixing bolt; 14. Fixing groove; 15. Slide bar; 16. Slide groove; 17. Anti-slip bevel gear. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-4 This application is described in further detail.
[0033] The embodiment of the present application discloses a material unloading platform for construction.
[0034] Reference Figure 1 A material unloading platform for construction includes a bearing plate 1, three panels 2 are welded on the upper surface of the bearing plate 1, the three panels 2 enclose a material discharge area 3 for placing materials, the open end of the material discharge area 3 faces the house, two bearing rods 4 are welded to the bottom of the bearing plate 1, a plurality of anti-slip bevel teeth 17 are welded on the side of the bearing rod 4 facing the ground of the house, the bearing rod 4 is used to be placed on the ground of the house, and a limiting block 5 is welded at the bottom of each bearing rod 4, and the limiting block 5 is used to abut against the edge of the floor slab.
[0035] Reference Figure 1 , Figure 2 and Figure 3 A fixing device 6 for fixing the bearing rod 4 is arranged on the bearing rod 4, and the fixing device 6 includes a support rod 61 rotatably arranged on the bearing rod 4, and a receiving groove 62 for accommodating the support rod 61 is opened on the bearing rod 4. The support rod 61 is located on the side of the limit block 5 facing away from the enclosure 2, and a top support groove 63 is opened on the support rod 61 along its length direction. The top support rod 64 is tightly attached to the top support groove 63, and a top support rod 64 is slidable on the top support groove 63. Slide bars 15 are welded on both sides of the top support rod 64 along its sliding direction, and a slide groove 16 for the slide bar 15 to slide is opened on the inner side wall of the top support groove 63.
[0036] Reference Figure 2 , Figure 3 and Figure 4 The reinforcing rod 10 is rotatably arranged on the support rod 61, and a reinforcing groove 11 for accommodating the reinforcing rod 10 is opened on the support rod 61. A fixing plate 12 is hinged at one end of the reinforcing rod 10 away from its rotation center, and a fixing bolt 13 is threadedly connected to the fixing plate 12. A fixing groove 14 for bolting the fixing bolt 13 is opened on the accommodating groove 62.
[0037] Reference Figure 1 , Figure 2 and Figure 3 When the support rod 61 is stored in the accommodating groove 62, the top support rod 64 is located between the support rod 61 and the load-bearing rod 4, and a pull rope 7 is tied to the side of the support rod 61 facing away from the top support rod 64. A contact block 8 is welded to the end of the top support rod 64, and the contact block 8 is used to contact the top of the house. A plurality of friction cones 9 are welded to one side of the contact block 8 for contacting the top of the house. When the top support rod 64 contacts the top of the house, the support rod 61 contacts the inner wall of the accommodating groove 62.
[0038] The worker first places the load-bearing rod 4 on the floor of the house, and adjusts the load-bearing rod 4 so that the limit block 5 abuts against the edge of the floor slab. Then the worker pulls the pull rope 7 to rotate the support rod 61 around its rotation center until the support rod 61 abuts against the inner wall of the accommodating groove 62. Then the worker rotates the reinforcing rod 10 and rotates the fixing plate 12 so that the fixing bolts 13 on the fixing plate 12 can be bolted to the fixing groove 14, thereby fixing the support rod 61.
[0039] Reference Figure 1 , Figure 2 and Figure 3A driving assembly 65 for driving the top support rod 64 to move is arranged on the support rod 61, and the driving assembly 65 includes a screw rod 651 rotatably arranged on the support rod 61, and two fixing ears 652 with a certain distance are welded on the support rod 61 relative to the top support groove 63, and the screw rod 651 is rotatably passed through the two fixing ears 652, and a top support block 653 is welded on the top support rod 64, and the top support block 653 is located between the two fixing ears 652, and the top support block 653 is threadedly connected to the screw rod 651.
[0040] Reference Figure 1 , Figure 2 and Figure 3 A rotating member 654 for driving the screw 651 to rotate is arranged on the support rod 61, and the rotating member 654 includes a transmission rod 6541 rotatably arranged on the support rod 61, the transmission rod 6541 and the screw 651 are perpendicular to each other, and the transmission rod 6541 and the screw 651 are transmitted through mutually meshing bevel gears 6542, a handle 6543 is welded on the transmission rod 6541, a ratchet 6544 is welded on the transmission rod 6541, and a thorn 6545 meshing with the ratchet 6544 is rotatably arranged on the support rod 61.
[0041] The worker turns the handle 6543, and the handle 6543 drives the transmission rod 6541 to rotate. The transmission rod 6541 drives the screw 651 to rotate through the mutually meshing bevel gears 6542 to control the rotation direction of the screw 651. The screw 651 moves with the top support block 653, and the top support block 653 drives the top support rod 64 to approach and gradually abut against the top of the house. As the worker continues to turn the handle 6543, the top support rod 64 pierces the friction cone 9 on the abutment block 8 into the wall at the top of the house, and at the same time the anti-slip bevel teeth 17 are gradually embedded in the ground of the house, thereby fixing the bearing plate 1.
[0042] The implementation principle of an unloading platform for construction in an embodiment of the present application is as follows: a worker first places the load-bearing rod 4 on the ground of a house, and adjusts the load-bearing rod 4 so that the limit block 5 abuts against the edge of the floor slab, and then the worker pulls the pull rope 7 to rotate the support rod 61 around its rotation center until the support rod 61 abuts against the inner wall of the accommodating groove 62, and then the worker rotates the reinforcing rod 10, and rotates the fixing plate 12 so that the fixing bolts 13 on the fixing plate 12 can be bolted to the fixing groove 14, thereby fixing the support rod 61.
[0043] The worker turns the handle 6543, and the handle 6543 drives the transmission rod 6541 to rotate. The transmission rod 6541 drives the screw 651 to rotate through the mutually meshing bevel gears 6542 to control the rotation direction of the screw 651. The screw 651 moves with the top support block 653, and the top support block 653 drives the top support rod 64 to approach and gradually abut against the top of the house. As the worker continues to turn the handle 6543, the top support rod 64 pierces the friction cone 9 on the abutment block 8 into the wall at the top of the house, and at the same time the anti-slip bevel teeth 17 are gradually embedded in the ground of the house, thereby fixing the bearing plate 1.
[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A material unloading platform for construction, characterized in that: The invention comprises a bearing plate (1), wherein a plurality of enclosure plates (2) are arranged on the bearing plate (1), wherein the plurality of enclosure plates (2) enclose a material discharge area (3) for placing materials, wherein a plurality of bearing rods (4) are arranged on the bearing plate (1), wherein the bearing rods (4) are used to be placed on the floor of a house, wherein a limiting block (5) is arranged on the bearing rod (4), wherein the limiting block (5) is used to abut against the edge of a floor slab, and wherein a fixing device (6) for fixing the bearing rod (4) is arranged on the bearing rod (4), wherein the fixing device (6) comprises a supporting rod (6) rotatably arranged on the bearing rod (4). 1), a receiving groove (62) for receiving a support rod (61) is provided on the bearing rod (4), the support rod (61) is located on the side of the limit block (5) facing away from the enclosure (2), a top support groove (63) is provided on the support rod (61), a top support rod (64) for contacting the top of the house is slidably disposed on the top support groove (63), when the top support rod (64) contacts the top of the house, the support rod (61) contacts the inner side wall of the receiving groove (62), and a driving component (65) for driving the top support rod (64) to move is provided on the support rod (61).
2. A material unloading platform for construction according to claim 1, characterized in that: The supporting rod (64) is in close contact with the supporting groove (63), and the driving assembly (65) includes a screw rod (651) rotatably arranged on the supporting rod (61), and two fixing ears (652) with a certain distance are arranged on the supporting rod (61) relative to the supporting groove (63), and the screw rod (651) is rotatably passed through the two fixing ears (652), and a supporting block (653) is arranged on the supporting rod (64) and between the two fixing ears (652), and the supporting block (653) is threadedly connected to the screw rod (651), and a rotating member (654) for driving the screw rod (651) to rotate is arranged on the supporting rod (61).
3. A material unloading platform for construction according to claim 2, characterized in that: The rotating member (654) comprises a transmission rod (6541) rotatably arranged on the support rod (61); the transmission rod (6541) and the screw rod (651) are transmitted via mutually meshing bevel gears (6542); a handle (6543) is arranged on the transmission rod (6541); a ratchet (6544) is arranged on the transmission rod (6541); and a thorn (6545) meshing with the ratchet (6544) is rotatably arranged on the support rod (61).
4. A material unloading platform for construction according to claim 1, characterized in that: When the support rod (61) is received in the receiving groove (62), the top support rod (64) is located between the support rod (61) and the bearing rod (4), and a pull rope (7) is provided on the support rod (61).
5. A material unloading platform for construction according to claim 1, characterized in that: The top support rod (64) is provided with an abutment block (8) for abutting against the top of the house, and a plurality of friction cones (9) are provided on one side of the abutment block (8) for abutting against the top of the house.
6. A material unloading platform for construction according to claim 1, characterized in that: A reinforcing rod (10) is rotatably arranged on the support rod (61), and a reinforcing groove (11) for accommodating the reinforcing rod (10) is provided on the support rod (61). A fixing plate (12) is hingedly connected to one end of the reinforcing rod (10) away from its rotation center, and a fixing bolt (13) is threadedly connected to the fixing plate (12). A fixing groove (14) for bolting the fixing bolt (13) is provided on the accommodating groove (62).
7. A material unloading platform for construction according to claim 1, characterized in that: The top support rod (64) is provided with a slide bar (15) along its sliding direction, and the inner side wall of the top support groove (63) is provided with a slide groove (16) for the slide bar (15) to slide.
8. A material unloading platform for construction according to claim 1, characterized in that: The side of the bearing rod (4) facing the house ground is provided with a plurality of anti-slip conical teeth (17).